Improved dry sludge bin for storing dried biogas residues
By designing and improving dry mud silt, including feeding system, heat insulation layer, discharge system, spraying system and suction fan, the problems of poor sealing, easy corrosion and low storage efficiency of traditional dry mud silt are solved, and stable storage and efficient transportation of dry slags are achieved.
Patent Information
- Application Number
- CN202421219970.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-31
- Publication Date
- 2025-02-28
- Estimated Expiration
- 2034-05-31
AI Technical Summary
Traditional dry mud silos have problems such as poor sealing, easy corrosion and low storage efficiency, which is difficult to meet the needs of modern environmentally friendly treatment.
An improved dry mud silt silt silt is designed, including feeding system, heat insulation layer, discharge system, spray system and suction fan. Through these systems and structures, the continuity and stability of materials are ensured, water accumulation and dust explosions are avoided, and storage efficiency is improved.
It realizes stable storage of dry slag, avoids accumulated water and dust explosion, improves storage efficiency, and meets the needs of modern environmentally friendly treatment.
Smart Images

Figure CN222539495U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of environmental protection equipment, in particular to a dry mud bin. Background Art
[0002] With the improvement of environmental awareness and the development and utilization of biogas energy, the treatment and utilization of biogas residues have received increasing attention. As a valuable resource, the storage and management of dried biogas residues have become an important link in the biogas production process. As a by-product of the development of biomass energy, the effective treatment and utilization of biogas residues are of great significance to reducing environmental pollution and promoting the circular economy. After the biogas residues are dried and dehydrated by the drying system, the moisture content of the biogas residues has dropped below 40%, becoming marketable green soil with sales conditions. However, due to the long duration of the production process, vehicles cannot always wait for loading, and the market demand is not continuous. In the absence of sales, a buffer warehouse is needed for storage, and when there is sales, the residues are exported and loaded by auger. However, traditional dry mud warehouses have problems such as poor sealing, easy corrosion, and low storage efficiency, which are difficult to meet the needs of modern environmental protection treatment. Utility Model Content
[0003] In order to solve some problems existing in the above-mentioned prior art, the utility model provides an improved dry mud bin for storing dried biogas residue to solve the deficiencies existing in the prior art.
[0004] To achieve the above-mentioned purpose, the utility model provides an improved dry mud silo for storing dried sludge, including a dry mud silo body, the dry mud silo body including a feeding system, the feeding system is arranged above the dry mud silo body, an insulation layer is arranged on the outside of the dry mud silo body, a discharging system is arranged at the bottom of the dry mud silo body, and a spraying system is arranged inside the dry mud silo, and the spraying system is cooperated with a suction fan.
[0005] As a further improvement of the utility model, in order to avoid blockage of the feed square pipe of the dry mud bin, the feeding system includes a feed port arranged on the dry mud bin body, a feed screw conveyor is arranged above the feed port, the feed port is cooperated with a feed square pipe, the feed square pipe is arranged in multiple groups, and the feed screw conveyor is cooperated with a vertical agitator.
[0006] As a further improvement of the present utility model, in order to ensure stable discharge of the discharge system and avoid blockage, the discharge system includes a discharge auger spiral arranged on the dry mud bin body, the discharge auger spiral is cooperated with a mounting groove, and multiple groups of the discharge auger spirals are provided. The connection between each of the discharge auger spirals and the bin wall of the dry mud bin is sealed, and the discharge system is provided with a main discharge auger on the outside of the dry mud bin body.
[0007] As a further improvement of the utility model, in order to avoid the high temperature inside the dry mud bin and the occurrence of dust explosion, the spray system includes a water mist spray arranged inside the dry mud bin body, and the water mist spray is arranged in multiple groups, which are coordinated with the suction fan.
[0008] As a further improvement of the utility model, in order to ensure stable operation of the inlet and outlet ends of the dry mud bin, several groups of electric gate valves are arranged inside the dry mud bin body in coordination with the feeding system and the discharging system.
[0009] As a further improvement of the present invention, in order to facilitate lifting the biogas sludge to a certain height, a lifting screw conveyor is provided on the outside of the dry mud bin body.
