Highway roadbed slope supporting and reinforcing device

By setting a fixing ring on the anchor that matches the inner diameter of the drilling hole, the anchor is located in the middle of the drilling hole, which solves the problem of poor anchor fixing effect in the prior art, and achieves the effect of stable reinforcement.

CN222541501UActive Publication Date: 2025-02-28ROAD & BRIDGE INT CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421316480.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-11
Publication Date
2025-02-28
Estimated Expiration
2034-06-11

AI Technical Summary

Technical Problem

In the existing slope protection devices, the anchor rod has poor fixing effect, which makes it difficult to stabilize and reinforce the protective device.

Method used

The anchor rod is provided with a first fixing ring and a second fixing ring that match the inner diameter of the drilling hole, so that the anchor rod is located in the middle of the drilling hole, so that after the concrete is poured, the anchor rod is located in the center of the concrete to ensure the fixed quality of the anchor rod.

Benefits of technology

Through this method, the fixing effect of the anchor rod is significantly improved, achieving the purpose of stable reinforcement, and avoiding the problem of the anchor rod position offset after concrete pouring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

The utility model provides a highway subgrade side slope supporting and reinforcing device, and relates to the technical field of side slope reinforcing, the highway subgrade side slope supporting and reinforcing device comprises a reinforcing assembly arranged in a side slope drill hole and a frame assembly arranged on a side slope, the reinforcing assembly is connected with the frame assembly, and a first fixing ring and a second fixing ring are arranged on an anchor rod; the outer diameter of the first fixing ring and the outer diameter of the second fixing ring are both matched with the inner diameter of the drill hole, an anchor rod penetrates through the first fixing ring and the second fixing ring, the anchor rod, the first fixing ring and the second fixing ring are coaxial, and when the anchor rod is inserted into the drill hole, the anchor rod is inserted into the drill hole. The outer wall of the first fixing ring and the outer wall of the second fixing ring are both attached to the hole wall of the drill hole, so that the anchor rod is stably located in the middle of the drill hole, after concrete is poured, the anchor rod is located in the center of the concrete, and therefore the fixing quality of the anchor rod is guaranteed, and the purpose of stable reinforcement is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of slope reinforcement, and in particular to a highway roadbed slope support reinforcement device. Background Art

[0002] When a highway is being built, sometimes the two sides of the roadside are not flat roads, but inclined slopes. When protecting the slopes, a common means of protection is to use pre-measurement and layout, and to drill holes on the slopes by bombardment, and the drilling positions are all measured in advance, and then anchor rods are placed, and then a grouting machine is used to fill the holes. After the concrete solidifies, a steel frame is built outside the slope, and then concrete is poured on the outside of the steel frame for slope protection. The existing anchor rods are inserted into the holes. Since the anchor rods have no supporting mechanism, the anchor rods are generally located at the bottom of the holes. When pouring concrete, the anchor rods are located on the side of the concrete, so the fixing effect of the anchor rods will be greatly weakened. Therefore, a highway roadbed slope support reinforcement device is proposed to address the above problems. Utility Model Content

[0003] An embodiment of the present application provides a highway roadbed slope support and reinforcement device, which provides a first fixing ring and a second fixing ring that match the inner diameter of the drilled hole on the anchor rod, so that the first fixing ring and the second fixing ring support the anchor rod, and the anchor rod is located in the middle of the drilled hole. After the concrete is poured, the anchor rod is located in the middle of the concrete, thereby ensuring the fixing quality of the anchor rod and achieving the purpose of stable reinforcement. The present application solves the problem that the existing slope protection device has a poor fixing effect of the anchor rod, which makes it difficult to stably reinforce the protection device.

[0004] The embodiment of the present application provides a highway roadbed slope support reinforcement device, comprising a reinforcement component arranged in a slope borehole and a frame component arranged on the slope, wherein the reinforcement component is connected to the frame component;

[0005] Wherein, the reinforcement assembly includes an anchor rod and a first fixing ring and a second fixing ring arranged on the anchor rod, the outer diameters of the first fixing ring and the second fixing ring both match the inner diameter of the borehole, the anchor rod passes through the first fixing ring and the second fixing ring, a first connecting rod is arranged between the anchor rod and the first fixing ring, a second connecting rod is arranged between the anchor rod and the second fixing ring, and the anchor rod, the first fixing ring and the second fixing ring are coaxial;

[0006] The first end of the anchor rod is inserted into the borehole, the outer walls of the first fixing ring and the second fixing ring are in contact with the wall of the borehole, and the second end of the anchor rod extends out of the borehole and is connected to the frame assembly.

