Integrated capture method for pouring and sand box cooling flue gas
Through the integrated flue gas capture method of pouring and sand box cooling, combined with axial flow fan and attached jet technology, the problems of limited smoke and dust capture space and large ventilation volume in the ground casting process are solved, and efficient flue gas capture is achieved The integrated environmental protection effect reduces operating costs and energy consumption.
Patent Information
- Application Number
- CN202211534072.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-02
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2042-12-02
AI Technical Summary
In the ground pouring process, smoke and dust capture during pouring and sand box cooling has problems such as space limitations, large ventilation volume, high initial investment and high operating costs, which leads to hindering the implementation of environmental protection measures.
The integrated capture method of casting and sand box cooling flue gas is adopted. The integrated capture device combines casting flue gas and cooling flue gas, and uses an axial flow fan and a mixed flow fan, and uses an L-shaped bent pipe and attached jet port to achieve it. The return and delivery of flue gas reduces ventilation volume, and improves the capture efficiency through joint control of the fan and dust removal purification device.
It realizes an efficient capture rate of pouring and cooling flue gas, reduces ventilation volume, pollutant emissions and operating energy consumption, reduces operating costs, and improves occupational hygiene and environmental protection benefits.
Smart Images

Figure CN115921475B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of smoke capture, and in particular to an integrated casting and sand box cooling smoke capture method. Background Art
[0002] Ground pouring is one of the important process technologies in the foundry industry. A large amount of smoke is generated during casting. After casting, the high-temperature casting and sand box continue to emit smoke. The smoke generated during the above casting and casting cooling process needs to be captured and purified before being discharged in compliance with the standards. The main characteristics of the ground casting process are: large footprint, non-fixed casting operation point, continuous release of smoke during sand box cooling, and sand box and iron ladle are transported by crane. Based on the characteristics of the ground casting process, the capture of casting and cooling smoke has the following problems: 1) The driving transportation method limits the space for the capture facility layout. The space requirement for the sand box to be transported by crane should be considered when setting the capture hood; 2) The contradiction between the short-term release of casting smoke and the long-term cooling of the sand box. Exhaust hoods and purification equipment are set up for casting and sand box cooling respectively, which has the problems of large ventilation volume, high initial investment, and high operating costs. At the same time, the space for the purification equipment is limited or even impossible to arrange; 3) The large smoke ventilation volume causes the equipment to occupy a large area, high initial investment and operating costs, and high system operation energy consumption. The above difficulties limit the implementation of relevant environmental protection measures in ground pouring, and create obstacles to environmental protection, green development and high-quality development of enterprises. Summary of the invention
[0003] In order to solve the above problems, the present invention provides an integrated capture method for pouring and sand box cooling flue gas, which can specifically adopt the following technical solutions:
[0004] The integrated pouring and sand box cooling fume capture method of the present invention is suitable for the working condition where the pouring zone is arranged at the end of the sand box cooling zone, and is realized by an integrated capture device.
