Long-distance curve pipe jacking automatic guiding device and guiding method thereof
By setting up a laser relay mechanism in the pipe jacking machine, establishing a laser chain and automatically adjusting the laser direction, the problem of laser signal attenuation in long-distance curved pipe jacking construction is solved, and longer-distance construction and more efficient guidance are achieved.
Patent Information
- Application Number
- CN202410917554.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-10
- Publication Date
- 2024-10-15
AI Technical Summary
In long-distance curved pipe jacking construction, laser beam transmission is affected by environmental factors, resulting in a decrease in signal strength and stability, limiting the extension length and quality of the construction.
Multiple laser relay mechanisms are used at intervals along the length of the pipe jacking machine. Through the rotation and adjustment of the laser receiver and transmitter, a laser chain is established to realize automatic fitting and refraction of the laser beam, reducing the impact of environmental factors on the laser signal. Increase effective transmission distance.
The transmission distance and construction length of the laser beam are increased, ensuring the precise guidance and correction of the pipe jacking machine, and improving the construction efficiency and signal stability.
Smart Images

Figure CN118774834A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of pipe jacking machines, and in particular to an automatic guiding device for long-distance curved pipe jacking and a guiding method thereof. Background Art
[0002] As a method of underground pipeline construction, pipe jacking construction does not require excavation of the surface layer and can cross rivers, roads, railways, ground buildings, underground structures and various underground pipelines.
[0003] The pipe jacking construction is mainly completed with the help of a pipe jacking machine. The pipe jacking machine includes a machine head and several pipe sections. Generally, the machine head is installed in the tunnel starting shaft. Driven by the main jacking hydraulic cylinder in the tunnel starting shaft, the machine head advances forward in the horizontal direction to realize tunnel excavation. In the process of advancing the machine head, new pipe sections are continuously added behind the machine head until the machine head of the pipe jacking machine is advanced into the receiving shaft. At this time, several pipe sections form an underground pipeline between the tunnel starting shaft and the receiving shaft.
[0004] In the existing pipe jacking construction process, long-distance construction is required. At this time, in order to prevent the construction trajectory of the pipe jacking machine from deviating, an automatic guide device will be installed in the pipe jacking machine. The main function of the automatic guide device is to monitor the forward direction of the pipe jacking machine in real time. When it is found that the construction trajectory of the pipe jacking machine deviates, the corresponding correction system is controlled to realize the correction of the pipe jacking machine.
[0005] At present, common automatic guidance devices mainly include: laser target, initial total station and secondary total station. Specifically, the laser target is set in the head of the pipe jacking machine, the initial total station is set in the starting shaft of the tunnel, and multiple secondary total stations are installed in sequence between the laser target and the initial total station, and the secondary total station moves forward with the pipe jacking machine. Coaxial prisms are installed in the initial total station and several secondary total stations, and the initial total station and multiple secondary total stations are connected to the computer for communication. The initial total station emits laser and receives reflected laser signals to determine the position of the pipe jacking machine. The laser target is installed on the head of the pipe jacking machine to reflect the laser. Multiple secondary total stations receive and reflect laser signals along the excavation path of the pipe jacking machine. The computer control system analyzes the data and generates correction instructions. Finally, the correction system is used to achieve accurate excavation of the pipe jacking machine along the predetermined trajectory.
[0006] Regarding the above-mentioned technologies, the laser beam may be affected by the surrounding environment during transmission and reflection, such as dust, smoke, water vapor, etc. These factors may scatter or absorb the laser, affecting the strength and stability of the signal. This effect is particularly significant in long-distance curved pipe jacking construction, which may limit the effective transmission distance of the laser beam, thereby restricting the extension length and construction quality of the pipe jacking construction. Summary of the invention
[0007] The present application provides an automatic guiding device for long-distance curved pipe jacking and a guiding method thereof, the purpose of which is to reduce the influence of environmental factors on the laser beam during long-distance curved pipe jacking construction, increase the effective transmission distance of the laser beam, and thereby increase the extension length of the pipe jacking construction. In the first aspect, the present application provides a long-distance curved pipe jacking automatic guiding device adopts the following technical solution: A long-distance curved pipe jacking automatic guiding device comprises a pipe jacking machine; a laser emitting mechanism installed in a tunnel starting shaft; a laser receiving mechanism installed in the head of the pipe jacking machine; a plurality of laser relay mechanisms, which are sequentially arranged in the pipe jacking machine at intervals along the length direction of the pipe jacking machine, and the laser relay mechanism is located between the laser emitting mechanism and the laser receiving mechanism; the laser relay mechanism comprises a mounting frame, which is connected to the pipe jacking machine, and a laser receiver and a laser transmitter are arranged on the mounting frame, the laser transmitter is arranged along the length direction of the pipe jacking machine toward the laser receiving mechanism, and the laser receiver is arranged along the length direction of the pipe jacking machine toward the laser emitting mechanism; the laser receiver and the laser transmitter are both rotatably connected to the mounting frame, and a rotating drive assembly for driving the laser receiver and the laser transmitter to rotate is arranged on the mounting frame; the laser relay mechanism, the laser emitting mechanism and the laser receiving mechanism are all connected to a computer for communication.
[0008] By adopting the above technical scheme, a laser chain can be established through the coordinated work of the laser emitting mechanism and the laser receiving mechanism, and the laser chain represents the length trajectory of the pipe jacking machine itself, which is also the actual trajectory of the pipe jacking machine for pipe jacking construction. Since the laser receiving mechanism and the laser emitting mechanism are connected to the computer for communication, the actual trajectory data of the pipe jacking machine can be collected and compared with the theoretical trajectory data, thereby realizing accurate monitoring and guidance of the pipe jacking machine along the predetermined trajectory, and thus having the function of automatic measurement and correction.
