Pier PC beam end joint structure and joint method

The PC beam end joint structure with recessed intake and pile cap block bonding addresses offshore work challenges and enhances lateral strength, ensuring robustness against earthquakes and tsunamis.

JP7578232B1Active Publication Date: 2024-11-06KUROSAWA CONSTRUCTION CO LTD +1
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
JP2024011314
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2024-01-29
Publication Date
2024-11-06
Estimated Expiration
2044-01-29

Smart Images

  • Figure 0007578232000001_ABST
    Figure 0007578232000001_ABST
Patent Text Reader

Abstract

To provide a beam-end joint structure and a joint method therefor that minimize the amount of on-site cast-in-place concrete work required when forming the framework of a pier superstructure using precast PC beams, and that is significantly stronger against large-scale tsunamis caused by huge earthquakes than conventional techniques. [Solution] This is a PC beam end joint structure for a pier in which precast PC beams (X beam 1, Y beam 2) are provided between the pile heads in two horizontal directions, and a deck is formed on top of them, and is characterized in that it is recessed to a predetermined depth at a position corresponding to the beam end 5a of the PC beam, and has a beam end intake section 5 formed in a concave shape that surrounds the beam end 5a of the PC beam on three sides when viewed from above, has a pile head block 3 fixed to the pile head, the beam end 5a is inserted into the beam end intake section 5, the PC steel material 6 that penetrates the PC beam and pile head block 3 is fixed in tension, and the PC beam and pile head block 3 are joined by PC compression bonding.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a beam end joint structure and a joining method for constructing a straight pile horizontal pier in which the beam end of a precast PC beam is integrated with the pile head block by PC pressure joining, regardless of whether the pier is an existing one or a new one is being constructed. [Background technology]

[0002] Prior art relating to a method for installing precast PC beams (girders) on foundation piles and joining and integrating the PC beams (girders) with the pile heads in a concrete pier is disclosed in several patent documents.

[0003] Patent Document 1 discloses a method in which precast concrete vertical and horizontal beams are suspended between the heads of the foundation piles, with reinforcing bars protruding from both ends of each beam and exposed to the outside, and the beams and piles are integrated with cast-in-place concrete in the pile head, so that only the pile head concrete is cast in place, significantly reducing the amount of work required at sea.

[0004] Patent Document 2 describes a method in which steel frames and reinforcing bars are protruded from the end face of the precast section of the beam, and then the steel frames and reinforcing bars are placed on a support base on the pile, and then the space between the pile and the end face of the precast section of the beam is filled with cast-in-place concrete to join the pile and the beam, thereby minimizing on-site work and eliminating the labor required for constructing the joints.

[0005] In Patent Document 3, after a precast PC main beam is installed at the pile head, the space between the main beam and the pile head is filled with interfacial concrete to join and integrate them, and a precast PC cross beam is erected on a support shelf protruding from the side of the main beam, and PC steel wires are passed through and tensioned to integrate the main beam and cross beam. Since the lattice frame is a precast product, it does not require offshore scaffolding or shoring that is required for cast-in-place concrete, and furthermore, it can be constructed quickly because it does not require assembling and demolding formwork.

[0006] In Patent Document 4, a joint member is inserted into the pile head, and a prefabricated beam member is formed with a flat top plate portion and side walls hanging down from both sides, so-called an inverted U-shaped cross section, and the end of the top plate portion is installed on a receiving shelf portion installed on the joint member, and the penetrating PC member (PC steel material) is tensioned and fixed, and the prefabricated beam and the joint member are joined by PC pressure bonding to be integrated, and then the opening or sheath pipe that fits with the pile head at the center of the joint member is filled with cast-in-place concrete to join the joint member and the pile head. Then, a precast concrete floor slab or a floor slab portion is formed on the beam portion formed by the pile, and a pile support structure is constructed. By making the cross section of the prefabricated beam into an inverted U shape, the weight of the precast member is reduced, and even if it is a factory product, it is easy to transport, and a large hoist or lifting machine is not required. Furthermore, even if the pile sways due to waves or the like at the stage when the prefabricated beam member is temporarily installed, the prefabricated beam member can be prevented from falling off.