[0005] The integrated capture device comprises
[0006] Casting of fume capture section, including
[0007] A first bracket is arranged across the pouring area;
[0008] A first cover body is slidably connected to the first bracket and moves laterally along the first bracket;
[0009] A first capture assembly is arranged on the first cover body, and includes an axial flow first fan, wherein the inlet and outlet of the first fan are respectively connected to an L-shaped elbow, the L-shaped elbow is located on the same side of the first fan, and a return air port is provided on the L-shaped elbow close to the sand box cooling zone, and an air supply port is provided on the L-shaped elbow away from the sand box cooling zone, and the return air port and the air supply port are both arranged in a single row at intervals on the horizontal pipe section of the L-shaped elbow;
[0010] Cooling flue gas capture section, including
[0011] A second bracket is arranged above the cooling zone of the sand box;
[0012] A second cover body is slidably connected to the second bracket and moves longitudinally along the second bracket, and the top of the second cover body is a herringbone structure;
[0013] The second capture assembly is arranged on the second cover body, and includes a smoke exhaust pipe arranged at the highest point of the second cover body in the longitudinal direction, the bottom of the smoke exhaust pipe is provided with an air suction port, and the top of the smoke exhaust pipe is provided with a circulation pipe and an exhaust pipe; the circulation pipe is provided with an axial flow first fan, and the other end of the circulation pipe is connected to the air supply pipes arranged on both sides of the top of the second cover body, and the air supply pipe is provided with a roof-attached jet port; the exhaust pipe is connected to the exhaust main pipe through a sliding sealing pipe mechanism, and the exhaust main pipe is connected to the dust removal and purification device;
[0014] The integrated capture method comprises:
[0015] The position of the first cover body is adjusted according to the pouring station so that the cover is connected to the top of the pouring station; then, the position of the second cover body is adjusted so that it is connected to the edge of the first cover body; then, the first fan is started to capture the pouring smoke, and part of the smoke is sent into the second cover body through the air supply port; at the same time, the power unit of the second fan and the dust removal and purification device is started to form an attached jet on the top of the second cover body to capture the cooling smoke and / or pouring smoke in the second cover body, and send it to the dust removal and purification device connected to the exhaust main pipe through the exhaust pipe.
[0016] In order to facilitate movement, a guide rail slidably connected to the first bracket is arranged on the ground, so as to enable the first bracket to be transferred longitudinally between the sand box cooling zones at both ends of the casting zone.
[0017] The first fan is an axial flow fan or a mixed flow fan connected to a forward and reverse circuit, and is used to interchange the return air outlet and the supply air outlet.
[0018] The return air port and the supply air port on the L-shaped elbow are both arranged close to the first fan side and obliquely downward, so that part of the wind can be returned and part of the wind can enter the second cover of the sand box cooling zone.
[0019] The cross section of the smoke exhaust pipe is an inverted triangle structure, the air inlets are arranged on both sides of the bottom of the smoke exhaust pipe, and there are at least two circulation pipes, which extend to both sides of the smoke exhaust pipe respectively.
[0020] The second fan is an axial flow fan or a mixed flow fan.
[0021] The roof-attached jet port on the air supply pipe is a linear port arranged in the longitudinal direction, and the roof-attached jet port is provided with an angle-adjustable guide plate.
[0022] The inner side of the top of the second cover body is a smooth steel plate, and the outer side of the smooth steel plate is provided with a frame or purlins to create conditions for forming an attached jet on the top plate.
[0023] Both ends of the second cover body are provided with lifting curtains, which can be raised or lowered according to actual conditions to keep the second cover body sealed.
[0024] The second fan on the circulation pipe and the fan of the dust removal and purification device are controlled in linkage, and the first fan on the first cover body is controlled independently.
[0025] The integrated capture method for pouring and sand box cooling smoke provided by the present invention is realized by an integrated capture device, which can combine pouring smoke capture and cooling smoke capture into one, simplifying the operation and optimizing the capture effect. Compared with the prior art, it has the following advantages: 1) reducing a set of pouring smoke purification devices, and using an axial flow fan at the same time, reducing the air volume of the main fan, and facilitating the pipeline layout; 2) reducing the ventilation volume of the system, by arranging an axial flow fan or a mixed flow fan (i.e., the second fan) in the cooling smoke capture hood (i.e., the second hood body) to return the smoke captured in the hood to the outside. The top plate attached jet formed in the return hood participates in the capture of the smoke again, reducing the exhaust volume of the hood; 3) The pouring smoke is captured by the air supply jet and sent to the cooling smoke capture hood, reducing the ventilation volume of the pouring smoke capture system; 4) The pouring smoke capture hood (i.e., the first hood) can reach the other end from one end through the cooling smoke capture hood, reducing the footprint of the hood. At the same time, the axial flow or mixed flow fan (i.e., the first fan) of the pouring smoke capture hood realizes the change of the air supply direction through reverse operation, expanding the scope of use of the device and meeting the requirements of full coverage of the pouring area. Experiments have shown that the present invention achieves a pouring and cooling smoke capture rate of more than 90%, can reduce the ventilation volume by about 70%, reduce the total amount of pollutant emissions by about 70%, reduce energy saving by 80%, reduce operating costs by 50%, and reduce operating energy consumption by 70%, effectively improving the occupational health conditions in the workshop, and has good green and low-carbon characteristics and good social benefits, environmental benefits, and economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a structural schematic diagram of the integrated capture device in the present invention.
