Ecological restoration treatment device and method for green mine construction

By installing anti-scouring components and turning nets on the steep slopes of abandoned mines, the weight of rainwater and gravity are used to solve the problem of poor fixation of soil and grass seeds after spraying, achieving more efficient ecological restoration and being suitable for high and steep slopes. Environmentally green mine construction.

CN118847692AActive Publication Date: 2024-10-29SINOHYRDO ENG BUREAU 3 CO LTD
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202411098537.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-12
Publication Date
2024-10-29
Estimated Expiration
2044-08-12

AI Technical Summary

Technical Problem

During the ecological restoration process of steep slope areas in abandoned mines, the soil and grass seeds after spraying are easily affected by rain erosion, resulting in unsatisfactory fixation effects. The laying and dismantling of geotextiles in the existing technology is cumbersome and requires a large amount of work, especially in High and steep mining areas are difficult to operate.

Method used

Adopt an ecological restoration and management device that includes slope nets, anchors, and anti-scouring components. The anti-scouring components are composed of installation pads, anti-scouring pieces, interception ring pieces, elastic supports, and flipping nets. By setting anti-scouring components on the slope net , using the weight of rainwater to force the anti-scouring components to unfold, reducing the impact of rainwater erosion on the soil, and increasing the slurry adhesion area and depth through the design of the flip net and slope net.

Benefits of technology

It improves the efficiency of grass planting, enhances the fixation effect of soil and grass seeds, reduces the impact of rainwater on steep slopes, and accelerates the rate of repair and treatment of steep slopes in mines. The device design is easy to install and disassemble, and is suitable for high and steep slope environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118847692A_ABST
    Figure CN118847692A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of environment restoration equipment, and particularly relates to an ecological restoration treatment device and method for green mine construction, the ecological restoration treatment device comprises a side slope net and anchor rods, the side slope net covers a mine abrupt slope, the anchor rods are fixedly mounted on the mine abrupt slope, and the side slope net is fixedly connected with the anchor rods; the anti-scouring device further comprises an anti-scouring assembly, and the anti-scouring assembly is fixedly installed on the side slope net and used for preventing rainwater from scouring the side slope net. In heavy rain weather, the anti-scouring assembly is forced to be unfolded by means of the weight of rainwater, then soil on a side slope net is shielded, scouring of rainwater to soil and the like sprayed on a side slope is reduced, the grass planting efficiency is improved, meanwhile, the anti-scouring pieces with the water and soil intercepting function exist, the water and soil fixing function can be achieved to a certain degree, and the water and soil can be fixed to a certain degree. And the fixing effect on sprayed soil and grass seeds is further enhanced, and the remediation and treatment rate of the mine abrupt slope is increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of environmental restoration equipment, and in particular to an ecological restoration and management device and method for green mine construction. Background Art

[0002] my country is a country rich in mineral resources. In the long process of mining and exploitation, there are a large number of abandoned mines. These abandoned mines are not only not conducive to soil and water conservation due to the barren land and scarce soil, but also have an adverse impact on the sustainable development of the local ecosystem. With the gradual promotion of green ecological and environmental protection concepts, the greening and restoration of abandoned mines has gradually been implemented.

[0003] When carrying out ecological restoration and management of abandoned mines, planting grass and trees is one of the ecological restoration measures. Planting different types of plants in different areas of abandoned mines can enhance the soil and water conservation capacity of abandoned mine areas and subtly improve the ecological environment of abandoned mines. For the steep slope areas of abandoned mines, due to exposed rocks, scarce soil, and relatively difficult working environment, it is suitable to plant herbaceous or low shrub species. According to the specific construction process, it can be divided into a variety of greening processes such as guest soil spraying and hanging nets and grass bag planting. Among them, the guest soil spraying and hanging net process is widely used in mine steep slope restoration operations due to its low operating difficulty and strong adaptability to the environment. In addition, in the guest soil spraying and hanging net process, in order to enhance the fixation effect of the sprayed soil and grass seeds, the spatial structure of the three-dimensional net is often used to enhance the fixation effect of the soil and grass seeds, thereby reducing the impact of rainwater erosion on the steep slope after the operation. However, in the early stage after spraying, under the erosion of rainwater, the loss of soil, grass seeds, etc. on the three-dimensional net is still not ideal, resulting in unsatisfactory progress in the ecological restoration of the steep slope.

