Multi-connected air-conditioning unit and its remote upgrading method

A multi-connected air conditioner and remote upgrade technology, applied in the direction of digital transmission system, data exchange network, electrical components, etc., can solve the problems of GPRS module upgrade package transmission interruption, etc., to ensure the effect of normal upgrade

Active Publication Date: 2020-11-24
GREE ELECTRIC APPLIANCES INC
View PDF22 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The main purpose of the present invention is to provide a multi-connected air-conditioning unit and its remote upgrade method, aiming to solve the technical problem in the prior art that the transmission of the upgrade package of the GPRS module is interrupted when the bus is blocked

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Multi-connected air-conditioning unit and its remote upgrading method
  • Multi-connected air-conditioning unit and its remote upgrading method
  • Multi-connected air-conditioning unit and its remote upgrading method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0020] In order to make the purpose, features and advantages of the present invention more obvious and understandable, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described The embodiments are only some of the embodiments of the present invention, but not all of them. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without making creative efforts belong to the protection scope of the present invention.

[0021] figure 1 It is the network topology diagram of multi-connected air-conditioning units and GPRS modules. Multiple clients correspond to one server, one server corresponds to multiple projects, one project corresponds to multiple outdoor units and corresponding GPRS modules, and one outdoor unit and one GPRS module correspond to multiple...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a multi-connected air conditioning unit and a remote upgrading method thereof. The multi-connected air conditioning unit remote upgrading method comprises the steps that eachmulti-connected air conditioning unit is remotely upgraded through a GPRS module, the GPRS module adopts an election mechanism in a network, and when the GPRS module is elected, a selected zone bit and upgrading packet data are sent to a bus; and when the GPRS module is not elected, whether a selected zone bit or upgrade package data exists on the bus is judged, if so, the election is not participated in, and if not, the election is participated in. When the GPRS module is used for upgrading the air conditioning unit, the elected GPRS module sends a large amount of upgrade package data to thebus; even if the non-elected GPRS module cannot receive the selected flag bit sent by the bus within the preset time, the selected flag bit cannot be received by the unelected GPRS module; when the GPRS modules are not elected, the GPRS modules receive the upgrading package data sent by the bus, once the GPRS modules which are not elected receive the upgrading package data, it is indicated that one GPRS module is elected under the same project, the GPRS modules do not participate in election, and therefore normal upgrading of the air conditioning unit is guaranteed.

Description

technical field [0001] The invention relates to the technical field of air conditioning, in particular to a multi-connected air conditioning unit and a remote upgrading method thereof. Background technique [0002] At present, the multi-connected air-conditioning unit has the remote upgrade function of the GPRS module. The GPRS module downloads the upgrade package from the server through the bus and sends the downloaded upgrade package to the bus, so that the air-conditioning units on the same bus can be upgraded. Under one project, there may be more than two GPRS modules. In order to save traffic, GPRS modules have an election mechanism in the network, that is, under the same network, one GPRS module is elected to work, and other GPRS modules are on standby. The conventional processing scheme is that the elected GPRS module sends the selected flag bit flag=1 to the bus every preset time, when other GPRS modules that are not elected receive the selected flag bit sent on the ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): H04W8/22H04W8/24H04L12/24H04L12/407
CPCH04L12/407H04L41/082H04L41/30H04W8/22H04W8/24H04W8/245
Inventor 杨燕陈智鹏江裴玲彭志富蔡海春李健龙吴惠欢
Owner GREE ELECTRIC APPLIANCES INC
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products