[0007] The applicant has already disclosed the prior art related to PC compression joints in numerous patent documents, the most representative of which is the PC compression joint construction method. In order to explain the difference between the present invention and the prior art described below, Patent Document 5 will be taken up here. The characteristics of the prior art PC compression joints are as shown in Figures 1, 2 and 4 of Patent Document 5. [Prior art documents] [Patent documents]

[0008] [Patent Document 1] Japanese Patent Application Publication No. 7-207641 [Patent Document 2] Japanese Patent Application Publication No. 8-120638 [Patent Document 3] Patent No. 4597921 [Patent Document 4] Patent No. 7178050 [Patent Document 5] Patent No. 5612231 Summary of the Invention [Problem to be solved by the invention]

[0009] The methods disclosed in Patent Documents 1 and 2 involve protruding reinforcing bars or steel frames from the ends of precast beams and using them as pile head concrete, or pouring in-situ concrete between the end faces of the pile and the precast part of the beam to join the pile head and the precast beam. This in-situ concrete work is carried out at sea, and the processes of assembling shoring and formwork, carrying out reinforcing bar work, pouring concrete, and curing it are all carried out at sea, which not only lengthens the construction period and increases costs, but also makes quality control more difficult. In particular, reinforcing bars are easily corroded even at the construction stage due to salt damage caused by seawater spray, resulting in a problem of significantly reduced strength and durability of the constructed structure.

[0010] Patent Documents 3 and 4 disclose inventions that solve the above problems and further reduce on-site cast-in-place work at sea.

[0011] Specifically, in Patent Document 3, in the longitudinal (normal) direction, the precast PC main beam and the part equivalent to the conventional concrete pile head (footing) are integrated to form a single continuous piece across multiple spans. In the transverse (perpendicular to the normal) direction, the precast PC cross beam is erected on a support shelf protruding from the side of the PC main beam, and the PC steel wires that pass through both beams are tensioned and fixed, and integrated by PC pressure bonding.

[0012] However, there are the following problems. 1. The beam itself is one continuous piece spanning multiple spans, which results in considerable weight and length. As a normal precast factory product, it is difficult to transport and install. It can only be manufactured on-site. There are significant constraints on on-site manufacturing and the capacity of heavy equipment for installation, making it difficult to adapt to various span divisions and floor plans. 2. The precast PC cross beam is erected on the support shelf protruding from the side of the PC main beam, and the penetrating PC steel wire is tensioned and fixed to form an integrated structure. This creates a strong connection in the longitudinal direction (beam axis direction) of the cross beam, just like conventional PC pressure joints. However, the connection in the lateral direction (perpendicular to the beam axis) is weaker than in the longitudinal direction. When a large tsunami caused by a massive earthquake strikes from the side, there is a risk that the cross beam will fall and be swept away. 3. Since the precast PC main beam is essentially a combination of the conventional pile head concrete (footing) and the PC beam body, the width of the beam must be adjusted to match the required size of the pile head concrete (footing), resulting in wasted parts in the component.

