A colored support formwork structure for concrete structure and construction method thereof
By using a color-coded support formwork structure with water pressure display, rebar anti-sticking detection and padding, and cement slurry delivery components, the problems of formwork area differentiation, rebar detection and integrated pouring were solved, achieving efficient construction and high-quality molding.
Patent Information
- Application Number
- CN202411207835.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-08-30
AI Technical Summary
In existing concrete floor construction, formwork is not convenient for distinguishing areas, the quality inspection of steel reinforcement binding and support is difficult, steel reinforcement is easily exposed, the integrity of the casting is poor, deformation control is difficult, and flatness is affected.
The structure uses a colored support template, which includes a water pressure display, a rebar anti-sticking detection device, a rebar padding device, and a cement grout delivery device. The water pressure display detects deformation, the rebar anti-sticking detection and padding device adjusts the height of the rebar, and the cement grout delivery device seals pits. Color bars are used to distinguish areas.
It improves the efficiency of template assembly, ensures complete coverage of reinforcing bars, enhances the quality of pouring, guarantees the integrity and flatness of the molding, and prevents exposed reinforcing bars and pits.
Smart Images

Figure CN118728063B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of floor construction formwork, and in particular to a concrete structure colored support formwork structure and a construction method thereof. Background Art
[0002] In actual construction work, floor formwork is required for forming construction of building floor. Formwork is an important casting support component structure. Support formwork needs to be directly attached to concrete for support. At present, aluminum alloy formwork is widely used due to its advantages such as light weight. In actual concrete floor construction work, bolts are required to assemble support formworks in various areas, and brackets are used for support. Steel bars need to be placed on top of the formwork and tied. The current concrete formwork support structure is not convenient for distinguishing formworks in different areas, and it is also not convenient for quality inspection of upper steel bar bundling support. Local steel bars are attached to the formwork, which is difficult to accurately inspect manually, which is easy to cause exposed steel bars after pouring and rust after pouring concrete. It is also not convenient to fill cement slurry at the support of steel bars. Stone or concrete pads are mostly used for support. After pouring, the pads are directly exposed, which affects the integrity of concrete casting and forming, and is not convenient for controlling the deformation of formwork support. Repeated use can easily affect the flatness of casting.
[0003] Therefore, we propose a colored support formwork structure for concrete structure and a construction method thereof. Summary of the invention
[0004] The object of the present invention is to provide a colored support formwork structure for a concrete structure and a construction method thereof, so as to solve the problems raised in the above-mentioned background technology.
[0005] To achieve the above object, the present invention provides the following technical solution: a colored support formwork structure for a concrete structure, comprising a support formwork member, a water storage auxiliary member is installed on the support formwork member, and a water pressure display member is installed on the water storage auxiliary member; the water pressure display member is used to detect the deformation of the support formwork member;
[0006] A steel bar anti-sticking detection member is installed on the support formwork member; the steel bar anti-sticking detection member is used to slide on the support formwork member;
[0007] A steel bar pad is installed on the support formwork; the steel bar pad passes through the steel bar anti-sticking detection part;
[0008] A cement slurry conveying member is installed on the supporting formwork member; a piston propulsion member is installed inside the cement slurry conveying member; the piston propulsion member is used to slide and propel inside the cement slurry conveying member;
[0009] The supporting formwork includes: a floor formwork, connection holes and color strips. Two connection holes are respectively provided around the floor formwork; the connection holes are used to assemble the floor formwork through bolts; four color strips are fixedly embedded at the bottom of the floor formwork; the color strips are used to distinguish floor formworks in different areas.
[0010] Preferably, the supporting formwork member also includes: a central threaded barrel and a grouting hole, the central threaded barrel is fixedly installed in the middle of the floor formwork; a threaded hole is provided in the middle of the central threaded barrel; a grouting hole is opened on the central threaded barrel; the grouting hole is used to circulate cement slurry.
[0011] Preferably, the water storage auxiliary component includes: a base plate and a water supply pipe, the base plate is fixedly mounted with a water supply pipe, and a valve is provided on the water supply pipe; the base plate is fixedly mounted on the bottom of the floor formwork.
