Steam generating equipment for compound fertilizer production
By setting up buffer boxes, partitions and other structures in the steam generation equipment for compound fertilizer production, and preheating water with steam, the problem of energy waste in existing equipment is solved and the energy utilization rate is improved.
Patent Information
- Application Number
- CN202421327755.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-12
- Publication Date
- 2025-02-28
- Estimated Expiration
- 2034-06-12
AI Technical Summary
The existing steam-generating equipment for the production of composite fertilizers has the problem of energy waste, and the excess heat is directly discharged, resulting in low energy utilization.
A steam generation equipment for compound fertilizer production was designed. By setting up a buffer box, partition board, water supply pipe, storage box, air bag, air conduit pipe and pressure relief pipe, steam is used to preheat the water in the buffer box to improve the utilization rate of steam heat.
Through the design of this equipment, direct waste of heat is avoided, energy utilization is improved, and efficient utilization of steam heat is ensured.
Smart Images

Figure CN222543807U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of compound fertilizer production, in particular to steam generating equipment for compound fertilizer production. Background Art
[0002] Compound fertilizer is a fertilizer made by chemical or mixed methods that contains any two or three of the crop nutrient elements nitrogen, phosphorus and potassium. The production of compound fertilizer is a complex process, which requires the use of steam generating equipment. Steam generators, also called steam heat source machines, are mechanical equipment that uses the thermal energy of fuel or other energy sources to heat water into hot water or steam.
[0003] For example, a steam generating device for compound fertilizer production with publication number CN215863299U has a second spring whose elasticity makes the second piston have a buffering effect. When the medium pressure is large, the medium will push the second piston upward until the second pressure relief hole leaks out, and the pressure can be released through the second pressure relief hole. When the medium pressure is too large, the second piston pushed by the medium can continue to push the first piston until the first pressure relief hole leaks out, and the pressure can be released through the first pressure relief hole, achieving a dual-stage discharge effect. However, the excess heat is directly discharged, resulting in energy waste and insufficient energy saving. For this reason, a steam generating device for compound fertilizer production is proposed for improvement. Utility Model Content
[0004] The purpose of the present invention is to solve at least one of the above technical deficiencies.
[0005] Therefore, one purpose of the utility model is to provide a steam generating device for compound fertilizer production to solve the problems mentioned in the background technology and overcome the deficiencies in the prior art.
[0006] In order to achieve the above-mentioned object, an embodiment of the utility model provides a steam generating device for compound fertilizer production, comprising a frame, a heating furnace is arranged in the frame, a fuel bin is arranged below the heating furnace, a placement plate is arranged in the fuel bin, an output pipe is fixedly connected to one side of the heating furnace, and an observation window is arranged on the front of the heating furnace;
[0007] A cache box is arranged on the top of the rack, a partition is arranged inside the cache box, a plurality of heat-conducting rods are vertically arranged on the partition, a water pipe is arranged between the cache box and the heating furnace, and a water inlet pipe is arranged on the cache box;
[0008] A containing box is arranged on one side of the cache box, an air bag is arranged in the containing box, an air guide pipe is arranged between the air bag and the cache box, and a pressure relief pipe with an air outlet extending into the air bag is arranged on the top of the heating furnace.
[0009] Preferably, any of the above schemes is that a base is provided at the bottom of the frame, and an air pressure display component is provided at the front of the heating furnace.
[0010] Preferably, any of the above schemes is that a heating assembly is arranged in the frame around the heating furnace, and mesh holes are opened on the placement plate.
[0011] The above technical solution is adopted: the frame provides support for the heating furnace to ensure the stability of the heating furnace. A base is set at the bottom of the frame to improve the stability of the frame. A heating component is set outside the heating furnace to facilitate heating of the heating furnace. The fuel bin provides space for fuel combustion, and the placement plate provides a placement platform for solid fuel. Meshes are opened on the placement plate to facilitate air contact with solid fuel from the bottom, thereby improving the combustion efficiency of fixed fuel. An output pipe is set on the heating furnace, and the output pipe is used to connect with the external compound fertilizer production component to provide steam to the compound fertilizer production component.
