Steel pipe pressure resistance detection device
By designing a steel pipe pressure resistance detection device that combines clamps, end plates, air pumps, etc., the problem of long detection time of traditional devices is solved, rapid pressure resistance detection of steel pipes is achieved, and detection efficiency is improved.
Patent Information
- Application Number
- CN202421137293.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-23
- Publication Date
- 2025-03-07
- Estimated Expiration
- 2034-05-23
AI Technical Summary
Traditional steel pipe pressure resistance detection devices require the flange to be fixed first, and then the air-tight device is installed, resulting in a long detection time and reducing the detection efficiency.
A steel pipe pressure resistance detection device is designed, using a combination of a clamp, a first end plate, a second end plate, an air pump, a gas pipe, a sealing plug and a support column. The end plate is quickly installed through the clamp, and gas injected into the air pump for pressure resistance detection.
The rapid sealing and pressure resistance detection of steel pipes are realized, which improves detection efficiency and reduces detection time.
Smart Images

Figure CN222579551U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pressure resistance detection devices, in particular to a steel pipe pressure resistance detection device. Background Art
[0002] A steel pipe is a long strip of steel with a hollow cross-section and no seams around it. To ensure the quality of the steel pipe, it is necessary to conduct a pressure test on the steel pipe before it is put into normal use. This is to ensure the service life of the seamless steel pipe and prevent the seamless steel pipe from malfunctioning and injuring staff during use. The steel pipe pressure test often uses the airtight method to test the steel pipe's pressure resistance, which requires sealing both ends of the steel pipe and injecting gas.
[0003] In the process of realizing the utility model, the inventors found that there are at least the following problems in this technology: when using the traditional device, it is necessary to first fix the flange on the steel pipe and then fix the airtight device on the flange. However, this method will cause the steel pipe inspection to take a long time, thereby reducing the inspection efficiency of the device. Utility Model Content
[0004] In order to improve the problem that the above-mentioned traditional device needs to first fix a flange on the steel pipe and then fix the airtight device on the flange when in use, thereby reducing the detection efficiency of the device, the utility model provides a steel pipe pressure resistance detection device.
[0005] The utility model provides a steel pipe pressure resistance detection device, which adopts the following technical solutions:
[0006] A steel pipe pressure resistance detection device comprises a first end plate and a second end plate, the opposite surfaces of the first end plate and the second end plate are both installed with clamping members for clamping the steel pipe, the outer surface of the first end plate is installed with an air pump, the inner surface of the first end plate is installed with an air guide tube, the air guide tube is installed at the air outlet end of the air pump, the inner surface of the second end plate is installed with a support column, the outside of the air guide tube and the support column are both sleeved with sealing plugs, and limiting members are respectively arranged between the first end plate and the second end plate and the sealing plugs.
[0007] By adopting the above technical solution, the first end plate and the second end plate are located at the two ends of the steel pipe. The staff drives the first end plate and the second end plate to move toward the direction of the steel pipe until the sealing plug contacts the end of the steel pipe and clamps the steel pipe through the clamping piece, so that the first end plate and the second end plate can be quickly installed on the two ends of the steel pipe. Then the air pump injects gas into the steel pipe through the air guide pipe to perform pressure resistance test on the steel pipe, thereby achieving the purpose of quickly sealing the steel pipe by the device and improving the detection efficiency of the device.
[0008] Optionally, the clamping member includes a support ring, which is sleeved on the outside of the steel pipe, and a plurality of electric hydraulic telescopic rods are installed at the edges of the opposite surfaces of the first end plate and the second end plate, and a chuck is installed at the telescopic ends of the plurality of electric hydraulic telescopic rods, and the middle part of the chuck is installed on the support ring.
[0009] By adopting the above technical solution, the electric hydraulic telescopic rod rotates with the chuck when it contracts, so that the chuck clamps the steel pipe at one end away from the electric hydraulic telescopic rod, which facilitates the rapid installation of the first end plate and the second end plate at both ends of the steel pipe.
[0010] Optionally, an anti-slip groove is provided at one end of the clamp away from the telescopic end of the electric hydraulic telescopic rod.
[0011] By adopting the above technical solution and setting the anti-slip groove, the friction between the chuck and the steel pipe is increased, and sliding between the steel pipe and the chuck during the clamping process is avoided as much as possible.
[0012] Optionally, five clamping members are provided on the first end plate and the second end plate, and the support ring, the clamp head, the electric hydraulic telescopic rod and the anti-slip groove correspond to each other one by one.
[0013] By adopting the above technical solution, the steel pipe is clamped simultaneously by multiple clamping members, so that the steel pipe is clamped more firmly, thereby improving the stability of the device during the detection process.