[0013] In Patent Document 4, the cross section of the prefabricated beam is made in an inverted U shape to achieve weight reduction and to solve the problems of weight and length caused by the extra-large precast members in Patent Document 3. However, the prefabricated beam and the joint member are connected by tensioning and fixing the PC member (PC steel material) that penetrates the prefabricated beam and the joint member, and although the joint is strong in the longitudinal direction (beam axis direction) as in the conventional PC pressure joint, the joint in the lateral direction (beam axis perpendicular direction) is still weak. And, since the PC member (PC steel material) passes only through the side wall parts hanging down from both side edges at the PC pressure joint surface between the beam end of the prefabricated beam and the joint member, only the side wall parts of the prefabricated beam are actually PC pressure-joined to the joint member, and the top plate part is only placed on the receiving shelf part and is not directly joined to the joint member. It also states that "When the prefabricated beam member is loaded onto the joint member, a gap is generated between the inner surface of the side wall of the prefabricated beam member and the side surface of the receiving shelf of the joint member. It is desirable to fill the gap with grout. Also, instead of filling the gap with grout, rubber may be attached to the side surface of the receiving shelf in advance with a size that matches the gap, and then the prefabricated beam member is loaded onto the receiving shelf. Also, instead of filling with grout or attaching rubber, water-repellent paint may be applied." However, even if the gap between the inner surface of the side wall and the side surface of the receiving shelf of the joint is filled with grout, since the PC member (PC steel material) is not directly penetrated and the PC is not crimped and joined, there is a high possibility that the grout will fall due to the constant vibration caused by the large crane traveling on the superstructure of the pier, causing a gap. Also, even if rubber is attached instead of grout and water-repellent paint is applied, it is allowed that a gap will occur after the construction is substantially completed. Therefore, the joints in the horizontal direction (perpendicular to the beam axis) are as weak as conventional PC pressure joints, and since there is a gap between the support shelf and the prefabricated beam, when a large tsunami caused by a major earthquake attacks the prefabricated beam from the side, it will not function to prevent the prefabricated beam from falling, and there is still a risk that the prefabricated beam will fall.In the first place, Patent Document 4 states that "after erection, before the joint member and the prefabricated beam member are integrated, even if the pile column-shaped body sways due to waves, etc., the prefabricated beam member can be prevented from falling off." However, even if the gap is filled and the prefabricated beam (under its own weight only) can be prevented from falling off due to small lateral shaking caused by waves, it cannot withstand a large-scale tsunami caused by a huge earthquake when the structure after being joined is in service, and is no different from the conventional technology. This is because Patent Document 4 states that since the superstructure is integrated with the upper deck, there is no need to take special consideration, and that "the support shelf part is shown as an example with a shape having an inclined surface that slopes downward from the protruding edge of the support surface to reduce weight, but it is sufficient that the upper surface has a support surface that supports the top plate end of the prefabricated beam member," and the PC member (PC steel material) does not penetrate the support shelf part, and the prefabricated beam member and the support shelf part are not joined by PC pressure bonding.

[0014] Conventional techniques for integrating precast members, for example beams and columns, by PC pressure bonding include a technique in which a barb is extended from the column surface, the end of the beam is placed on the barb, and PC steel wires penetrate the barb to connect the column and beam to each other by PC pressure bonding, as shown in Figs. 1, 2, and 4 of Patent Document 5. This is the basic configuration of the PC pressure bonding joint construction method developed by the applicant. In addition, some conventional PC pressure bonding joints are joined without a barb. In any case, the building structure is constructed on land, and although lateral loads include strong winds and earthquakes, these act on the entire structure, and there is almost no risk of the beam members being subjected to localized strong impact loads, so there is no need to take special care about the lateral fall of individual beams. However, in the case of a pier, there is a risk that the beams will fall and be swept away when a large tsunami caused by a huge earthquake attacks from the side depending on the specific usage environment. This point is not taken into consideration in the conventional techniques.

[0015] Therefore, the present invention aims to minimize offshore work using cast-in-place concrete when forming the framework of a pier superstructure using precast PC beams, and to provide a beam-end joint structure and a joint method therefor that are significantly stronger against large-scale tsunamis caused by major earthquakes than conventional techniques. [Means for solving the problem]

[0016] The PC beam end joint structure of the pier of this invention is as follows: A PC beam end joint structure for a pier in which precast PC beams are installed between pile heads in two directions on a plane, and a deck is formed on top of the precast PC beams. The pile head block is fixed to the pile head and has a beam end capture portion that is recessed to a predetermined depth at a position corresponding to the beam end of the PC beam in either of the two plane directions and is formed in a concave shape surrounding the beam end of the PC beam on three sides in a plan view, A portion of the beam end excluding the lower portion protrudes toward the corresponding beam end intake portion and is inserted into the beam end intake portion, In a member cross section perpendicular to the longitudinal direction of the PC beam, the protruding portion of the beam end is The area of ​​the other beam end portion is at least half that of the other beam end portion. The pile head block has a jaw protruding below the PC beam, The PC beam is installed on the jaw, The PC steel material that penetrates the PC beam, the jaw, and the pile head block is tensioned and fixed, and the PC beam and the pile head block are joined by PC pressure bonding.

