Installation method of pump set with double-layer vibration isolation structure

Through the measurement of the settlement of the reserved piping system and the installation method of the double-layer vibration isolation structure, the problem of poor vibration and noise control effects of the pump unit is solved, higher stability and service life are achieved, and the difficulty and cost of operation are reduced. And improve the safety of the piping system.

CN118775343AActive Publication Date: 2024-10-15HUDONG ZHONGHUA SHIPBUILDINGGROUP +1

Patent Information

Application Number
CN202410888761.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-04
Publication Date
2024-10-15
Estimated Expiration
2044-07-04

AI Technical Summary

Technical Problem

The existing pump set installation method lacks an optimized double-layer vibration isolation device, resulting in poor vibration and noise control effects. In addition, the settlement of the pump set causes the pipe system to be installed highly misaligned, affecting the service life.

Method used

By measuring the settlement of the reserved piping system, the installation method of the double-layer vibration isolation structure is adopted, including the specific steps for vertical and horizontal pump units, and the use of adapter bases, vibration isolators and fixed brackets to ensure the accuracy of the piping system installation. and stability to avoid dislocation problems caused by settlement.

Benefits of technology

It effectively reduces the vibration and noise of the pump unit, improves stability and service life, reduces operating difficulty and cost, and enhances the safety of the piping system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118775343A_ABST
    Figure CN118775343A_ABST
Patent Text Reader

Abstract

The invention discloses a method for mounting a pump set with a double-layer vibration isolation structure, which comprises the following steps of: mounting a ship body mounting base according to a vertical pump set or a horizontal pump set, pre-mounting switching bases on the ship body mounting base after the ship body mounting base is mounted, mounting a lower-layer vibration isolator on each switching base, and mounting a lower-layer vibration isolator on each switching base. The middle base is installed on the lower-layer vibration isolator, the middle base is fixedly connected with the lower-layer vibration isolator, the upper-layer vibration isolator is installed at the corresponding position of the middle base according to the connecting position of the pump set and the upper-layer vibration isolator, then the pump set is hoisted on the upper-layer vibration isolator, and installation of the pump set is completed; and then the piping system and the fixing support are installed according to the measured settlement amount of the reserved piping system, and installation of the pump set is completed. The settlement amount of the reserved piping system is measured, the situation that after the piping system is installed, in the subsequent using process, the installation height of the piping system is dislocated due to settlement of the pump set, and consequently the piping system is broken is avoided, and the service life of the pump set is prolonged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of shipbuilding, and in particular relates to a method for installing a pump group with a double-layer vibration isolation structure. Background Art

[0002] Pump sets are widely used in industrial production, mainly for conveying various fluids, such as liquids, gases, etc. During the operation of the pump set, vibrations and noises will be generated, which will not only disturb the surrounding environment, but also cause certain damage to the pump set itself. In order to reduce the vibration and noise during the operation of the pump set, various vibration isolation devices are usually used. However, in the existing pump set installation method, there is no more optimized solution for the installation and use of double-layer vibration isolation devices, resulting in poor vibration and noise control effects of the pump set. Summary of the invention

[0003] The purpose of the present invention is to overcome the deficiencies in the above-mentioned prior art and to provide a method for installing a pump group with a double-layer vibration isolation structure. The method of the present invention avoids the problem that after the installation of the pipe system, during subsequent use, the pipe system installation height is misaligned due to the settlement of the pump group, resulting in pipe rupture, by reserving the measurement of the settlement of the pipe system, thereby improving the service life of the pump group.

[0004] In order to achieve the above invention purpose, the technical solution provided by the present invention is as follows:

[0005] A method for installing a pump group with a double-layer vibration isolation structure, the method specifically comprising the following steps:

[0006] S1, installation of vertical pump unit. First install the hull installation base at the installation position of the vertical pump unit. After the installation of the hull installation base is completed, pre-install the transfer base at the four corners of the hull installation base.

