A tunnel advanced geological prediction device
By designing the device of the slide, outer shaft sleeve and sampling hollow cylinder, and using electromagnetic separator and locking structure, the problems of difficulty in sample collection and pollution in the prior art are solved, and the accuracy of tunnel advance geological forecast and sample completeness are achieved. Improvement of sex.
Patent Information
- Application Number
- CN202211495246.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-26
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2042-11-26
AI Technical Summary
The existing advanced geological forecasting methods have difficulty and pollution problems when collecting samples, especially in geological layers with high water content, and the accuracy of the samples is insufficient.
A tunnel advance geological forecasting device is designed, including a slide, an outer shaft sleeve and a sampling hollow cylinder. The samples are protected in segments with electromagnetic separators to prevent water flow contamination, and the samples are easily installed and disassembled through locking structures to realize samples. complete sampling and segmentation extraction.
It effectively solves the problem of difficulty in collecting samples and contamination, improves the accuracy of geological forecasts, and ensures the integrity of samples and the reliability of data.
Smart Images

Figure CN115788422B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of geological prediction, and in particular to a tunnel advanced geological prediction device. Background Art
[0002] With the rapid development of road traffic engineering, tunnel construction is increasing. Tunnel disasters such as rock collapse, water gushing, mud burst, gas leakage, etc. often occur. Therefore, geophysical exploration methods are used to conduct advanced geological forecasts during tunnel excavation to timely discover unfavorable geological bodies in front of the tunnel face, provide accurate and sufficient geological data for tunnel construction, and enable construction personnel to adjust the construction process, thereby reducing and preventing the occurrence of engineering accidents. This is of significant significance to ensuring the personal safety of tunnel construction personnel and accelerating the construction progress.
[0003] The current means of advanced geological prediction include advanced drilling methods, which specifically use the rotation of the drill bit to generate energy to crush various materials in the geological layer (including soil, water, sand, gravel, and stones) to achieve the drilling purpose. When working, it mainly relies on the reaction force of the drilling rig base and the thrust of the operator to provide a certain axial force of the drill pipe to the drill bit. The shear force generated by the high-speed rotation of the drill bit will cut the geological layer near the drill bit. At the same time, the high-pressure water or gas introduced from the core hole of the drill pipe will flush the cut material out along the gap behind the borehole. During the drilling process, the particle size, hardness, and lithology of the return slag of each drilling section, the color and smell of the flushing fluid, the size of the water return site and its changing characteristics, and the gas and other gas outbursts are continuously observed and recorded.
[0004] The above technical means have certain defects. First, the composition of the returned slag material is complex and splashes randomly, making it difficult to collect. In addition, the geological layer has a large water content, which will gather and gush out in large quantities, seriously interfering with the normal collection of the collected materials. Second, during the drilling process, the returned slag material has a certain speed and irregular movement and impact. Before being discharged, it will mix with some of the edge materials of the geological layer in the path and be discharged together with them, resulting in contamination of the collected samples and inaccurate data results. For this reason, we propose a tunnel advanced geological prediction device. Summary of the invention
[0005] The main purpose of the present invention is to provide a tunnel advanced geological prediction device, which can effectively solve the problems of difficult collection and sample contamination in the background technology.
[0006] To achieve the above object, the technical solution adopted by the present invention is:
[0007] A tunnel advanced geological prediction device includes a slide seat, an outer sleeve and a sampling hollow cylinder. The slide seat is located in a slide rail. A connecting groove is provided at the middle position of the bottom of the slide seat. One end of the outer sleeve is fixed in the connecting groove. A slide groove for the outer sleeve to slide is provided in the middle of the slide rail. A rotating shaft is installed in the outer sleeve through an inner bearing. The front end of the rotating shaft extends outward and is connected to a sampling hollow cylinder through a locking structure. The sampling hollow cylinder is used to extend horizontally into the tunnel geological layer to take out geological samples.