[0009] In addition, the rotating drive assembly on the mounting frame can drive the laser transmitter and the laser receiver to rotate, which can automatically adjust the orientation of the laser receiver and the laser transmitter, so that the direction of the laser beam can be dynamically adjusted according to the actual excavation path of the pipe jacking machine, so that the laser relay mechanism can replace the prism to realize the refraction of the laser beam, and then change the transmission direction of the laser beam, so that the established laser chain can automatically fit the curved construction trajectory. Therefore, such a setting enables the guide device of the present application to be used for long-distance curved pipe jacking construction.
[0010] Several laser relay mechanisms are arranged at intervals along the length of the pipe jacking machine. The laser receiver in the laser relay mechanism can receive laser signals, and the laser transmitter can emit lasers, so that the laser relay mechanism can restore the intensity of the laser signal to its initial state, eliminate the influence of environmental factors on the laser during the transmission process, and effectively solve the problem of laser signal attenuation in long-distance excavation.
[0011] Therefore, in the long-distance curved pipe jacking construction, multiple laser relay mechanisms are installed in the pipe jacking machine along the transmission direction of the laser chain, so that the pipe jacking machine can perform long-distance straight pipe jacking construction or long-distance curved pipe jacking construction, and can reduce the impact of environmental factors on the laser beam, increase the effective transmission distance of the laser beam, and thus increase the extension length of the pipe jacking construction. Optionally, a first mounting plate and a second mounting plate are provided on the mounting frame, the first mounting plate is arranged in parallel with the second mounting plate, and the first mounting plate and the second mounting plate are arranged at intervals along the length direction of the pipe jacking machine, the first mounting plate and the second mounting plate are both rotatably connected to the mounting frame, and the rotation drive assembly includes a first driving member and a second driving member, the first driving member is arranged between the first mounting plate and the mounting frame, and the first driving member is used to drive the first mounting plate to rotate, the second driving member is arranged between the second mounting plate and the mounting frame, and the second driving member is used to drive the second mounting plate to rotate; There are a plurality of laser receivers and laser transmitters, and the plurality of laser receivers are arranged on a first mounting plate, and the plurality of laser transmitters are arranged on a second mounting plate. The plurality of laser transmitters and the plurality of laser receivers are arranged in sequence along a horizontal direction, and the laser transmitters and the laser receivers are arranged in one-to-one correspondence, and the laser transmitters are coaxially arranged with the corresponding laser receivers.
[0012] By adopting the above technical solution, accurate arrangement and adjustment of the laser transmitter and the laser receiver are achieved through the first mounting plate and the second mounting plate and the corresponding rotation drive assembly arranged on the mounting frame.
[0013] Since the laser receiver can also receive the laser signal when the laser receiver is not facing the laser receiver, it is impossible to determine whether the laser receiver is facing the corresponding laser transmitter when the laser receiver receives the laser during the process of rotating the laser receiver, and it is also impossible to determine the specific transmission path of the laser according to the rotation angle signal of the laser receiver. Therefore, a plurality of laser receivers and a plurality of laser transmitters are provided, so that during the rotation process of the first mounting plate, only when the laser intensities received by the plurality of laser receivers are the same, it indicates that the plurality of laser beams between the two adjacent laser relay mechanisms are parallel, and at this time the first mounting plate in the laser relay and the second mounting plate in another adjacent laser relay are perpendicular to the laser beam between the two, so the rotation angle of the first mounting plate and the corresponding second mounting plate can be accurately determined, so that the laser chain can be accurately fitted, and then the curved construction trajectory can be accurately fitted.
[0014] Optionally, an auxiliary component is arranged between the first driving member and the first mounting plate, and the auxiliary component includes a quick-connect column, which is arranged in a vertical direction and is coaxially connected to the output shaft of the first driving member; a quick-connect groove is opened at the upper end of the quick-connect column, and the quick-connect groove penetrates the quick-connect column in a horizontal direction, and the first mounting plate is plugged into and matched with the quick-connect groove.
[0015] By adopting the above technical solution and the design and arrangement of the quick-connect column and the clamping groove, the first mounting plate and the first driving member can be quickly installed.
[0016] Optionally, the quick-connect groove is provided with clamping parts on both inner walls thereof, and the clamping parts include a clamping rod, and a clamping hole is penetrated through the inner wall of the quick-connect groove, the clamping rod is plugged into and matched with the clamping hole, and the clamping rod is slidingly connected with the inner wall of the clamping hole along its own axial direction; a positioning hole is provided on the first mounting plate, the positioning hole is connected with the clamping hole, and one end of the clamping rod is plugged into and matched with the positioning hole.
[0017] By adopting the above technical solution, the coordination of the clamping rod in the clamping member, the clamping hole on the quick-connect column and the positioning hole on the first mounting plate can increase the stability of the connection between the first mounting plate and the first driving member and the accuracy of positioning.
[0018] Optionally, the mounting frame further includes a base rod and a driving rod, the base rod and the driving rod are both arranged in a vertical direction, the upper end of the base rod is connected to the inner wall of the pipe jacking machine, the lower end of the base rod and the upper end of the driving rod are rotatably connected, the laser receiver, the laser transmitter and the rotation drive assembly are all arranged on the driving rod, and a rotating drive member for driving the driving rod to rotate is arranged between the base rod and the driving rod.
[0019] By adopting the above technical solution, the arrangement of the base rod, the driving rod and the rotating driving member enables the laser relay mechanism to automatically rotate according to actual needs, so that the laser relay mechanism can choose whether to connect to the laser chain between the laser emitting mechanism and the laser receiving mechanism according to actual needs.
