Deep steel sheet pile inclinometer pipe installation auxiliary device and construction method thereof
A technology for installation assistance and inclinometer tubes, which is applied in sheet pile walls, excavation, foundation structure engineering, etc., can solve the problems of out-of-synchronization deformation between inclinometer tubes and steel sheet piles, and achieve simple structure, strong practicability, and convenient construction Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] An auxiliary device for installing an inclinometer pipe of a deep steel sheet pile, comprising an inclinometer pipe 7 , a soil discharge pipe shoe 1 , a hoop 2 , and a top plate 3 .
[0037] The hoop 2 adopts an Ω-shaped hoop, and two arc-shaped flat irons 2-2 are welded inside the hoop body 2-1, and a groove 2 corresponding to the protrusion on the outer wall of the inclinometer pipe is reserved between the two arc-shaped flat irons 2-2 -4. The Ω-shaped hoop 2 is welded with the steel sheet pile 4 by its hoop ears 2-3 to form an integral structure.
[0038] The top plate 3 adopts a channel steel top plate, which is buckled on the top of the inclinometer pipe 7, one side is welded and fixed with the steel sheet pile 4, and the other side is inserted into the reserved seam on the top of the inclinometer pipe.
[0039] Each section of the inclinometer pipe 7 is connected by the pipe collar 5. During the installation process, the grooves 2-4 on the inner wall of the hoop 2...
Embodiment 2
[0043] The specific construction method of the installation auxiliary device for the inclinometer pipe of the deep steel sheet pile is as follows:
[0044] ① Weld the soil discharge pipe shoe 1 to the bottom of the central axis of the steel sheet pile 4;
[0045] ②Connect the inclinometer pipe to the predetermined length piece by piece with the pipe clamp 5, and cut a gap along the outer wall protrusion at the top of the inclinometer pipe 7 at the top section, and then insert the inclinometer pipe into the soil discharge pipe shoe 1;
[0046] ③ Fasten the Ω-shaped hoop 2 on the upper end surface of each section of pipe hoop 5, and rotate the inclinometer tube so that the grooves 2-4 on the inner wall of the Ω-shaped hoop 2 engage with the protrusions on the outer wall of the inclinometer tube;
[0047] ④ After welding and fixing the hoop ear 2-3 of each Ω-shaped hoop 2 with the steel sheet pile 4, buckle the channel steel top plate 3 on the top of the inclinometer pipe and wel...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com