[0004] In the related technologies, the ability of steep slopes to resist rain erosion after spraying is often enhanced by laying protective cloth. For example, a Chinese patent discloses a steep slope spraying greening method with application number 201410507771X. In this scheme, geotextiles are laid after spraying and removed after the plants survive to enhance the ability of steep slopes to resist rain erosion. However, in actual application, it is found that the laying and removal of geotextiles are relatively troublesome, especially in high and steep mining areas, and the amount of work is large.

[0005] In view of this, the present invention proposes an ecological restoration and management device and method for green mine construction, which are used to solve the above-mentioned technical problems. Summary of the invention

[0006] In order to make up for the deficiencies of the prior art and solve the above-mentioned technical problems, the present invention proposes an ecological restoration and management device and method for green mine construction.

[0007] The technical solution adopted by the present invention to solve the technical problem is: the ecological restoration and management device for green mine construction described in the present invention comprises a slope net and an anchor rod, the slope net covers the steep slope of the mine, the anchor rod is fixedly installed on the steep slope of the mine, and the slope net and the anchor rod are fixedly connected;

[0008] It also includes an anti-scouring component, which is fixedly installed on the slope net and is used to prevent rainwater from scouring the slope net;

[0009] The anti-scour assembly includes mounting pads, which are fixedly mounted on the slope net at equal intervals;

[0010] Anti-scour sheet, the installation pad is fixedly installed with evenly distributed anti-scour sheets on one side away from the slope net, and the length of the anti-scour sheet is greater than the distance between two adjacent installation pads;

[0011] Interception ring pieces, the anti-scour sheet is fixedly mounted with uniformly distributed interception ring pieces, the interception ring pieces cooperate with the anti-scour sheet to form a bag-like structure, and the interception ring pieces are designed to be open above the mounting pad;

[0012] An elastic support member is installed on the anti-scour sheet. The elastic support members are fixedly installed on the anti-scour sheet at equal intervals. The elastic support sheet is used to elastically support the anti-scour sheet. The anti-scour sheet is rolled up under the support of the elastic support member.

[0013] Preferably, the anti-scour sheet is made of a slow-permeability fiber material, and the anti-scour sheet is rolled up into an incomplete cylindrical structure, and the incomplete cylindrical structure is designed to open upward.

[0014] Preferably, the elastic support member is composed of an elastic metal sheet and a telescopic strip, the elastic metal sheet is fixedly attached to the anti-scour sheet, one end of the telescopic strip is fixedly connected to the elastic metal sheet, and the other end is fixedly connected to the mounting pad.

[0015] Preferably, a fixing bolt is installed on the mounting pad, and the anti-scour sheet and the elastic metal sheet are fixedly installed on the mounting pad through the fixing bolt. The fixing bolt and the elastic metal sheet away from the slope net are provided with connecting grooves, and fastening bolts are fixedly installed at both ends of the telescopic strip. The telescopic strip is detachably fixedly connected to the elastic metal sheet and the anti-scour sheet through the fastening bolts and the connecting grooves.

[0016] Preferably, the telescopic strip is made of water-swellable rubber material.

[0017] Preferably, a flip net is fixedly mounted on the side wall of the mounting pad, a traction rope is fixedly mounted on the side of the flip net away from the mounting pad, and two traction ropes adjacent to each other are fixedly connected to each other.

[0018] Preferably, the flip net extends upward away from one end of the mounting pad, and the flip net is made of a flexible three-dimensional net material. In the initial state, the flip net deflects downward under the action of gravity, and the flip net shields the corresponding anti-scour sheet.

[0019] Preferably, a wire loop is fixedly mounted on the anchor rod via a clamp, a conical groove is provided on the inner wall of the wire loop, a symmetrically designed friction block is elastically mounted in the conical groove via a spring, the traction rope passes through the gap of the friction block, and the wire loop is used to unidirectionally lock the traction rope.

[0020] Preferably, the width of the installation pad, the anti-scour sheet and the width of the slope net are all smaller than the width of the slope net, and the edges of two adjacent slope nets are overlapped.

