Building construction progress management method

A technology for building construction and construction progress, applied in data processing applications, instruments, office automation, etc., can solve problems such as insufficient technology and management, impact on projects, and large number of construction sites, so as to improve the scientific and intelligent level and ensure The effect of smooth progress

Inactive Publication Date: 2018-02-09
深圳市易联智道科技有限公司
View PDF7 Cites 29 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

As we all know, in some construction projects, due to inadequate technology, management, etc., resulting in poor construction quality, many safety hazards and frequent accidents
In the management of building construction, due to the scattered and unstable locations of many building constructions, and the large number of construction sites, it increases the difficulty of management of safe construction and civilized construction, as well as the difficulty of supervision of personnel and equipment.
On the other hand, in construction projects, affected by various factors such as funds, personnel, materials, weather, geological conditions and management, the construction progress often cannot be completed as planned. Manually investigate and analyze the reasons and adjust the schedule. This traditional method has a long cycle and low efficiency, and will affect the progress of the project.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Building construction progress management method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0015] The following examples are further explanations and illustrations of the present invention, and do not constitute any limitation to the present invention.

[0016] The construction progress management method of the present invention relates to a method for implementing intelligent management of the whole process of a construction project from planning, construction process to construction progress, and is used to improve the scientific and intelligent construction progress management.

[0017] refer to figure 1 , the method of the present invention comprises:

[0018] S10: The management platform is connected to the design and construction management departments of the construction project through the local area network, collects real-time data of the construction plan, construction process, and construction progress, and forms an electronic data report. The construction plan includes but is not limited to construction management organizational structure, construction ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a building construction progress management method. The method comprises the steps that a, a management platform acquires the real-time data of the building construction plan, the construction process and the construction progress to form an electronic data report, and the management platform is connected with and communicates with the mobile communication terminal of each engineering project leader and each engineering project leader reports the progress of the project; b, the management platform acquires the video data of the construction project progress and the safety condition through the cameras of each construction site; c, the management platform performs big data integration and analysis on the acquired electronic data to from a data analysis report and analyzes and finds out the abnormity of the building construction plan, the construction process and the construction progress and the causes thereof; and d, the management platform performs automatic risk assessment on the discovered abnormity and the causes thereof and performs automatic early warning and also intelligently adjusts the implementation scheme. Intelligent management of the building engineering can be performed so that the management personnel is enabled to master the engineering progress in real time and discover and solve the problems in time and adjust the scheme in time.

Description

【Technical field】 [0001] The invention relates to construction project management technology, in particular to a construction progress management method. 【Background technique】 [0002] At present, with the acceleration of industrialization and urbanization, the construction of buildings has become the norm. While paying attention to the scale and speed of construction, people also pay more attention to the quality of buildings and the safety of construction. However, the actual situation is not as expected. As we all know, in some construction projects, due to inadequate technology, management, etc., resulting in poor construction quality, many safety hazards and frequent accidents. In the management of building construction, due to the scattered and unfixed locations of many building constructions, and the large number of construction sites, it increases the difficulty of managing safe and civilized construction and the supervision of personnel and equipment. On the oth...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10G06Q50/08
CPCG06Q10/103G06Q50/08
Inventor 罗欢畅
Owner 深圳市易联智道科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products