[0008] As a preferred solution of the tunnel advanced geological prediction device described in the present invention, the slide rail is located at the upper end of the device platform, and limit grooves acting on the slide seat are symmetrically arranged on both sides of the slide rail. The cross-section of the slide groove is semicircular, the bottom surface is smooth, and it is adapted to the size of the outer sleeve, and the front end of the rotating shaft is hollowed out to form an empty groove.
[0009] As a preferred solution of the tunnel advanced geological prediction device described in the present invention, the locking structure includes a clip and an elastic clamping mouth, the clip passes through the first through hole, the second through hole and the third through hole in sequence and is locked with the elastic clamping mouth fixed inside, a slot head is provided at one end of the clip, and the elastic clamping mouth includes two groups of clips acting on the slot head, and the clip is released from the elastic clamping mouth restriction after rotating 90 degrees.
[0010] As a preferred solution of the tunnel advanced geological prediction device described in the present invention, wherein: the first through hole is located on one end of the sampling hollow cylinder, the second through hole is located on the rubber gasket, the third through hole is located on the rotating shaft, the sampling hollow cylinder is sleeved on the outside of the rotating shaft, the rubber gasket is located between the sampling hollow cylinder and the rotating shaft, and the locking structure is arranged in several groups around the outside of the sampling hollow cylinder, and the preferred number of the locking structure is 2-6 groups.
[0011] As a preferred solution of the tunnel advanced geological prediction device described in the present invention, the other end of the sampling hollow cylinder is welded with a drill bit crushing sleeve, the drill bit crushing sleeve includes a bucket-shaped sleeve, an arc surface, a first crushing knife and a second crushing knife, the hollow volume of the bucket-shaped sleeve and the sampling hollow cylinder is the same, the cross-section of the bucket-shaped sleeve is a funnel shape, the arc surface is located at the front end inlet of the bucket-shaped sleeve, and a plurality of groups of second crushing knives are evenly distributed around the arc surface. The preferred number of the second crushing knives is 8-12 groups, and the cutting direction of the second crushing knives radiates outward with the inlet as the center. Several groups of the first crushing knives surround the bucket-shaped sleeve twice, and the preferred number of the first crushing knives is 8-12 groups, and their cutting direction is perpendicular to the sleeve surface of the bucket-shaped sleeve.
[0012] As a preferred solution of the tunnel advanced geological prediction device described in the present invention, several groups of electromagnetic separators are equidistantly arranged inside the sampling hollow cylinder, and the preferred number of the electromagnetic separators is 4-10 groups. The electromagnetic separators divide the sampling hollow cylinder into several groups of small sections, which are used to protect geological samples in sections to prevent mixing, and one group of the electromagnetic separators is located between the sampling hollow cylinder and the drill bit crushing sleeve.
[0013] As a preferred solution of the tunnel advanced geological prediction device described in the present invention, the electromagnetic separator includes an annular outer receiving groove, a semicircular arc baffle, an auxiliary baffle, an inner receiving groove, a tension spring and a cutting knife portion, the annular outer receiving groove is opened at the cylinder wall of the sampling hollow cylinder, the semicircular arc baffles are symmetrically arranged in two groups and are located in the annular outer receiving groove, a receiving inner groove is opened between the inner side surfaces of the semicircular arc baffles, an auxiliary baffle is installed in the receiving inner groove, the auxiliary baffle is fixed by two groups of tension springs and the bottom of the inner receiving groove, the two groups of the semicircular arc baffles are combined to form a sealing baffle with a gap, and the two groups of the auxiliary baffles fill the gap position by moving.
[0014] As a preferred solution of the tunnel advanced geological prediction device described in the present invention, the inner edge of the auxiliary baffle and the two ends of the inner side of the semicircular arc baffle are provided with cutting knife parts, and the semicircular arc baffle and the auxiliary baffle are provided with powered electromagnets inside, and the powered electromagnets are connected to wires, and the wires are pre-buried in the inner wall of the sampling hollow cylinder.
