Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A balanced optimization method for distribution network main transformer operation

An optimization method and distribution network technology, applied to electrical components, circuit devices, AC network circuits, etc., can solve the problems of low return on investment in power grid construction, low utilization of power grid equipment, waste of investment in power grid construction, etc. Open capacity, significant scalability, and the effect of improving the operating level

Active Publication Date: 2021-07-16
STATE GRID ZHEJIANG ELECTRIC POWER CO LTD HANGZHOU POWER SUPPLY CO +2
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, in order to solve the problem of heavy overload of the main transformer in the distribution network, the measures usually taken are mainly to change the state of the tie switch or section switch, or add a new main transformer to transfer the load. Although this type of method meets the requirements of the distribution network The requirement for the load ratio margin of the main transformer has exacerbated the existing problem of generally low utilization rate of power grid equipment during the low power consumption period, which may lead to low return on investment in power grid construction and waste of investment in power grid construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A balanced optimization method for distribution network main transformer operation
  • A balanced optimization method for distribution network main transformer operation
  • A balanced optimization method for distribution network main transformer operation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0038] The technical solution of the present invention will be further described in detail below in conjunction with the accompanying drawings.

[0039] Such as figure 1 Shown, the present invention comprises the steps:

[0040] Step 1: Obtain data, including the following four types of data for the pre-optimized regional distribution network:

[0041] a) Historical current or power data of the main transformer, including data time, name of the main transformer, ID of the main transformer, current or power value of the main transformer.

[0042] b) Historical current or power data of the feeder, specifically including: including data time, feeder name, feeder ID, feeder current or power value.

[0043] c) The connection relationship between the main transformer and the feeder, the subordinate relationship between the main transformer and the substation, and the rated capacity of the main transformer;

[0044] d) BPA flow file at the peak load time.

[0045] The duration of...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an operation equilibrium optimization method of a main transformer of a distribution network, and relates to the field of power distribution of a power network. At present, while solving the heavy and overload of the main transformer of the distribution network, it often exacerbates the problem of low utilization of power grid equipment during the low power consumption period, or causes low return on investment in power grid construction and waste of investment in power grid construction. This technical scheme screens and optimizes the target main transformer group; by changing the feeder combination connected to the main transformer, the main transformer balance optimization calculation is performed on each target main transformer group, and the comprehensive index of each candidate scheme is calculated; the candidate is selected according to the comprehensive index The schemes are sorted, and the optimal scheme is selected for power flow calculation and verification; the feasibility evaluation of each candidate scheme is obtained according to the network loss value, and the optimal feasible scheme is obtained for the actual transformation of the distribution network. This technical solution reduces the peak load and volatility of the main transformer by changing the feeder connected to the main transformer, and increases the openable capacity of the main transformer of the distribution network. It is highly operable and has significant scalability.

Description

technical field [0001] The invention relates to the field of power distribution of a power grid, in particular to a method for balancing and optimizing the operation of a main transformer of a power distribution network. Background technique [0002] With the rapid development of social economy, people's quality of life has been significantly improved, and users have higher and higher requirements for a stable supply of electric energy. There are potential safety hazards in the heavy overload operation of 10kV distribution network transformers, which may not only affect social production and cause economic losses, but also directly affect the living order of the people. Therefore, in order to provide users with a more stable, reliable and safe power supply, and to achieve the best state of power supply, it is of great practical significance to conduct research on the optimization of the main transformer operation of the distribution network. [0003] At present, in order to...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): H02J3/00H02J3/24H02J3/06
CPCH02J3/00H02J3/06H02J3/24
Inventor 姜建楼健吴舜裕李衡赵斌炎陈文超鲍威刘海琼王一鸣朱虹
Owner STATE GRID ZHEJIANG ELECTRIC POWER CO LTD HANGZHOU POWER SUPPLY CO
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products