Communication network alarm data analysis method and system based on alarm maintenance delay degree

A data analysis system and data analysis technology, applied in the field of communication network operation and maintenance, can solve the problems of improvement of operation and maintenance work, the lack of quantifiable measurement of maintenance delay, and the inability to provide guidance on the timeliness of alarm maintenance and other issues

CN110086656AActive Publication Date: 2019-08-02WUHAN FIBERHOME TECHNICAL SERVICES CO LTD
6 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Current Assignee / Owner
Publication Date
2019-08-02

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention discloses a communication network alarm data analysis method and system based on alarm maintenance delay degree, and relates to the field of communication network operation and maintenance. The method comprises the following steps of collecting and counting the total alarm amount in an investigation period, and defining and counting various ultra-long alarm amounts in the investigation period; calculating the speed and the ratio of the overlong alarm in the investigation period, and calculating the alarm maintenance delay degree. According to the invention, the scientific evaluation of the timely state of the communication network alarm maintenance can be realized, and the operation and maintenance production work is guided.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to the field of communication network operation and maintenance, in particular to a communication network alarm data analysis method and system based on alarm maintenance delay. Background technique

[0002] Communication networks have high security requirements, and alarms are the main data reflecting network security. The scientific analysis of alarms helps to reflect the network security status and operation and maintenance status, so as to further guide the network operation and maintenance work.

[0003] Alarms that occur on the communication network need to be maintained and processed in a timely manner to eliminate alarms and ensure communication security. However, in the actual operation and maintenance work, there are many factors that will cause the alarm to not be processed in time, thus bringing security risks to the communication network.

[0004] In general, the operation and maintenance of the current communicatio...

Examples

Embodiment Construction

[0064] Reference will now be made in detail to specific embodiments of the invention, examples of which are illustrated in the accompanying drawings. While the invention will be described in conjunction with specific embodiments, it will be understood that it is not intended to limit the invention to the described embodiments. On the contrary, it is intended to cover alterations, modifications and equivalents as included within the spirit and scope of the invention as defined by the appended claims. It should be noted that the method steps described here can all be realized by any functional block or functional arrangement, and any functional block or functional arrangement can be realized as a physical entity or a logical entity, or a combination of both.

[0065] In order to enable those skilled in the art to better understand the present invention, the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embo...