Building construction brick clamp shaper

By designing a brick pliers setter for construction construction, and using clamping parts and clamping mechanisms to clamp the bricks, the problem of manual loading and unloading of bricks to increase working strength is solved, and the effect of improving work efficiency is achieved.

CN222521026UActive Publication Date: 2025-02-25CHINA MCC 2 GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420219939.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-26
Publication Date
2025-02-25
Estimated Expiration
2034-01-26

AI Technical Summary

Technical Problem

During construction, manual loading and unloading of bricks by manpower increases the work intensity of staff and reduces work efficiency.

Method used

A building construction brick clamp setter is designed, including two clamping parts and a clamping mechanism. The clamping members are arranged to clamp a plurality of bricks, and the clamping mechanism brings the two clamping members closer together by a first pulling plier, a second pulling plier, an operating piece and an auxiliary mechanism to clamp the bricks.

Benefits of technology

Through this device, multiple bricks can be loaded and unloaded at the same time without manual loading and unloading, and the operation is simple, which reduces the work intensity of the staff and improves work efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222521026U_ABST
    Figure CN222521026U_ABST
Patent Text Reader

Abstract

The utility model provides a building construction brick clamp shaper. The building construction brick clamp shaper comprises two clamping pieces and a clamping mechanism. Wherein the two clamping pieces are oppositely arranged so as to clamp a plurality of bricks; the clamping mechanism is connected with the two clamping pieces and used for enabling the two clamping pieces to be close to each other so as to clamp the bricks. According to the brick loading and unloading device, the two clamping pieces are oppositely arranged to clamp a plurality of bricks, the clamping mechanism enables the two clamping pieces to be close to each other, and then the two clamping pieces clamp the bricks, so that the bricks can be loaded and unloaded at the same time, manual loading and unloading are not needed, only the clamping mechanism needs to be controlled, operation is simple, the working intensity of workers is reduced, and the working efficiency is improved. And the working efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building tools, in particular to a brick clamp shaping device for building construction. Background Art

[0002] During construction, bricks are loaded and unloaded by workers wearing gloves, which increases their workload and reduces work efficiency. Utility Model Content

[0003] In view of this, the utility model proposes a brick clamp shaping device for construction, aiming to solve the problem of increased work intensity in manual loading and unloading of bricks by manpower in the prior art.

[0004] The utility model provides a brick clamp shaper for building construction, comprising: two clamping members and a clamping mechanism; wherein the two clamping members are arranged opposite to each other to clamp a plurality of bricks; and the clamping mechanism is connected to both clamping members to bring the two clamping members close to each other to clamp each brick.

[0005] Furthermore, in the above-mentioned building construction brick clamp former, the clamping mechanism includes: a first clamp, a second clamp, an operating member and an auxiliary mechanism; wherein the first clamp is L-shaped, and the first end of the first clamp is connected to one of the clamping members; the second clamp is L-shaped, and the first end of the second clamp is connected to the other clamping member, and the second end of the second clamp is rotatably connected to the second end of the first clamp; the operating member is arranged on the second clamp, and is used to pull the second clamp so that the second clamp approaches the first clamp, thereby bringing the two clamping members closer; the auxiliary mechanism is arranged between the second end of the first clamp and the second end of the second clamp.

[0006] Furthermore, in the above-mentioned brick clamp shaping device for construction, the end of the second end of the first pulling clamp is connected to the end of the second end of the second pulling clamp via a rotating shaft.

[0007] Furthermore, in the above-mentioned brick clamp shaping device for construction, the operating member is L-shaped, the first end of the operating member is vertically connected to the second end of the second pulling clamp, and the second end of the operating member is a free end and parallel to the second end of the second pulling clamp.

[0008] Furthermore, in the above-mentioned brick clamp shaping device for construction, the auxiliary mechanism includes: an elastic member and two pull rings; wherein the two pull rings are respectively arranged at the second end of the first pull clamp and the second end of the second pull clamp; and the two ends of the elastic member are respectively connected to the two pull rings in a one-to-one correspondence.

[0009] Furthermore, in the above-mentioned brick clamp former for construction, the elastic member is a spring tensioner.

[0010] Furthermore, in the above-mentioned brick clamp shaping device for construction, the first end of the first pulling clamp is detachably connected to one of the clamping members; the first end of the second pulling clamp is detachably connected to the other clamping member.