[0012] Preferably, in any of the above schemes, flanges are provided at the ends of the output pipe and the water inlet pipe, and the portion of the water delivery pipe in the buffer box is arranged above the partition.
[0013] Preferably, in any of the above schemes, the portion of the air duct in the cache box is arranged below the partition, and the water inlet pipe is arranged above the partition.
[0014] The above technical solution is adopted: a flange is set at the end of the output pipe to facilitate its connection with the external structure. An observation window is set on the front of the heating furnace to facilitate the staff to observe the working conditions inside the heating furnace. The cache box is used to cache water, and a partition is set inside it to divide the space inside the cache box into upper and lower parts. Among them, the upper part is used to store water, and the lower part is used to inject steam, and the steam is used to preheat the water in the upper part of the cache box. The heat conducting rod connects the upper and lower parts of the partition, which facilitates the rapid heat conduction of the steam to the water in the upper part of the cache box, thereby improving the utilization rate of the steam heat.
[0015] Preferably, any of the above schemes is provided with a valve on the water pipe, and a through hole is formed at the lower portion of the side of the cache box away from the air duct.
[0016] Preferably, any of the above schemes is that a spring is provided at the top of the pressure relief pipe and a piston plate is provided at the bottom of the spring, and an air outlet is opened on the side of the top of the pressure relief pipe.
[0017] The above technical solution is adopted: the water pipe connects the cache box and the heating furnace, and the water in the cache box can be introduced into the heating furnace. The containing box provides a storage space for the airbag, and the airbag can elastically collect the steam flowing out of the pressure relief pipe, and when there is a lot of steam in it, the steam is transported to the cache box through the air guide pipe. Then, this part of the steam can be used to preheat the water in the cache box. A spring, a piston plate and other structures are arranged in the pressure relief pipe. When the air pressure in the heating furnace is high, the steam pushes the piston plate up and squeezes the spring, so that the piston plate moves up, and then the steam flows into the airbag.
[0018] Compared with the prior art, the advantages and beneficial effects of the utility model are:
[0019] The steam generating equipment for compound fertilizer production is provided with structures such as a buffer box, a partition, a water pipe, a containing box, an air bag, an air duct, and a pressure relief pipe. When the air pressure in the heating furnace is high, the steam pushes the piston plate upward and squeezes the spring, so that the piston plate moves upward, and then the steam flows into the air bag. The air bag elastically collects the steam flowing out of the pressure relief pipe, and when there is more steam in it, it conveys the steam to the buffer box through the air duct. Then, this part of the steam is used to preheat the water in the buffer box. The heat conducting rod connects the upper and lower parts of the partition, which facilitates the rapid heat conduction of the steam to the water on the upper part of the buffer box, thereby improving the utilization rate of the steam heat. The direct waste of heat in this part is avoided, and the energy utilization rate is improved.
[0020] Additional aspects and advantages of the present invention will be given in part in the following description and in part will become apparent from the following description or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0022] Figure 1 This is a schematic diagram of the structure of the utility model from a first perspective;
[0023] Figure 2 This is a schematic diagram of the structure of the utility model from a second viewing angle;
[0024] Figure 3 It is a schematic diagram of the cutaway structure of the utility model;
[0025] Figure 4 For the utility model Figure 3 Schematic diagram of the structure at A in the middle.