[0027] Figure 2 yes Figure 1 AA section view in.
[0028] Figure 3 yes Figure 1 BB cross-section diagram in.
[0029] Figure 4 yes Figure 1 CC cross-section diagram in .
[0030] Figure 5 yes Figure 1 Airflow state diagram of smoke capture in the middle hood. DETAILED DESCRIPTION
[0031] The following is a detailed description of an embodiment of the present invention in conjunction with the accompanying drawings. This embodiment is implemented on the premise of the technical solution of the present invention, and a detailed implementation method and a specific construction process are given, but the protection scope of the present invention is not limited to the following embodiment.
[0032] The integrated pouring and flask cooling fume capture method of the present invention is suitable for the working condition where the pouring zone is arranged at the end of the flask cooling zone, and is realized by an integrated capture device, which is composed of a pouring fume capture part and a cooling fume capture part.
[0033] Specifically, Figure 1-5 As shown, the pouring smoke capture part includes a first bracket 11 arranged across the pouring area, and a first cover body 12 is slidably connected to the first bracket 11, which can move laterally along the first bracket 11; a first capture assembly is installed on the first cover body 12, including an axial flow first fan 13 (an axial flow fan or a mixed flow fan can be used), and the inlet and outlet of the first fan 13 are respectively connected to an L-shaped elbow, and the two L-shaped elbows are both on the same side of the first fan 13, and a return air port 14 is opened on the L-shaped elbow close to the sand box cooling zone, and an air supply port 15 is opened on the L-shaped elbow away from the sand box cooling zone. The above-mentioned return air port 14 and air supply port 15 are both on the horizontal pipe section of the L-shaped elbow and are arranged in a single row at intervals. During the pouring operation, a large amount of high-temperature smoke and dust is generated and evaporates upward. Under the action of the first fan 13, it is captured by the first capture component, wherein a part of the airflow sent out from the air supply port 15 is sucked by the return air port 14 and returns to the first capture component again, and a part of it enters the sand box cooling zone under the action of the air supply airflow and is captured by the cooling smoke capture part. Normally, the return air port 14 and the air supply port 15 on the L-shaped elbow are both close to the first fan side and are arranged obliquely downward so that part of the air can be refluxed and part of the air can enter the sand box cooling zone. When sand box cooling zones are provided at both ends of the pouring area, a guide rail slidably connected to the first bracket 11 is provided on the ground to facilitate the transfer of the first bracket 11 between the two sand box cooling zones in the longitudinal direction. At this time, the first fan 13 uses a forward and reverse fan to facilitate the interchange of the return air port 14 and the air supply port 15.