[0011] Furthermore, the above-mentioned construction brick clamp former also includes: two fastening bolts; wherein, a threaded hole extending inward is provided on the end face of the first end of the first clamp and the end face of the first end of the second clamp; the two clamps are both L-shaped, and a through hole is provided at the first end of each clamp, and the second ends of the two clamps are arranged opposite to each other; one of the fastening bolts is passed through the through hole on one of the clamps and is threadedly connected to the threaded hole on the first clamp, and the other fastening bolt is passed through the through hole on the other clamp and is threadedly connected to the threaded hole on the second clamp.

[0012] Furthermore, in the above-mentioned brick clamp shaping device for construction, the wall surface opposite to each clamping piece is provided with an anti-slip mechanism.

[0013] Furthermore, in the above-mentioned brick clamp setting device for construction, each anti-slip mechanism is a plurality of grooves arranged at intervals on the wall surface of the clamping member facing another clamping member.

[0014] In the utility model, two clamping members are arranged opposite to each other to clamp a plurality of bricks, and the clamping mechanism makes the two clamping members close to each other, so that the two clamping members clamp each brick. In this way, a plurality of bricks can be loaded and unloaded at the same time without manual loading and unloading. Only the clamping mechanism needs to be operated, which is simple to operate, reduces the work intensity of the staff, improves the work efficiency, and solves the problem of increased work intensity in manual loading and unloading of bricks in the prior art. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] By reading the detailed description of the preferred embodiment below, various other advantages and benefits will become clear to those of ordinary skill in the art. The accompanying drawings are only used for the purpose of illustrating the preferred embodiment and are not considered to be limiting of the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:

[0016] Figure 1 A schematic diagram of the structure of a brick clamp shaping device for construction provided by an embodiment of the utility model;

[0017] Figure 2 A schematic structural diagram of a first pulling clamp in a brick clamp shaping device for construction provided by an embodiment of the utility model;

[0018] Figure 3 A structural schematic diagram of a second pulling clamp in a brick clamp shaping device for construction provided by an embodiment of the utility model;

[0019] Figure 4A schematic structural diagram of a clamping member in a brick clamp shaping device for construction provided by an embodiment of the utility model. DETAILED DESCRIPTION

[0020] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art. It should be noted that, in the absence of conflict, the embodiments in the present utility model and the features in the embodiments can be combined with each other. The present utility model will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0021] See also Figures 1 to 4 The figure shows the preferred structure of the brick clamp shaper for construction in this embodiment. As shown in the figure, the brick clamp shaper for construction includes: two clamps 1 and a clamping mechanism 2. The two clamps 1 are arranged opposite to each other, and the two clamps 1 are used to clamp multiple bricks.

[0022] The clamping mechanism 2 is connected to both clamping members 1, and is used to bring the two clamping members 1 closer together so that the two clamping members 1 clamp each brick.

[0023] In specific implementation, there is a certain distance between the two clamping members 1, which can be determined according to actual conditions, and this embodiment does not impose any restrictions on this. In this embodiment, the distance between the two clamping members 1 is 25 cm, and the minimum number of bricks to be taken at one time is 5, which speeds up the loading and unloading speed.

[0024] It can be seen that in the present embodiment, the two clamping members 1 are arranged relative to each other to clamp a plurality of bricks, and the clamping mechanism 2 makes the two clamping members 1 close to each other, and the two clamping members 1 clamp each brick. In this way, a plurality of bricks can be loaded and unloaded at the same time without manual loading and unloading. It is only necessary to operate the clamping mechanism 2, which is simple to operate, reduces the work intensity of the staff, improves the work efficiency, and solves the problem of increased work intensity in manual loading and unloading of bricks in the prior art.

[0025] See also Figures 1 to 3 In the above embodiment, the clamping mechanism 2 includes: a first clamp 21, a second clamp 22, an operating member 23 and an auxiliary mechanism 24. The first clamp 21 is L-shaped, and the first end ( Figure 2 The lower end as shown in the figure is connected to one of the clamping members 1. Preferably, the first end of the first pliers 21 is detachably connected to the clamping member 1.

