Overhead temporary channel structure
By designing an overhead temporary passage structure, the main beam of the passage and the passage unit plate span the space clearance and the enclosure assembly provide lateral protection, the problem of the space clearance at the construction site affecting passage, and safe and efficient construction passage is achieved.
Patent Information
- Application Number
- CN202420440113.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-07
- Publication Date
- 2025-03-11
- Estimated Expiration
- 2034-03-07
AI Technical Summary
At the construction site, the space clearance between the floor slabs on both sides affects the passage of construction personnel and organizations. The existing technology requires bypassing or erecting floor-standing or cantilever scaffolding, resulting in long working hours, high manpower, inconvenient disassembly and assembly, affecting construction progress and safety.
An overhead temporary channel structure is designed, including a channel main beam, a sealing assembly and a channel unit plate. A pair of channel main beams span the space gap, and a channel unit plate and a sealing assembly are laid thereon to form a safe passage platform.
It realizes safe passage between the floor slabs on both sides, saves manpower and labor, is convenient to disassemble and assemble, and does not occupy the space below the space clearance, improving construction efficiency and safety.
Smart Images

Figure CN222595473U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to an overhead temporary passage structure. Background Art
[0002] At the construction site of a building, there is often a design where the floor is interrupted or cantilevered, that is, there is a certain cantilever gap between the floor slabs on both sides. This cantilever gap affects the walking of construction personnel and organizations between the floor slab areas on both sides. In order to ensure construction safety, it is usually necessary to bypass the cantilever gap, which has a certain impact on the construction; or to set up floor-standing scaffolding, cantilever scaffolding and other supports at the cantilever gap to form a passage. The erection of the scaffolding consumes a lot of man-hours and manpower, and it is inconvenient to disassemble and assemble, which affects the construction progress and also occupies the space under the cantilever gap. Therefore, it is necessary to provide an overhead temporary passage structure that can solve the problem in the prior art that the cantilever gap between the floor slabs on both sides affects the passage of construction personnel and organizations. Summary of the invention
[0003] The utility model aims to provide an overhead temporary passage structure, which can solve the problem in the prior art that the space between the floor slabs on both sides affects the passage of construction personnel and organizations.
[0004] The utility model is achieved in this way:
[0005] A temporary overhead passage structure comprises a passage main beam, a protective enclosure component and a passage unit plate; the two ends of the passage main beam are respectively erected on the floor slabs on both sides, so that a pair of passage main beams are arranged in parallel and straddle the cantilever gap between the floor slabs on both sides; a number of passage unit plates are sequentially spliced end to end to form a passage plate, and the passage plate is laid on a pair of passage main beams to form a passage between the floor slabs on both sides; a pair of protective enclosure components are respectively vertically arranged on the pair of passage main beams, and the two ends of each set of protective enclosure components extend to the floor slabs on both sides.
[0006] Each of the channel main beams comprises a main beam and a bearing beam; both ends of the main beam are respectively overlapped on the floor slabs on both sides, and the main beam spans the cantilever gap; a pair of channel main beams are respectively provided with bearing beams on the opposite sides of the main beams, and the channel unit plates are laid on the pair of bearing beams.
[0007] The channel unit plate is provided with downwardly bent portions at both side edges, and the outer walls of the downwardly bent portions on both sides are respectively fitted on one side of a pair of main beams arranged opposite to each other, and the bottom of the downwardly bent portions abuts against the load-bearing beam, so that the top surface of the channel unit plate is flush with the top surface of the main beam.
[0008] A unit plate beam is arranged between the bottom surface of the channel unit plate and the inner walls of the lower curved parts on both sides thereof. The unit plate beam is arranged perpendicular to a pair of main beams, and both ends of the unit plate beam are placed on the bearing beams of the pair of main beams.
[0009] A hanging plate is formed at one end of the channel unit plate, and a hanging groove is formed at the other end of the channel unit plate. The hanging plate can be matched and inserted into the hanging groove, so that two adjacent channel unit plates are spliced into a flat plate structure.
[0010] Rope passing holes are respectively formed at both ends of the hanging plate, and the pulling rope is passed through the rope passing holes.