[0014] Optionally, the limiting member includes a plurality of limiting rods, which are installed on opposite surfaces of the first end plate and the second end plate, and a plurality of limiting holes are provided on the surface of the sealing plug away from one end of the steel pipe, and the plurality of limiting rods are installed one by one inside the plurality of limiting holes.
[0015] By adopting the above technical solution, the stability of the sealing plug installed on the surfaces of the first end plate and the second end plate is increased.
[0016] Optionally, the sealing plug is a half-spherical structure.
[0017] By adopting the above technical solution, it is convenient to seal the end of the steel pipe through the sealing plug.
[0018] In summary, the present invention has at least one of the following beneficial effects:
[0019] Through the coordinated arrangement of the clamping member, the first end plate, the second end plate, the air pump, the air duct, the sealing plug and the support column, the clamping member facilitates the rapid installation of the first end plate and the second end plate on both ends of the steel pipe, and enables the sealing plug to seal the ends of the steel pipe, making it convenient for the air pump to inject gas into the steel pipe through the air duct and perform pressure resistance testing on the steel pipe, thereby improving the detection efficiency of the device.
[0020] By inserting a plurality of limiting plug rods into the limiting plug holes, the first end plate and the left end sealing plug as well as the second end plate and the right end sealing plug can be limited, thereby increasing the stability of the sealing plugs installed on the surfaces of the first end plate and the second end plate. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0022] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;
[0023] Figure 2 It is a partial cross-sectional schematic diagram of the utility model;
[0024] Figure 3 This is a schematic diagram of the structure of the clamping member, the first end plate and the air pump of the utility model;
[0025] Figure 4 It is a schematic diagram of the clamping member and the second end plate of the utility model;
[0026] Figure 5 For the utility model Figure 2 The enlarged structural diagram at A in the middle;
[0027] Figure 6 It is a schematic diagram of the chuck of the utility model.
[0028] In the figure: 1. Clamping member; 11. Support ring; 12. Clamp; 13. Electric hydraulic telescopic rod; 14. Anti-slip groove; 2. First end plate; 3. Second end plate; 4. Air pump; 5. Air guide tube; 6. Sealing plug; 7. Support column; 8. Limiting rod; 9. Limiting hole. DETAILED DESCRIPTION
[0029] The following is combined with Figure 1-6 The utility model is described in further detail.
[0030] Please refer to the attached figure in the instruction manual Figure 1 , Figure 2 , Figure 3 and Figure 4 The utility model provides an embodiment: a steel pipe pressure resistance detection device, comprising a first end plate 2 and a second end plate 3, the opposite surfaces of the first end plate 2 and the second end plate 3 are both installed with a clamping member 1 for clamping the steel pipe, the clamping member 1 comprises a support ring 11, the support ring 11 is sleeved on the outside of the steel pipe, a plurality of electric hydraulic telescopic rods 13 are rotatably installed at the edges of the opposite surfaces of the first end plate 2 and the second end plate 3, the telescopic ends of the plurality of electric hydraulic telescopic rods 13 are rotatably installed with a chuck 12, and the middle part of the chuck 12 is rotatably installed on the support ring 11. When the electric hydraulic telescopic rod 13 is contracted, the chuck 12 rotates with it, so that the chuck 12 is away from one end of the electric hydraulic telescopic rod 13 to clamp the steel pipe, which is convenient for quickly installing the first end plate 2 and the second end plate 3 at both ends of the steel pipe.
[0031] Please refer to the attached figure in the instruction manual Figure 1 , Figure 2 and Figure 6 The end of the chuck 12 away from the telescopic end of the electric hydraulic telescopic rod 13 is provided with a plurality of anti-skid grooves 14. The anti-skid grooves 14 are provided to increase the friction between the chuck 12 and the steel pipe, and to avoid sliding between the steel pipe and the chuck 12 during the clamping process.
[0032] Please refer to the attached figure in the instruction manual Figure 1 , Figure 3 and Figure 4 There are five clamping members 1 on each of the first end plate 2 and the second end plate 3, and the support ring 11, the clamp head 12, the electric hydraulic telescopic rod 13 and the anti-slip groove 14 correspond to each other. The steel pipe is clamped more firmly by multiple clamping members 1 at the same time, thereby improving the stability of the device during the detection process.
[0033] Please refer to the attached figure in the instruction manual Figure 1 , Figure 2 and Figure 4 The air pump 4 is fixedly mounted on the outer surface of the first end plate 2, the air guide tube 5 is fixedly mounted on the inner surface of the first end plate 2, and the air guide tube 5 is installed at the air outlet of the air pump 4. The support column 7 is fixedly mounted on the inner surface of the second end plate 3. The air guide tube 5 and the support column 7 are both fixedly sleeved with a sealing plug 6 on the outside. The sealing plug 6 is a half-spherical structure. It is convenient to seal the end of the steel pipe through the sealing plug 6.