[0026] The second clamp 22 is L-shaped, and the first end ( Figure 3The lower end as shown in the figure is connected to another clamping member 1. Preferably, the first end of the second pliers 22 is detachably connected to the clamping member 1.

[0027] The second end of the second pliers 22 ( Figure 3 The left end shown) and the second end of the first pliers 21 ( Figure 2 Specifically, the end of the second end of the first pliers 21 and the end of the second end of the second pliers 22 are connected via a rotating shaft, so that the second pliers 22 and the first pliers 21 can rotate relative to each other. At this time, the first end of the first pliers 21 and the first end of the second pliers 22 are arranged opposite to each other, and the second end of the first pliers 21 and the second end of the second pliers 22 are rotatably connected, so that the first pliers 21 and the second pliers 22 form an inverted U-shaped structure.

[0028] The operating member 23 is arranged on the second pulling clamp 22. Specifically, the operating member 23 is placed inside the inverted U-shaped structure. The operating member 23 is used to pull the second pulling clamp 22. Since the second pulling clamp 22 and the first pulling clamp 21 can rotate relative to each other, when the second pulling clamp 22 is pulled, the second pulling clamp 22 approaches the first pulling clamp 21, thereby driving the two clamps 1 to approach each other, and the two clamps 1 clamp multiple bricks.

[0029] Preferably, the operating member 23 is L-shaped, and the first end ( Figure 3 The upper end shown in FIG. 1 is vertically connected to the second end of the second pliers 22, and the second end of the operating member 23 ( Figure 3 The left end shown in the figure is a free end, and the second end of the operating member 23 is parallel to the second end of the second pliers 22. Specifically, the operating member 23 is placed below the second end of the second pliers 22, and the first end of the operating member 23 is vertically welded to the second end of the second pliers 22.

[0030] The auxiliary mechanism 24 is arranged between the second end of the first pliers 21 and the second end of the second pliers 22. The auxiliary mechanism 24 is used to ensure the transmission of force when the operating member 23 pulls the second pliers 22 close to the first pliers 21, ensure the smooth clamping and clamping of the bricks, and drive the second pliers 22 to reset when the bricks are released.

[0031] Preferably, the auxiliary mechanism 24 includes: an elastic member 241 and two pull rings 242. The two pull rings 242 are respectively arranged at the second end of the first pliers 21 and the second end of the second pliers 22. Specifically, a pull ring 242 is arranged near the end of the second end of the first pliers 21, and a pull ring 242 is also arranged near the end of the second end of the second pliers 22, and both pull rings 242 are placed outside the inverted U-shaped structure. The two ends of the elastic member 241 correspond to the two pull rings 242 one by one, and each end of the elastic member 241 is connected to the corresponding pull ring 242. Specifically, each end of the elastic member 241 is hooked with the corresponding pull ring 242. In this way, when the operating member 23 pulls the second pliers 22 close to the first pliers 21, the stability of the brick clamping process is ensured, so that the construction brick clamp former is more stable when in use. After the brick reaches the desired position, the operating member 23 no longer pulls the second clamp 22 close to the first clamp 21, and the elastic member 241 can drive the second clamp 22 back to its original position under the action of the elastic restoring force, so as to facilitate the clamping of the remaining bricks next time.

[0032] More preferably, the elastic member 241 is a spring tensioner.

[0033] In a specific implementation, the second end of the first pulling forceps 21 is connected to one of the pull rings 242 by welding, and the second end of the second pulling forceps 22 is connected to the other pull ring 242 by welding.

[0034] When in use, a plurality of bricks are placed between the two clamps 1, and the staff lifts up the second end of the operating member 23, so that the operating member 23 approaches the first clamp 21, driving the second clamp 22 to approach the first clamp 21, so that the two clamps 1 are close to each other, and then the bricks are clamped. When the bricks are transported to the desired position, the staff releases the second end of the operating member 23, and the second clamp 22 returns to its original position under the elastic restoring force of the elastic member 241.

[0035] It can be seen that in this embodiment, the clamping mechanism 2 has a simple structure and is easy to implement.

[0036] See also Figures 1 to 3 In the above embodiments, a threaded hole extending inward is provided on the end surface of the first end of the first pliers 21. Specifically, the threaded hole extends from the end surface of the first end of the first pliers 21 along the first end to the turning point between the first end and the second end.