[0007] In a feasible implementation, the reinforcement assembly further includes a guide plate;

[0008] The first ends of the plurality of guide plates are connected to the first end of the anchor rod, the second ends of the plurality of guide plates are connected to the first end of the first fixing ring, and the plurality of guide plates are evenly distributed in a cone shape;

[0009] The outer wall of the guide plate is slidably connected to the hole wall of the drilled hole.

[0010] In a feasible implementation, the reinforcement assembly further includes a threaded sleeve and an enlarged plate disposed at an end of the threaded sleeve;

[0011] The second end of the anchor rod is threadedly connected to the threaded sleeve, and the enlarged plate is located in the frame assembly.

[0012] In a feasible implementation, the frame assembly includes a steel reinforcement frame;

[0013] A planting area is formed inside the steel frame, a first concrete is poured on the outer wall of the steel frame, and the enlarged plate is located inside the first concrete.

[0014] In a feasible implementation, the second end of the anchor rod is hinged to the enlarged plate via a connecting piece, and the second end of the anchor rod, the connecting piece and the enlarged plate are all fixed in the first concrete.

[0015] In a feasible implementation, the frame assembly further includes a reinforced steel frame;

[0016] The reinforcement steel frame is fixed in the steel bar frame, and a plurality of the reinforcement steel frames divide the planting area into a plurality of sub-areas.

[0017] In a feasible implementation, second concrete is poured into the reinforced steel frame.

[0018] In a feasible implementation, the reinforcement steel frame is arranged in an arc shape, and the protrusion direction of the arc-shaped reinforcement steel frame is upward.

[0019] In a feasible implementation, the upper outer wall of the reinforced steel frame is provided with a first protective mesh plate, the end of the first protective mesh plate is connected to the inner wall of the steel frame, and the lower surfaces of the reinforced steel frame, the first protective mesh plate and the steel frame are parallel.

[0020] In a feasible implementation, a second protective mesh plate is provided on the inner wall of the bottom end of the steel frame, and the second protective mesh plate is parallel to the lower surface of the steel frame.

[0021] A highway roadbed slope support and reinforcement device provided in an embodiment of the present application comprises a first fixing ring and a second fixing ring arranged on an anchor rod, wherein the outer diameters of the first fixing ring and the second fixing ring are matched with the inner diameter of the borehole, the anchor rod passes through the first fixing ring and the second fixing ring, and the anchor rod, the first fixing ring and the second fixing ring are coaxial, and when the anchor rod is inserted into the borehole, the outer walls of the first fixing ring and the second fixing ring are fitted with the wall of the borehole, so that the anchor rod is stably located in the middle of the borehole, and after pouring concrete, the anchor rod is located in the center of the concrete, thereby ensuring the fixing quality of the anchor rod and achieving the purpose of stable reinforcement. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 is a schematic diagram of an existing slope protection device;

[0023] Figure 2 It is a structural schematic diagram of the highway roadbed slope support reinforcement device provided by the present application;

[0024] Figure 3 It is a schematic diagram of the structure of the reinforcement component;

[0025] Figure 4 is a cross-sectional view of the reinforcement assembly;

[0026] Figure 5 It is a structural diagram of the framework components;

[0027] Figure 6 is a schematic diagram of a steel frame and its connection components.

[0028] Description of reference numerals:

[0029] 10-reinforcement assembly; 20-frame assembly;

[0030] 11-anchor rod; 12-first fixing ring; 13-second fixing ring; 14-first connecting rod; 15-second connecting rod; 16-guide plate; 17-threaded sleeve; 18-enlargement plate; 21-steel frame; 22-first concrete; 23-reinforced steel frame; 24-second concrete; 25-first protective mesh; 26-second protective mesh. DETAILED DESCRIPTION

[0031] In order to enable those skilled in the art to better understand the technical solutions in the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work should fall within the scope of protection of the present application.

[0032] Highway slope refers to the slope on both sides of the highway. It is a slope with a certain inclination formed to ensure the stability and safety of the highway. When the highway is being built, when the slope needs to be protected, the commonly used protection method is to use pre-measurement and layout, and use artillery to drill holes on the slope. The drilling positions are all measured in advance, and then anchor rods are placed. Then, a grouting machine is used to fill the holes. After the concrete solidifies, a steel frame is built outside the slope, and then concrete is poured outside the steel frame to protect the slope.

