[0010] combined with figure 1 , 2 The present invention is further described:
[0011] A construction method for laying asphalt on a ring road slope, comprising the following steps:
[0012] A. Prepare the measurement work before paving the inclined surface of the ring road. Measure a cross-section of the lower bearing layer of the paving surface every 5m. Each cross-section is divided into left, middle and right to measure at least 5 data points, and the left and right points are used to hang steel wires. The two points on the left and right are the top and bottom points of the slope of the ring road. These two points determine the reference slope and the design slope of the slope of the ring road. It is ensured that these two points of all cross sections are on the same plane, and the middle of the calculation is at least The vertical distance of the 3 points relative to the reference slope is averaged, and the average value of the deviation of at least 3 points in the mid...