[0021] An ecological restoration and management method for green mine construction, the method comprising the following steps:

[0022] S1. Mine slope cleaning: Workers clean the mine slope to be repaired, which improves the surface smoothness of the slope;

[0023] S2. Anchor structure installation: fix and install the anchor rods according to the predetermined distribution of anchor points;

[0024] S3, assembling the hanging net: laying the treatment device from the top of the slope downward;

[0025] S4, anchoring and deployment: hang the slope net on the anchor rod through the mesh, and fix the wire loop on the anchor rod through the clamp;

[0026] S5. Spraying and covering: Spraying the mixed grass seeds, soil, nutrients, etc. on the surface of the slope net and the flip net by a sprayer;

[0027] S6. Long-term maintenance: Regularly spray water mist and nutrient solution onto the treatment device to provide a suitable environment for grass seed growth.

[0028] The beneficial effects of the present invention are as follows:

[0029] 1. The ecological restoration and management device and method for green mine construction described in the present invention, by setting an anti-scour component, uses the weight of rainwater to force the anti-scour component to unfold in heavy rain weather, thereby providing a shield for the soil on the slope net, reducing the scouring of rainwater on the soil sprayed on the slope, etc., and improving the grass planting efficiency. At the same time, the presence of the anti-scour sheet with water and soil interception function can also achieve the water and soil fixation function to a certain extent, further enhance the fixation effect of the sprayed soil and grass seeds, and accelerate the repair and management rate of the steep slope of the mine.

[0030] 2. The ecological restoration and management device and method for green mine construction described in the present invention is that after the slope net is hung, the flip net flips downward under the action of gravity. On the one hand, the flip net shields the cylindrical anti-scour sheet, and when spraying slurry, the probability of slurry spraying on the anti-scour sheet is reduced. On the other hand, the anti-scour sheet supports the flip net, so that the flip net is spread out in space, and cooperates with the slope net to increase the slurry spraying and adhesion area. After the slurry spraying is completed, the staff manually pulls the traction rope, and under the pulling of the traction rope, the flip net is The rotating net gradually fits with the slope net, and at this time, the attachment surface of the slurry on the flip net and the slope net is located between the flip net and the slope net. On the one hand, compared with direct spraying from the surface, this design increases the depth of the slurry and facilitates the fixation of the slurry. It should be noted that in other embodiments of the present application, when the flip net is flipped, the flip net can be sprayed again to further increase the fixed thickness of the slurry on the slope. On the other hand, under the interception effect of the flip net, the probability of the slurry falling off the flip net and the slope net after being washed by rainwater is reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] The present invention will be further described below in conjunction with the accompanying drawings.

[0032] Figure 1 It is a three-dimensional diagram of the flip net of the present invention when it is not tightened;

[0033] Figure 2 It is a partial side view of the turning net of the present invention when it is not tightened;

[0034] Figure 3 is a three-dimensional diagram of the inverted net of the present invention when it is tightened;

[0035] Figure 4 is a partial side view of the inverted net of the present invention when it is tightened;

[0036] Figure 5 It is a stereoscopic diagram of the assembly of the mounting pad, the anti-scour sheet and the flip net in the present invention;

[0037] Figure 6 It is a partial structural cross-sectional view of the present invention;

[0038] Figure 7 yes Figure 6 A partial enlarged view of the middle A;

[0039] Figure 8 It is a partial stereogram of the anti-scour sheet after it is flattened;

[0040] Fig. 9 It is a stereoscopic diagram of the assembly of the anchor rod, wire ring and traction rope;

[0041] Fig.10 is a cross-sectional view of the wire loop;

[0042] Fig.11 It is a method flow chart of the ecological restoration and management method for green mine construction of the present invention;

[0043] In the figure: 1. Slope net; 11. Anchor rod; 2. Mounting pad; 21. Anti-scour sheet; 22. Intercepting ring sheet; 23. Elastic metal sheet; 24. Telescopic strip; 25. Fixing bolt; 26. Fastening bolt; 27. Connecting groove; 3. Flip net; 31. Towing rope; 4. Wire ring; 41. Conical groove; 42. Friction block; 43. Spring. DETAILED DESCRIPTION

[0044] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0045] like Figures 1 to 11 As shown, an ecological restoration and management device for green mine construction described in the present invention comprises a slope net 1 and an anchor rod 11, wherein the slope net 1 covers the steep slope of the mine, and the anchor rod 11 is fixedly installed on the steep slope of the mine, and the slope net 1 and the anchor rod 11 are fixedly connected;

[0046] It also includes an anti-scouring component, which is fixedly mounted on the slope net 1 and is used to prevent rainwater from scouring the slope net 1;

[0047] The anti-scour assembly includes mounting pads 2, and the mounting pads 2 are fixedly mounted on the slope net 1 at equal intervals;