[0015] As a preferred solution of the tunnel advanced geological prediction device described in the present invention, the electromagnetic separator also includes a connecting sleeve, a fixed shaft and a torsion spring, the connecting sleeve is welded to the top of the semi-circular arc baffle, the fixed shaft is located inside the connecting sleeve, the fixed shaft is provided with a torsion spring and is fixed to the connecting sleeve, the end of the fixed shaft is welded to the groove wall of the annular receiving outer groove, and under normal conditions, the two groups of semi-circular arc baffles are completely located in the annular receiving outer groove due to the traction of the torsion spring.
[0016] As a preferred solution of the tunnel advanced geological prediction device described in the present invention, the other end of the rotating shaft is sleeved with a first gear, the upper end surface of the outer sleeve is provided with an opening, and the second gear extends into the opening and meshes with the first gear.
[0017] As a preferred solution of the tunnel advance geological prediction device of the present invention, the second gear is located on the intermediate shaft, the two ends of the intermediate shaft are fixed by the first bearing seat and the inner wall of the slide seat, and a large pulley is sleeved on the intermediate shaft, and the large pulley moves synchronously with the small pulley through a belt connection.
[0018] As a preferred solution of the tunnel advanced geological prediction device described in the present invention, the small pulley is located on the motor output shaft, one end of the motor output shaft is fixed by the second bearing seat and the rear inner wall of the slide, the other end of the motor output shaft is connected to the drive motor, and the drive motor is mounted in the middle of the slide.
[0019] As a preferred solution of the tunnel advanced geological prediction device described in the present invention, the rear side of the slide seat is fixedly connected to the output end of the thruster, and the thruster is fixedly arranged at the tail end of the device platform.
[0020] As a preferred solution of the tunnel advanced geological prediction device described in the present invention, four groups of adjustable supporting legs are symmetrically arranged at the bottom of the device platform.
[0021] As a preferred solution of the tunnel advanced geological prediction device described in the present invention, the upper end surface of the outer sleeve is symmetrically provided with two rows of clamping grooves.
[0022] As a preferred solution of the tunnel advanced geological prediction device described in the present invention, the elastic clamping nozzle is riveted at the position of the third through hole on the empty slot of the rotating shaft.
[0023] The present invention provides a tunnel advance geological prediction device through improvement, which has the following significant improvements and advantages compared with the prior art:
[0024] (1) A hollow sampling tube is designed to be inserted into the geological layer for complete sampling. The separated geological layer samples are inserted horizontally. When the hollow sampling tube reaches the farthest extension distance, each group of electromagnetic separators is used to segment the samples in the tube in time to prevent the samples from carrying water and contaminating each other. After segmentation, the hollow sampling tube is returned along the original route so that the samples can be extracted from the tunnel geological layer.
[0025] (2) Use a flat-blade screwdriver to twist the clip and rotate it 90 degrees to make it disengage from the elastic clamping nozzle, and separate the sampling hollow tube and the rotating shaft. This structure is convenient for the installation and disassembly of the sampling hollow tube, saving time and effort. Then prepare several groups of sample storage tubes, and pour out the samples in sequence from the end of the sampling hollow tube away from the drill bit crushing sleeve, so as to achieve the technical effect of complete sampling segmentation and improve the accuracy of geological prediction.
[0026] (3) The electromagnets in the two groups of semicircular baffles and the auxiliary baffles are energized, generating electromagnetic attraction and adsorbing each other, so that the two groups of semicircular baffles move from a state of being separated and located in the annular outer groove to a central position of contact with each other and merge. The two groups of semicircular baffles are combined to form a sealing baffle with a gap. The two groups of auxiliary baffles move by attraction to fill the gap position to form a complete sealing structure, which plays a blocking role and solves the technical problem that a separator structure that can be automatically opened and closed cannot be installed on the narrow inner wall of the sampling hollow cylinder. The cutting knife parts at the inner edge of the auxiliary baffle and the two ends of the inner side surface of the semicircular baffle will cut the sample to form a fault during the movement, thereby ensuring the smooth sealing of the structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the overall structure of a tunnel advanced geological prediction device of the present invention;
[0028] Figure 2 It is a connection view of the outer sleeve and the sampling hollow cylinder of the present invention;
[0029] Figure 3 The figure is an external structural diagram of the outer sleeve of the present invention;
[0030] Figure 4 This is a disassembled view of the locking structure of the present invention;
[0031] Figure 5 This is a specific structural diagram of the drill bit crushing sleeve of the present invention;
[0032] Figure 6 It is a state diagram of the electromagnetic separator of the present invention when it is closed;
[0033] Figure 7 is a disassembled view of the electromagnetic separator of the present invention;
[0034] Figure 8 This is a specific structural diagram of the semicircular arc baffle of the present invention;
[0035] Fig. 9 This is a transmission structure diagram of the drive motor of the present invention.