[0007] S2, install the lower vibration isolator on each adapter base, install the middle base on the lower vibration isolator, the support plates at the four corners of the middle base are respectively connected and fixed to the lower vibration isolator, and install the upper vibration isolator at the corresponding position of the middle base according to the connection position between the vertical pump unit and the upper vibration isolator;

[0008] S3, after the upper vibration isolator is installed, the vertical pump unit is hoisted to connect and fix the vertical pump unit to the upper vibration isolator. After the vertical pump unit is installed, the adapter base is fixedly connected to the installation base;

[0009] S4, after the vertical pump unit is installed, install the rubber expansion joints at the pump unit inlet and outlet, measure the reserved pipe system settlement, and install the pipe system according to the measured reserved pipe system settlement;

[0010] S5. After the vertical pump group piping system is installed, install a fixed bracket at the rubber expansion joint flange to support the piping system;

[0011] S6,; Installation of the horizontal pump unit: first install the hull installation base at the installation position of the horizontal pump unit. After the installation of the hull installation base is completed, pre-install the transfer base on both sides of the hull installation base;

[0012] S7, install a lower vibration isolator on each adapter base, install a horizontal intermediate base 6 on the lower vibration isolator, and the two sides of the lower end of the horizontal intermediate base 6 are respectively connected and fixed to the lower vibration isolator, and the upper vibration isolator is installed at the corresponding positions on both sides of the upper end of the horizontal intermediate base 6 according to the connection position of the horizontal pump group and the upper vibration isolator;

[0013] S8, after the upper vibration isolator is installed, the horizontal pump unit is hoisted to connect and fix the horizontal pump unit to the upper vibration isolator. After the horizontal pump unit is installed, the adapter base is fixedly connected to the installation base;

[0014] S9. After the installation of the horizontal pump unit is completed, install the pipes of the rubber expansion joints at the inlet and outlet of the pump unit, measure the reserved pipe system settlement, install the pipe system according to the measured reserved pipe system settlement, and install fixed brackets at the flanges of the rubber expansion joints to support the pipe system; the installation of the pump unit is completed.

[0015] Furthermore, the adapter base is a square gasket, the adapter base is welded and fixed to the hull mounting base, the flatness of the adapter base is no more than 1 mm, and the adapter base is drilled according to the installation position of the lower vibration isolator and connected to the outer interface of the lower vibration isolator.

[0016] Furthermore, 48 hours after the upper vibration isolator of the vertical pump group is installed, the pipes of the rubber expansion joints at the inlet and outlet of the pump group are installed, and 48 hours after the upper vibration isolator of the horizontal pump group is installed, the pipes of the rubber expansion joints at the inlet and outlet of the pump group are installed.

[0017] Furthermore, the reserved piping settlement measurement includes the deformation of the upper vibration isolator and the deformation of the lower vibration isolator. The reserved piping settlement measurement is specifically as follows: after the vertical pump group or the horizontal pump group is installed, the vertical pump group or the horizontal pump group is left to stand for 48 hours, and the deformation of the upper vibration isolator and the lower vibration isolator are measured respectively; according to the measured deformation of the upper vibration isolator and the lower vibration isolator and the settlement margin, the butt installation of the connecting flange of the rubber expansion joint of the piping and the pump group is adjusted.

[0018] Furthermore, the deformation of the upper vibration isolators in the vertical pump group and the horizontal pump group after standing for 48 hours is 3-5mm, the deformation of the lower vibration isolators in the vertical pump group and the horizontal pump group after standing for 48 hours is 5-8mm, and the allowance for the sinking is 3-5mm.

[0019] Furthermore, when the pipe system and the connecting flange of the rubber expansion joint of the pump group are butt-jointed, the crack surface between the flanges at the butt joint is allowed to be no more than 4.5 mm, the displacement is no more than 5.4 mm, and the butt joint installation spacing deviation is less than 2% of the nominal length of the rubber expansion joint.

[0020] Furthermore, the fixing bracket includes a flange bracket and a fixing bracket, the flange bracket is bolted to the side of the rubber expansion joint flange, the upper end of the fixing bracket is connected to the flange bracket, and the lower end of the fixing bracket is connected and fixed to the hull deck, the upper end of the flange bracket is an arc-shaped plate, and bolt holes are opened on the arc-shaped plate, the bolt holes on the arc-shaped plate are aligned with the flange holes at the lower end of the side of the rubber expansion joint flange and are fixed by bolts, the rear end of the flange bracket is provided with reinforcing ribs, the upper end of the fixing bracket supports the flange bracket, and the rear end of the fixing bracket is provided with bracket reinforcing ribs.