[0012] Preferably, the water pressure display component includes: a water pressure connecting pipe, a detection cylinder, a lifting sliding column and a spring, the water pressure connecting pipe is fixedly installed at the bottom of the base plate; a detection cylinder is fixedly installed at the bottom of the water pressure connecting pipe; the detection cylinder is made of transparent material; scale lines are provided on the detection cylinder; a lifting sliding column is slidably installed inside the detection cylinder; a spring is sleeved inside the detection cylinder, and the spring is connected between the lifting sliding column and the detection cylinder; the lifting sliding column is used to detect deformation of the floor formwork.
[0013] Preferably, the steel bar anti-sticking detection component includes: a detection sliding column and a lifting plate, the detection sliding columns are provided with two, and scale lines are respectively provided on the two detection sliding columns; the two detection sliding columns are respectively slidably installed on the floor formwork; the lifting plates are fixedly installed on the top of the two detection sliding columns; the lifting plates are embedded in the floor formwork; when the lifting plates are retracted to the top of the floor formwork, the top of the floor formwork is flush with the lifting plates; a through hole is provided in the middle of the lifting plates.
[0014] Preferably, the steel bar anti-sticking detection component also includes: a grouting rubber membrane ring and a coupling frame, the grouting rubber membrane ring is fixedly sleeved in the through hole in the middle of the lifting plate; the grouting rubber membrane ring is an elastic rubber structure; the coupling frame is fixedly installed at the bottom of the two detection sliding columns by bolts.
[0015] Preferably, the steel bar padding parts include: a padding threaded rod, a sloped grouting end, a plug-in column and a supporting horseshoe tendon, the padding threaded rod is threadedly connected to the central threaded tube; the top of the padding threaded rod is fixedly installed with a sloped grouting end; the sloped grouting end is a truncated cone structure; the outside of the sloped grouting end is elastically and tightly sleeved with a grouting rubber membrane ring; the plug-in column is plugged into the sloped grouting end; a circle of supporting horseshoe tendons is installed on the plug-in column; the padding threaded rod is used to adjust the supporting height of a circle of supporting horseshoe tendons; the sloped grouting end is attached to the grouting rubber membrane ring for grouting sealing; the supporting horseshoe tendon is a "U"-shaped structure.
[0016] Preferably, the cement slurry conveying member includes: a cement slurry adjustment pipe and a piston cylinder, the cement slurry adjustment pipe is fixedly installed at the bottom of the central threaded cylinder; the cement slurry adjustment pipe is connected to the grouting hole; the end of the cement slurry adjustment pipe is inserted into the piston cylinder; the piston cylinder is used to store cement slurry.
[0017] Preferably, the piston propulsion member comprises: a piston rod and a piston, the piston being fixedly mounted on the piston rod; the piston being slidably sleeved on the piston cylinder; and a handle being provided at the tail of the piston rod.
[0018] Preferably, a construction method of a colored support formwork structure for a concrete structure:
[0019] 1) Different areas of the floor formwork are distinguished by the color of the color strips, and the floor formwork of the same area is taken; through the through holes set around the floor formwork, bolts and nuts are passed through, and multiple floor formworks are assembled, and supported by scaffolding at the bottom of the assembled floor formwork;
[0020] 2) Support the horseshoe tendons to assist workers in tying the steel bars; insert the plug-in column into the inclined surface slurry discharge end, and then rotate the threaded rod to adjust the distance between the bottom of the steel bars and the lifting plate after tying;
[0021] 3) After the supporting steel bars of the inclined surface discharge end are cast and formed, the threaded rod is rotated to drive the inclined surface discharge end to move downward, and the piston is pushed to inject cement slurry into the grouting hole through the piston cylinder. The cement slurry can be filled into the groove formed by the inclined surface discharge end. The threaded rod is rotated to drive the inclined surface discharge end to move upward, and the grouting rubber membrane ring is fitted to seal the inclined surface discharge end. After the cement slurry is solidified, the floor formwork is demoulded and disassembled.