[0034] The cooling smoke capture part includes a second bracket 21 arranged above the sand box cooling zone, and a second cover body 22 is slidably connected to the second bracket 21, which can move longitudinally along the second bracket 21 to capture the sand box cooling smoke in the covered area. The top of the second cover body 22 is a herringbone structure, the inner side of which is a smooth steel plate, and the outer side is provided with a frame or purlins to create conditions for forming an attached jet on the top plate. Both ends of the above-mentioned second cover body 22 are also respectively installed with lifting curtains, which can be raised and lowered according to actual conditions to maintain the sealing of the second cover body 22. The top of the second cover body 22 is installed with a second capture assembly, including a smoke exhaust pipe 23 arranged at the highest point of the second cover body 22 in the longitudinal direction. The cross-section of the smoke exhaust pipe 23 generally adopts a triangular structure, and air suction ports are opened on both sides of the bottom, and a circulation pipe 24 and an exhaust pipe 25 are installed on the top. There are at least two circulation pipes 24, which extend to both sides of the smoke exhaust pipe 23 respectively; when there are more than two circulation pipes 24, they will be staggered on both sides of the smoke exhaust pipe 23 to make the airflow as evenly distributed as possible. Each of the above circulation pipes 24 is installed with an axial flow second fan 26 (axial flow fan or mixed flow fan can be used), and the other end is connected to the air supply pipes 27 arranged on both sides of the top of the second cover body 22. The above air supply pipes 27 are respectively provided with roof-attached jet ports, each of which is a linear port arranged in the longitudinal direction, and an angle-adjustable guide plate is installed at the opening of the roof-attached jet port, so that the ejected airflow is attached to the roof to form an attached jet with a suction effect, which is used to capture the high-temperature smoke emitted during the cooling process of the sand box and the casting smoke entering the second cover body 22. The above-mentioned exhaust pipe 25 is located at the end of the smoke exhaust pipe 23, and is connected to the exhaust main pipe 28 through a sliding sealing pipe mechanism (the sliding sealing pipe mechanism can adopt the structure described in ZLCN202221491426.8). The exhaust main pipe 28 is connected to the dust removal and purification device, so that the smoke entering the smoke exhaust pipe 23 through the air intake port can be dust-removed and purified, and finally discharged in compliance with the standards.
[0035] Normally, the second fan 26 on the circulation pipe 24 is linked to the fan of the dust removal and purification device by linkage control, while the first fan 13 on the first cover body 12 is independently controlled, thereby achieving the purpose of convenient operation, simple and easy control, and improved capture effect.
[0036] The first cover 12 and the second cover 22 can be used in combination to capture casting fumes, or to capture casting fumes and casting cooling fumes at the same time; the second cover 22 can also be used alone to capture casting cooling fumes.
[0037] The following takes the case where the first cover body 12 and the second cover body 22 are used together as an example to illustrate the integrated capture method of pouring and sand box cooling smoke of the present invention. Specifically, it includes:
[0038] S1, adjusting the position of the first cover body 12 according to the pouring station so that the cover is connected above the pouring station;
[0039] S2, adjusting the position of the second cover body 22 so that it is in contact with the edge of the first cover body 12;
[0040] S3, start the first fan 13, then start the linked second fan and the power unit of the dust removal and purification device, then start the pouring operation, the air flow is heated by the pouring smoke, the temperature rises and evaporates upward, and is sucked into the L-shaped elbow from the return air port 14, and then discharged from the air supply port 15 and sent into the second cover body 22; after entering the second cover body 22, the above-mentioned smoke is captured by the attached jet on the top of the cover body under the action of the high-temperature smoke in the sand box and the buoyancy of its own airflow, and enters the smoke exhaust pipe 23 through the air suction port; part of the gas entering the smoke exhaust pipe 23 is circulated through the circulation pipe 24 and the air supply pipe 27 under the action of the second fan 26 to form an attached jet, and the other part enters the smoke exhaust main pipe 28 and the dust removal and purification device through the exhaust pipe 25, and finally meets the emission standards;
[0041] S4, repeat S1 to complete the fume capture work of all casting stations in the casting area;
[0042] S5, moving the first cover body 12 to the pouring area at the other end of the sand box cooling area, repeating S1-S4, and completing the fume capture work of all pouring stations in the pouring area.
[0043] When the pouring operation is not performed, the first cover body 12 can be moved to the lower part of the second cover body 22 to provide an operating space for non-pouring operations.