[0020] Optionally, a protective box is provided on the mounting frame, and the laser receiver, laser transmitter and rotation drive assembly are all arranged in the protective box; light-transmitting holes are opened on the side walls of the protective box, and light-transmitting plates are provided on the outer side walls of the protective box, and the light-transmitting plates close the corresponding light-transmitting holes.
[0021] By adopting the above technical solution, the light-transmitting holes on the side wall of the protection box and the light-transmitting plate on the outer wall not only ensure the smooth transmission of the laser signal, but also effectively prevent dust and other impurities from damaging the laser transmitter and laser receiver. This design significantly improves the durability and maintenance convenience of the laser relay mechanism, ensuring the long-term stability of laser transmission and the accuracy of measurement.
[0022] Optionally, a dust cleaning part is provided on the outer wall of the protection box, and the dust cleaning part includes a mounting plate, which is detachably connected to the outer wall corresponding to the protection box, and a clearance hole is formed through the mounting plate, and the clearance hole is connected with the light-transmitting hole; a mounting groove is formed on the mounting plate toward the side of the protection box, and the mounting groove is connected with the clearance hole, and the light-transmitting plate is inserted into the mounting groove, and the light-transmitting plate is slidably connected to the inner wall of the mounting groove in a vertical direction, and the light-transmitting plate closes the clearance hole; soft dust scraping strips are provided on the two opposite inner walls of the clearance hole in the vertical direction, one side of the soft dust scraping strip is in contact with the light-transmitting plate, and the light-transmitting plate is slidably connected to the soft dust scraping strip in a vertical direction.
[0023] By adopting the above technical solution, the connection between the clearance hole on the mounting plate and the light-transmitting hole ensures that the laser signal can be transmitted normally; the opening of the mounting groove in the mounting plate provides installation space for the light-transmitting plate; the cooperation between the light-transmitting plate and the dust-scraping soft strip enables the light-transmitting plate to automatically remove dust during the sliding process. This design not only improves the cleanliness of the light-transmitting plate, but also reduces the impact of external factors on the laser transmission performance, and improves the reliability of the system and the convenience of maintenance.
[0024] In the second aspect, the present application provides a long-distance curved pipe jacking automatic guiding method using the following technical solutions: A long-distance curved pipe jacking automatic guiding method, using the above-mentioned long-distance curved pipe jacking automatic guiding device to guide the pipe jacking machine, comprises the following steps: S1: Install a laser receiving mechanism in the head of the pipe jacking machine, install a laser relay mechanism in each pipe section of the pipe jacking machine, and install a laser transmitting mechanism in the tunnel starting shaft; S2: The pipe jacking machine performs long-distance curved pipe jacking construction; S21: The pipe jacking machine moves forward and adds new pipe sections; S22: During the tunnel excavation process of the pipe jacking machine, a laser chain is established according to the laser transmission route between the laser emitting mechanism, the laser receiving mechanism and several laser relay mechanisms. The laser chain is fitted to the actual construction trajectory of the pipe jacking machine, and the actual construction trajectory is compared with the theoretical construction trajectory. The head of the pipe jacking machine is corrected and guided according to the comparison data.
[0025] By adopting the above technical solution, this method realizes real-time laser chain establishment and trajectory fitting during tunnel excavation by installing a laser receiving mechanism in the pipe jacking machine, a laser relay mechanism in each pipe section, and a laser transmitting mechanism in the tunnel starting wellhead. This automatic guidance method not only improves the accuracy of the pipe jacking machine along the predetermined trajectory, but also improves the construction efficiency through deviation correction and guidance. By comparing the laser chain with the theoretical trajectory, the guidance device can automatically generate deviation correction instructions to achieve precise guidance of the pipe jacking machine.
[0026] Optionally, step S2 further includes the following steps: S23: During the process of tunnel excavation by the pipe jacking machine, when the laser receiving mechanism does not receive the laser, several laser relay mechanisms are adjusted so that the laser receiver in the laser relay mechanism can receive the signal sent by the previous laser relay mechanism or laser transmitter, and the laser transmitter in the laser relay mechanism can send a signal to the next laser relay mechanism or laser receiving mechanism until the laser receiving mechanism receives the laser again; According to the rotation angles of the laser receiver and laser transmitter in each laser relay mechanism and the laser information received in the laser receiving mechanism, the laser chain between the laser transmitting mechanism and the laser receiving mechanism is fitted, and then the laser chain is used as the actual construction trajectory of the pipe jacking machine. The actual construction trajectory is compared with the theoretical construction trajectory, and the head of the pipe jacking machine is corrected and guided according to the comparison data.
[0027] By adopting the above technical solution, when the laser receiving mechanism does not receive the laser signal, the rotation angle of the laser receiver and the laser transmitter in the laser relay mechanism is adjusted to ensure the recovery and establishment of the laser chain between the laser receiver mechanism and the laser transmitting mechanism. And according to the rotation angle of the laser receiver and the laser transmitter in the laser relay mechanism and the laser information received in the laser receiving mechanism, the curved transmission route of the laser between the laser transmitting mechanism and the laser receiving mechanism can be fitted, and then the actual trajectory of the pipe jacking machine during the curved pipe jacking construction can be determined. This method enables the pipe jacking machine to provide effective guidance and deviation correction functions when performing long-distance curved construction.
[0028] In summary, the present application includes at least one of the following beneficial technical effects: 1. This application can ensure the intensity of the laser beam in the pipe jacking machine and reduce the impact of environmental factors on the laser beam through the setting of the laser relay mechanism, thereby increasing the effective transmission distance of the laser beam and further increasing the extension length of the pipe jacking construction. 2. This application can establish a laser chain through a laser emitting mechanism, a laser receiving mechanism and a number of laser relay mechanisms. The laser chain can fit the actual construction trajectory of the pipe jacking machine, thereby facilitating the guidance and deviation correction of the pipe jacking machine.
