An overall evaluation method for power quality of electrified railway monitoring points based on comprehensive factors
A technology for electrified railways and power quality, applied to electrical components, circuit devices, AC network circuits, etc., can solve problems such as increasing the complexity of problem analysis
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0033] In the present embodiment, the overall evaluation method of power quality of electrified railway monitoring points based on comprehensive factors is carried out as follows:
[0034] 1. Establish a single power quality index description system and a power quality comprehensive factor description system according to the following steps;
[0035] 1. Based on relevant standards, establish a single power quality description system x, x=[x 1 ,x 2 ,...,x p ], where x 1 ,x 2 ,...,x p It is a description of each individual power quality, and each individual power quality includes:
[0036] Short circuit ratio reciprocal R' sce , R′ sce =S equ / S sc In the formula, S equ is the equipment capacity, S sc is the short-circuit capacity at the monitoring point;
[0037] Harmonic indicators, including current total harmonic distortion THD used in the national standard GB / T 14549-93 i and voltage total harmonic distortion THD u ;Define the average percentage of harmonic cu...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com