[0022] Compared with the prior art, the present invention has the following beneficial effects:
[0023] The present invention adopts a water pressure display component, which can use water injection to display the water pressure when the floor formwork is squeezed or deformed, and detect the deformation of the formwork. It is more suitable for use with support formwork that bears heavier pressure. After deformation occurs, correction and other maintenance work can be carried out in time to ensure the accuracy of the floor formwork. At the same time, the floor formwork used is provided with color strips, which can be used for differentiation. It can be more convenient for workers to distinguish floor formworks in different areas, and the efficiency of workers in formwork assembly construction can be improved, which is more intuitive.
[0024] The steel bar anti-sticking detection parts are used. Through the lifting and displacement method, the lifting plate is moved up and down to fit the steel bars arranged above for detection. The lowest height of the arranged steel bars is detected to prevent the floor steel bars from sticking to the lifting plate. This ensures that the steel bars can be completely surrounded by concrete during the subsequent concrete pouring, which will not cause the steel bars to be exposed after forming, thereby improving the quality of pouring construction.
[0025] The use of threaded rods can be used to adjust the height between the bottom of the bundled steel bars and the floor formwork. The adjustment is flexible and convenient. The threaded rods can be adjusted quickly and more flexibly. Compared with the traditional pad method, this structure has a high degree of customization. At the same time, it can be separated and reused after the concrete is formed.
[0026] By using a piston pusher and cooperating with a cement slurry conveying part to drive cement slurry into the concrete surface when the inclined surface discharge end is pulled out, the pits produced can be sealed, thereby avoiding the problem of exposed plug-in columns at the bottom of the floor concrete when the inclined surface discharge end is removed. The structure uses plug-in columns to support the steel bars, which can be easily removed. At the same time, the piston pusher is used to grout and seal the pits, which can ensure the integrity of the concrete after molding and improve the sealing performance, thereby preventing the traditional method of using concrete pads for support, which is easy to affect the sealing performance of concrete molding. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the overall structure of the colored support formwork structure of the concrete structure of the present invention;
[0028] Figure 2 It is a schematic diagram of the top structure of the colored support formwork structure of the concrete structure of the present invention;
[0029] Figure 3 It is a cross-sectional view of the internal structure of the colored support formwork structure of the concrete structure of the present invention;
[0030] Figure 4 It is a schematic diagram of the structure of the supporting formwork of the present invention;
[0031] Figure 5 It is a schematic diagram of the structure of the water storage auxiliary component of the present invention;
[0032] Figure 6For the present invention Figure 3 A magnified view of the structure of the middle B area;
[0033] Figure 7 This is a schematic diagram of the structure of the steel bar anti-sticking detection member of the present invention;
[0034] Figure 8 For the present invention Figure 3 A magnified view of the structure of the middle C region;
[0035] Fig. 9 It is a structural schematic diagram of the cement slurry conveying member of the present invention;
[0036] Fig.10 For the present invention Figure 3 A magnified view of the structure of the middle D region;
[0037] Fig.11 For the present invention Figure 3 A magnified view of the structure of the middle E region;
[0038] Fig.12 For the present invention Figure 3 A magnified view of the structure of the middle F region.