[0017] The PC beam end joining method for a pier of the present invention is as follows: A PC beam end connection method for a pier in which precast PC beams are provided between pile heads in two directions on a plane and a deck is formed on the precast PC beams, A pile head block is fixed to the pile head, the pile head having a beam end capture portion formed in a concave shape that is recessed to a predetermined depth at a position corresponding to the beam end of the PC beam in either of the two plane directions and surrounds the beam end of the PC beam on three sides in a plan view; The portion of the beam end excluding the lower portion protrudes toward the corresponding beam end intake portion, and in a member cross section perpendicular to the longitudinal direction of the PC beam, the protruding portion of the beam end has an area of ​​at least half of the other portion of the beam end, A jaw protruding from the lower side of the beam end intake portion is formed on the pile head block, The PC beam is placed on the jaw, After arranging the PC beam with the beam end inserted into the beam end intake, fill the joints provided in the beam end intake and between the jaw and the beam end with joint mortar and allow it to harden, The PC beam and the pile head block are joined together by tensioning and fixing the PC steel wire that passes through the PC beam, the jaw, and the pile head block. Effect of the Invention

[0018] According to the present invention, the following effects can be obtained. (1) The PC beam-end joint structure that is formed is strong not only in the longitudinal direction (in the direction of the beam axis) but also in the lateral direction (perpendicular to the beam axis). Even if a large tsunami caused by a major earthquake strikes from the side, the beams will not fall and be washed away, significantly improving both earthquake resistance and tsunami resistance. (2) By constructing and forming the pile head block and the beam member separately, it is possible to easily adapt to various span divisions and floor plans. (3) By using precast beam members and pile cap blocks, the amount of on-site concrete work at sea can be significantly reduced and construction time can be shortened, making this method particularly suitable for repair work on aging existing piers. [Brief description of the drawings]

[0019] [Figure 1] FIG. 1 is a plan view showing a PC beam end joint structure of a pier according to a first embodiment of the present application. [Diagram 2] 1. (b) is a cross-sectional view taken along the line AA shown in (a). [Diagram 3]1A is a partially enlarged plan view of a PC beam end joint structure of a pier according to Example 2 of the present application, and FIG. 1B is a BB cross-sectional view shown in FIG. [Figure 4] Fig. 1(a) is a plan view of a pile head block according to Example 3 of the present application, (b) is a CC sectional view shown in (a), (c) is a plan view showing a PC beam end joint structure of a pier according to Example 3 of the present application, and (d) is a DD sectional view shown in (c). [Diagram 5] FIG. 11 is a perspective view showing a PC beam end joint structure of a pier according to Example 3 of the present application. [Figure 6] (a) is a diagram showing the standards for seismic performance assessment of specific facilities. (b) is a diagram showing the standards for seismic performance assessment of standard facilities. [Figure 7] This is an image of local buckling of a steel pipe pile. [Figure 8] This is a side view showing the joint clearance at the PC pressure joint (surface) between the beam end and the pile head block. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0020] The present invention will be described in detail based on the embodiments shown in the drawings. In this application, a straight pile horizontal pier is mainly shown as an embodiment. Figures 1 and 2 show Example 1 of the present invention. Figure 1 shows a part of the plan layout of a pier. Here, the normal direction is the X direction, and the direction perpendicular to the normal is the Y direction. The beam arranged parallel to the X direction is X beam 1, and the beam arranged parallel to the Y direction is Y beam 2.

[0021] A number of steel pipe piles 7 are erected as foundation piles at a prescribed interval (span) in two directions, X and Y. A pile head block 3 of a required size is formed in advance at the head of each pile. X beams 1 and Y beams 2, which serve as precast PC beams, are installed between each pile head block 3. The central section surrounded by X beams 1 and Y beams 2 is a concrete floor slab 4.

[0022] Although not shown in the figure because it is not directly related to the problem of this application, a small beam may be provided between PC beams (girders) depending on the pile arrangement interval (span). As in the past, stirrup reinforcement is placed in advance from the top end of the precast PC beam to a specified height and integrated with the top concrete, but the stirrup reinforcement is not shown in the figure.

[0023] The precast PC beams (X beam 1, Y beam 2) in the present invention are precast products, and are beam members to which prestress is applied. Note that sheaths for inserting PC steel wires are embedded and arranged in advance in the beam members and pile head block 3, but are not shown in the figure.