[0033] like Figure 1 As shown, Figure 1 Schematic diagram of an existing slope protection device, in which A is a slope, B is a hole, C is an anchor rod, and D is concrete. The anchor rod C of the existing slope protection device is inserted into the hole B. Since the anchor rod C has no supporting mechanism, the anchor rod C is generally located at the bottom of the hole B. When pouring concrete D, the anchor rod C is located on the side of the concrete D, resulting in that the fixing effect of the anchor rod C will be greatly weakened.

[0034] The present application arranges a first fixing ring and a second fixing ring on the anchor rod that match the inner diameter of the drilled hole, so that the first fixing ring and the second fixing ring support the anchor rod and the anchor rod is located in the middle of the drilled hole. Therefore, after pouring concrete, the anchor rod is located in the middle of the concrete, thereby ensuring the fixing quality of the anchor rod and achieving the purpose of stable reinforcement.

[0035] The specific structure of the highway roadbed slope support reinforcement device provided in this application is described in detail below in conjunction with the accompanying drawings.

[0036] Reference Figure 2-Figure 6 As shown, the embodiment of the present application provides a highway roadbed slope support reinforcement device, including a reinforcement component 10 arranged in a slope borehole and a frame component 20 arranged on the slope, and a plurality of reinforcement components 10 are connected to the frame component 20;

[0037] Among them, Figure 3 and Figure 4As shown, the reinforcement assembly 10 includes an anchor rod 11 and a first fixing ring 12 and a second fixing ring 13 arranged on the anchor rod 11. The anchor rod 11 can be a metal rod body. The first fixing ring 12 and the second fixing ring 13 can both be metal rings, and the outer diameters of the first fixing ring 12 and the second fixing ring 13 match the inner diameter of the borehole. The anchor rod 11 passes through the first fixing ring 12 and the second fixing ring 13. A plurality of first connecting rods 14 are arranged between the anchor rod 11 and the first fixing ring 12. A plurality of second connecting rods 15 are arranged between the anchor rod 11 and the second fixing ring 13. The first connecting rod 14 and the second connecting rod 15 can both be metal connecting rods. The anchor rod 11, the first connecting rod 14, the second connecting rod 15, the first fixing ring 12 and the second fixing ring 13 can be welded as a whole, and the anchor rod 11, the first fixing ring 12 and the second fixing ring 13 are coaxial. The right end of the anchor rod 11 extends out of the borehole and is connected to the frame assembly 20.

[0038] When reinforcing the roadbed slope, the left end of the anchor rod 11 is inserted into the drill hole, the first fixing ring 12 and the second fixing ring 13 are both inserted into the drill hole, and the outer walls of the first fixing ring 12 and the second fixing ring 13 are both in contact with the hole wall of the drill hole, thereby supporting the anchor rod 11 and fixing the anchor rod 11 in the middle of the drill hole; after pouring concrete, the anchor rod 11 is in the center of the concrete, thereby ensuring the fixing quality of the anchor rod and achieving the purpose of stable reinforcement.

[0039] Reference Figure 3 and Figure 4 As shown, in some embodiments, the reinforcement assembly 10 further includes a guide plate 16, and the guide plate 16 may be a metal plate body with a smooth exterior;

[0040] The left ends of the multiple guide plates 16 are connected to the left end of the anchor rod 11, and the right ends of the multiple guide plates 16 are connected to the left end of the first fixing ring 12. The anchor rod 11, the guide plates 16 and the first fixing ring 12 can be welded as a whole. The multiple guide plates 16 are evenly distributed in a cone shape. The guide plates 16 can be arc-shaped plates, and the left end of the guide plates 16 is narrow and the right end is wide, so that the geometric body formed by the multiple guide plates 16 is closer to a cone.

[0041] When the reinforcement assembly 10 is inserted into the drill hole, the outer wall of the guide plate 16 is slidably connected to the wall of the drill hole to serve the purpose of guidance, thereby facilitating the stable insertion of the anchor rod 11 into the drill hole.

[0042] In some embodiments, the reinforcement assembly 10 further includes a threaded sleeve 17 and an enlarged plate 18 disposed at the end of the threaded sleeve 17;

[0043] The threaded sleeve 17 is a metal tube body with internal threads. The left end of the threaded sleeve 17 is an open end. The right end of the anchor rod 11 is screwed to the inner wall of the threaded sleeve 17. The enlarged plate 18 can be a metal plate body. The enlarged plate 18 is located in the frame assembly 20 to ensure that the reinforcement assembly 10 is tightly connected to the frame assembly 20 to achieve the purpose of stable reinforcement.