[0026] In the figure: 1-frame, 2-heating furnace, 3-fuel bin, 4-placing plate, 5-output pipe, 6-observation window, 7-cache box, 8-partition, 9-heat conduction rod, 10-water pipe, 11-containing box, 12-air pipe, 13-air bag, 14-pressure relief pipe, 15-water inlet pipe. DETAILED DESCRIPTION
[0027] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0028] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0029] like Figures 1 to 4 As shown, the utility model comprises a frame 1, a heating furnace 2 is arranged in the frame 1, a fuel bin 3 is arranged below the heating furnace 2, a placement plate 4 is arranged in the fuel bin 3, an output pipe 5 is fixedly connected to one side of the heating furnace 2, and an observation window 6 is arranged on the front of the heating furnace 2;
[0030] A cache box 7 is arranged on the top of the rack 1, a partition 8 is arranged inside the cache box 7, a plurality of heat conducting rods 9 are vertically arranged on the partition 8, a water delivery pipe 10 is arranged between the cache box 7 and the heating furnace 2, and a water inlet pipe 15 is arranged on the cache box 7;
[0031] A receiving box 11 is provided on one side of the cache box 7, an air bag 13 is provided in the receiving box 11, an air guide pipe 12 is provided between the air bag 13 and the cache box 7, and a pressure relief pipe 14 with an air outlet extending to the air bag 13 is provided on the top of the heating furnace 2.
[0032] Embodiment 1: A base is provided at the bottom of the frame 1, and a pressure display assembly is provided on the front of the heating furnace 2. A heating assembly is provided in the frame 1 around the heating furnace 2, and a mesh is provided on the placement plate 4. The frame 1 provides support for the heating furnace 2 to ensure the stability of the heating furnace 2. A base is provided at the bottom of the frame 1 to improve the stability of the frame 1. A heating assembly is provided on the outside of the heating furnace 2 to facilitate heating of the heating furnace 2. The fuel bin 3 provides space for fuel combustion, and the placement plate 4 provides a placement platform for solid fuel. A mesh is provided on the placement plate 4 to facilitate air contact with the solid fuel from the bottom, thereby improving the combustion efficiency of the fixed fuel. An output pipe 5 is provided on the heating furnace 2, and the output pipe 5 is used to connect with an external compound fertilizer production assembly to provide steam to the compound fertilizer production assembly.
[0033] Embodiment 2: The ends of the output pipe 5 and the water inlet pipe 15 are both provided with flanges, and the portion of the water delivery pipe 10 in the cache box 7 is arranged above the partition 8. The portion of the air duct 12 in the cache box 7 is arranged below the partition 8, and the water inlet pipe 15 is arranged above the partition 8. A flange is arranged at the end of the output pipe 5 to facilitate its connection with the external structure. An observation window 6 is arranged on the front of the heating furnace 2 to facilitate the staff to observe the working conditions in the heating furnace 2. The cache box 7 is used to cache water, and a partition 8 is arranged therein, so that the space in the cache box 7 is divided into an upper and lower part. Among them, the upper part is used to store water, and the lower part is used to inject steam, and the steam is used to preheat the water in the upper part of the cache box 7. The heat conducting rod 9 connects the upper and lower parts of the partition 8, which facilitates the rapid heat transfer of the steam heat to the water in the upper part of the cache box 7, thereby improving the utilization rate of the steam heat.
[0034] Embodiment 3: A valve is provided on the water pipe 10, and a through hole is provided at the lower part of the side of the buffer box 7 away from the air guide pipe 12. A spring is provided at the top of the pressure relief pipe 14 and a piston plate is provided at the bottom of the spring, and an air outlet is provided on the side of the top of the pressure relief pipe 14. The water pipe 10 connects the buffer box 7 and the heating furnace 2, and can guide the water in the buffer box 7 into the heating furnace 2. The receiving box 11 provides a storage space for the airbag 13, and the airbag 13 can elastically collect the steam flowing out of the pressure relief pipe 14, and transport the steam to the buffer box 7 through the air guide pipe 12 when there is more steam in it. Then, this part of the steam can be used to preheat the water in the buffer box 7. A spring, a piston plate and other structures are provided in the pressure relief pipe 14. When the air pressure in the heating furnace 2 is high, the steam pushes the piston plate up and squeezes the spring, so that the piston plate moves up, and then the steam flows into the airbag 13.