[0037] A threaded hole extending inward is also formed on the end surface of the first end of the second pliers 22. Specifically, the threaded hole extends from the end surface of the first end of the second pliers 22 along the first end to the turning point between the first end and the second end.

[0038] The two clamping members 1 are both L-shaped. Specifically, the first end ( Figure 1The first end of the other clamp 1 (as shown in the right end) is perpendicular to the first end of the first clamp 21, and the second end of the clamp 1 is parallel to the first end of the first clamp 21. Figure 1 The left end shown in the figure) is perpendicular to the first end of the second clamp 22, and the second end of the clamp 1 is parallel to the first end of the second clamp 22. Figure 1 The lower ends of the two clamping members 1 are parallel and opposite to each other, and each brick is clamped between the second ends of the two clamping members 1. A through hole is provided at the first end of each clamping member 1.

[0039] The brick clamp shaping device for construction may also include: two fastening bolts 3. The two fastening bolts 3 correspond to the two clamps 1 one by one. One of the fastening bolts 3 is passed through a through hole on one of the clamps 1 and is screwed to a threaded hole on the first clamp 21, and the other fastening bolt 3 is passed through a through hole on the other clamp 1 and is screwed to a threaded hole on the second clamp 22.

[0040] It can be seen that in this embodiment, the first pulling forceps 21 are connected to the corresponding clamping member 1 by the fastening bolts 3, and the second pulling forceps 22 are also connected to the corresponding clamping member 1 by the fastening bolts 3, which is convenient for installation and disassembly, and thus easy to carry, thereby improving practicality.

[0041] Preferably, the cross-sectional dimension of each clamping member 1 gradually decreases from the turning point between the first end and the second end to the cross-sectional dimension at the second end, so that the second end of each clamping member 1 is needle-shaped.

[0042] Preferably, a first stiffening rib (not shown in the figure) is obliquely arranged between the first end of the first clamp 21 and the first end of the corresponding clamp 1. Specifically, the first stiffening rib is in an inclined state, the first end of the first stiffening rib is connected to the first end of the first clamp 21, and the second end of the first stiffening rib is connected to the first end of the clamp 1. The first stiffening rib is used to improve the strength between the first clamp 21 and the corresponding clamp 1. More preferably, the first stiffening rib is detachably connected to the first end of the first clamp 21 and the first end of the corresponding clamp 1, such as bolted connection.

[0043] A second stiffening rib (not shown in the figure) is obliquely arranged between the first end of the second clamp 22 and the first end of the corresponding clamp 1. Specifically, the second stiffening rib is in an inclined state, the first end of the second stiffening rib is connected to the first end of the second clamp 22, and the second end of the second stiffening rib is connected to the first end of the clamp 1. The second stiffening rib is used to improve the strength between the second clamp 22 and the corresponding clamp 1. More preferably, the first stiffening rib is detachably connected to the first end of the second clamp 22 and the first end of the corresponding clamp 1, such as bolted connection.

[0044] See also Figure 1 and Figure 4 In the above embodiments, the wall surface opposite to each clamping member 1 is provided with an anti-skid mechanism. Specifically, there are two anti-skid mechanisms, each of which is provided at the second end of the corresponding clamping member 1. In this way, the friction between the brick and the clamping member 1 can be increased by the anti-skid mechanism, ensuring that the brick is stably clamped, thereby improving the clamping effect.

[0045] Preferably, each anti-slip mechanism is a plurality of grooves 4 arranged at intervals on the wall surface of the clamping member 1 facing the other clamping member 1. Specifically, the second end of the clamping member 1 is provided with a plurality of grooves 4 on the wall surface facing the second end of the other clamping member 1, and each groove 4 is spaced and evenly distributed on the second end of the clamping member 1. In this way, the structure of each anti-slip mechanism is simple and easy to implement, and the arrangement of the grooves 4 can increase the friction resistance, thereby increasing the friction between the second end of the clamping member 1 and the brick, ensuring the stable clamping between the brick and the second ends of the two clamping members 1, and ensuring the clamping effect.

[0046] In specific implementation, each groove 4 has a preset depth, which can be determined according to actual conditions, and this embodiment does not impose any restrictions on this. In this embodiment, the depth of each groove 4 is 3 mm.