[0021] Based on the above technical solution, the pump group installation method with a double-layer vibration isolation structure of the present invention has achieved the following technical advantages through practical application:

[0022] 1. The present invention provides a method for installing a pump group with a double-layer vibration isolation structure, which can realize the installation of a pump group with a double-layer vibration isolation device. It can effectively reduce the vibration and noise interference of the pump group, improve the stability of the pump group, and extend its service life; compared with the prior art, the present invention has the advantages of simple operation, high adjustment accuracy, and good stability. At the same time, the implementation of the present invention can effectively reduce the user's operating difficulty, reduce adjustment time and cost, and improve the use efficiency.

[0023] 2. The pump installation method with a double-layer vibration isolation structure of the present invention reserves the measurement of the settlement of the piping system, thereby avoiding the misalignment of the piping installation height due to the settlement of the pump unit during the subsequent use after the piping system is installed, resulting in the rupture of the piping system, thereby improving the service life of the pump unit.

[0024] 3. The present invention provides a method for installing a pump group with a double-layer vibration isolation structure. Through the use of fixed brackets, the displacement generated when the pump group is started is not transmitted to the pipe system connected to the pump group. The displacement when the pump group is started is compensated by the setting of rubber expansion joints and vibration isolators. The placement of the fixed brackets transmits vibrations to adjacent pipe systems, thereby improving the safety of the pipe system. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a front view of a vertical pump group installation in a pump group installation method with a double-layer vibration isolation structure of the present invention.

[0026] Figure 2 It is a side view of a vertical pump group installation in a pump group installation method with a double-layer vibration isolation structure of the present invention.

[0027] Figure 3 It is a front view of the installation of a horizontal pump group in a pump group installation method with a double-layer vibration isolation structure of the present invention.

[0028] Figure 4 It is a side view of the installation of a horizontal pump group in a pump group installation method with a double-layer vibration isolation structure of the present invention.

[0029] Figure 5 It is a front view of the installation of a fixed bracket in a method for installing a pump group with a double-layer vibration isolation structure according to the present invention.

[0030] Figure 6 The present invention is a side view of the installation of a fixed bracket in a method for installing a pump unit with a double-layer vibration isolation structure. DETAILED DESCRIPTION

[0031] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is described below by the specific examples shown in the accompanying drawings. However, it should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the present invention.

[0032] like Figure 1-6 The present invention relates to a method for installing a pump group with a double-layer vibration isolation structure, which specifically comprises the following steps:

[0033] S1, installation of the vertical pump unit, first installing the hull installation base at the vertical pump unit installation position, after the hull installation base is installed, pre-install the adapter base 5 at the four corners of the hull installation base;

[0034] S2, install the lower vibration isolator 3 on each adapter base 5, install the middle base 4 on the lower vibration isolator 3, the support plates at the four corners of the middle base 4 are respectively connected and fixed to the lower vibration isolator 3, and install the upper vibration isolator 2 at the corresponding position of the middle base 4 according to the connection position between the vertical pump unit and the upper vibration isolator 2;

[0035] S3, after the upper vibration isolator 2 is installed, the vertical pump unit is hoisted so that the vertical pump unit is connected and fixed to the upper vibration isolator 2. After the vertical pump unit is installed, the adapter base 5 is fixedly connected to the installation base;

[0036] S4, after the vertical pump unit is installed, the rubber expansion joint 1 is installed at the inlet and outlet of the pump unit, the reserved pipe system settlement is measured, and the pipe system is installed according to the measured reserved pipe system settlement;

[0037] S5, after the vertical pump group piping system is installed, install a fixed bracket at the flange of the rubber expansion joint 1 to support the piping system;

[0038] S6,; installation of the horizontal pump unit, first installing the hull mounting base at the horizontal pump unit installation position, after the hull mounting base is installed, pre-install the adapter base 5 on both sides of the hull mounting base;