[0036] In the figure: 1, device table; 2, slide rail; 3, slide seat; 4, limit groove; 5, connecting groove; 6, outer shaft sleeve; 7, slide groove; 8, drill bit crushing sleeve; 801, bucket sleeve; 802, arc surface; 803, first crushing knife; 804, second crushing knife; 9, electromagnetic separator; 901, annular storage outer groove; 902, semi-circular arc baffle; 903, auxiliary baffle; 904, storage inner groove; 905, tension spring; 906, cutting knife; 907, connecting sleeve; 908, fixed shaft; 909, torsion spring; 10, sampling hollow cylinder; 11. Inner bearing; 12. Rotating shaft; 13. Third through hole; 14. Elastic clamping nozzle; 15. Rubber gasket; 16. Second through hole; 17. Snap-in groove; 18. First through hole; 19. Snap-in device; 20. Slot head; 21. Clip; 22. First gear; 23. Opening; 24. Second gear; 25. Intermediate shaft; 26. First bearing seat; 27. Large pulley; 28. Small pulley; 29. Belt; 30. Motor output shaft; 31. Second bearing seat; 32. Driving motor; 33. Propeller; 34. Adjustable support leg. DETAILED DESCRIPTION
[0037] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0038] Embodiment 1:
[0039] like Figure 1-5 as well as Fig. 9 As shown, this embodiment provides a tunnel advanced geological prediction device, including a slide seat 3, an outer sleeve 6 and a sampling hollow cylinder 10, the slide seat 3 is located in the slide rail 2, the slide rail 2 is horizontally arranged, a connecting groove 5 is opened at the middle position of the bottom of the slide seat 3, one end of the outer sleeve 6 is fixed in the connecting groove 5, and a slide groove 7 for the outer sleeve 6 to slide is opened in the middle of the slide rail 2, a rotating shaft 12 is installed in the outer sleeve 6 through an inner bearing 11, the front end of the rotating shaft 12 extends outward, and is connected to the sampling hollow cylinder 10 through a locking structure, and the sampling hollow cylinder 10 is used to extend horizontally into the tunnel geological layer to take out geological samples.
[0040] In this embodiment, the slide rail 2 is located at the upper end of the device platform 1 , and limiting grooves 4 acting on the slide seat 3 are symmetrically arranged on both sides of the slide rail 2 .
[0041] In this embodiment, the cross section of the slide groove 7 is semicircular, the bottom surface is smooth, and it is adapted to the size of the outer sleeve 6. The front end of the rotating shaft 12 is hollowed out as an empty groove for installing the elastic clamping nozzle 14.
[0042] Specifically, the locking structure includes a buckle 19 and an elastic clamping mouth 14. Figure 4 shown.
[0043] In this embodiment, the buckle 19 passes through the first through hole 18, the second through hole 16 and the third through hole 13 in sequence and is locked with the elastic clamping mouth 14 fixed inside.
[0044] In this embodiment, a slot head 20 is provided at one end of the snap device 19, and the elastic clamping mouth 14 includes two groups of clips 21 acting on the slot head 20. When the slot head 20 is attached to the corresponding clip 21, the two are locked and connected, and the snap device 19 is disengaged from the restriction of the elastic clamping mouth 14 after rotating 90 degrees.
