Project settlement whole-process cost dynamic management method

A dynamic management and whole-process technology, applied in the field of project settlement, can solve the problems of many influencing factors, many construction project investment activities, and the inability to dynamically adjust the project cost, etc.

Pending Publication Date: 2020-04-14
新泉工程咨询有限公司
View PDF5 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

But if the difference is too large, there is a possibility of intentionally lowering the cost or overestimating it
[0003] Cost management is an important part of project settlement. Due to the large number of investment activities in construction projects, which involve a wide range of factors and many influencing factors, the existing cost control is mainly based on artificial analysis and statistics of each stage after the completion of the project, which cannot be dynamic. Adjust the cost of engineering projects, there is still room for improvement

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project settlement whole-process cost dynamic management method
  • Project settlement whole-process cost dynamic management method
  • Project settlement whole-process cost dynamic management method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0052] The present invention will be described in further detail below in conjunction with the accompanying drawings.

[0053] refer to figure 1 , is a dynamic management method for the whole process of project settlement disclosed by the present invention, comprising the following steps: Step S100: compare the planned investment and actual investment in each stage of the engineering project; Step S200: when there is a deviation between the planned investment and the actual investment Analyze the reason; step S300: send the deviation data and the cause of the deviation to the corresponding approval personnel for approval in time; step S400: complete the approval and enter the next stage of the project.

[0054] Such as figure 2As shown, further considering the comparison between the planned investment and the actual investment of each stage of the engineering project, step S100 includes the following steps: Step S110: constructing the first project that stores the planned in...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a project settlement whole-process cost dynamic management method, relates to the technical field of project settlement, and solves the problem that the cost of an engineeringproject cannot be dynamically adjusted due to the fact that the existing cost management and control is mainly to manually analyze and count each stage after the engineering project is completed. Themethod comprises the steps: S100, comparing planned investment and actual investment of each stage of the engineering project; S200, analyzing reasons when the planned investment deviates from the actual investment; S300, sending the deviation data and the deviation reasons to corresponding approval personnel in time for approval; and S400, completing examination and approval and entering the next stage of the engineering project. The influence factors are analyzed systematically, comprehensively and dynamically, the influence factors are controlled, the purpose of engineering construction cost control management and control is achieved, the cost is reasonably determined and the cost is effectively controlled.

Description

technical field [0001] The invention relates to the technical field of project settlement, in particular to a method for dynamic management of cost in the whole process of project settlement. Background technique [0002] Project settlement is directly related to the vital interests of the construction unit and the construction unit. Due to the different positions, standpoints and purposes of the editors and reviewers in the process of editing and reviewing settlements, as well as differences in the working level of the reviewers, it is completely normal that there are varying degrees of gaps in the review results. However, if the difference is too large, there is a possibility of deliberately lowering the cost or overestimating it. [0003] Cost management is an important part of project settlement. Due to the large number of investment activities in construction projects, which involve a wide range of factors and many influencing factors, the existing cost control is main...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/10G06Q50/08
CPCG06Q10/103G06Q50/08
Inventor张国新唐国易伟
Owner新泉工程咨询有限公司