[0024] The pile head block 3 is recessed to a predetermined depth at a position corresponding to the PC beam (X beam 1, Y beam 2) and has a beam end intake 5 that surrounds the beam end 5a on three sides in a plan view. The PC beam is installed by inserting its beam end 5a into the beam end intake 5, and a PC steel wire 6 is inserted into a sheath (not shown) that is pre-placed on the beam member and the pile head block 3, and is tensioned and fixed, thereby integrating the PC beam and the pile head block 3 with a PC pressure joint.

[0025] As an enlarged detailed view of one of these, the plan view and side view AA of the part indicated by the dashed circle in Fig. 1 are shown in Fig. 2. The pile head block 3 is a precast member, and is installed and integrated at the head of the pile 7 before the installation of the beam. The planar shape is not limited to the octagon shown in the figure, and may be changed as long as it satisfies the structural performance and the arrangement of the PC steel wires.

[0026] In plan view, the beam end intake 5 forms joints 14 by leaving a specified gap from the peripheral surface (three sides) of the beam end 5a of the PC beam (X beam 1, Y beam 2) to absorb construction errors. On the side (beam formation direction) as well, joints 14 are similarly provided below the beam end 5a. After the PC beam is fitted into the beam end intake 5 and erected, the joints 14 are filled with joint mortar (not shown) and allowed to harden. After hardening, the PC steel wires 6 are inserted into the sheaths (not shown) that have been embedded in advance and fixed in place under tension to form a beam end joint structure. After that, a concrete floor slab 4 is formed on the upper ends of the beams to form a PC pier.

[0027] The beam end joint structure formed in this way is strong not only in the longitudinal direction (beam axis direction) but also in the lateral direction (direction perpendicular to the beam axis), and the risk of the beam falling is eliminated even if it is attacked from the lateral direction by a large-scale tsunami caused by a huge earthquake. In addition, since a prestress force is introduced between the beam end 5a of the PC beam (X beam 1, Y beam 2) and the pile head block 3 and the PC compression joint is performed, the joint mortar between the beam end 5a of the PC beam and the pile head block 3 will not fall even if it is subjected to a constant vibration load. Since the pile head block 3 supports the bottom of the joint mortar, the joint mortar on both sides of the beam end 5a will not fall under the constant vibration load. In the structure described in Patent Document 4, grout (joint mortar) is filled in the gap between the inner surface of the side wall part and the side of the receiving shelf part, but since the PC member (PC steel material) does not penetrate, there is a risk that the grout (joint mortar) will fall and create a gap when it is subjected to a constant vibration load, but according to the above-mentioned configuration of the present application, such a problem is eliminated.

[0028] Next, a second embodiment shown in Fig. 3 will be described. Note that a description of the same configuration as that of the first embodiment shown in Fig. 1 and Fig. 2 will be omitted. In Fig. 3 as well, the sheaths for inserting PC steel wires provided on the beam member and the pile head block 3 are omitted. Also, the joint mortar filled in the joints 14 is omitted.

[0029] When the height (also called thickness) of the pile head block 3 is approximately the same as the beam configuration of the PC beams (X beam 1, Y beam 2) or is slightly larger, it becomes impossible to insert the entire member cross section of the beam end 5a into the pile head block 3. In other words, if the concrete member cross section in the height direction of the pile head block 3 remaining under the beam end 5a is small, the shear strength will be insufficient. In such a case, only a portion of the member cross section in the height direction of the beam end 5a is inserted into the beam end inlet portion 5. It is desirable that this portion have a cross-sectional area of ​​more than half the member cross section of the beam end 5a. In addition, it is preferable that a part of the beam member protrudes from the adjacent part toward the pile head block 3 and is supported by the jaw 8 protruding from the side of the pile head block 3 toward the beam end 5a through the joint mortar filled in the joint 14. In this case, the above-mentioned "part of the beam member" includes a part inserted into the pile head block 3 and a part not inserted into the pile head block 3 and placed on the jaw 8, thereby increasing the stability of the beam member. The pile head block 3 and the beam member are joined by tensioning and fixing the PC steel wire 6 passing through the upper part of the beam end 5a and the PC steel wire 6 passing through the lower part of the beam end 5a and the jaw 8. The configuration of the second embodiment also provides the same effect as that of the first embodiment against a large-scale tsunami from the lateral direction.