[0029] 3. This application significantly improves the environmental adaptability and durability of the laser receiver and laser transmitter by providing a protective box and a dust cleaning component. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is a schematic diagram of the overall structure of the guide device of the present application.
[0031] Figure 2 It is a schematic diagram of the overall structure of the laser relay mechanism of the present application.
[0032] Figure 3 It is a schematic cross-sectional structure diagram of the protection box of the present application.
[0033] Figure 4 It is a schematic cross-sectional structural diagram of another position of the protection box of the present application.
[0034] Figure 5 yes Figure 4 Schematic diagram of the local enlarged structure of part A.
[0035] In the figure, 1, pipe jacking machine; 11, machine head; 12, pipe section; 13, tunnel starting shaft; 2, laser emitting mechanism; 21, emitting probe; 3, laser receiving mechanism; 31, laser target; 32, visual camera; 4, laser relay mechanism; 41, mounting frame; 411, base rod; 412, driving rod; 413, auxiliary rod; 414, rotating driving member; 42, laser emitter; 43, laser receiver; 44, protective box; 441, light-transmitting hole; 442, light-transmitting plate; 443, Dust-cleaning parts; 4431, mounting plate; 4432, clearance hole; 4433, mounting groove; 4434, dust-scraping soft strip; 4435, driving long hole; 4436, driving long block; 45, first mounting plate; 46, second mounting plate; 47, rotary drive assembly; 471, first driving member; 472, second driving member; 48, auxiliary assembly; 481, quick-connect column; 482, quick-connect groove; 483, clamping part; 4831, clamping rod; 4832, clamping hole; 4833, positioning hole. DETAILED DESCRIPTION
[0036] The following is combined with Figure 1 -Attached Figure 5 , further details of this application are given.
[0037] An automatic guiding device for long-distance curved pipe jacking, referring to Figure 1 , including: a pipe jacking machine 1, a laser emitting mechanism 2 and a laser receiving mechanism 3. The laser emitting mechanism 2 is installed in a tunnel starting shaft 13, and the laser receiving mechanism 3 is arranged in a head 11 of the pipe jacking machine 1. The laser emitting mechanism 2 emits a laser toward the laser receiving mechanism 3. When the laser receiving mechanism 3 receives the laser, a laser chain is established between the laser emitting mechanism 2 and the laser receiving mechanism 3. The laser chain is a construction track of the pipe jacking machine 1. The pipe jacking machine 1 is guided according to the data of the laser chain.
[0038] Reference Figure 1 , a plurality of transmitting probes 21 are arranged on the laser transmitter 42, and the plurality of transmitting probes 21 are arranged in sequence and at intervals in the horizontal direction. The laser receiving mechanism 3 includes a laser target 31 and a visual camera 32, the laser target 31 is arranged in the machine head 11, and the visual camera 32 is arranged toward the laser target 31. The plurality of transmitting probes 21 can emit lasers to the laser target 31, and the visual camera 32 can establish a laser chain by detecting the number and position of laser points on the laser target 31, and determine the jacking state of the pipe jacking machine 1 according to the laser chain.
[0039] Reference Figure 1 The automatic guiding device further comprises a plurality of laser relay mechanisms 4, which are arranged between the laser transmitter 42 and the laser receiver 43 along the length direction of the pipe jacking machine 1, and the plurality of laser relay mechanisms 4 are arranged in sequence and at intervals along the length direction of the pipe jacking machine 1. In this embodiment, each pipe section 12 of the pipe jacking machine 1 is correspondingly provided with a laser relay mechanism 4.
[0040] Reference Figure 1 and Figure 2 The laser relay mechanism 4 includes a mounting frame 41, which includes a base rod 411 and a driving rod 412. The base rod 411 and the driving rod 412 are coaxially arranged and arranged in the vertical direction. The upper end of the base rod 411 is connected to the inner wall of the pipe section 12 corresponding to the pipe jacking machine 1, and the lower end of the base rod 411 is rotatably connected to the upper end of the driving rod 412. An auxiliary rod 413 is arranged on the side wall of the base rod 411. One end of the auxiliary rod 413 is connected to the base rod 411, and the other end extends in the horizontal direction away from the base rod 411. A rotating driving member 414 is arranged between the auxiliary rod 413 and the driving rod 412. The rotating driving member 414 adopts a linear push rod or a cylinder or an oil cylinder. The two ends of the rotating driving member 414 are rotatably connected to the auxiliary rod 413 and the driving rod 412 respectively.
[0041] Driven by the rotating driving member 414, the driving rod 412 can rotate in a vertical plane, which makes the driving rod 412 and the base rod 411 have two positional relationships. The first one is that the driving rod 412 is coaxial and collinear with the base rod 411. At this time, the laser relay mechanism 4 is located between the laser emitting mechanism 2 and the laser receiving mechanism 3, and the laser relay mechanism 4 is connected to the laser chain between the laser emitting mechanism 2 and the laser receiving mechanism 3; the second one is that the driving rod 412 is vertically arranged with the base rod 411, and at this time, the laser relay mechanism 4 can be moved out of the laser chain.
[0042] Reference Figure 2 and Figure 3 The laser relay mechanism 4 also has a protection box 44 , and the protection box 44 is connected to the lower end of the driving rod 412 .
[0043] Reference Figure 3 and Figure 4 , light holes 441 are provided on the side walls of the protection box 44, light-transmitting plates 442 are provided on the outer side walls of the protection box 44, and the light-transmitting plates 442 seal the corresponding light holes 441. In this embodiment, the light-transmitting plates 442 are made of quartz glass or optical glass or other light-transmitting materials that have a small effect on laser attenuation. The light holes 441 are provided to ensure that the laser can be injected into the protection box 44 and also to ensure that the laser can be emitted from the protection box 44, while the light-transmitting plates 442 can seal the light holes 441 to prevent dust or other impurities from entering the protection box 44 and contaminating the devices in the protection box 44.