[0010] When the utility model is working, the dry mud silo body includes a feeding system, which is arranged above the dry mud silo body. The feeding system includes a feeding port arranged on the dry mud silo body, a feeding screw conveyor is arranged above the feeding port, and the feeding port is cooperated with a feeding square tube, and multiple groups of feeding square tubes are arranged. A heat insulation layer is arranged on the outside of the dry mud silo body, and a discharging system is arranged at the bottom of the dry mud silo body. The discharging system includes a discharging auger spiral arranged on the dry mud silo body, and the discharging auger spiral is cooperated with an installation groove, and multiple groups of discharging auger spirals are arranged. The connection between each discharging auger spiral and the silo wall of the dry mud silo is sealed, and the discharging system is provided with a discharging main auger on the outside of the dry mud silo body, and a spray system is arranged inside the dry mud silo, and the spray system is cooperated with a suction fan, and a lifting screw conveyor is arranged on the outside of the dry mud silo body.
[0011] The beneficial effects of the utility model are as follows: the utility model provides an improved dry mud silo for storing dried sludge, which prevents excessive accumulation of materials on a single auger through each electric gate valve and a feed square pipe to ensure the continuity and stability of transportation. The discharging main auger is coordinated with the lifting screw conveyor to lift the materials to a certain height, which is convenient for subsequent transportation vehicles to load. The agitator stirs the materials to prevent material accumulation. A suction fan is required to be arranged on the top of the dry mud silo to prevent the dried sludge coming out of the dryer from generating condensed water after the dry mud silo is cooled due to the high temperature, resulting in water accumulation on the silo wall and bottom of the dry mud silo; a water mist spray is arranged above the dry mud silo to prevent the dried sludge from falling into the silo due to the height difference of several meters and causing large dust to fall to the ground, which is easy to form a dust explosion environment, is convenient for eliminating dust in the room, can realize the storage of water-containing sludge, and at the same time avoid the accumulation of water and dust during storage. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] In order to facilitate the understanding of those skilled in the art, the present invention is further described below in conjunction with the accompanying drawings:
[0013] Figure 1It is a structural diagram of the utility model.
[0014] Figure 2 It is an analysis diagram of the utility model.
[0015] Among them, 1 feeding system, 101 feeding port, 102 feeding screw conveyor, 103 feeding square pipe, 104 agitator, 2 insulation layer, 3 discharging system, 301 discharging auger screw, 302 installation trough, 303 discharging main auger, 4 suction fan, 5 spray system, 501 water mist spray, 6 electric gate valve, 7 lifting screw conveyor. DETAILED DESCRIPTION
[0016] In order to enable those skilled in the art to better understand the technical solution in this application, Figure 1-2 The present invention is further described in the following embodiments, which are only used to more clearly illustrate the technical solution of the present invention and are not intended to limit the protection scope of the present invention.
[0017] like Figure 1-2 An improved dry mud silo for storing dried sludge is shown, comprising a dry mud silo body, the dry mud silo body comprising a feeding system 1, the feeding system 1 is arranged above the dry mud silo body, an insulation layer 2 is arranged on the outside of the dry mud silo body, a discharging system 3 is arranged at the bottom of the dry mud silo body, a spraying system 5 is arranged inside the dry mud silo, and the spraying system 5 is cooperated with a suction fan 4.
[0018] The feeding system 1 includes a feeding port 101 arranged on the dry mud silo body, a feeding screw conveyor 102 is arranged above the feeding port 101, the feeding port 101 is provided with a feeding square pipe 103, the feeding square pipe 103 is provided in multiple groups, and the feeding screw conveyor 102 is provided with a vertical agitator 104.
[0019] The discharging system 3 includes a discharging auger spiral 301 arranged on the dry mud bin body, and the discharging auger spiral 301 is cooperated with a mounting groove 302. The discharging auger spiral 301 is provided with multiple groups, and the connection between each discharging auger spiral 301 and the bin wall of the dry mud bin is sealed. The discharging system 3 is provided with a discharging main auger 303 on the outside of the dry mud bin body.
[0020] The spray system 5 includes a water mist spray 501 arranged inside the dry mud bin body. The water mist spray 501 is provided in multiple groups, and the water mist spray 501 is arranged in coordination with the suction fan 4.
[0021] The dry mud silo body is internally provided with a plurality of groups of electric gate valves 6 in coordination with the feeding system 1 and the discharging system 3 .
[0022] A lifting screw conveyor 7 is provided outside the dry mud bin body.