[0039] In the figure: 1. Support formwork parts; 101. Floor formwork; 1011. Connection hole; 102. Color strip; 103. Center threaded cylinder; 1031. Grouting hole; 2. Water storage auxiliary parts; 201. Base plate; 202. Water supply pipe; 3. Water pressure display parts; 301. Water pressure connecting pipe; 302. Detection cylinder; 303. Lifting and sliding column; 304. Spring; 4. Steel bar anti-sticking detection parts; 401. Detection sliding column; 402. Lifting plate; 4021. Grouting rubber membrane ring; 403. Coupling frame; 5. Steel bar padding parts; 501. Pad threaded rod; 502. Inclined slurry discharge end; 503. Plug-in column; 504. Support horseshoe tendon; 6. Cement slurry conveying parts; 601. Cement slurry adjustment pipe; 602. Piston cylinder; 7. Piston propulsion parts; 701. Piston rod; 702. Piston. DETAILED DESCRIPTION
[0040] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0041] Example 1: Please refer to Figure 1-Figure 12 As shown:
[0042] The present invention provides a technical solution: a colored support formwork structure for a concrete structure, comprising a support formwork member 1, a water storage auxiliary member 2 is installed on the support formwork member 1; a water pressure display member 3 is installed on the water storage auxiliary member 2; the water pressure display member 3 is used to detect the deformation of the support formwork member 1; a steel bar anti-sticking detection member 4 is installed on the support formwork member 1; the steel bar anti-sticking detection member 4 is used to slide on the support formwork member 1; a steel bar padding member 5 is installed on the support formwork member 1; the steel bar padding member 5 passes through the steel bar anti-sticking detection member 4; the support formwork member 1 is installed There is a cement slurry conveying member 6; a piston propulsion member 7 is installed inside the cement slurry conveying member 6; the piston propulsion member 7 is used to slide and propel inside the cement slurry conveying member 6; the supporting formwork member 1 includes: a floor formwork 101, a connecting hole 1011 and a color strip 102, and two connecting holes 1011 are respectively opened around the floor formwork 101; the connecting hole 1011 is used to pass bolts to assemble the floor formwork 101; four color strips 102 are fixedly embedded at the bottom of the floor formwork 101; the color strips 102 are used to distinguish the floor formwork 101 in different areas.
[0043] The supporting formwork member 1 further comprises: a central threaded tube 103 and a grouting hole 1031, wherein the central threaded tube 103 is fixedly mounted in the middle of the floor formwork 101; a threaded hole is provided in the middle of the central threaded tube 103; a grouting hole 1031 is provided on the central threaded tube 103; the grouting hole 1031 is used to circulate cement slurry; the water storage auxiliary member 2 comprises: a bottom plate 201 and a water supply pipe 202, wherein a water supply pipe 202 is fixedly mounted on the bottom plate 201, and a valve is provided on the water supply pipe 202; the bottom plate 201 is fixedly mounted at the bottom of the floor formwork 101; the bottom plate 201 and the A cavity is provided between the floor templates 101; the water pressure display element 3 includes: a water pressure connecting pipe 301, a detection cylinder 302, a lifting sliding column 303 and a spring 304, the water pressure connecting pipe 301 is fixedly installed at the bottom of the base plate 201; a detection cylinder 302 is fixedly installed at the bottom of the water pressure connecting pipe 301; the detection cylinder 302 is made of transparent material; a scale line is provided on the detection cylinder 302; a lifting sliding column 303 is slidably installed inside the detection cylinder 302; a spring 304 is sleeved inside the detection cylinder 302, and the spring 304 is connected between the lifting sliding column 303 and the detection cylinder 3 02; the lifting sliding column 303 is used to detect the deformation of the floor formwork 101; the water pressure display part 3 can be used to display the water pressure when the floor formwork 101 is squeezed or deformed by water injection, and the deformation of the formwork can be detected. It is more suitable for the support formwork with heavier pressure. After deformation, correction and other maintenance work can be carried out in time to ensure the use accuracy of the floor formwork 101. At the same time, the floor formwork 101 used is provided with a color strip 102, which can be distinguished by color, which can make it easier for the staff to distinguish different The floor formwork 101 in the regional position can improve the efficiency of the workers in assembling the formwork and is more intuitive. When the floor formwork 101 is deformed or sunken, the top of the floor formwork 101 will compress the water between the bottom plate 201 and the floor formwork 101, thereby pushing the lifting sliding column 303 to move. The lifting sliding column 303 will squeeze the spring 304 for elastic compression. At this time, the lifting sliding column 303 corresponds to the scale position on the detection tube 302 that changes. The staff can quickly observe and learn that after the floor formwork 101 is demolded, plastic surgery and other work can be performed.