[0034] Please refer to the attached figure in the instruction manual Figure 1 , Figure 5 and Figure 6A limiting member is provided between the first end plate 2 and the second end plate 3 and the sealing plug 6, and the limiting member includes a plurality of limiting plug rods 8, and the plurality of limiting plug rods 8 are fixedly installed on the opposite surfaces of the first end plate 2 and the second end plate 3. A plurality of limiting plug holes 9 are provided on the surface of the sealing plug 6 away from one end of the steel pipe, and the plurality of limiting plug rods 8 are correspondingly installed inside the plurality of limiting plug holes 9. The stability of the sealing plug 6 installed on the surface of the first end plate 2 and the second end plate 3 is increased.
[0035] Working principle: When using the device, the steel pipe is passed through the support ring 11 so that the first end plate 2 and the second end plate 3 are located at both ends of the steel pipe. The staff drives the first end plate 2 and the second end plate 3 to move toward the direction of the steel pipe until the sealing plug 6 contacts the end of the steel pipe. Then an external power supply is connected to control the telescopic end of the electric hydraulic telescopic rod 13 to retract. At this time, the electric hydraulic telescopic rod 13 rotates around the support ring 11 with the chuck 12, and the steel pipe is clamped by the chuck 12. When the electric hydraulic telescopic rod 13 continues to retract, the sealing plug 6 seals the end of the steel pipe.
[0036] When conducting a pressure resistance test, the air pump 4 is connected to an external power source and started. At this time, the air outlet of the air pump 4 injects gas into the steel pipe through the air pipe 5. When the air pump 4 stops pressurizing, the pressure reading meter provided on the air pump 4 is used to monitor the air pressure in the steel pipe. By judging whether the value changes, it is determined whether the steel pipe is leaking, thereby realizing the pressure resistance test of the steel pipe.
[0037] The above are all preferred embodiments of the present utility model, and are not intended to limit the protection scope of the present utility model. Therefore, any equivalent changes made based on the structure, shape, and principle of the present utility model should be included in the protection scope of the present utility model.
Claims
1. A steel pipe pressure resistance detection device, comprising a first end plate (2) and a second end plate (3), characterized in that: Clamping members (1) for clamping steel pipes are installed on the opposite surfaces of the first end plate (2) and the second end plate (3); an air pump (4) is installed on the outer surface of the first end plate (2); an air guide tube (5) is installed on the inner surface of the first end plate (2); the air guide tube (5) is installed at the air outlet end of the air pump (4); a support column (7) is installed on the inner surface of the second end plate (3); the outsides of the air guide tube (5) and the support column (7) are both sleeved with sealing plugs (6); and limiting members are respectively arranged between the first end plate (2) and the second end plate (3) and the sealing plugs (6).
2. A steel pipe pressure detection device according to claim 1, characterized in that: The clamping member (1) comprises a support ring (11), the support ring (11) being sleeved on the outer side of the steel pipe, a plurality of electric hydraulic telescopic rods (13) being installed at the edges of the opposing surfaces of the first end plate (2) and the second end plate (3), a plurality of electric hydraulic telescopic rods (13) being installed at the telescopic ends of the plurality of electric hydraulic telescopic rods (13), and a chuck (12) being installed at the middle part of the chuck (12) on the support ring (11).
3. A steel pipe pressure resistance detection device according to claim 2, characterized in that: An anti-slip groove (14) is provided at one end of the clamp (12) away from the telescopic end of the electric hydraulic telescopic rod (13).
4. A steel pipe pressure resistance detection device according to claim 3, characterized in that: The first end plate (2) and the second end plate (3) are each provided with five clamping members (1), and the support ring (11), the clamping head (12), the electric hydraulic telescopic rod (13) and the anti-slip groove (14) correspond to each other one by one.
5. A steel pipe pressure resistance detection device according to claim 1, characterized in that: The limiting member comprises a plurality of limiting plug rods (8), the plurality of limiting plug rods (8) being mounted on opposite surfaces of the first end plate (2) and the second end plate (3), a plurality of limiting plug holes (9) being formed on a surface of the sealing plug (6) away from one end of the steel pipe, and the plurality of limiting plug rods (8) being mounted in a one-to-one correspondence inside the plurality of limiting plug holes (9).
6. A steel pipe pressure resistance detection device according to claim 1, characterized in that: The sealing plug (6) is a half-spherical structure.