[0023] When the utility model is working, the dry mud silo body includes a feeding system 1, which is arranged above the dry mud silo body. The feeding system 1 includes a feeding port 101 arranged on the dry mud silo body, a feeding screw conveyor 102 is arranged above the feeding port 101, and a feeding square pipe 103 is arranged in cooperation with the feeding port 101. The feeding square pipe 103 is provided in multiple groups, and a heat insulation layer 2 is arranged outside the dry mud silo body. A discharge system 3 is arranged at the bottom of the dry mud silo body, and the discharge system 3 includes a device A discharging auger spiral 301 is arranged on the dry mud bin body, and is provided with a mounting groove 302. There are multiple groups of discharging auger spirals 301, and the connection between each discharging auger spiral 301 and the bin wall of the dry mud bin is sealed. The discharging system 3 is provided with a discharging main auger 303 on the outside of the dry mud bin body, and a spraying system 5 is provided inside the dry mud bin, and the spraying system 5 is provided with a suction fan 4, and a lifting screw conveyor 7 is provided outside the dry mud bin body.
[0024] The dried biogas residue falls into the dry mud bin through the four feeding square pipes 103 and four groups of electric gate valves 6 on the feeding screw conveyor 102. The single electric gate valve 6 is opened in sequence. Each electric gate valve 6 is set with a fixed opening time to avoid excessive accumulation of materials on a single feeding square pipe 103. Condensed water will be generated after the dry mud bin is cooled, causing water accumulation on the wall and bottom of the dry mud bin, increasing the load during discharge. A suction fan 4 needs to be set on the top of the dry mud bin to absorb the hot air. In the process of the dried biogas residue falling into the dry mud bin, it will accumulate There is a height difference of several meters. When the dried sludge hits the bottom of the dry mud bin when falling, there will be a lot of dust, which is easy to form a dust explosion environment. A water mist spray 501 is set to eliminate the dust in the room. After the dried sludge falls to the bottom of the dry mud bin, the four discharge auger screws 301 at the bottom of the dry mud bin start to work and send the material to the discharge main auger 303 outside the bin. The discharge main auger 303 transports the dried sludge to the lifting screw conveyor 7. The lifting screw conveyor 7 lifts the transported dried sludge to a certain height to facilitate loading by the transport vehicle.
[0025] The present utility model is not limited to the above-mentioned embodiments. On the basis of the technical solution disclosed in the present utility model, technicians in this field can make some substitutions and deformations to some technical features therein according to the disclosed technical content without creative labor, and these substitutions and deformations are all within the protection scope of the present utility model.
Claims
1. An improved dry mud silo for storing dried biogas residue, comprising a dry mud silo body, characterized in that: The dry mud silo body comprises a feeding system (1), wherein the feeding system (1) is arranged above the dry mud silo body, a heat insulation layer (2) is arranged outside the dry mud silo body, a discharge system (3) is arranged at the bottom of the dry mud silo body, and a spray system (5) is arranged inside the dry mud silo, and the spray system (5) is provided in combination with a suction fan (4).
2. The improved dry mud silo for storing dried biogas residue according to claim 1, characterized in that: The feeding system (1) comprises a feeding port (101) arranged on a dry mud silo body, a feeding screw conveyor (102) being arranged above the feeding port (101), a feeding square tube (103) being arranged in combination with the feeding port (101), a plurality of groups of the feeding square tubes (103) being arranged, and a vertical agitator (104) being arranged in combination with the feeding screw conveyor (102).
3. The improved dry mud silo for storing dried biogas residue according to claim 1, characterized in that: The discharging system (3) comprises a discharging auger spiral (301) arranged on a dry mud bin body, the discharging auger spiral (301) being provided with a mounting groove (302), a plurality of groups of the discharging auger spirals (301) being provided, the connection between each of the discharging auger spirals (301) and the bin wall of the dry mud bin being sealed, and the discharging system (3) being provided with a discharging main auger (303) on the outside of the dry mud bin body.
4. The improved dry mud silo for storing dried biogas residue according to claim 1, characterized in that: The spray system (5) comprises a water mist spray (501) arranged inside the dry mud bin body, wherein a plurality of groups of the water mist spray (501) are arranged, and the water mist spray (501) is arranged in coordination with the suction fan (4).
5. The improved dry mud silo for storing dried biogas residue according to claim 1, characterized in that: A plurality of groups of electric gate valves (6) are arranged inside the dry mud silo body in coordination with the feeding system (1) and the discharging system (3).
6. The improved dry mud silo for storing dried biogas residue according to claim 1, characterized in that: A lifting screw conveyor (7) is provided on the outside of the dry mud bin body.