[0044] Reference Figure 3 and Figure 4 The outer wall of the protection box 44 is provided with a dust cleaning member 443, which includes a mounting plate 4431, which is detachably connected to the corresponding outer wall of the protection box 44. The mounting plate 4431 is provided with a clearance hole 4432, which is connected to the corresponding light-transmitting hole 441. The opening of the clearance hole 4432 ensures that the laser can enter the corresponding light-transmitting hole 441 or ensures that the laser can be emitted from the corresponding light-transmitting hole 441.
[0045] Reference Figure 3 and Figure 4 The mounting plate 4431 is provided with a mounting groove 4433 on one side facing the protection box 44, and the mounting groove 4433 is connected with the clearance hole 4432 and the corresponding light-transmitting hole 441. The light-transmitting plate 442 is arranged in the mounting groove 4433, and the light-transmitting plate 442 is slidably connected with the inner side wall of the mounting groove 4433 along the vertical direction. During the sliding process of the light-transmitting plate 442, the light-transmitting plate 442 always closes the corresponding clearance hole 4432. The clearance hole 4432 is provided with soft dust scraping strips 4434 on both inner side walls opposite to each other in the vertical direction, and the soft dust scraping strips 4434 are in contact with the light-transmitting plate 442 on the side facing the light-transmitting plate 442.
[0046] When the light-transmitting plate 442 slides in the mounting groove 4433 along the vertical direction, the dust-scraping soft strip 4434 can scrape off the dust on the light-transmitting plate 442 , which can improve the clarity of the light-transmitting plate 442 and reduce the reduction of laser light by impurities such as dust attached to the light-transmitting plate 442 .
[0047] Reference Figure 3 and Figure 4 A driving long hole 4435 is provided on the side wall of the mounting plate 4431. The driving long hole 4435 is connected to the mounting groove 4433, and the length direction of the driving long hole 4435 is arranged along the vertical direction. A driving long block 4436 is arranged on the side wall of the light-transmitting plate 442. The driving long block 4436 is plugged and matched with the driving long hole 4435. The driving long block 4436 is detachably connected to the side wall of the light-transmitting plate 442, and the driving long block 4436 is slidably connected to the inner side wall of the driving long hole 4435 along the vertical direction.
[0048] By manually pushing the driving long block 4436 to move in the vertical direction, the light-transmitting plate 442 can be moved in the vertical direction, and then the corresponding scraping soft strip 4434 can scrape off the dust on the surface of the light-transmitting plate 442, which facilitates the cleaning of the light-transmitting plate 442.
[0049] Reference Figure 1 and Figure 3 A first mounting plate 45 and a second mounting plate 46 are arranged in the protection box 44. The length direction of the first mounting plate 45 is arranged in the horizontal direction, and the length direction of the first mounting plate 45 is arranged perpendicular to the length direction of the pipe jacking machine 1. The first mounting plate 45 is arranged in parallel with the second mounting plate 46. The first mounting plate 45 and the second mounting plate 46 are arranged at intervals along the length direction of the pipe jacking machine 1, and the first mounting plate 45 is located on the side of the second mounting plate 46 facing the laser emitting mechanism 2.
[0050] Reference Figure 3 and Figure 4 A plurality of laser receivers 43 are mounted on the first mounting plate 45, and the plurality of laser receivers 43 are sequentially arranged at intervals along the length direction of the first mounting plate 45. The laser receivers 43 are arranged one-to-one with the transmitting probes 21, and the laser receivers 43 are arranged directly opposite to the corresponding transmitting probes 21 along the length direction of the pipe jacking machine 1. A plurality of laser transmitters 42 are mounted on the second mounting plate 46, and the plurality of laser transmitters 42 are sequentially arranged at intervals along the length direction of the second mounting plate 46. The laser transmitters 42 are arranged one-to-one with the laser receivers 43, and the laser transmitters 42 and the corresponding laser receivers 43 are arranged coaxially.
[0051] The laser receiver 43 is used to receive the laser emitted by the laser emitting mechanism 2 or the corresponding laser relay mechanism 4, and the laser emitter 42 is used to emit the laser toward the laser receiving mechanism 3 or the corresponding laser relay mechanism 4. Therefore, through the cooperation of the laser emitting mechanism 2, the laser receiving mechanism 3 and several laser relay mechanisms 4, a complete laser chain is formed.
[0052] Reference Figure 1 and Figure 3 A plurality of laser relay mechanisms 4 are arranged between the laser emitting mechanism 2 and the laser receiving mechanism 3. Each laser relay mechanism 4 can re-emit the laser after receiving the laser. This ensures that the laser intensity emitted by the laser relay mechanism 4 is the same each time. Therefore, when the length of the pipe jacking machine 1 for pipe jacking processing is too long, the cooperation of a plurality of laser relay mechanisms 4 can reduce the influence of environmental factors such as dust and smoke on the laser intensity, thereby ensuring that the laser receiving mechanism 3 can receive laser with sufficient intensity.
[0053] Reference Figure 3 and Figure 4 A rotation drive assembly 47 is arranged in the protective box 44, and the rotation drive assembly 47 includes a first drive member 471 and a second drive member 472. The first drive member 471 and the second drive member 472 both adopt motors. The first drive member 471 and the second drive member 472 are both arranged in the protective box 44. The output shaft of the first drive member 471 and the output shaft of the second drive member 472 are both arranged in the vertical direction. The output shaft of the first drive member 471 is connected to the middle part of the first mounting plate 45, and the output shaft of the second drive member 472 is connected to the middle part of the second mounting plate 46.