[0030] Next, as Example 3, a PC beam end joining method for a pier will be described with reference to Fig. 4. Note that the sheaths for inserting PC steel wires are omitted from the illustration of the beam member and the pile head block 3. Also, the joint mortar filled in the joint 14 of the beam end 5a is omitted from the illustration.

[0031] First, as shown in Fig. 4(a) and (b), 1. A prefabricated pile head block 3 is installed on the head of a steel pipe pile 7. An upper hole 3a and a lower hole 3b are formed in the center of the pile head block 3. The inner diameter of the lower hole 3b is made larger than the pile diameter to allow for construction deviation of the pile head. It is preferable that the inner diameter of the upper hole 3a is made smaller than the pile diameter so that the pile head block 3 can be directly placed on the pile head. This allows the pile head block 3 to be temporarily installed by standing on the pile head without the need for shoring or support materials. 2. The upper part of the pile head block 3 is provided with a beam end intake section 5 and a reinforcing bar 9, and the lower part is provided with a sheath for inserting the pile head lateral tightening cable 10 and a notch 10b for attaching the fixing device 10a. The pile head lateral tightening cable 10 is placed on both sides of the pile head without penetrating the pile head so as not to cause a cross-sectional defect in the steel pipe pile 7. 3. After the pile head block 3 is installed on the pile head, the joint 14 between the lower hole 3b and the pile head is filled with joint mortar 11. 4. The pile head block 3 is firmly integrated with the pile head by inserting the pile head horizontal tightening cable 10 and attaching a fixing device 10a to the end thereof and tensioning and fixing it. 5. Place the reinforcing bar 9 in the central hole of the pile head, and place a sheath (not shown) and other necessary reinforcing bars (not shown) at the position of the PC steel wire 6 that is planned to pass through the beam. 6. Pour concrete 12 into the central hole of the pile head to a specified depth and allow to cure. The depth is preferably twice the pile diameter.

[0032] However, the construction procedure is not limited to the above. For example, step 4 may be performed after step 6, with the filler concrete 12 poured first, and then the pile head lateral tightening cable 10 tensioned and fixed.

[0033] Next, as shown in Fig. 4(c) and (d), 7. The precast PC beams in two directions on the plane are positioned by inserting each beam end 5a into the beam end intake portion 5, and joint mortar is filled into the beam ends 5a and the surrounding joints 14 and allowed to harden. 8. The PC steel wire 6 is inserted into a pre-buried sheath (not shown), inserted through the pile head, and tensioned and fixed, and the beam end 5a and the pile head block 3 are joined together by PC crimping to form a single unit. 9. Finally, the top concrete main reinforcement is inserted through the stirrups that have been placed in advance to protrude from the top end of the PC beam and the reinforcing bars 9 that have been placed in advance on the top surface of the pile head block, and the top concrete is poured to integrate them. However, it is more efficient to pour the top concrete at the same time as pouring the concrete floor slab 4.

[0034] Although not shown in the figure, the concrete floor slab 4 is constructed by brimming a precast PC floor slab with ribs between precast PC beams, placing reinforcement on top of it, and pouring top concrete to integrate them. This allows the precast PC floor slab to double as a formwork, which reduces the labor required for on-site work. To make it easier to understand the work procedures for the above-mentioned embodiments 1 to 8, they are all shown together in Figure 5 (perspective view). However, some of the procedures and details are not shown in the figure.

[0035] A pile head block 3, which has been manufactured and prepared in advance, is installed on the head of the steel pipe pile 7. The pile head block 3 is provided with a beam end intake section 5, a sheath 13 for inserting the PC steel wire 6, and a notch 10b for a fixing device for the pile head lateral tightening cable 10.

[0036] The upper opening of the pile head block 3 is placed on the top surface of the steel pipe pile 7. For ease of understanding, a cross section of one pile head block 3 cut approximately in half is shown. The gap between the lower opening and the steel pipe pile head is filled with joint mortar (not shown), the pile head lateral tightening cable 10 is inserted into the sheath 13 and arranged in two horizontal directions, and a fixing device 10a (not shown in FIG. 5) is attached to the notch 10b at the end for tensioning and fixing, and prestress is introduced to the pile head in two horizontal directions and tightened, thereby firmly joining the pile head block 3 to the head of the steel pipe pile 7.