[0011] A plurality of main beam mounting holes are arranged at intervals on the main beam, and the enclosure assembly is fixedly mounted on the main beam through the main beam mounting holes by means of mounting pieces.
[0012] The enclosure assembly comprises columns and fences. The columns are vertically mounted on the main beam through the main beam mounting holes via mounting pieces, and the fences are mounted between every two adjacent columns.
[0013] Compared with the prior art, the utility model has the following beneficial effects:
[0014] 1. The utility model is provided with a channel main beam and a channel unit plate. A pair of channel main beams are arranged across the cantilever gap between the floor slabs on both sides, and both ends of the pair of channel main beams are overlapped on the floor slabs on both sides. A plurality of channel unit plates are laid on the pair of channel main beams to form a channel plate. Both ends of the channel plate extend to the floor slabs on both sides, thereby forming a safe passage platform between the floor slabs on both sides. There is no need to take a detour or to set up a ground-based or cantilevered scaffolding below, which saves manpower and working hours, is convenient to disassemble and assemble, and is more convenient to construct. It does not occupy the space below the cantilever gap, and is particularly suitable for the ground structure construction stage.
[0015] 2. The utility model is provided with a protective component, which is installed on a pair of channel main beams to provide lateral protection for the passage platform, preventing construction personnel or organizations from falling accidentally during passage, which is conducive to further improving construction safety.
[0016] 3. The utility model is provided with hanging plates, hanging grooves and rope-threading holes, so that two adjacent passage unit boards can be modularly spliced by matching and plugging the hanging plates and hanging grooves. The splicing parts are reliably connected, and the passage unit boards can be laid by pulling the pulling ropes on the rope-threading holes while splicing to form an integral passage board. The splicing, paving and disassembly are convenient, which is conducive to improving construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a main cross-sectional view of the overhead temporary passage structure of the utility model;
[0018] Figure 2 It is a side cross-sectional view of the overhead temporary passage structure of the utility model;
[0019] Figure 3 It is a top view of the overhead temporary passage structure of the utility model;
[0020] Figure 4 It is a top view of a channel unit plate in the overhead temporary channel structure of the utility model;
[0021] Figure 5 It is a bottom view of a channel unit plate in the overhead temporary channel structure of the utility model;
[0022] Figure 6 It is a front view of a channel unit plate in the overhead temporary channel structure of the utility model;
[0023] Figure 7 It is a front view of the splicing of adjacent channel unit plates in the overhead temporary channel structure of the utility model;
[0024] Figure 8 It is a top view of the main beam of the passage in the overhead temporary passage structure of the utility model;
[0025] Fig. 9 It is a front view of a channel main beam in an overhead temporary channel structure of the utility model.
[0026] In the figure, 1 is the channel main beam, 101 is the main beam, 102 is the load-bearing beam, 2 is the enclosure assembly, 201 is the column, 202 is the fence, 3 is the floor slab, 301 is the cantilever gap, 4 is the channel unit plate, 401 is the lower bent part, 5 is the unit plate beam, 6 is the main beam mounting hole, 7 is the hanging plate, 8 is the hanging groove, and 9 is the rope threading hole. DETAILED DESCRIPTION
[0027] The utility model is further described below in conjunction with the accompanying drawings and specific embodiments.
[0028] Please see attached Figure 1 To Attachment Figure 3 A temporary overhead passage structure comprises a passage main beam 1, a protective enclosure component 2 and a passage unit plate 4; the two ends of the passage main beam 1 are respectively erected on the floor slabs 3 on both sides, so that a pair of passage main beams 1 are arranged in parallel and straddle the cantilever gap 301 between the floor slabs 3 on both sides; a plurality of passage unit plates 4 are spliced end to end in sequence to form a passage plate, and the passage plate is laid on a pair of passage main beams 1 to form a passage between the floor slabs 3 on both sides; a pair of protective enclosure components 2 are respectively vertically arranged on a pair of passage main beams 1, and the two ends of each group of protective enclosure components 2 extend to the floor slabs 3 on both sides.