[0044] The steel bar anti-sticking detection member 4 includes: a detection sliding column 401 and a lifting plate 402. The detection sliding column 401 is provided with two, and the two detection sliding columns 401 are respectively provided with scale lines; the two detection sliding columns 401 are respectively slidably installed on the floor formwork 101; the lifting plates 402 are fixedly installed on the top of the two detection sliding columns 401; the lifting plates 402 are embedded in the floor formwork 101; when the lifting plates 402 are retracted to the top of the floor formwork 101, the top of the floor formwork 101 is flush with the lifting plates 402; the lifting plates 402 A through hole is provided in the middle; the steel bar anti-sticking detection part 4 also includes: a grouting rubber membrane ring 4021 and a coupling 403, the grouting rubber membrane ring 4021 is fixedly sleeved in the through hole in the middle of the lifting plate 402; the grouting rubber membrane ring 4021 is an elastic rubber structure; the coupling 403 is fixedly installed at the bottom of the two detection sliding columns 401 by bolts; the steel bar anti-sticking detection part 4 is adopted, and the lifting plate 402 is moved up to fit the steel bars arranged above for detection by means of lifting and displacement, and the lowest height of the arranged steel bars is detected to prevent the floor steel bars from sticking. Attached to the lifting plate 402, once the floor steel bars are attached to the lifting plate 402, the floor steel bars cannot move upward, ensuring that the steel bars can be completely surrounded by concrete during subsequent concrete pouring, and the steel bars will not be exposed after forming. The structure is more reasonable, the detection method is simple and efficient, and the lifting plate 402 used can be completely embedded in the floor formwork 101, ensuring that the top of the floor formwork 101 is flat and the construction forming quality is higher. After the steel bars on the top of the floor formwork 101 are arranged and tied, although the steel bars are supported and raised, the intervals are still prone to sticking to the lifting plate 402. At this time, the detection sliding column 401 is pushed upward to drive the detection sliding column 401 to move up until it touches the steel bars. The quality of the steel bar bundling construction can be determined by observing the reading of the detection sliding column 401 at this time. If the intervals of the steel bar support are attached to the lifting plate 402, or the spacing is too small, it can be adjusted in time without manual inspection on the surface of the tied steel bars one by one. The detection of this structure is intuitive and efficient; the grouting rubber membrane ring 4021 can be attached to the inclined surface grouting end 502 to play a role in sealing and leakproofing.
[0045] Among them, the steel bar pad 5 includes: a pad threaded rod 501, an inclined grouting end 502, a plug-in column 503 and a supporting horseshoe tendon 504, and the supporting horseshoe tendon 504 is a "U"-shaped structure; the pad threaded rod 501 is threadedly connected to the central threaded tube 103; the top of the pad threaded rod 501 is fixedly installed with an inclined grouting end 502; the inclined grouting end 502 is a truncated cone structure; the outer elasticity of the inclined grouting end 502 is tightly sleeved with a grouting rubber membrane ring 4021; the plug-in column 503 is plugged into the inclined grouting end 502; a circle of supporting horseshoe tendons 504 is installed on the plug-in column 503; the pad threaded rod 501 is used to adjust the support height of a circle of supporting horseshoe tendons 504; the inclined grouting end 502 and the grouting rubber membrane ring 4021 are attached to each other for grouting and sealing, and the threaded rod 501 can be used to adjust the height of the bottom of the tied steel bar from the floor formwork 101. The adjustment is flexible and convenient. The threaded rod 501 can be quickly adjusted, which is more flexible. Compared with the traditional pad method, the structure has a high degree of customization in adjustment. At the same time, it can be separated and reused after the concrete is formed. The supporting horseshoe tendon 504 can facilitate the bundling of double-layer steel bars. By utilizing the inclined grouting end 502 of the inclined structure, this structure can facilitate the subsequent grouting and hole filling circulation, and avoid the problem of pits in the concrete when the inclined grouting end 502 is pulled out; the upper and lower sides of the supporting horseshoe tendon 504 are respectively used for bundling the upper and lower steel bars in the floor concrete steel bars.
