Unlock instant, AI-driven research and patent intelligence for your innovation.

Test loading test device for intermediate frequency power supply and commercial frequency power supply

A technology of loading test device and industrial frequency power supply, which is applied in the direction of power supply test, measuring device, and parts of electrical measuring instruments, etc., which can solve the inconvenient operation and unsatisfactory loading test system. Problems such as speed and equipment cost, to achieve the effect of convenient maintenance and repair, reasonable structure and simple operation

Active Publication Date: 2018-10-26
WEIHAI GUANGTAI AIRPORT EQUIP CO LTD
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, the test loading test method for high-power intermediate frequency 400Hz power supply and industrial frequency 50Hz power supply is usually to pass the output intermediate frequency power 400Hz (115 / 200VAc) or industrial frequency power 50Hz (220 / 380VAc) through a high-power load box. The resistance of the load box produces heat consumption, and this test method usually uses two independent loading systems to test the intermediate frequency 400Hz power supply and the power frequency 50Hz power supply respectively, and the intermediate frequency 400Hz power supply and the power frequency 50Hz power supply use two independent loading tests During the use of the system, on the one hand, it avoids the interlacing of the power frequency power and the intermediate frequency power, and on the other hand, it is to reduce the mutual interference between the two power sources through the cables, but its substantive deficiency is: during use Since the intermediate frequency and power frequency use independent loading test test systems, it is not only inconvenient to operate, but also increases the complexity of the test system and equipment costs, resulting in great limitations in the use process, which cannot meet the requirements of the loading test system. Simple, easy maintenance requirements

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Test loading test device for intermediate frequency power supply and commercial frequency power supply

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0011] Example 1: The output end of the intermediate frequency 400Hz power supply is connected to the input end of the intermediate frequency input contactor through the connecting copper bar, the output end of the power frequency 50Hz power supply is connected to the industrial frequency input contactor through the connecting copper bar, and the output end of the intermediate frequency input contactor is connected to the industrial frequency input contactor. The output ends of the frequency input contactor are respectively connected to the input end of the main contactor through the connecting copper bar. The output end of the main contactor is connected to the load box through the load distribution contactor through the connection copper bar, and the other way is connected to the load distribution contactor through the load distribution contactor. The load boxes are connected, and the size of the respective loads is controlled by controlling the on-off of the respective contac...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a power source load system, in particular to a test load test device for a medium-frequency power source and a power-frequency power source. The test load test device comprises the power-frequency power source, the medium-frequency power source and a load box and is characterized in that a total contact, a medium-frequency power input contact, a power-frequency power input contact, load distribution contacts and connecting copper bars are arranged; the output end of the medium-frequency power source is connected with the medium-frequency power input contact through the corresponding connecting copper bar, the output end of the power-frequency power source is connected with the power-frequency power input contact through the corresponding connecting copper bar, the medium-frequency power input contact and the power-frequency power input contact are respectively connected with the input end of the total contact through the corresponding connecting copper bars, one circuit of the output end of the total contact is connected to the load box through the corresponding load distribution contact by the corresponding connecting copper bar, and the other circuit of the output end of the total contact is connected to the load box through the corresponding load distribution contact. The test load test device has the advantages of being reasonable in structure, simple in operation and convenient to maintain and repair, and reducing cost.

Description

technical field [0001] The invention relates to the technical field of testing systems, in particular to a loading test device for testing intermediate frequency power supplies and industrial frequency power supplies. Background technique [0002] At present, the test loading test method for high-power intermediate frequency 400Hz power supply and industrial frequency 50Hz power supply is usually to pass the output intermediate frequency power 400Hz (115 / 200VAc) or industrial frequency power 50Hz (220 / 380VAc) through a high-power load box. The resistance of the load box produces heat consumption, and this test method usually uses two independent loading systems to test the intermediate frequency 400Hz power supply and the power frequency 50Hz power supply respectively, and the intermediate frequency 400Hz power supply and the power frequency 50Hz power supply use two independent loading tests During the use of the system, on the one hand, it avoids the interlacing of the pow...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G01R31/42G01R1/28
Inventor 杨飞梁吉军姚有刚
Owner WEIHAI GUANGTAI AIRPORT EQUIP CO LTD