[0045] Furthermore, the first through hole 18 is located on one end of the sampling hollow cylinder 10 , the second through hole 16 is located on the rubber gasket 15 , and the third through hole 13 is located on the rotating shaft 12 .
[0046] Furthermore, the elastic clamping nozzle 14 is riveted to the third through hole 13 on the empty groove of the rotating shaft 12, the sampling hollow cylinder 10 is sleeved on the outside of the rotating shaft 12, and the rubber gasket 15 is located between the sampling hollow cylinder 10 and the rotating shaft 12 to play a role of buffering and sealing.
[0047] Furthermore, a plurality of locking structures are arranged around the outer side of the sampling hollow cylinder 10 .
[0048] In this embodiment, a drill bit crushing sleeve 8 is welded to the other end of the sampling hollow cylinder 10 .
[0049] Specifically, the drill bit crushing sleeve 8 includes a bucket sleeve 801, an arc surface 802, a first crushing knife 803 and a second crushing knife 804. Figure 5 shown.
[0050] In this embodiment, the hollow volumes of the bucket-shaped sleeve 801 and the sampling hollow cylinder 10 are the same, which facilitates smooth entry of the sample. The cross-section of the bucket-shaped sleeve 801 is in the shape of a funnel, which plays a guiding role.
[0051] In this embodiment, the arc surface 802 is located at the front end entrance of the bucket-shaped sleeve 801, and several groups of second crushing knives 804 are evenly distributed around the arc surface 802. The cutting direction of the second crushing knives 804 diverges outward from the entrance, which is convenient for forming the fracture surface of the sample during cutting and advancing along a straight line.
[0052] In this embodiment, a plurality of groups of first crushing knives 803 surround the bucket-shaped sleeve 801 twice, and the cutting direction thereof is perpendicular to the sleeve surface of the bucket-shaped sleeve 801, so as to facilitate circular cutting and expand the gap.
[0053] Furthermore, a plurality of groups of electromagnetic separators 9 are equidistantly arranged inside the sampling hollow cylinder 10 .
[0054] In this embodiment, the electromagnetic separators 9 divide the sampling hollow cylinder 10 into several groups of small sections, which are used to protect the geological samples in sections and prevent mixing. One group of electromagnetic separators 9 is located between the sampling hollow cylinder 10 and the drill bit crushing sleeve 8.
[0055] Furthermore, a first gear 22 is sleeved on the other end of the rotating shaft 12 , an opening 23 is formed on the upper end surface of the outer sleeve 6 , and a second gear 24 extends into the opening 23 and meshes with the first gear 22 .
[0056] Furthermore, the second gear 24 is located on the intermediate shaft 25, and the two ends of the intermediate shaft 25 are fixed by the first bearing seat 26 and the inner wall of the slide seat 3. A large pulley 27 is also sleeved on the intermediate shaft 25, and the large pulley 27 is connected to the small pulley 28 through a belt 29 and moves synchronously.
[0057] Furthermore, the small pulley 28 is located on the motor output shaft 30 , one end of the motor output shaft 30 is fixed by the second bearing seat 31 and the rear inner wall of the slide 3 , and the other end of the motor output shaft 30 is connected to the drive motor 32 , which is mounted in the middle of the slide 3 .
[0058] In this embodiment, the rear side of the slide 31 is fixedly connected to the output end of the propeller 33 , and the propeller 33 is fixedly arranged at the rear end of the device platform 1 .
[0059] In this embodiment, four sets of adjustable support legs 34 are symmetrically arranged at the bottom of the device platform 1, and the height can be adjusted by hydraulic thrust.
[0060] In this embodiment, two rows of clamping grooves 17 are symmetrically arranged on the upper end surface of the outer sleeve 6 , which play a role of connecting and fixing in the connecting groove 5 .
[0061] In this embodiment, when encountering a particularly large rock mass during the drilling process, it is not suitable for the device to continue drilling and sampling, but it can serve as a reminder.