[0029] A pair of channel main beams 1 are overlapped between two floor slabs 3 to support the channel plate formed by splicing a number of channel unit plates 4, so that the channel plate across the cantilever gap 301 provides an overhead passage platform for the cantilever gap 301 between the two side floor slabs 3, and transfers the load during passage to the two side floor slabs 3 to ensure the safe passage of construction personnel and organizations. At the same time, the enclosure components 2 on the pair of channel main beams 1 provide lateral protection, and the enclosure components 2 extend to the two side floor slabs 3 to ensure the effectiveness of protection and prevent personnel or equipment on the channel plate from falling.
[0030] Please see attached Figure 8 and attached Fig. 9 Each of the channel main beams 1 includes a main beam 101 and a load-bearing beam 102; the two ends of the main beam 101 are respectively overlapped on the floor slabs 3 on both sides, and the main beam 101 spans the cantilever gap 301; a pair of channel main beams 1 are respectively provided with load-bearing beams 102 on the opposite sides of the main beams 101, and the channel unit plates 4 are laid on the pair of load-bearing beams 102.
[0031] Preferably, the main beam 101 can be made of square steel ("U" shaped cross section), and the specifications and length of the square steel can be adaptively adjusted according to actual use requirements to ensure the bearing capacity of the channel. The load-bearing beam 102 can be welded to the main beam 101 using steel plates or angle steels ("L" shaped cross section or "I" shaped cross section), and the bottom surface of the load-bearing beam 102 is flush with the bottom surface of the main beam 101, and is used to bear the channel unit plate 4.
[0032] Please see attached Figure 4 To Attachment Figure 7 The channel unit plate 4 is provided with downwardly bent portions 401 at both side edges, and the outer walls of the downwardly bent portions 401 on both sides are respectively attached to one side of a pair of main beams 101 that are oppositely arranged, and the bottom of the downwardly bent portions 401 is abutted against the load-bearing beam 102, so that the top surface of the channel unit plate 4 is flush with the top surface of the main beam 101.
[0033] Preferably, the channel unit plate 4 can be made of patterned steel plate, and the edges on both sides are bent downward by 90° to form a lower bend 401, and the height of the lower bend 401 is equal to the thickness of the main beam 101 minus the thickness of the load-bearing beam 102, so as to ensure that when the lower bend 401 is overlapped on the load-bearing beam 102, the top surface of the channel unit plate 4 is flush with the top surface of the main beam 101.
[0034] The outer wall spacing of the lower bent parts 401 on both sides of the channel unit plate 4 is basically consistent with the spacing of the opposite sides of a pair of main beams 101, so that when the channel unit plate 4 is laid on a pair of bearing beams 102, there will be no large gap between it and the channel main beam 1, thereby ensuring the safety of the channel unit plate 4.
[0035] Please see attached Figure 4 To Attachment Figure 7 A unit plate beam 5 is provided between the bottom surface of the channel unit plate 4 and the inner wall of the lower bent portion 401 on both sides thereof. The unit plate beam 5 is arranged perpendicular to a pair of main beams 101 , and both ends of the unit plate beam 5 are placed on the load-bearing beams 102 of the pair of main beams 101 .
[0036] Preferably, the unit plate beam 5 can be made of a steel pipe with a rectangular cross section, and the length of the unit plate beam 5 is consistent with the inner wall spacing of the lower bent portion 401 on both sides of the channel unit plate 4, which is used to enhance the structural strength and bearing capacity of the channel unit plate 4. According to the size of the channel unit plate 4, three unit plate beams 5 can be arranged at equal intervals.
[0037] Please see attached Figure 4 To Attachment Figure 7 A hanging plate 7 is formed at one end of the channel unit plate 4, and a hanging groove 8 is formed at the other end of the channel unit plate 4. The hanging plate 7 can be matched and inserted into the hanging groove 8, so that two adjacent channel unit plates 4 are spliced into a flat plate structure.
[0038] Preferably, the hanging plate 7 is in an inverted L-shaped structure, and the hanging groove 8 is in a U-shaped structure. By matching and plugging the hanging plate 7 and the hanging groove 8, the splicing convenience and efficiency of the two adjacent channel unit plates 4 can be improved, and the splicing position connection is reliable, ensuring the integrity and bearing capacity of the channel plate.
[0039] Please see attached Figure 4 To Attachment Figure 7 The two ends of the hanging plate 7 are respectively formed with rope holes 9, and the pulling rope is passed through the rope holes 9.