[0047] In summary, in this embodiment, the two clamping members 1 are arranged relatively to clamp multiple bricks, and the clamping mechanism 2 makes the two clamping members 1 close to each other, so that the two clamping members 1 clamp each brick. In this way, multiple bricks can be loaded and unloaded at the same time without manual loading and unloading. It is only necessary to operate the clamping mechanism 2. The operation is simple, which reduces the work intensity of the staff, speeds up the loading and unloading speed, improves the work efficiency, saves time and effort, and the brick clamp shaper for construction has a simple structure, which can ensure stability during use, and is easy to disassemble and assemble, easy to carry, and has improved adaptability.

[0048] It should be noted that, in the description of the present invention, terms such as "up", "down", "left", "right", "inside" and "outside" indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings. This is merely for the convenience of description and does not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it should not be understood as a limitation on the present invention.

[0049] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0050] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A brick clamp shaping device for construction, characterized in that: include: Two clamping members (1) and a clamping mechanism (2); wherein, The two clamping members (1) are arranged opposite to each other to clamp a plurality of bricks; The clamping mechanism (2) is connected to both of the two clamping members (1) and is used to bring the two clamping members (1) closer together to clamp the bricks; The clamping mechanism (2) comprises: a first clamp (21), a second clamp (22), an operating member (23) and an auxiliary mechanism (24); wherein: The first pulling forceps (21) is L-shaped, and the first end of the first pulling forceps (21) is connected to one of the clamping members (1); The second pulling clamp (22) is L-shaped, the first end of the second pulling clamp (22) is connected to the other clamp (1), and the second end of the second pulling clamp (22) is rotatably connected to the second end of the first pulling clamp (21); The operating member (23) is arranged on the second pulling clamp (22) and is used to pull the second pulling clamp (22) so as to make the second pulling clamp (22) approach the first pulling clamp (21), thereby making the two clamping members (1) approach each other; The auxiliary mechanism (24) is arranged between the second end of the first pulling forceps (21) and the second end of the second pulling forceps (22).

2. The brick clamp shaping device for construction according to claim 1, characterized in that: The end of the second end of the first pulling forceps (21) and the end of the second end of the second pulling forceps (22) are connected via a rotating shaft.

3. The brick clamp shaping device for construction according to claim 1, characterized in that: The operating member (23) is L-shaped, the first end of the operating member (23) is vertically connected to the second end of the second pliers (22), and the second end of the operating member (23) is a free end and is parallel to the second end of the second pliers (22).

4. The brick clamp shaping device for construction according to claim 1, characterized in that: The auxiliary mechanism (24) comprises: an elastic member (241) and two pull rings (242); wherein: The two pull rings (242) are respectively arranged at the second end of the first pulling pliers (21) and the second end of the second pulling pliers (22); The two ends of the elastic member (241) are respectively connected to the two pull rings (242) in a one-to-one correspondence.

5. The brick clamp shaping device for construction according to claim 4, characterized in that: The elastic member (241) is a spring tensioner.

6. The brick clamp shaping device for construction according to claim 1, characterized in that: The first end of the first pulling forceps (21) is detachably connected to one of the clamping members (1); The first end of the second pulling forceps (22) is detachably connected to the other clamping member (1).

7. The brick clamp shaping device for construction according to claim 6, characterized in that: Also includes: Two fastening bolts (3); wherein, The end surface of the first end of the first pulling forceps (21) and the end surface of the first end of the second pulling forceps (22) are both provided with a threaded hole extending inwards; The two clamping members (1) are both L-shaped, a through hole is provided at the first end of each clamping member (1), and the second ends of the two clamping members (1) are arranged opposite to each other; One of the fastening bolts (3) is inserted through a through hole on one of the clamping members (1) and is threadedly connected to a threaded hole on the first clamp (21), and the other fastening bolt (3) is inserted through a through hole on the other clamping member (1) and is threadedly connected to a threaded hole on the second clamp (22).

8. The brick clamp shaping device for construction according to claim 1, characterized in that: The wall surface opposite to each clamping member (1) is provided with an anti-slip mechanism.

9. The brick clamp shaping device for construction according to claim 8, characterized in that: Each of the anti-slip mechanisms is a plurality of grooves (4) arranged at intervals on the wall surface of the clamping member (1) facing another clamping member (1).