[0046] Embodiment 2, on the basis of embodiment 1, the cement slurry conveying member 6 comprises: a cement slurry adjustment pipe 601 and a piston cylinder 602, the cement slurry adjustment pipe 601 is fixedly mounted at the bottom of the central threaded cylinder 103; the cement slurry adjustment pipe 601 is connected to the grouting hole 1031; the end of the cement slurry adjustment pipe 601 is plugged into the piston cylinder 602; the piston cylinder 602 is used to store cement slurry; the piston pushing member 7 comprises: a piston rod 701 and a piston 702, the piston rod 701 is fixedly mounted with a piston 702; the piston 702 is slidably sleeved on the piston cylinder 602; a handle is provided at the tail of the piston rod 701, and the piston pushing member 7 is used to cooperate with the cement slurry conveying member 6 to drive the cement slurry into the pit generated when the inclined surface slurry discharge end 502 is extracted. It can be sealed to avoid the problem of exposed plug-in columns 503 at the bottom of the floor concrete when the inclined slurry discharge end 502 is removed and pulled out. The present structure adopts the plug-in columns 503 to support the steel bars, which can be easily removed and at the same time cooperate with the piston thruster 7 to perform grouting and sealing of the pits, which can ensure the integrity of the concrete after molding and have better sealing. It prevents the problem of poor fit between the surface of the concrete steel bar pad and the concrete pouring due to vibration omissions and the like in the traditional method of using concrete pads for support, which easily affects the sealing of the concrete molding. The present structure is simple to operate and uses the elastic structure of the grouting rubber membrane ring 4021 to ensure the grouting repair effect. It can fit and seal the inclined slurry discharge end 502 to prevent cement slurry from leaking.
[0047] A construction method for a colored support formwork structure of a concrete structure:
[0048] 1) Different areas of the floor formwork 101 are distinguished by the color of the color strip 102, and the floor formwork 101 of the same area is taken; bolts and nuts are passed through the through holes set around the floor formwork 101, and multiple floor formworks 101 are assembled, and the bottom of the assembled floor formwork 101 is supported by a scaffold;
[0049] 2) Support the horseshoe tendon 504 to assist the workers in tying the steel bars; insert the plug-in column 503 into the inclined surface slurry discharge end 502, and then the threaded rod 501 can be rotated to adjust the distance between the bottom of the steel bars and the lifting plate 402 after tying;
[0050] 3) After the inclined surface grouting end 502 supports the steel bars for casting and forming, the rotating pad threaded rod 501 drives the inclined surface grouting end 502 to move downward, and the piston 702 is pushed to inject cement slurry into the grouting hole 1031 through the piston cylinder 602. The cement slurry can be filled into the groove formed by the inclined surface grouting end 502. The rotating pad threaded rod 501 drives the inclined surface grouting end 502 to move upward, and the grouting rubber membrane ring 4021 is fitted to seal the rotating pad threaded rod 501. After the cement slurry is cured, the floor formwork 101 is demolded and disassembled.
[0051] The working principle of this embodiment is as follows: first, before using the floor formwork 101, open the valve on the water supply pipe 202 to inject water into the cavity between the bottom plate 201 and the floor formwork 101, and then use the through holes set around the floor formwork 101 to pass bolts and nuts to assemble multiple floor formworks 101, and then use scaffolding and other structures to support the bottom of the assembled floor formwork 101 to ensure the stability of the floor formwork 101. The support horseshoe tendon 504 can be used to support the steel bars. The upper and lower sides of the support horseshoe tendon 504 are respectively used to bundle the upper and lower steel bars in the floor concrete steel bars, so as to assist workers in the steel bar bundling work. When the plate 101 is deformed or dented, the top of the floor formwork 101 will compress the water between the bottom plate 201 and the floor formwork 101, thereby pushing the lifting sliding column 303 to move, and the lifting sliding column 303 will squeeze the spring 304 to elastically compress. At this time, the scale position on the corresponding detection tube 302 of the lifting sliding column 303 changes, and the staff can quickly observe and learn about it; push the detection sliding column 401 upward, drive the detection sliding column 401 to move up until it touches the steel bar, and observe the reading of the detection sliding column 401 at this time to determine the quality of the steel bar bundling construction; the plug-in column 503 is plugged into the inclined slurry discharge end 502, and the threaded rod 501 can be rotated to adjust the support height;
[0052] After the inclined surface grouting end 502 supports the steel bars for casting and forming and completely solidifies, the threaded rod 501 is rotated to drive the inclined surface grouting end 502 to move downward. At this time, the inclined surface grouting end 502 is driven to be located below the grouting rubber membrane ring 4021, and cement slurry is sucked into the piston cylinder 602. The inclined surface structure is used to drive the inclined surface grouting end 502, which does not affect the circulation of cement slurry. The piston 702 is pushed to inject cement slurry into the grouting hole 1031 through the piston cylinder 602. The cement slurry can be filled into the groove formed by the inclined surface grouting end 502 to achieve the plugging of the plug column 503. The plugging is more direct and pressurized, and the plugging column 503 can be prevented from oxidation and rust. At this time, it can be rotated The threaded rod 501 is installed to drive the inclined surface grouting end 502 to move upward and fit the grouting rubber membrane ring 4021. With the elastic characteristics of the grouting rubber membrane ring 4021, the inclined surface grouting end 502 can be blocked to prevent the cement slurry from leaking. Then, the piston cylinder 602 can be directly pulled out from the cement slurry adjustment tube 601. At this time, a small amount of excess cement slurry can be directly discharged from the cement slurry adjustment tube 601. Then, after the cement slurry solidifies, a more viscous cement slurry can be used to improve the adhesion, and the demoulding and disassembly work of the floor formwork 101 can be carried out directly. Subsequently, the entire structure can be rinsed and cleaned to remove impurities adhering to the surface to prevent affecting subsequent use.