[0054] Driven by the first driving member 471 and the second driving member 472, the first mounting plate 45 and the second mounting plate 46 can both rotate, which can adjust the orientations of the plurality of laser emitters 42 and the plurality of laser receivers 43 in the protective box 44. By rotating the laser emitters 42 and the laser receivers 43, the laser relay mechanism 4 can receive lasers at different angles and emit lasers at different angles. At this time, the laser relay mechanism 4 can replace the prism and realize the refraction function of the laser.
[0055] Reference Figure 4 , an auxiliary assembly 48 is provided between the output shaft of the first driving member 471 and the first mounting plate 45, and between the output shaft of the second driving member 472 and the second mounting plate 46. In this embodiment, the auxiliary mechanism between the output shaft of the first driving member 471 and the first mounting plate 45 and the auxiliary assembly 48 between the output shaft of the second driving member 472 and the second mounting plate 46 have the same structure, and this embodiment is described by taking the auxiliary assembly 48 between the output shaft of the first driving member 471 and the first mounting plate 45 as an example.
[0056] Reference Figure 4 and Figure 5 The auxiliary component 48 includes a quick-connection column 481, which is coaxially connected to the output shaft of the first driving member 471. A quick-connection groove 482 is provided on the upper side of the quick-connection column 481. The quick-connection groove 482 penetrates the quick-connection column 481 along the length direction of the first mounting plate 45, and the first mounting plate 45 is plugged into the quick-connection groove 482. The arrangement of the quick-connection column 481 enables quick installation between the first mounting plate 45 and the output shaft of the first driving member 471.
[0057] Reference Figure 4 and Figure 5 , the two inner side walls of the quick-connect groove 482 are both provided with a clamping member 483, and the clamping member 483 includes a clamping rod 4831. A clamping hole 4832 is provided through the outer side wall of the quick-connect column 481, and the clamping hole 4832 is connected to the quick-connect groove 482. The clamping rod 4831 is plugged into the clamping hole 4832, and the clamping rod 4831 is slidably connected to the inner side wall of the clamping hole 4832 along its own axis. A positioning hole 4833 is provided on the first mounting plate 45, and the positioning hole 4833 is coaxially connected to the clamping hole 4832, and one end of the clamping rod 4831 is plugged into the corresponding positioning hole 4833. The provision of the clamping member 483 can strengthen the connection between the quick-connect column 481 and the first mounting plate 45, and the provision of the clamping rod 4831 can ensure the accuracy of the installation position of the first mounting plate 45.
[0058] In addition, the pipe jacking machine 1, the laser emitting mechanism 2 and the laser relay mechanism 4 in this embodiment are all connected to a computer for communication, which ensures that the data can be acquired by the host computer, and the host computer can also send signals to achieve deviation correction.
[0059] The implementation principle of the embodiment of the present application is as follows: the laser relay mechanism 4 is arranged between the laser emitting mechanism 2 and the laser receiving mechanism 3. Since the laser receiver 43 in the laser relay mechanism 4 can receive the laser and the laser emitter 42 can emit the laser, the laser intensity can be restored to its initial state each time the laser passes through the laser relay mechanism 4. This can eliminate the influence of dust, smoke, etc. on the laser during the transmission process, thereby increasing the effective transmission distance of the laser and increasing the extension length of the pipe jacking construction.
[0060] Since the laser transmitter 42 and the laser receiver 43 in the laser relay mechanism 4 can both rotate, there can be an angle between the laser received by the laser receiver 43 and the laser emitted by the laser transmitter 42, which can replace the role of the prism and realize the refraction of the laser. Therefore, when the pipe jacking machine 1 performs long-distance curved pipe jacking construction, by adjusting the laser transmitter 42 and the laser receiver 43 in the laser relay mechanism 4, a curved laser chain can be established between the laser emitting mechanism 2 and the laser receiving mechanism 3, which can realize the guidance and deviation correction of the pipe jacking machine 1.
[0061] This embodiment also discloses a long-distance curved pipe jacking automatic guiding method, which uses the above-mentioned long-distance curved pipe jacking automatic guiding device to guide the pipe jacking machine 1, including the following steps: S1: A laser receiving mechanism 3 is installed in the head 11 of the pipe jacking machine 1, a laser relay mechanism 4 is installed in each pipe section 12 of the pipe jacking machine 1, and a laser emitting mechanism 2 is installed in the tunnel starting shaft 13.
[0062] Specifically, the laser receiving mechanism 3 and the laser emitting mechanism 2 are installed in place, the laser emitting mechanism 2 is started, and the positions of the laser receiving mechanism 3 and the laser emitting mechanism 2 are adjusted to calibrate the relative positions of the laser emitting mechanism 2 and the laser receiving mechanism 3 .
[0063] S2: Pipe jacking machine 1 performs long-distance curved pipe jacking construction.
[0064] S21: The pipe jacking machine 1 moves forward and adds a new pipe segment 12.
[0065] Specifically, after installing the new pipe section 12 , the position of the laser relay mechanism 4 in the new pipe section 12 is fine-tuned to ensure that the laser relay mechanism 4 can receive the signal sent by the laser transmitter 42 , thereby achieving calibration of the position of the laser relay mechanism 4 .
[0066] S22: During the tunnel excavation process of the pipe jacking machine 1, when the laser receiving mechanism 3 is able to receive the laser signal, a laser chain is established according to the laser transmission route among the laser emitting mechanism 2, the laser receiving mechanism 3 and a plurality of laser relay mechanisms 4, and the laser chain is fitted to the actual construction trajectory of the pipe jacking machine 1. The actual construction trajectory is compared with the theoretical construction trajectory, and the head 11 of the pipe jacking machine 1 is corrected and guided according to the comparison data.