[0037] A precast PC beam, which is previously fitted with a sheath 13 for inserting PC steel wires, is spanned between pile head blocks 3 with its beam end 5a inserted into the beam end intake section 5 of the pile head block 3 installed on the steel pipe pile 7.

[0038] A sheath for the PC steel wire and a reinforcing bar (not shown) are placed in the central hole of the pile head block 3 , and the PC steel wire 6 is inserted into the sheath of the beam and placed so as to penetrate the pile head block 3 .

[0039] After filling the central hole of the pile head block 3 with filler concrete 12 and hardening, the PC steel wire 6 is tensioned and fixed (fixing device not shown) and the PC beam and pile head block 3 are joined together by PC pressure bonding to form a single unit.

[0040] The above construction procedure is a rough explanation, but is not limited to this. For example, if a reinforcing bar is placed in the central hole of the pile head block 3 and the filler concrete 12 is poured to reliably integrate it with the pile head block 3, it may not be necessary to place and tension the pile head lateral tightening cable 10 shown in the figure. The configuration in this case will be as shown in Figures 1 to 3, and the upper and lower parts of the pile head block 3 can also be octagonal in plan view, which is also applicable to the present invention.

[0041] In the current technology, the seismic performance verification of the straight pile horizontal pier is based on the technical standards of the port facilities, and the method of verifying the deformation performance of the pier is adopted, allowing localized damage during an earthquake that does not lead to the collapse of the entire structure. Specifically, as shown in Figure 6, the contingency verification of the level 2 earthquake motion of the seismic reinforcement facility is as follows: In the case of specific facilities, (1) The design section force acting on the superstructure does not exceed the design section strength. (2) There are no piles that have reached the limit curvature in two or more places on a single pile. (3) The design value of the axial force acting on the pile does not exceed the design value of the resistance force based on the failure of the ground. For standard facilities, Regarding (2) above, it is required that there are fewer than two points per pile where the limit curvature is reached.

[0042] In other words, in the event of a massive earthquake (level 2 earthquake load), the superstructure of any facility will not be destroyed, and all pile heads will yield in bending, reaching full plastic moment and creating plastic hinges. For special facilities, it is acceptable for plastic hinges not to occur in more than two places per pile (pile head and underground), while for standard facilities, it is acceptable for there to be at least two places per pile (pile head and underground) that do not create plastic hinges. Therefore, the current state of structural design places emphasis on the degree of fixation between the superstructure, which will be made of reinforced concrete or precast concrete, and the pile heads (degree of rotational restraint of the pile heads), and large structural margins are created so that the pile heads do not drop until they reach full plastic moment and create plastic hinges.

[0043] However, as shown in Figure 7, it has been reported that during a large-scale earthquake (level 2 earthquake load), after a steel pipe pile reaches the bending yield moment (My), local buckling may occur at the head of the steel pipe pile, causing it to lose its strength before reaching the full plastic moment (Mu).

[0044] In order to solve this problem, the present invention goes against the current design method in which the superstructure (beam) excessively restrains the pile head, and instead, based on the earthquake-resistant design method using the PC compression joint method shown in Patent Document 5, the joints at the PC compression joints (surfaces) between precast PC members are left rigidly connected without opening the joints until a certain design load is reached, and when the certain design load is exceeded, the joints are separated (opened) to protect the structural members around the joints from damage. An image of this is shown in Figure 8.

[0045] Specifically, prestress is introduced by the tension anchoring force of the PC steel wire 6 at the beam end 5a of the PC beam (X beam 1, Y beam 2) and the pile head block 3 and the PC compression joint (surface) so that the relationship shown in the following equation holds. Me≦My The joints are tightly connected without any gaps Me>My Joint spacing Me: Bending moment due to earthquake load acting on the beam end My: Yield bending moment of steel pipe pile head

[0046] As described above, by separating the joints after the head of the steel pipe pile reaches the yield bending moment, the constraint of the PC beam on the head of the steel pipe pile is reduced, preventing local buckling at the head of the steel pipe pile, and ensuring that the load-bearing capacity of the pile head reaches the full plastic moment (Mu) as designed, even during a large-scale earthquake. Also, if the type and number of PC steel wires 6 are designed so that the PC steel wires at the end of the PC beam do not yield during a massive earthquake (level 2 earthquake load), then after the earthquake, because the PC steel wires 6 are in the elastic range, the separated joints will close and return to their original state, and the steel pipe pile 7, together with the superstructure, can be maintained in good condition.