[0044] Reference Figure 5 and Figure 6 As shown, in some embodiments, the frame assembly 20 includes a steel frame 21, which is made of metal welding, and the steel frame 21 is rectangular as a whole, and its upper part is arc-shaped;

[0045] A planting area is formed inside the steel frame 21 for planting green plants to serve a protective purpose. The outer wall of the steel frame 21 is cast with a first concrete 22. The thickness of the first concrete 22 matches the height of the steel frame 21. The outer contour of the first concrete 22 can be a rectangle, which is convenient for multiple supporting and reinforcement devices to be fitted and arranged, and the enlarged plate 18 is fixed in the first concrete 22.

[0046] In some embodiments, the right end of the anchor rod 11 is hinged to the enlarged plate 18 through a connecting piece, and the connecting piece can be a conventional hinged piece, so that the angle between the enlarged plate 18 and the anchor rod 11 can be adjusted, thereby meeting the requirements for slope reinforcement of various slopes;

[0047] The right end of the anchor rod 11 , the connecting piece and the enlarged plate 18 are all fixed in the first concrete 22 , thereby ensuring that the reinforcement assembly 10 and the frame assembly 20 are tightly connected.

[0048] In some embodiments, the frame assembly 20 further includes a reinforcement steel frame 23;

[0049] The reinforcement steel frame 23 is fixed in the steel frame 21 . A plurality of reinforcement steel frames 23 may be arranged in the steel frame 21 . The plurality of reinforcement steel frames 23 divide the planting area into a plurality of sub-areas, thereby improving the strength of the reinforcement steel frames 23 .

[0050] In some embodiments, the reinforcement steel frame 23 may be a trough plate, the upper surface of the trough plate is an open end, and the second concrete 24 is poured in the reinforcement steel frame 23 .

[0051] Reference Figure 5 and Figure 6 As shown, in some embodiments, the reinforcement steel frame 23 is arranged in an arc shape, and the protrusion direction of the arc-shaped reinforcement steel frame 23 is upward.

[0052] In some embodiments, the upper outer wall of the reinforcement steel frame 23 is provided with a first protective mesh plate 25, which may be a metal mesh plate, and the end of the first protective mesh plate 25 is connected to the inner wall of the reinforcement frame 21, and the reinforcement steel frame 23, the first protective mesh plate 25 and the lower surface of the reinforcement steel frame 21 are parallel;

[0053] A second protective mesh plate 26 is provided on the inner wall of the bottom end of the steel frame 21. The second protective mesh plate 26 may also be a metal mesh plate. The second protective mesh plate 26 is parallel to the lower surface of the steel frame 21.

[0054] In the exposed planting area of ​​the steel frame, green plants are generally planted for protection purposes. In the early stage of slope protection, the exposed planting area is still soil. Once heavy rain occurs before the green plants grow, the rainwater gathers and flows. At this time, the soil in the planting area above the reinforced steel frame 23 is easily washed away, causing soil loss and local collapse, which in turn affects the quality of slope protection. The device sets a first protective mesh plate 25 to cover the outside of the soil, and sets a second protective mesh plate 26 on the bottom side of the steel frame 21. At this time, multiple groups of protective mesh plates can play a certain role in preventing soil loss, and the overall frame assembly 20 is set at an angle, which can match the slope at this time for stable protection purposes.

[0055] The highway roadbed slope support and reinforcement device provided by the present application is provided with a first fixing ring 12 and a second fixing ring 13 on an anchor rod 11, the outer diameters of the first fixing ring 12 and the second fixing ring 13 are matched with the inner diameter of the borehole, the anchor rod 11 passes through the first fixing ring 12 and the second fixing ring 13, and the anchor rod 11, the first fixing ring 12 and the second fixing ring 13 are coaxial, and when the anchor rod 11 is inserted into the borehole, the outer walls of the first fixing ring 12 and the second fixing ring 13 are fitted with the wall of the borehole, so that the anchor rod 11 is stably located in the middle of the borehole. After pouring concrete, the anchor rod 11 is located in the center of the concrete, thereby ensuring the fixing quality of the anchor rod and achieving the purpose of stable reinforcement.