[0040] Preferably, the length of the hook of the hanging plate 7 is consistent with the length of the hanging groove 8, and is slightly smaller than the length of the hanging plate 7, so that a certain space is reserved at both ends of the hanging plate 7 to set the rope threading hole 9. The steel wire rope is threaded in the rope threading hole 9, and the threading of the steel wire rope will not interfere with the plugging of the hanging plate 7 and the hanging groove 8. After the steel wire rope is threaded, it is convenient for construction workers to pull the channel unit plate 4 and lay the channel unit plate 4 on a pair of channel main beams 1, which is convenient for disassembly and assembly and has high safety.
[0041] The channel unit plate 4, the lower bent portion 401, the hanging plate 7 and the hanging groove 8 can be integrally formed by a mold, and are easy to be standardized and mass-produced.
[0042] Please see attached Figure 8 A plurality of main beam mounting holes 6 are provided at intervals on the main beam 101 , and the enclosure assembly 2 is fixedly mounted on the main beam 101 through the main beam mounting holes 6 by means of mounting parts.
[0043] Preferably, the main beam mounting holes 6 can be threaded holes, and the mounting members can be bolts, which facilitates the convenient disassembly and assembly of the enclosure assembly 2 and the main beam 101, and has high connection reliability. The number and arrangement spacing of the main beam mounting holes 6 can be adaptively adjusted according to actual installation requirements.
[0044] Please see attached Figure 2 and attached Figure 3The enclosure assembly 2 includes columns 201 and fences 202 . The columns 201 are vertically mounted on the main beam 101 through the mounting pieces via the main beam mounting holes 6 , and the fences 202 are installed between every two adjacent columns 201 .
[0045] Preferably, the fence 202 can be made of a wire mesh fence with good protective effect, and the column 201 can be made of square steel. The bottom is vertically installed on the main beam 101 through the ear plate, the mounting part and the main beam mounting hole 6. The specifications of the column 201 and the fence 202 can be adaptively adjusted according to actual usage requirements.
[0046] Please see attached Figure 1 To Attachment Fig. 9 , the installation method of the utility model is:
[0047] The construction workers stand on the floor slabs 3 on both sides and transfer the channel main beam 1 from one side of the floor slab 3 to the other side, so that the channel main beam 1 is set across the cantilever gap 301. The setting spacing of a pair of channel main beams 1 is determined according to the width of the channel unit plate 4, and the two ends of the pair of channel main beams 1 are overlapped and fixed on the floor slabs 3 on both sides by chemical expansion bolts.
[0048] A shorter channel main beam 1 can be directly transferred manually, and a longer or heavier channel main beam 1 can be transferred with the assistance of equipment such as a hand winch to ensure construction safety.
[0049] On the floor 3 on one side, steel wire ropes are passed through the rope holes 9 at both ends of the hanging plate 7 of the first channel unit plate 4, and the construction workers on the floor 3 on the other side move the first channel unit plate 4 from the floor 3 on one side to the floor 3 on the other side by pulling the steel wire ropes.
[0050] During the movement of the first channel unit panel 4, the construction workers on the floor slab 3 on one side splice the second channel unit panel 4 to the first channel unit panel 4 through the hanging plate 7 and the hanging groove 8, and the construction workers on the floor slab 3 on the other side continue to pull the wire rope to make the first and second channel unit panels 4 move synchronously toward the floor slab 3 on the other side.
[0051] During the movement of the first and second channel unit panels 4, the third channel unit panel 4 is spliced on the second channel unit panel 4 through the hanging panel 7 and the hanging groove 8, and so on, until the first channel unit panel 4 moves to the floor slab 3 on the other side, and the last channel unit panel 4 is located on the floor slab 3 on one side, forming a channel panel spanning the cantilever gap 301.
[0052] The bottom of the channel plate is placed on a pair of bearing beams 102 through the lower bend 401 and the unit plate beam 5, and there is no large gap between the two sides of the channel plate and the main beam 101, and the top surface of the channel plate is flush with the top surface of the main beam 101. The channel unit plate 4 and the channel main beam 1 can be fixed by spot welding and clamping to prevent the channel unit plate 4 from slipping.