[0047] To summarize the above, in the present invention, in the PC compression joint at the beam end 5a, prestress is introduced by the tensioning anchoring force of the PC steel wire 6 in the longitudinal direction (beam axis direction) so that joint separation is possible without local buckling occurring after the yield bending moment at the pile head of the steel pipe pile 7, and in the lateral direction (perpendicular to the beam axis), it is a PC beam end joint structure for a pier that is designed to prevent the beam from falling due to a large tsunami.

[0048] Therefore, this is a further evolution of the conventional PC compression joint construction method, and will result in a pier structure that can be safely used in the specific usage environment of a PC pier, with significantly improved earthquake resistance and durability.

[0049] The present invention has been described in more detail and specifically with reference to the embodiments. However, the embodiments are merely illustrative and do not limit the present invention. [Explanation of symbols]

[0050] 1X Beam 2 Y beam 3 Pile head block 3a Upper hole 3b Lower hole 4 Concrete deck 5 Beam end intake 5a beam end 6 PC steel wire 7 Piles (steel pipe piles) 8 Jaw 9. Steel Bars 10 Pile head horizontal tightening cable 10a Fixture 10b Notch 11 Joint mortar 12 Filling concrete 13 Sheath 14 Joint

Claims

1. A PC beam end joint structure for a pier in which precast PC beams are provided between pile heads in two directions on a plane, and a deck is formed on the precast PC beams, The pile head block is fixed to the pile head, and is provided with a beam end capture portion that is recessed to a predetermined depth at a position corresponding to the beam end of the PC beam in either of the two plane directions and is formed in a concave shape surrounding the beam end of the PC beam on three sides in a plan view. A portion of the beam end excluding the lower portion protrudes toward the corresponding beam end intake portion and is inserted into the beam end intake portion, In a member cross section perpendicular to the longitudinal direction of the PC beam, the protruding portion of the beam end has an area at least half that of the other portion of the beam end, The pile head block has a jaw protruding below the PC beam, The PC beam is installed on the jaw, A PC beam end joint structure for a pier, characterized in that the PC steel material passing through the PC beam, the jaw and the pile head block is tensioned and fixed, and the PC beam and the pile head block are PC pressure joined.

2. A PC beam end joining method for a pier in which precast PC beams are provided between pile heads in two directions on a plane and a deck is formed on the precast PC beams, A pile head block is fixed to the pile head, the pile head having a beam end capture portion formed in a concave shape that is recessed to a predetermined depth at a position corresponding to the beam end of the PC beam in either of the two plane directions and surrounds the beam end of the PC beam on three sides in a plan view, A portion of the beam end excluding the lower portion protrudes toward the corresponding beam end intake portion, and in a member cross section perpendicular to the longitudinal direction of the PC beam, the protruding portion of the beam end has an area of ​​at least half of the other portion of the beam end, A jaw protruding from the lower side of the beam end intake portion is formed on the pile head block, The PC beam is placed on the jaw, After arranging the PC beam with the beam end inserted into the beam end intake, fill the joints provided in the beam end intake and between the jaw and the beam end with joint mortar and allow it to harden, A method for joining the ends of PC beams of a pier, characterized in that the PC beam and the pile head block are joined together by tensioning and fixing the PC steel wire that passes through the PC beam, the jaw, and the pile head block.

Citation Information

Patent Citations

  • Assembly type pile foundation wharf structure

    CN209397564U

  • Prefabricated concrete beam column prestress energy dissipation node

    CN214784711U

  • Loading apparatus for long scaled product

    JP1981012231A

  • Pier

    JP1995207641A

  • Connecting structure of pile and beam and execution method of structure using connecting structure

    JP1996120638A