Period testing method for alternating-current power supply of 1U2 rack-mounted server
A rack-mounted server, AC power supply technology, applied in the fault hardware testing method, using the power-on test to detect faulty hardware, and detecting faulty computer hardware, etc., can solve the problem of not being able to detect the on-off state of two nodes at the same time.
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2017-05-10
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1
Abstract
Description
technical field
[0001] The invention relates to a method for testing the AC power cycle of a 1U2 rack server in server development and testing. Background technique
[0002] In the prior art, the well-known technology is that in server development and testing, the existing stability test tool uses a fatigue tester, which detects the 12V signal of the mainboard. When the 12V voltage of the mainboard is turned off, the fatigue machine performs AC disconnect Power on, and then turn on the power to start the node, but the 1U2 rack server (Rack 1U2) node is composed of two independent server nodes, sharing a secondary power supply board, the AC power cycle test (AC cycle) of the 1U2 node , that is, the AC test, the 1U2 node has two main boards working at the same time, and it is impossible to detect the switching status of the two nodes at the same time, which is the deficiency of the existing technology. Contents of the invention
[0003] The purpose of the present invention ...
Examples
Embodiment Construction
[0014] In order to clearly illustrate the technical features of the solution, the solution will be described below through a specific implementation mode combined with the accompanying drawings.
[0015] It can be seen from the accompanying drawings that a method for testing the AC power cycle of a 1U2 rack-mounted server in this solution includes the following steps:
[0016] 1) Build a test platform, prepare the test environment, and install the operating system;
[0017] 2) Connect one of the two independent nodes on the 1U2 rack server as the control terminal to the fatigue testing machine;
[0018] 3) The control node node02A as the control terminal detects the power-on / off state of another node node01A, if the detected node node01A is in the power-off state, then enter step 4), if the detected node node01A is in the power-on state, continue to detect; Node node01A executes the shutdown script to shut down.
[0019] 4) Shut down the control node node02A as the control t...