[0056] It is easy to understand that those skilled in the art can combine, split, reorganize, etc. the embodiments of the present application to obtain other embodiments based on the several embodiments provided in the present application, and these embodiments do not exceed the protection scope of the present application.

[0057] The above specific implementation methods further explain in detail the purpose, technical solutions and beneficial effects of the embodiments of the present application. It should be understood that the above are only specific implementation methods of the embodiments of the present application and are not used to limit the protection scope of the embodiments of the present application. Any modifications, equivalent substitutions, improvements, etc. made on the basis of the technical solutions of the embodiments of the present application should be included in the protection scope of the embodiments of the present application.

Claims

1. A highway roadbed slope support reinforcement device, characterized in that: It comprises a reinforcement component (10) arranged in a hole drilled in a slope and a frame component (20) arranged on the slope, wherein the reinforcement component (10) is connected to the frame component (20); The reinforcement assembly (10) comprises an anchor rod (11) and a first fixing ring (12) and a second fixing ring (13) arranged on the anchor rod (11); the outer diameters of the first fixing ring (12) and the second fixing ring (13) both match the inner diameter of the borehole; the anchor rod (11) passes through the first fixing ring (12) and the second fixing ring (13); a first connecting rod (14) is arranged between the anchor rod (11) and the first fixing ring (12); a second connecting rod (15) is arranged between the anchor rod (11) and the second fixing ring (13); and the anchor rod (11), the first fixing ring (12) and the second fixing ring (13) are coaxial; The first end of the anchor rod (11) is inserted into the drilled hole, the outer walls of the first fixing ring (12) and the second fixing ring (13) are in contact with the wall of the drilled hole, and the second end of the anchor rod (11) extends out of the drilled hole and is connected to the frame assembly (20).

2. The highway roadbed slope support reinforcement device according to claim 1 is characterized in that: The reinforcement assembly (10) further comprises a guide plate (16); The first ends of the plurality of guide plates (16) are connected to the first end of the anchor rod (11), the second ends of the plurality of guide plates (16) are connected to the first end of the first fixing ring (12), and the plurality of guide plates (16) are evenly distributed in a cone shape; The outer wall of the guide plate (16) is slidably connected to the wall of the drilled hole.

3. The highway roadbed slope support reinforcement device according to claim 2 is characterized in that: The reinforcement assembly (10) further comprises a threaded sleeve (17) and an enlarged plate (18) arranged at the end of the threaded sleeve (17); The second end of the anchor rod (11) is threadedly connected to the threaded sleeve (17), and the enlarged plate (18) is located in the frame assembly (20).

4. The highway roadbed slope support and reinforcement device according to claim 3 is characterized in that: The frame assembly (20) comprises a steel reinforcement frame (21); A planting area is formed inside the steel frame (21), a first concrete (22) is poured on the outer wall of the steel frame (21), and the enlarged plate (18) is located inside the first concrete (22).

5. The highway roadbed slope support reinforcement device according to claim 4 is characterized in that: The second end of the anchor rod (11) is hinged to the enlarged plate (18) via a connecting piece, and the second end of the anchor rod (11), the connecting piece and the enlarged plate (18) are all fixed in the first concrete (22).

6. The highway roadbed slope support and reinforcement device according to claim 4 is characterized in that: The frame assembly (20) further comprises a reinforcement steel frame (23); The reinforcement steel frame (23) is fixedly arranged in the reinforcement frame (21), and a plurality of the reinforcement steel frames (23) divide the planting area into a plurality of sub-areas.

7. The highway roadbed slope support reinforcement device according to claim 6 is characterized in that: Second concrete (24) is poured into the reinforcement steel frame (23).

8. The highway roadbed slope support and reinforcement device according to claim 6, characterized in that: The reinforcing steel frame (23) is arranged in an arc shape, and the protruding direction of the arc-shaped reinforcing steel frame (23) is upward.

9. The highway roadbed slope support and reinforcement device according to claim 6, characterized in that: The upper outer wall of the reinforcing steel frame (23) is provided with a first protective mesh plate (25), the end of the first protective mesh plate (25) is connected to the inner wall of the reinforcing steel frame (21), and the lower surfaces of the reinforcing steel frame (23), the first protective mesh plate (25) and the reinforcing steel frame (21) are parallel.

10. The highway roadbed slope support and reinforcement device according to any one of claims 4 to 9, characterized in that: A second protective mesh plate (26) is provided on the inner wall of the bottom end of the steel frame (21), and the second protective mesh plate (26) is parallel to the lower surface of the steel frame (21).