[0039] S7, install the lower vibration isolator 3 on each adapter base 5, install the horizontal intermediate base 6 on the lower vibration isolator 3, the two sides of the lower end of the horizontal intermediate base 6 are respectively connected and fixed to the lower vibration isolator 3, and according to the connection position of the horizontal pump group and the upper vibration isolator 2, install the upper vibration isolator 2 at the corresponding positions on both sides of the upper end of the horizontal intermediate base 6;

[0040] S8, after the upper vibration isolator 2 is installed, the horizontal pump unit is hoisted so that the horizontal pump unit is connected and fixed to the upper vibration isolator 2. After the horizontal pump unit is installed, the adapter base 5 is fixedly connected to the installation base;

[0041] S9. After the installation of the horizontal pump unit is completed, install the pipe of the rubber expansion joint 1 at the inlet and outlet of the pump unit, measure the reserved pipe system settlement, install the pipe system according to the measured reserved pipe system settlement, and install a fixed bracket at the flange of the rubber expansion joint 1 to support the pipe system; the installation of the pump unit is completed.

[0042] The adapter base is a square gasket, which is welded and fixed to the hull mounting base. The flatness of the adapter base is not greater than 1 mm. The adapter base is drilled according to the installation position of the lower vibration isolator 3 and connected to the outer interface of the lower vibration isolator 3.

[0043] 48 hours after the upper vibration isolator 2 of the vertical pump group is installed, the pipes of the rubber expansion joint 1 are installed at the inlet and outlet of the pump group. 48 hours after the upper vibration isolator 2 of the horizontal pump group is installed, the pipes of the rubber expansion joint 1 are installed at the inlet and outlet of the pump group.

[0044] like Figure 1 and 2 As shown, the double-layer vibration isolation device of the vertical pump group consists of an upper vibration isolator 2, an intermediate base 4 and a lower vibration isolator 3. The weight of the entire pump group is transferred to the intermediate base 4 through the upper shock absorber, and the intermediate base 4 is installed through the lower vibration isolator 3 and the shipyard base. The vibration of the pump group is eliminated through the upper and lower vibration isolators and the rubber expansion joint 1, reducing the vibration of the pump group from being transmitted to the piping system and the hull structure.

[0045] like Figure 3 and 4As shown, the double-layer vibration isolation device for a horizontal pump consists of an upper vibration isolator 2, a horizontal intermediate base 6 and a lower vibration isolator 3. The horizontal intermediate base 6 is usually a rectangular frame. The weight of the entire pump unit is transmitted to the horizontal intermediate base 6 through the upper shock absorber. The horizontal intermediate base 6 is installed through the lower vibration isolator 3 and the shipyard base. The vibration of the pump unit is eliminated through the upper and lower vibration isolators and the rubber expansion joint 1, thereby reducing the vibration of the pump unit transmitted to the piping system and the hull structure.

[0046] The reserved piping settlement measurement includes the deformation of the upper vibration isolator 2 and the deformation of the lower vibration isolator 3. The reserved piping settlement measurement is specifically as follows: after the vertical pump group or the horizontal pump group is installed, the vertical pump group or the horizontal pump group is left to stand for 48 hours, and the deformation of the upper vibration isolator 2 and the lower vibration isolator 3 are measured respectively; according to the measured deformation of the upper vibration isolator 2 and the lower vibration isolator 3 and the settlement margin, the butt-jointed installation of the connecting flange of the rubber expansion joint 1 of the piping and the pump group is adjusted; by reserving the piping settlement measurement, the piping installation height is avoided to be misaligned due to the settlement of the pump group during the subsequent use after the piping is installed, resulting in the rupture of the piping, thereby improving the service life of the pump group.

[0047] The deformation of the upper vibration isolator 2 in the vertical pump group and the horizontal pump group after standing for 48 hours is 3-5 mm, and the deformation of the lower vibration isolator 3 in the vertical pump group and the horizontal pump group after standing for 48 hours is 5-8 mm, and the allowance for the sinking amount is 3-5 mm.