[0067] S23: During the tunnel excavation process of the pipe jacking machine 1, when the laser receiving mechanism 3 does not receive the laser, several laser relay mechanisms 4 are adjusted so that the laser receiver 43 in the laser relay mechanism 4 can receive the signal sent by the previous laser relay mechanism 4 or the laser transmitter 42, and the laser transmitter 42 in the laser relay mechanism 4 can send a signal to the next laser relay mechanism 4 or the laser receiving mechanism 3 until the laser receiving mechanism 3 receives the laser again; According to the rotation angles of the laser receiver 43 and the laser transmitter 42 in each laser relay mechanism 4 and the laser information received in the laser receiving mechanism 3, a laser chain between the laser transmitting mechanism 2 and the laser receiving mechanism 3 is fitted, and then the laser chain is used as the actual construction trajectory of the pipe jacking machine 1. The actual construction trajectory is compared with the theoretical construction trajectory, and the head 11 of the pipe jacking machine 1 is corrected and guided according to the comparison data.
[0068] Specifically, when the laser receiving mechanism 3 does not receive the laser, the steps for the laser relay mechanisms 4 to establish a laser chain are as follows: In the first step, among the plurality of laser relay mechanisms 4 , the angle of the laser transmitter 42 inside the last laser relay mechanism 4 that can receive the laser signal is adjusted, and the laser emitted by the laser transmitter 42 is received by the next laser transmitter 42 .
[0069] The second step is to repeat step S221 until the laser receiving mechanism 3 can receive the laser signal.
[0070] The third step is to adjust the angles of the laser receivers 43 in each laser relay mechanism 4 in sequence from the laser receiving mechanism 3 to the laser transmitting mechanism 2 along the length direction of the pipe jacking machine 1, and make the laser signal intensities received by the laser receivers 43 in each laser relay mechanism 4 the same, and fix the rotation angles of all laser transmitters 42 and laser receivers 43 at this time.
[0071] The implementation principle of the embodiment of the present application is as follows: This method realizes the real-time establishment of a laser chain during long-distance pipe jacking construction by installing a laser receiving mechanism 3 in the pipe jacking machine 1, installing a laser relay mechanism 4 in each pipe section 12, and installing a laser emitting mechanism 2 in the tunnel starting shaft 13. The laser chain can fit the construction trajectory of the pipe jacking machine 1 and determine the actual construction trajectory of the pipe jacking machine 1. In addition, by comparing the actual construction trajectory with the theoretical trajectory, the guide device can automatically generate a correction instruction to achieve accurate guidance and correction of the pipe jacking machine 1.
[0072] Moreover, during the process of long-distance curved construction by the pipe jacking machine 1, the transmission direction of the laser can be changed by adjusting the laser relay mechanism 4, so that a curved laser chain can be fitted, and the laser chain fits the curved construction trajectory of the pipe jacking machine 1, thereby determining the actual trajectory of the pipe jacking machine 1 during the curved pipe jacking construction, and guiding and correcting the long-distance curved construction of the pipe jacking machine 1.
[0073] The embodiments of this specific implementation are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. The same components are represented by the same figure marks. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. An automatic guiding device for long-distance curved pipe jacking, characterized in that: include: Pipe jacking machine (1); A laser emitting mechanism (2) is installed in a tunnel launch shaft (13); A laser receiving mechanism (3) is installed in a machine head (11) of the pipe jacking machine (1); a plurality of laser relay mechanisms (4), wherein the plurality of laser relay mechanisms (4) are sequentially arranged in intervals along the length direction of the pipe jacking machine (1) in the pipe jacking machine (1), and the laser relay mechanism (4) is located between the laser emitting mechanism (2) and the laser receiving mechanism (3); The laser relay mechanism (4) comprises a mounting frame (41), the mounting frame (41) being connected to the pipe jacking machine (1), the mounting frame (41) being provided with a laser receiver (43) and a laser transmitter (42), the laser transmitter (42) being arranged along the length direction of the pipe jacking machine (1) towards the laser receiving mechanism (3), and the laser receiver (43) being arranged along the length direction of the pipe jacking machine (1) towards the laser transmitting mechanism (2); The laser receiver (43) and the laser transmitter (42) are both rotatably connected to the mounting frame (41), and a rotation drive component (47) for driving the laser receiver (43) and the laser transmitter (42) to rotate is provided on the mounting frame (41); The laser relay mechanism (4), the laser emitting mechanism (2) and the laser receiving mechanism (3) are all connected to the computer for communication.
2. The long-distance curved pipe jacking automatic guiding device according to claim 1 is characterized in that: The mounting frame (41) is provided with a first mounting plate (45) and a second mounting plate (46); the first mounting plate (45) and the second mounting plate (46) are arranged in parallel, and the first mounting plate (45) and the second mounting plate (46) are arranged at intervals along the length direction of the pipe jacking machine (1); the first mounting plate (45) and the second mounting plate (46) are both rotatably connected to the mounting frame (41); the rotation drive assembly (47) comprises a first driving member (471) and a second driving member (472); the first driving member (471) is arranged between the first mounting plate (45) and the mounting frame (41), and the first driving member (471) is used to drive the first mounting plate (45) to rotate; the second driving member (472) is arranged between the second mounting plate (46) and the mounting frame (41), and the second driving member (472) is used to drive the second mounting plate (46) to rotate; A plurality of the laser receivers (43) and the laser transmitters (42) are provided, the plurality of laser receivers (43) are provided on a first mounting plate (45), the plurality of laser transmitters (42) are provided on a second mounting plate (46), the plurality of laser transmitters (42) and the plurality of laser receivers (43) are arranged in sequence along a horizontal direction, the laser transmitters (42) and the laser receivers (43) are arranged in a one-to-one correspondence, and the laser transmitters (42) and the corresponding laser receivers (43) are arranged coaxially.