[0053] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0054] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A colored support formwork structure for a concrete structure, comprising a support formwork member (1), on which a water storage auxiliary member (2) is installed, characterized in that: A water pressure display component (3) is installed on the water storage auxiliary component (2); the water pressure display component (3) is used to detect the deformation of the supporting formwork component (1); A steel bar anti-sticking detection component (4) is installed on the support formwork component (1); the steel bar anti-sticking detection component (4) is used to slide on the support formwork component (1); A steel bar pad (5) is installed on the support formwork member (1); the steel bar pad (5) passes through the steel bar anti-sticking detection member (4); A cement slurry conveying member (6) is installed on the supporting formwork member (1); a piston propulsion member (7) is installed inside the cement slurry conveying member (6); the piston propulsion member (7) is used to slide and propel inside the cement slurry conveying member (6); The supporting formwork member (1) comprises: a floor formwork (101), a connection hole (1011) and a color strip (102); two connection holes (1011) are respectively provided around the floor formwork (101); the connection holes (1011) are used to pass bolts to assemble the floor formwork (101); four color strips (102) are fixedly embedded at the bottom of the floor formwork (101); the color strips (102) are used to distinguish floor formworks (101) in different areas.
2. A colored support formwork structure for concrete structure according to claim 1, characterized in that: The supporting formwork member (1) further comprises: a central threaded barrel (103) and a grouting hole (1031); the central threaded barrel (103) is fixedly mounted in the middle of the floor formwork (101); a threaded hole is provided in the middle of the central threaded barrel (103); a grouting hole (1031) is provided on the central threaded barrel (103); and the grouting hole (1031) is used for circulating cement slurry.
3. A colored support formwork structure for concrete structure according to claim 2, characterized in that: The water storage auxiliary component (2) comprises: a bottom plate (201) and a water supply pipe (202); the bottom plate (201) is fixedly mounted with the water supply pipe (202), and the water supply pipe (202) is provided with a valve; the bottom plate (201) is fixedly mounted at the bottom of the floor formwork (101).
4. A colored support formwork structure for concrete structure according to claim 3, characterized in that: The water pressure display component (3) comprises: a water pressure connecting pipe (301), a detection cylinder (302), a lifting sliding column (303) and a spring (304); the water pressure connecting pipe (301) is fixedly mounted on the bottom of the base plate (201); a detection cylinder (302) is fixedly mounted on the bottom of the water pressure connecting pipe (301); the detection cylinder (302) is made of a transparent material; a scale line is provided on the detection cylinder (302); a lifting sliding column (303) is slidably mounted inside the detection cylinder (302); a spring (304) is sleeved inside the detection cylinder (302), and the spring (304) is connected between the lifting sliding column (303) and the detection cylinder (302); the lifting sliding column (303) is used to detect deformation of the floor formwork (101).