[0048] Anti-scour sheets 21, the mounting pad 2 is fixedly mounted with uniformly distributed anti-scour sheets 21 on one side away from the slope net 1, and the length of the anti-scour sheets 21 is greater than the distance between two adjacent mounting pads 2;

[0049] Intercepting ring pieces 22, the anti-scour sheet 21 is fixedly mounted with uniformly distributed intercepting ring pieces 22, the intercepting ring pieces 22 cooperate with the anti-scour sheet 21 to form a bagged structure, and the intercepting ring pieces 22 are designed to be open above the mounting pad 2;

[0050] An elastic support member, wherein the elastic support member is installed on the anti-scour sheet 21, and the elastic support member is fixedly installed on the anti-scour sheet 21 at equal intervals, and the elastic support sheet is used to elastically support the anti-scour sheet 21, and the anti-scour sheet 21 is rolled up under the support of the elastic support member;

[0051] The anti-scour sheet 21 is made of a slow-permeable fiber material, and the anti-scour sheet 21 is rolled up into an incomplete cylindrical structure, and the incomplete cylindrical structure is designed to open upward;

[0052] After the mine is abandoned, due to its barren land and scarce soil, when green plants are used for restoration and management, it is usually necessary to move and fill in foreign soil. For high and steep slopes, due to its geographical environment restrictions, it is difficult to fix the soil. Therefore, when managing high and steep slopes, herbs and low shrubs with low soil requirements are usually planted. The hanging net sprinkler irrigation technology greatly reduces the difficulty of planting grass on high and steep slopes. At the same time, in order to further enhance the resistance of the sprayed and fixed soil, grass seeds, etc. on the steep slope to rainwater, the present invention arranges an anti-scouring component on the slope net 1 to enhance the resistance to rainwater scouring, reduce the degree of loss of soil sprayed on the steep slope of the mine, and thus accelerate the management rate of the steep slope;

[0053] Specifically, in the steep slope management, the steep slope in the management area is cleaned manually. During the cleaning process, protruding, loose rocks and other objects are gradually removed to avoid safety hazards caused by rock shedding in the later stage. At the same time, the steep slope can be leveled to a certain extent to facilitate the subsequent laying of the slope net 1. Then the staff drills anchor holes at the pre-planned anchor points, and installs the anchor rods 11 in the anchor holes one by one, and uses fixing means such as concrete pouring to stably fix the anchor rods 11 on the steep slope. Then the slope net 1 is gradually unfolded and hung from the top of the steep slope downward. When hanging, the slope net 1 is hung on the anchor rods 11, and the slope net 1 is fixed with evenly distributed anchor rods 11. At the same time, components such as steel wires and ropes are used to fix the slope net 1 and the anchor rods. 11 is reinforced at a fixed position. It should be noted that the slope net 1 used in the present invention can be a three-dimensional net, a wire mesh, or a composite net formed by superimposing a three-dimensional net, a wire mesh, etc. Since the anti-scour component has been manufactured and connected to the slope net 1 during the manufacturing process of the slope net 1, when the slope net 1 is hung, the staff can simultaneously adjust the anti-scour component installed on the slope net 1. After the slope net 1 is hung, the anti-scour sheets 21 arranged at equal intervals on the slope net 1 are incomplete cylindrical structures under the support of the elastic support members, that is, the anti-scour sheets 21 are surrounded in an incomplete circle, and since the anti-scour sheet 21 is rolled up, the incomplete cylinder formed by the anti-scour sheet 21 opens upward, and the anti-scour sheet 2 After the anti-scouring sheet 21 is rolled up, the slope net 1 is exposed, and because the anti-scouring sheet 21 is rolled up into a three-dimensional shape, the exposed area of ​​the slope net 1 is relatively large. At this time, the staff, with the cooperation of the sprayer, sprays the slurry mixed with soil, grass seeds, nutrients, etc. onto the slope net 1. Under the viscosity of the slurry itself and the interception effect of the structure of the slope net 1 itself, the slurry is fixed on the steep slope. It should be noted that during the spraying process, since the anti-scouring sheet 21 is cylindrical, the fitting range of the anti-scouring sheet 21 and the slope net 1 is relatively small. After adjusting the slurry spraying angle, the slurry can be sprayed on the slope net 1 as much as possible. After the slurry spraying is completed, you can wait for the grass seeds to grow and develop. In this process, when the weather turns cloudy and rain falls, the rain drops on the slope net 1. On the slope net 1 and the anti-scour sheet 21, when the rainwater is small, the rainwater is absorbed by the soil sprayed on the slope net 1, providing moisture for the growth of grass and trees. When the rainwater is large, the water content of the soil increases after the water drops into the soil. The excess water has a tendency to flow downward under the action of gravity. In the process of downward flow, the rainwater and part of the soil carried by it gradually enter the cylinder surrounded by the anti-scour sheet 21 and the bag-like structure composed of the interception ring sheet 22 and the anti-scour sheet 21. As the content of rainwater and soil entering the cylinder gradually increases, under the action of its gravity, the elastic support gradually deforms, causing the anti-scour sheet 21 to gradually unfold. On the one hand, as the degree of unfolding of the anti-scour sheet 21 increases, the degree of covering of the slope net 1 by the anti-scour sheet 21 gradually increases.Then, the scouring of the soil on the slope net 1 by rainwater is gradually reduced. On the other hand, as the anti-scouring sheet 21 is gradually unfolded, the lower the bottom of the bag-like structure composed of the interception ring sheet and the anti-scouring sheet 21 is, the greater the probability that the downward flowing water will enter its interior, thereby accelerating the unfolding speed of the anti-scouring sheet 21. Finally, the anti-scouring sheet 21 is fully unfolded. When the rain becomes smaller and stops, the rainwater intercepted in the bag-like structure composed of the interception ring sheet 22 and the anti-scouring sheet 21 slowly penetrates the anti-scouring sheet 21, and continuously replenishes water for the vegetation on the slope net 1 until the water flow is completely lost. At this time, under the action of the elastic support, the anti-scouring sheet 21 is rolled up again, which is convenient for the vegetation to supplement light.