3. The long-distance curved pipe jacking automatic guiding device according to claim 2, characterized in that: An auxiliary component (48) is disposed between the first driving member (471) and the first mounting plate (45), the auxiliary component (48) comprising a quick-connect column (481), the quick-connect column (481) being disposed in a vertical direction, and the quick-connect column (481) being coaxially connected to an output shaft of the first driving member (471); A quick connection groove (482) is provided at the upper end of the quick connection column (481), the quick connection groove (482) penetrates the quick connection column (481) in a horizontal direction, and the first mounting plate (45) is plugged into and matched with the quick connection groove (482).
4. The long-distance curved pipe jacking automatic guiding device according to claim 3 is characterized in that: The two inner side walls of the quick-connect groove (482) are both provided with a clamping member (483), the clamping member (483) comprising a clamping rod (4831), a clamping hole (4832) is formed through the inner side wall of the quick-connect groove (482), the clamping rod (4831) is plugged into and matched with the clamping hole (4832), and the clamping rod (4831) is slidably connected to the inner side wall of the clamping hole (4832) along its own axial direction; A positioning hole (4833) is provided on the first mounting plate (45), the positioning hole (4833) is communicated with the clamping hole (4832), and one end of the clamping rod (4831) is plugged into and fitted with the positioning hole (4833).
5. The long-distance curved pipe jacking automatic guiding device according to claim 1, characterized in that: The mounting frame (41) further comprises a base rod (411) and a driving rod (412); the base rod (411) and the driving rod (412) are both arranged in a vertical direction; the upper end of the base rod (411) is connected to the inner wall of the pipe jacking machine (1); the lower end of the base rod (411) and the upper end of the driving rod (412) are rotatably connected; the laser receiver (43), the laser transmitter (42) and the rotary drive assembly (47) are all arranged on the driving rod (412); and a rotary drive member (414) for driving the driving rod (412) to rotate is arranged between the base rod (411) and the driving rod (412).
6. The long-distance curved pipe jacking automatic guiding device according to claim 1, characterized in that: A protection box (44) is arranged on the mounting frame (41), and the laser receiver (43), the laser transmitter (42) and the rotation drive assembly (47) are all arranged in the protection box (44); light-transmitting holes (441) are opened on the side walls of the protection box (44), and light-transmitting plates (442) are arranged on the outer side walls of the protection box (44), and the light-transmitting plates (442) seal the corresponding light-transmitting holes (441).
7. The long-distance curved pipe jacking automatic guiding device according to claim 6, characterized in that: A dust cleaning component (443) is provided on the outer side wall of the protection box (44), the dust cleaning component (443) comprising a mounting plate (4431), the mounting plate (4431) being detachably connected to the outer side wall corresponding to the protection box (44), a clearance hole (4432) being formed through the mounting plate (4431), the clearance hole (4432) being in communication with the light transmission hole (441); A mounting groove (4433) is provided on one side of the mounting plate (4431) facing the protection box (44); the mounting groove (4433) is communicated with the clearance hole (4432); the light-transmitting plate (442) is inserted into the mounting groove (4433); the light-transmitting plate (442) is slidably connected to the inner side wall of the mounting groove (4433) in a vertical direction; and the light-transmitting plate (442) closes the clearance hole (4432); The two inner side walls of the clearance hole (4432) opposite to each other in the vertical direction are both provided with soft plaster scraping strips (4434), one side of the soft plaster scraping strip (4434) is in contact with the light-transmitting plate (442), and the light-transmitting plate (442) is slidably connected with the soft plaster scraping strip (4434) in the vertical direction.
8. A long-distance curved pipe jacking automatic guiding method, using the long-distance curved pipe jacking automatic guiding device according to any one of claims 1 to 7 to guide the pipe jacking machine, characterized in that: The following steps are involved: S1: installing a laser receiving mechanism (3) in a head (11) of a pipe jacking machine (1), installing a laser relay mechanism (4) in each pipe section (12) of the pipe jacking machine (1), and installing a laser emitting mechanism (2) in a tunnel launch shaft (13); S2: Pipe jacking machine (1) performs long-distance curved pipe jacking construction; S21: the pipe jacking machine (1) moves forward and adds a new pipe segment (12); S22: During the tunnel excavation process of the pipe jacking machine (1), a laser chain is established according to the laser transmission route between the laser emitting mechanism (2), the laser receiving mechanism (3) and the plurality of laser relay mechanisms (4). The laser chain is fitted to the actual construction trajectory of the pipe jacking machine (1), the actual construction trajectory is compared with the theoretical construction trajectory, and the head (11) of the pipe jacking machine (1) is corrected and guided according to the comparison data.
9. The long-distance curved pipe jacking automatic guiding method according to claim 8, characterized in that: Step S2 also includes the following steps: S23: During the process of tunnel excavation by the pipe jacking machine (1), when the laser receiving mechanism (3) does not receive the laser, the plurality of laser relay mechanisms (4) are adjusted so that the laser receiver (43) in the laser relay mechanism (4) can receive the signal sent by the previous laser relay mechanism (4) or the laser transmitter (42), and the laser transmitter (42) in the laser relay mechanism (4) can send a signal to the next laser relay mechanism (4) or the laser receiving mechanism (3), until the laser receiving mechanism (3) receives the laser again; According to the rotation angles of the laser receiver (43) and the laser transmitter (42) in each laser relay mechanism (4) and the laser information received in the laser receiving mechanism (3), a laser chain between the laser transmitting mechanism (2) and the laser receiving mechanism (3) is fitted, and then the laser chain is used as the actual construction trajectory of the pipe jacking machine (1), and the actual construction trajectory is compared with the theoretical construction trajectory, and the head (11) of the pipe jacking machine (1) is corrected and guided according to the comparison data.