[0053] After the construction workers wear the safety rope, they fix the columns 201 on the main beam 101 through the mounting pieces on the channel board through the main beam mounting holes 6, and install fences 202 between adjacent columns 201. During the construction process, the channel board can provide a safe passage at the cantilever gap 301 for construction workers and organizations.
[0054] When the passage is no longer needed, the construction workers tie a safety rope, remove the columns 201 and fences 202 on the passage board, connect the steel wire ropes through the rope holes 9 at both ends of the hanging plate 7 of the first passage unit plate 4, and cut off the welding points between the passage unit plate 4 and the passage main beam 1. The construction workers on one side of the floor slab 3 pull the steel wire ropes to pull all the passage unit plates 4 onto the floor slab 3, and lift the passage unit plate 4 to separate it from the adjacent passage unit plates 4. Then remove the expansion bolts used to fix a pair of passage main beams 1 on the floor slabs 3 on both sides, and remove the passage main beam 1.
[0055] The above are only preferred embodiments of the present invention and are not intended to limit the scope of protection of the present invention. Therefore, any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. An overhead temporary passage structure, characterized by: Include Channel A main beam (1), a protective component (2) and a channel unit plate (4); the two ends of the channel main beam (1) are respectively mounted on the floor slabs (3) on both sides, so that a pair of channel main beams (1) are arranged in parallel and straddle the cantilever gap (301) between the floor slabs (3) on both sides; a plurality of channel unit plates (4) are sequentially spliced end to end to form a channel plate, and the channel plate is laid on the pair of channel main beams (1) to form a channel between the floor slabs (3) on both sides; a pair of protective components (2) are respectively vertically arranged on the pair of channel main beams (1), and the two ends of each group of protective components (2) extend to the floor slabs (3) on both sides.
2. The overhead temporary passage structure according to claim 1 is characterized in that: Each of the channel main beams (1) comprises a main beam (101) and a bearing beam (102); the two ends of the main beam (101) are respectively overlapped on the floor slabs (3) on both sides, and the main beam (101) spans the cantilever gap (301); a pair of channel main beams (1) are provided with bearing beams (102) on opposite sides of the main beams (101), and the channel unit plates (4) are laid on the pair of bearing beams (102).
3. The overhead temporary passage structure according to claim 2 is characterized in that: The channel unit plate (4) is provided with downwardly bent portions (401) at both side edges, respectively. The outer walls of the downwardly bent portions (401) at both sides are respectively fitted on one side of a pair of main beams (101) that are arranged opposite to each other, and the bottom of the downwardly bent portions (401) is in contact with the load-bearing beam (102), so that the top surface of the channel unit plate (4) is flush with the top surface of the main beam (101).
4. The overhead temporary passage structure according to claim 3 is characterized in that: A unit plate beam (5) is provided between the bottom surface of the channel unit plate (4) and the inner walls of the lower curved portions (401) on both sides thereof. The unit plate beam (5) is arranged perpendicular to a pair of main beams (101), and both ends of the unit plate beam (5) are placed on the bearing beams (102) of the pair of main beams (101).
5. The temporary overhead passage structure according to any one of claims 1 to 4, characterized in that: A hanging plate (7) is formed at one end of the channel unit plate (4), and a hanging groove (8) is formed at the other end of the channel unit plate (4). The hanging plate (7) can be matched and inserted into the hanging groove (8), so that two adjacent channel unit plates (4) are spliced into a flat plate structure.
6. The overhead temporary passage structure according to claim 5 is characterized in that: Rope passing holes (9) are respectively formed at both ends of the hanging plate (7), and the pulling rope is passed through the rope passing holes (9).
7. The overhead temporary passage structure according to any one of claims 2 to 4, characterized in that: A plurality of main beam mounting holes (6) are arranged at intervals on the main beam (101), and the enclosure assembly (2) is fixedly mounted on the main beam (101) through the main beam mounting holes (6) by means of mounting parts.
8. The overhead temporary passage structure according to claim 7 is characterized in that: The enclosure assembly (2) comprises a column (201) and a fence (202); the column (201) is vertically mounted on the main beam (101) through a mounting piece via a main beam mounting hole (6); and the fence (202) is installed between every two adjacent columns (201).