pile construction method
A construction method and piling technology, applied in sheet pile walls, foundation structure engineering, construction, etc., can solve problems such as difficulty in meeting construction requirements, and achieve the effects of reliable quality, improved discharge process, and controllable process
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0029] A pile construction method comprising
[0030] (1) Placement: place the immersed tube system of the equipment on the set pile position, or near the pile position that has been constructed, or in the center of the cement-soil pile position that has been constructed; pile shoes can be pre-embedded on the pile position ;
[0031] (2) Immersed tube: sink the immersed tube system of the equipment to the set depth;
[0032] (3) Pouring: lift up the internal ramming pipe system, pour the pile body or lower the prefabricated pile body;
[0033] (4) Tube extraction: for prefabricated piles: pull out the outer tube, fill the gap around the precast pile with filler and curing agent, and the pile is formed; for cast-in-place piles: pull out the outer tube, and the reinforced concrete pile is formed; It is also possible not to pull out the outer pipe, and form the steel pipe concrete pile;
[0034] The immersed tube system in step (1) is a single-steel outer tube with a set rigid...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com