[0048] When the pipe system and the rubber expansion joint 1 of the pump group are butt-jointed, the crack surface between the flanges at the butt joint is allowed to be no more than 4.5mm, the displacement is no more than 5.4mm, and the butt joint installation spacing deviation is less than 2% of the nominal length of the rubber expansion joint 1.

[0049] The fixing bracket comprises a flange bracket 81 and a fixing bracket 82, wherein the flange bracket 81 is bolted to the side of the docking flange 7 of the rubber expansion joint 1, the upper end of the fixing bracket 82 is connected to the flange bracket 81, and the lower end of the fixing bracket 82 is connected and fixed to the hull deck, the upper end of the flange bracket 81 is an arc plate, and bolt holes are opened on the arc plate, and the bolt holes on the arc plate are aligned with the flange holes at the lower end of the side of the docking flange of the rubber expansion joint 1 and fixed by bolts, and the rear end of the flange bracket 81 is provided with a reinforcing rib 83, and the upper end of the fixing bracket 82 supports the flange bracket 81, and the rear end of the fixing bracket 82 is provided with a bracket reinforcing rib 84; through the use of the fixing bracket 82, the displacement generated when the pump group is started is not transmitted to the pipe system connected to the pump group, and the displacement when the pump group is started is compensated by the setting of the rubber expansion joint 1 and the vibration isolator, and the placement of the fixing bracket 82 transmits the vibration to the adjacent pipe system, thereby improving the safety of the use of the pipe system.

[0050] Reserve space for cable connection

[0051] The pump unit with double-layer vibration isolation device has a large displacement at the moment of starting. The motor cable and grounding cable of the pump unit need to have a certain margin to prevent the cables from being pulled and damaged during starting.

[0052] Reserve grille margin

[0053] Since the pump unit with double-layer vibration isolation device has a large displacement during startup or operation, a certain distance needs to be reserved for the grille around the pump unit. It is recommended that the distance between the grille and the pump unit should be greater than 50mm.

[0054] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the specific implementation methods of the invention can still be modified or some technical features can be replaced by equivalents without departing from the spirit of the technical solution of the present invention, which should be included in the scope of the technical solution for protection of the present invention.

Claims

1. A method for installing a pump unit with a double-layer vibration isolation structure, characterized in that: The method specifically comprises the following steps: S1, installation of vertical pump unit. First install the hull installation base at the installation position of the vertical pump unit. After the installation of the hull installation base is completed, pre-install the transfer base at the four corners of the hull installation base. S2, install the lower vibration isolator on each adapter base, install the middle base on the lower vibration isolator, the support plates at the four corners of the middle base are respectively connected and fixed to the lower vibration isolator, and install the upper vibration isolator at the corresponding position of the middle base according to the connection position between the vertical pump unit and the upper vibration isolator; S3, after the upper vibration isolator is installed, the vertical pump unit is hoisted to connect and fix the vertical pump unit to the upper vibration isolator. After the vertical pump unit is installed, the adapter base is fixedly connected to the installation base; S4, after the vertical pump unit is installed, install the rubber expansion joints at the pump unit inlet and outlet, measure the reserved pipe system settlement, and install the pipe system according to the measured reserved pipe system settlement; S5. After the vertical pump group piping system is installed, install a fixed bracket at the flange of the rubber expansion joint to support the piping system; S6,; For horizontal pump unit installation, first install the hull mounting base at the horizontal pump unit installation position. After the hull mounting base is installed, pre-install the transfer base on both sides of the hull mounting base. S7, install a lower vibration isolator on each adapter base, install a horizontal intermediate base on the lower vibration isolator, and the two sides of the lower end of the horizontal intermediate base are respectively connected and fixed to the lower vibration isolator. According to the connection position of the horizontal pump unit and the upper vibration isolator, install the upper vibration isolator at the corresponding positions on both sides of the upper end of the horizontal intermediate base; S8, after the upper vibration isolator is installed, the horizontal pump unit is hoisted to connect and fix the horizontal pump unit to the upper vibration isolator. After the horizontal pump unit is installed, the adapter base is fixedly connected to the installation base; S9. After the installation of the horizontal pump unit is completed, install the pipes of the rubber expansion joints at the inlet and outlet of the pump unit, measure the reserved pipe system settlement, install the pipe system according to the measured reserved pipe system settlement, and install fixed brackets at the flanges of the rubber expansion joints to support the pipe system; the installation of the pump unit is completed.