5. A colored support formwork structure for concrete structure according to claim 4, characterized in that: The steel bar anti-sticking detection member (4) comprises: a detection sliding column (401) and a lifting plate (402), wherein two detection sliding columns (401) are provided, and scale lines are respectively provided on the two detection sliding columns (401); the two detection sliding columns (401) are respectively slidably mounted on the floor formwork (101); the lifting plates (402) are fixedly mounted on the tops of the two detection sliding columns (401); the lifting plates (402) are embedded in the floor formwork (101); when the lifting plates (402) are retracted to the top of the floor formwork (101), the top of the floor formwork (101) is flush with the lifting plates (402); and a through hole is provided in the middle of the lifting plates (402).
6. A colored support formwork structure for concrete structure according to claim 5, characterized in that: The steel bar anti-sticking detection member (4) further comprises: a grouting rubber membrane ring (4021) and a coupling frame (403); the grouting rubber membrane ring (4021) is fixedly sleeved in a through hole in the middle of the lifting plate (402); the grouting rubber membrane ring (4021) is an elastic rubber structure; the coupling frame (403) is fixedly mounted on the bottom of the two detection sliding columns (401) by means of bolts.
7. A colored support formwork structure for concrete structure according to claim 6, characterized in that: The reinforcement pad (5) comprises: a pad threaded rod (501), an inclined grouting end (502), a plug-in column (503) and a supporting horseshoe tendon (504); the pad threaded rod (501) is threadedly connected to the central threaded tube (103); the inclined grouting end (502) is fixedly installed on the top of the pad threaded rod (501); the inclined grouting end (502) is a truncated cone structure; the outer portion of the inclined grouting end (502) is elastically and tightly sleeved A grouting rubber membrane ring (4021) is provided; the plug-in column (503) is plugged into the inclined grouting end (502); a circle of supporting horseshoe tendons (504) is installed on the plug-in column (503); the cushioned threaded rod (501) is used to adjust the support height of a circle of supporting horseshoe tendons (504); the inclined grouting end (502) is attached to the grouting rubber membrane ring (4021) for grouting and plugging; the supporting horseshoe tendons (504) are of a "U"-shaped structure.
8. The color support formwork structure for concrete structure according to claim 7, characterized in that: The cement slurry conveying member (6) comprises: a cement slurry adjustment pipe (601) and a piston cylinder (602); the cement slurry adjustment pipe (601) is fixedly mounted on the bottom of the central threaded cylinder (103); the cement slurry adjustment pipe (601) is connected to the grouting hole (1031); the end of the cement slurry adjustment pipe (601) is plugged into the piston cylinder (602); and the piston cylinder (602) is used to store cement slurry.
9. A colored support formwork structure for concrete structure according to claim 8, characterized in that: The piston propulsion member (7) comprises: a piston rod (701) and a piston (702); the piston rod (701) is fixedly mounted with the piston (702); the piston (702) is slidably sleeved on the piston cylinder (602); and a handle is provided at the rear end of the piston rod (701).
10. A construction method of a concrete structure colored support formwork structure, applied to a concrete structure colored support formwork structure as claimed in claim 9, characterized in that: The steps include: 1) Differentiate different areas of the floor formwork (101) by the color of the color strip (102), and take the floor formwork (101) of the same area; pass bolts and nuts through the through holes arranged around the floor formwork (101), assemble multiple floor formworks (101), and support the bottom of the assembled floor formwork (101) with a scaffold; 2) Supporting the horseshoe tendons (504) to assist workers in tying the steel bars; plugging the plug-in column (503) onto the inclined surface slurry discharge end (502), and then rotating the threaded rod (501) to adjust the distance between the bottom of the steel bars and the lifting plate (402) after tying; 3) After the inclined surface grouting end (502) is cast and formed by supporting the steel bars, the threaded rod (501) is rotated to drive the inclined surface grouting end (502) to move downward, and the piston (702) is pushed to inject cement slurry into the grouting hole (1031) through the piston cylinder (602). The cement slurry can be filled into the groove formed by the inclined surface grouting end (502). The threaded rod (501) is rotated to drive the inclined surface grouting end (502) to move upward, and the grouting rubber membrane ring (4021) is fitted to seal the inclined surface grouting end (502). After the cement slurry is solidified, the floor formwork (101) is demoulded and disassembled.