[0035] The working principle of the utility model is as follows:
[0036] S1, using the output pipe 5 and the water inlet pipe 15 to connect with the external related structure, injecting water into the heating furnace 2, starting the heating component or using solid fuel to burn on the placement plate 4 to heat the heating furnace 2, so that steam is generated in the heating furnace 2;
[0037] S2, when the air pressure in the heating furnace 2 is high, the steam pushes the piston plate upward and squeezes the spring, causing the piston plate to move upward, thereby causing the steam to flow into the airbag 13;
[0038] S3, the air bag 13 elastically collects the steam flowing out of the pressure relief pipe 14, and when there is more steam in it, it is transported to the buffer box 7 through the air guide pipe 12. Then, this part of the steam is used to preheat the water in the buffer box 7.
[0039] Compared with the prior art, the present invention has the following beneficial effects:
[0040] The steam generating equipment for compound fertilizer production is provided with structures such as a buffer box 7, a partition 8, a water pipe 10, a containing box 11, an air bag 13, an air guide pipe 12 and a pressure relief pipe 14. When the air pressure in the heating furnace 2 is high, the steam pushes the piston plate to move up and squeezes the spring, so that the piston plate moves up, and then the steam flows into the air bag 13. The air bag 13 elastically collects the steam flowing out of the pressure relief pipe 14, and when there is more steam in it, the steam is transported to the buffer box 7 through the air guide pipe 12. Then, this part of the steam is used to preheat the water in the buffer box 7. The heat conducting rod 9 connects the upper and lower parts of the partition 8, which facilitates the rapid heat conduction of the steam to the water on the upper part of the buffer box 7, thereby improving the utilization rate of the steam heat. The direct waste of heat in this part is avoided, and the energy utilization rate is improved.
Claims
1. A steam generating device for compound fertilizer production, comprising a frame (1); characterized in that: A heating furnace (2) is arranged in the frame (1), a fuel bin (3) is arranged below the heating furnace (2), a placement plate (4) is arranged in the fuel bin (3), an output pipe (5) is fixedly connected to one side of the heating furnace (2), and an observation window (6) is arranged on the front of the heating furnace (2); a cache box (7) is arranged on the top of the frame (1), a partition (8) is arranged in the cache box (7), a plurality of heat conducting rods (9) are vertically arranged on the partition (8), a water pipe (10) is arranged between the cache box (7) and the heating furnace (2), and a water inlet pipe (15) is arranged on the top of the cache box (7); A containing box (11) is provided on one side of the cache box (7), an air bag (13) is provided in the containing box (11), an air guide pipe (12) is provided between the air bag (13) and the cache box (7), and a pressure relief pipe (14) with an air outlet extending into the air bag (13) is provided on the top of the heating furnace (2).
2. A steam generating device for compound fertilizer production as claimed in claim 1, characterized in that: The bottom of the frame (1) is provided with a base, and the front of the heating furnace (2) is provided with an air pressure display component.
3. A steam generating device for compound fertilizer production as claimed in claim 2, characterized in that: A heating component is arranged in the frame (1) around the heating furnace (2), and mesh holes are provided on the placement plate (4).
4. A steam generating device for compound fertilizer production as claimed in claim 3, characterized in that: The ends of the output pipe (5) and the water inlet pipe (15) are both provided with flanges, and the portion of the water delivery pipe (10) located in the buffer box (7) is arranged above the partition (8).
5. A steam generating device for compound fertilizer production as claimed in claim 4, characterized in that: The portion of the air guide pipe (12) located in the buffer box (7) is arranged below the partition (8), and the water inlet pipe (15) is arranged above the partition (8).
6. A steam generating device for compound fertilizer production as claimed in claim 5, characterized in that: The water delivery pipe (10) is provided with a valve, and a through hole is provided at the lower portion of the buffer box (7) on the side away from the air guide pipe (12).
7. A steam generating device for compound fertilizer production as claimed in claim 6, characterized in that: A spring is arranged at the top of the pressure relief pipe (14) and a piston plate is arranged at the bottom of the spring. An air outlet is opened on the side of the top of the pressure relief pipe (14).