[0062] When the present embodiment is used, the height of the device platform 1 is first adjusted by the adjustable support legs 34 to reach the height and position of the tunnel to be tested, and then the drive motor 32 is started, the motor output shaft 30 rotates, and the large pulley 27 is driven to rotate through the belt 29 to improve the driving stability, and the intermediate shaft 25 is pulled to move, and the intermediate shaft 25 drives the first gear 22 and the rotating shaft 12 to rotate through the second gear 24, and the rotating shaft 12 drives the sampling hollow cylinder 10 connected thereto to rotate, causing the drill bit on the sampling hollow cylinder 10 to break. The drill bit 300 is used to drill holes at a high speed. At the same time, the propeller 33 generates thrust through jetting, driving the slide 3 to slowly move forward on the slide rail 2, pushing the outer sleeve 6 to move in the slide groove 7, pushing the sampling hollow cylinder 10 out, and sampling the geological layer in the tunnel. The drill bit crushing sleeve 8 includes a first crushing knife 803 and a second crushing knife 804. The second crushing knife 804 faces forward and uses hard teeth to crush and excavate the geological layer (including soil, water, sand, gravel, and stone) in the front annular area to form an annular gap. The first crushing knife 803 The drill bit crushing sleeve 8 is vertically oriented, and then the annular area outside the crushing sleeve 8 is further crushed and excavated, and enough space is reserved for the drill bit crushing sleeve 8 and the sampling hollow tube 10 to move forward smoothly, so that the separated geological layer samples are horizontally inserted into the sampling hollow tube 10. When the sampling hollow tube 10 reaches the farthest extension distance, the samples in the tube are segmented by each group of electromagnetic separators 9 in time, and the sampling hollow tube 10 is allowed to return along the original path after segmentation (because the drill bit crushing sleeve 8 is provided with an electromagnetic separator 9, which is equivalent to cutting off the sampling hollow tube 10). The hollow tube 10 is connected to the geological layer, and the sampling hollow tube 10 can be extracted from the tunnel geological layer together with the sample), and then the buckle 19 is twisted with a flat-head screwdriver and rotated 90 degrees to make it disengage from the elastic clamping nozzle 14, and the sampling hollow tube 10 and the rotating shaft 12 are separated, and then several groups of sample storage tubes are prepared, and the samples are poured out in sequence from the end of the sampling hollow tube 10 away from the drill bit crushing sleeve 8 (from back to front, each time a group of electromagnetic separators 9 is opened, the samples within a section are poured out), and placed in respective sample storage tubes for data detection and analysis.
[0063] Embodiment 2:
[0064] On the basis of the first embodiment, the electromagnetic separator 9 is designed to solve the technical problem that the separator structure capable of automatic opening and closing cannot be installed on the narrow inner wall of the sampling hollow cylinder 10, such as Figure 6-8 shown.
[0065] Specifically, the electromagnetic separator 9 includes an annular receiving outer groove 901 , a semicircular arc baffle 902 , an auxiliary baffle 903 , a receiving inner groove 904 , a tension spring 905 and a cutting knife portion 906 .
[0066] In this embodiment, the annular outer receiving groove 901 is opened on the cylinder wall of the sampling hollow cylinder 10 , and two groups of semicircular arc baffles 902 are symmetrically arranged and located in the annular outer receiving groove 901 .
[0067] In this embodiment, a receiving inner groove 904 is opened between the inner side surfaces of the semicircular baffle 902 , and an auxiliary baffle 903 is installed in the receiving inner groove 904 . The auxiliary baffle 903 is fixed by two sets of tension springs 905 and the bottom of the receiving inner groove 904 .
[0068] In this embodiment, two groups of semicircular baffles 902 are combined to form a sealing baffle with a gap (because the wall thickness of the sampling hollow cylinder 10 is limited, the depth of the annular outer groove 901 is limited, and the semicircular baffle 902 cannot be completely received, which affects the sampling. The only way is to cut off the unreceived part along the annular outer groove 901 to make the semicircular baffle 902 in this device, and then make an auxiliary baffle 903 to fill the gap). The two groups of auxiliary baffles 903 fill the gap position by moving.