[0044] It should be noted that, in the description of the present invention, terms indicating orientation or positional relationships, such as "front", "rear", "left", "right", "vertical", "horizontal", "inside", "outside", etc., are based on the orientation or positional relationships shown in the drawings and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
Claims
1. An integrated capture method for pouring and sand box cooling smoke, suitable for the working condition where the pouring zone is set at the end of the sand box cooling zone, is implemented by an integrated capture device, characterized in that: The integrated capture device comprises Casting of fume capture section, including A first bracket is arranged across the pouring area; A first cover body is slidably connected to the first bracket and moves laterally along the first bracket; A first capture assembly is arranged on the first cover body, and includes an axial flow first fan, wherein the inlet and outlet of the first fan are respectively connected to an L-shaped elbow, the L-shaped elbow is located on the same side of the first fan, and a return air port is provided on the L-shaped elbow close to the sand box cooling zone, and an air supply port is provided on the L-shaped elbow away from the sand box cooling zone, and the return air port and the air supply port are both arranged in a single row at intervals on the horizontal pipe section of the L-shaped elbow; Cooling flue gas capture section, including A second bracket is arranged above the cooling zone of the sand box; A second cover body is slidably connected to the second bracket and moves longitudinally along the second bracket, and the top of the second cover body is a herringbone structure; The second capture assembly is arranged on the second cover body, and includes a smoke exhaust pipe arranged at the highest point of the second cover body in the longitudinal direction, the bottom of the smoke exhaust pipe is provided with an air suction port, and the top of the smoke exhaust pipe is provided with a circulation pipe and an exhaust pipe; the circulation pipe is provided with an axial flow first fan, and the other end of the circulation pipe is connected to the air supply pipes arranged on both sides of the top of the second cover body, and the air supply pipe is provided with a roof-attached jet port; the exhaust pipe is connected to the exhaust main pipe through a sliding sealing pipe mechanism, and the exhaust main pipe is connected to the dust removal and purification device; The integrated capture method comprises: The position of the first cover body is adjusted according to the pouring station so that the cover is connected to the top of the pouring station; then, the position of the second cover body is adjusted so that it is connected to the edge of the first cover body; then, the first fan is started to capture the pouring smoke, and part of the smoke is sent into the second cover body through the air supply port; at the same time, the power unit of the second fan and the dust removal and purification device is started to form an attached jet on the top of the second cover body to capture the cooling smoke and / or pouring smoke in the second cover body, and send it to the dust removal and purification device connected to the exhaust main pipe through the exhaust pipe.
2. The method for collecting integrated pouring and sand box cooling flue gas according to claim 1, characterized in that: A guide rail slidably connected to the first bracket is arranged on the ground, and is used to transfer the first bracket longitudinally between the sand box cooling zones at both ends of the casting zone.
3. The method for collecting integrated pouring and sand box cooling flue gas according to claim 2, characterized in that: The first fan is an axial flow fan or a mixed flow fan connected to a forward and reverse circuit.
4. The method for collecting integrated pouring and sand box cooling flue gas according to claim 3, characterized in that: The return air inlet and the supply air inlet on the L-shaped curved pipe are both arranged close to the first fan side and obliquely downward.
5. The method for collecting the integrated pouring and sand box cooling flue gas according to claim 4, characterized in that: The cross section of the smoke exhaust pipe is an inverted triangle structure, the air inlets are arranged on both sides of the bottom of the smoke exhaust pipe, and there are at least two circulation pipes, which extend to both sides of the smoke exhaust pipe respectively.
6. The method for collecting integrated pouring and sand box cooling fumes according to claim 5, characterized in that: The second fan is an axial flow fan or a mixed flow fan.
7. The method for collecting integrated pouring and sand box cooling flue gas according to claim 6, characterized in that: The roof-attached jet port on the air supply pipe is a linear port arranged in the longitudinal direction, and the roof-attached jet port is provided with an angle-adjustable guide plate.
8. The method for collecting integrated pouring and sand box cooling fumes according to claim 7, characterized in that: The inner side of the top of the second cover body is a smooth steel plate, and the outer side of the smooth steel plate is provided with a frame or purlins.
9. The method for collecting integrated pouring and sand box cooling fumes according to claim 8, characterized in that: Both ends of the second cover body are provided with lifting curtains.
10. The method for collecting integrated pouring and sand box cooling flue gas according to claim 9, characterized in that: The second fan on the circulation pipe and the fan of the dust removal and purification device are controlled in linkage, and the first fan on the first cover body is controlled independently.
Citation Information
Patent Citations
Silico-calcium stove molten iron pouring equipment that has flue gas entrapment cover
CN204584242U
Movable dust removal system for iron alloy pouring pool
CN208912770U
Exhaust treatment system and method
US20220023880A1
