A multi-parameter dynamic trend early warning method for rock burst

A technology of rock burst and multi-parameters, which is applied in earthwork drilling, instruments, data processing applications, etc., can solve problems such as low reliability, low efficiency, and conflicting results, achieve accurate monitoring and early warning, and avoid false alarms/ The effect of high false negative rate, strong scalability and adaptability

CN114087021BActive Publication Date: 2022-08-02UNIV OF SCI & TECH BEIJING
0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Publication Date
2022-08-02

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention provides a multi-parameter dynamic trend early warning method of rock burst, belonging to the technical field of underground excavation engineering and coal rock dynamic disaster early warning. The method includes: according to the real-time monitoring data of the on-site microseismic monitoring system, using the Mann-Kendall trend test method to describe the change trend of the "time-space-strong" multivariate precursory early warning indicators in the process of rockburst gestation and evolution. According to the pre-warning rule of the rockburst precursor, the early warning is carried out; the early warning efficiency of each index is evaluated; the index is optimized based on the principle of maximizing early warning efficiency; the early warning efficiency corresponding to the optimized index is used as the weight to carry out multi-index fusion to obtain the comprehensive shock risk comprehensive abnormal index; The comprehensive anomaly index of impact risk is compared with the corresponding quantitative grading standard to determine the impact risk level; the index selection and weight update are carried out regularly driven by the actual monitoring data on site. The invention can provide efficient and accurate decision-making basis for prevention and control of downhole rock burst.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to the technical field of underground excavation engineering and coal and rock dynamic disaster early warning, in particular to a multi-parameter dynamic trend early warning method of rock burst. Background technique

[0002] Rockburst is one of the main dynamic disasters affecting underground production in coal mines, often causing serious consequences such as casualties and major property losses. In recent years, with the depletion of shallow mineral resources, coal mining continues to expand deep into the earth, the coal seam structure of the stope and the occurrence conditions of surrounding rocks around the roadway have become increasingly complex, and the internal dynamic response characteristics of the coal and rock mass have become more intense, resulting in shock The frequency of ground pressure accidents is rising rapidly, and accurate and efficient monitoring and early warning methods for this disaster are the key to en...

Examples

Embodiment Construction

[0075] In order to make the objectives, technical solutions and advantages of the present invention clearer, the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.

[0076] like figure 1 As shown, the embodiment of the present invention provides a multi-parameter dynamic trend early warning method for rock burst, including:

[0077] S101, according to the real-time monitoring data of the on-site microseismic monitoring system, use the Mann-Kendall trend test method to describe the change trend of the "time-space-strong" multivariate precursory early warning indicators in the process of rockburst gestation and evolution. Whether the change trend of each index conforms to the characteristic law of rockburst precursors is used as an early warning criterion for early warning; the specific steps may include the following:

[0078] A1. Collect the real-time monitoring data of the on-site microseismic monitorin...