2. A method for installing a pump unit with a double-layer vibration isolation structure according to claim 1, characterized in that: The adapter base is a square gasket, the adapter base is welded and fixed to the hull mounting base, the flatness of the adapter base is not greater than 1 mm, and the adapter base is drilled according to the installation position of the lower vibration isolator to connect with the outer interface of the lower vibration isolator.

3. A method for installing a pump unit with a double-layer vibration isolation structure according to claim 1, characterized in that: The pipes of the rubber expansion joints at the inlet and outlet of the pump group are installed 48 hours after the upper vibration isolator of the vertical pump group is installed, and the pipes of the rubber expansion joints at the inlet and outlet of the pump group are installed 48 hours after the upper vibration isolator of the horizontal pump group is installed.

4. A method for installing a pump unit with a double-layer vibration isolation structure according to claim 1, characterized in that: The reserved piping settlement measurement includes the deformation of the upper vibration isolator and the deformation of the lower vibration isolator. The reserved piping settlement measurement is specifically as follows: after the vertical pump group or the horizontal pump group is installed, the vertical pump group or the horizontal pump group is left to stand for 48 hours, and the deformation of the upper vibration isolator and the lower vibration isolator are measured respectively; according to the measured deformation of the upper vibration isolator and the lower vibration isolator and the settlement margin, the butt-jointed installation of the connecting flange of the rubber expansion joint of the piping and the pump group is adjusted.

5. A method for installing a pump unit with a double-layer vibration isolation structure according to claim 4, characterized in that: The deformation of the upper vibration isolators in the vertical pump group and the horizontal pump group after standing for 48 hours is 3-5 mm, and the deformation of the lower vibration isolators in the vertical pump group and the horizontal pump group after standing for 48 hours is 5-8 mm, and the allowance for the sinking is 3-5 mm.

6. A method for installing a pump unit with a double-layer vibration isolation structure according to claim 4, characterized in that: When the pipe system and the rubber expansion joint of the pump group are butt-jointed and installed, the crack surface between the flanges at the butt joint is allowed to be no more than 4.5mm, the displacement is no more than 5.4mm, and the butt joint installation spacing deviation is less than 2% of the nominal length of the rubber expansion joint.

7. A method for installing a pump unit with a double-layer vibration isolation structure according to claim 1, characterized in that: The fixing bracket comprises a flange bracket and a fixing bracket, the flange bracket is bolted to the side of the rubber expansion joint butt flange, the upper end of the fixing bracket is connected to the flange bracket, the lower end of the fixing bracket is connected and fixed to the hull deck, the upper end of the flange bracket is an arc-shaped plate, bolt holes are opened on the arc-shaped plate, the bolt holes on the arc-shaped plate are aligned with the flange holes at the lower end of the side of the rubber expansion joint butt flange and are fixed by bolts, the rear end of the flange bracket is provided with reinforcing ribs, the upper end of the fixing bracket supports the flange bracket, and the rear end of the fixing bracket is provided with bracket reinforcing ribs.

Citation Information

Patent Citations

  • Attachment of bearing elements by deformation

    CA2448772A1

  • Ship outboard tail shaft sinkage and vibration online monitoring device

    CN115593588A

  • Water pump damping structure

    CN210859162U

  • Marine double-layer vibration isolation centrifugal pump with good vibration reduction effect

    CN217401176U

  • Vibration prevention system for vertical shaft type pump

    JP2002005097A

Cited By

  • Double-layer vibration isolation device of vertical right-angle pump

    CN119712618A

  • Ship high-pressure pipeline system pump source operation condition installation attitude low-noise compensation structure

    CN119957558A

  • A low-noise compensation structure for a pump operation condition installation posture of a high-pressure pipeline system of a ship

    CN119957558B