[0069] Furthermore, cutting blades 906 are provided on the inner edge of the auxiliary baffle 903 and both ends of the inner side surface of the semicircular baffle 902 .
[0070] Furthermore, the semicircular baffle 902 and the auxiliary baffle 903 are both provided with energized electromagnets, which are connected to wires pre-buried in the inner wall of the sampling hollow cylinder 10 , extending outwards and electrically connected to an external controller.
[0071] Specifically, the electromagnetic separator 9 also includes a connecting sleeve 907, a fixed shaft 908 and a torsion spring 909. Figure 8 shown.
[0072] In this embodiment, the connecting sleeve 907 is welded to the top of the semicircular baffle 902, and the fixed shaft 908 is located inside the connecting sleeve 907. A torsion spring 909 is provided on the fixed shaft 908 and is fixed to the connecting sleeve 907. Both the connecting sleeve 907 and the torsion spring 909 can rotate around the fixed shaft 908.
[0073] In this embodiment, the end of the fixed shaft 908 is welded to the groove wall of the annular outer groove 901 , and in a normal state, the two groups of semicircular arc baffles 902 are completely located in the annular outer groove 901 due to the traction of the torsion spring 909 .
[0074] When the present embodiment is in use, after the electromagnetic separator 9 is turned on, the electromagnets in the two groups of semi-circular baffles 902 and the auxiliary baffles 903 are energized, bringing electromagnetic attraction to each other, so that the two groups of semi-circular baffles 902 move from the state of being separated and located in the annular storage outer groove 901 to the central position of contacting each other and merge together. The two groups of semi-circular baffles 902 are combined to form a sealing baffle with a gap, and the two groups of auxiliary baffles 903 move by attraction to fill the gap position to form a complete sealing structure. The structure plays a blocking role, wherein the inner edge of the auxiliary baffle 903 and the cutting knife parts 906 at both ends of the inner side surface of the semicircular baffle 902 will cut the sample to form a fault during the movement (especially hard stones that cannot be directly cut will be pushed to one side). When the electromagnetic separator 9 is closed, due to the loss of electromagnetic attraction, the two groups of semicircular baffles 902 are restored to their original positions by the rotational force of the torsion spring 909, and the two groups of auxiliary baffles 903 are also restored to the storage inner groove 904 by the restoring elastic force of the tension spring 905.
[0075] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0076] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A tunnel advanced geological prediction device, characterized in that: The invention comprises a slide seat (3), an outer sleeve (6) and a sampling hollow cylinder (10), wherein the slide seat (3) is located in a slide rail (2), a connecting groove (5) is provided at the middle position of the bottom of the slide seat (3), one end of the outer sleeve (6) is fixed in the connecting groove (5), a slide groove (7) for the outer sleeve (6) to slide is provided in the middle of the slide rail (2), a rotating shaft (12) is installed in the outer sleeve (6) through an inner bearing (11), the front end of the rotating shaft (12) extends outward and is connected to the sampling hollow cylinder (10) through a locking structure, and the sampling hollow cylinder (10) is used to extend horizontally into the geological layer of the tunnel to take out geological samples. The locking structure comprises a buckle (19) and an elastic clamping mouth (14); the buckle (19) passes through the first through hole (18), the second through hole (16) and the third through hole (13) in sequence and is locked with the elastic clamping mouth (14) fixed inside; a slot head (20) is provided at one end of the buckle (19); the elastic clamping mouth (14) comprises two groups of clips (21) acting on the slot head (20); the buckle (19) is disengaged from the elastic clamping mouth (14) after rotating 90 degrees; Wherein: the first through hole (18) is located on one end of the sampling hollow cylinder (10), the second through hole (16) is located on the rubber gasket (15), the third through hole (13) is located on the rotating shaft (12), the elastic clamping nozzle (14) is riveted to the position of the third through hole (13) on the empty groove of the rotating shaft (12), the sampling hollow cylinder (10) is sleeved on the outside of the rotating shaft (12), the rubber gasket (15) is located between the sampling hollow cylinder (10) and the rotating