Fixing device and method for quickly assembling suspended formwork and erecting formwork
A technology of fixing device and hanging formwork, which is applied to formwork/formwork/work frame, processing of building materials, preparation of building components on site, etc., can solve the problem of large deviation of sinking height, inconvenient transportation, and large deviation of concrete positioning. and other problems, to achieve the effect of fast and convenient installation and disassembly, easy assembly and disassembly, and not easy to be displaced and deformed.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] Such as Figure 1-5 As shown in the figure, a fixing device for quickly assembling the hanging formwork and supporting the formwork includes the hanging formwork body, the hanging formwork body is a rectangular frame composed of two L-shaped square steels 1, and the junction of the two L-shaped square steels 1 can be opened through The connection assembly 2 is connected, the connection assembly 2 includes a second bolt 4 and two connection nuts 3, the two connection nuts 3 are respectively fixed on the upper side of the junction of the two L-shaped square steel 1, and the second bolt 4 is threaded through Two connecting nuts 3 are threadedly connected with lock nuts 5 .
[0026] The lower side of the L-shaped square steel 1 is provided with a plurality of supporting assemblies at intervals, and the supporting assemblies include several-shaped brackets 6 and first bolts 7. The upper end of the several-shaped brackets 6 is provided with a positioning hole 8, and the lower...
Embodiment 2
[0029] The using method of the fast assembling hanging formwork support formwork described in embodiment 1 comprises the following steps:
[0030] (1) Two L-shaped square steels 1 are formed into a rectangular frame through the connection assembly 2 to obtain the hanger body; the first bolt 7 is passed through the sleeve 10 and the positioning hole 8 in turn, and then connected with the positioning nut 9 by threads, so that several The font support 6 is fixed on the lower side of the hanging mold body;
[0031] (2) Lay reinforced mesh on the platform formwork 12, then the lower end of several font support 6 is fixed on the platform formwork 12, carries out concrete pouring on the platform formwork 12 in the suspension formwork body;
[0032] (3) After the pouring is completed, the several-shaped support 6 is pre-embedded in the concrete, such as Image 6 As shown, take out the first bolt 7 from the positioning nut 9 and the sleeve 10, then open the connection assembly 2, and ...