shaft (12), and the locking structure is provided with a plurality of groups around the outside of the sampling hollow cylinder (10), Wherein: a plurality of groups of electromagnetic separators (9) are equidistantly arranged inside the sampling hollow cylinder (10), and the electromagnetic separators (9) divide the sampling hollow cylinder (10) into a plurality of small sections, so as to protect the geological samples in sections and prevent mixing, wherein one group of the electromagnetic separators (9) is located between the sampling hollow cylinder (10) and the drill bit crushing sleeve (8), The electromagnetic separator (9) comprises an annular outer receiving groove (901), a semicircular baffle (902), an auxiliary baffle (903), an inner receiving groove (904), a tension spring (905) and a cutting knife (906); the annular outer receiving groove (901) is provided on the wall of the sampling hollow tube (10); two groups of the semicircular baffles (902) are symmetrically arranged and located in the annular outer receiving groove (901); an inner receiving groove (904) is provided between the inner side surfaces of the semicircular baffles (902); an auxiliary baffle (903) is installed in the inner receiving groove (904); the auxiliary baffle (903) is fixed by two groups of tension springs (905) and the bottom of the inner receiving groove (904); the two groups of the semicircular baffles (902) are combined to form a sealing baffle with a gap; the two groups of the auxiliary baffles (903) fill the gap position by moving.
2. The tunnel advanced geological prediction device according to claim 1, characterized in that: The slide rail (2) is located at the upper end of the device platform (1), and limit grooves (4) acting on the slide seat (3) are symmetrically arranged on both sides of the slide rail (2). The cross-section of the slide groove (7) is semicircular, and the bottom surface is smooth, which is adapted to the size of the outer shaft sleeve (6), and the front end of the rotating shaft (12) is hollowed out to form an empty groove.
3. The tunnel advanced geological prediction device according to claim 1, characterized in that: A drill bit crushing sleeve (8) is welded to the other end of the sampling hollow cylinder (10), and the drill bit crushing sleeve (8) comprises a bucket-shaped sleeve (801), an arc surface (802), a first crushing knife (803) and a second crushing knife (804). The hollow volume of the bucket-shaped sleeve (801) and the sampling hollow cylinder (10) is the same. The cross-section of the bucket-shaped sleeve (801) is funnel-shaped. The arc surface (802) is located at the front end inlet of the bucket-shaped sleeve (801). A plurality of groups of second crushing knives (804) are evenly distributed around the arc surface (802). The cutting direction of the second crushing knives (804) diverges outwards with the inlet as the center. A plurality of groups of the first crushing knives (803) surround the bucket-shaped sleeve (801) twice, and their cutting direction is perpendicular to the sleeve surface of the bucket-shaped sleeve (801).
4. The tunnel advanced geological prediction device according to claim 1, characterized in that: The inner edge of the auxiliary baffle (903) and both ends of the inner side of the semicircular baffle (902) are provided with cutting knife parts (906), and the semicircular baffle (902) and the auxiliary baffle (903) are provided with energized electromagnets inside, and the energized electromagnets are connected to wires, and the wires are pre-buried in the inner wall of the sampling hollow cylinder (10).
5. The tunnel advanced geological prediction device according to claim 4 is characterized in that: The electromagnetic separator (9) further comprises a connecting sleeve (907), a fixed shaft (908) and a torsion spring (909); the connecting sleeve (907) is welded to the top of the semicircular arc baffle (902); the fixed shaft (908) is located inside the connecting sleeve (907); a torsion spring (909) is provided on the fixed shaft (908) and is fixed to the connecting sleeve (907); an end of the fixed shaft (908) is welded to the groove wall of the annular receiving outer groove (901); and in a normal state, the two groups of semicircular arc baffles (902) are completely located in the annular receiving outer groove (901) under the traction of the torsion spring (909).
6. A tunnel advanced geological prediction device according to claim 5, characterized in that: The other end of the rotating shaft (12) is sleeved with a first gear (22), the upper end surface of the outer sleeve (6) is provided with an opening (23), and the second gear (24) extends into the opening (23) and meshes with the first gear (22).