[0054] The present invention provides an anti-scour component. In heavy rain, the weight of rainwater is used to force the anti-scour component to unfold, thereby providing a shield for the soil on the slope net 1, reducing the scouring of soil sprayed on the slope by rainwater, and improving the grass planting efficiency. At the same time, the presence of the anti-scour sheet 21 with the function of intercepting water and soil can also achieve the water and soil fixation function to a certain extent, further enhance the fixation effect of the sprayed soil and grass seeds, and accelerate the repair and management rate of the steep slope of the mine.

[0055] As a preferred embodiment of the present invention, the elastic support member is composed of an elastic metal sheet 23 and a telescopic strip 24. The elastic metal sheet 23 is fixedly attached to the anti-scour sheet 21. One end of the telescopic strip 24 is fixedly connected to the elastic metal sheet 23, and the other end is fixedly connected to the mounting pad 2.

[0056] The telescopic strip 24 is made of water-absorbing and swelling rubber material;

[0057] The elastic support is made of an elastic metal sheet 23 and a telescopic strip 24. The telescopic strip 24 is made of a water-absorbing and swelling rubber material. Therefore, when it is not raining, the water content of the telescopic strip 24 is low. At this time, the length of the telescopic strip 24 is relatively small. Under the pulling action of the telescopic strip 24 and the elastic action of the elastic metal sheet 23 itself, the elastic metal sheet 23 and the anti-scouring sheet 21 surround to form a cylindrical structure. Due to the supporting action of the elastic metal sheet 23, the cylindrical structure is close to a standard circle. When it rains, the telescopic strip 24 gradually absorbs water and expands, and the length of the telescopic strip 24 increases. Under the elastic recovery action of the elastic metal sheet 23, the elastic metal sheet 23 and the anti-scouring sheet 21 gradually unfold, and finally form a sheet-like structure, which shields and protects the slope net 1. The pulling and pressing action of the weight of rainwater accelerates the unfolding rate of the anti-scouring sheet 21, and further reduces the scouring effect of rainwater on the sprayed soil and other objects.

[0058] As a preferred embodiment of the present invention, a fixing bolt 25 is installed on the mounting pad 2, and the anti-scour sheet 21 and the elastic metal sheet 23 are fixedly installed on the mounting pad 2 through the fixing bolt 25. The fixing bolt 25 and the elastic metal sheet 23 are both provided with a connecting groove 27 at the end away from the slope net 1, and fastening bolts 26 are fixedly installed at both ends of the telescopic strip 24. The telescopic strip 24 is detachably fixedly connected to the elastic metal sheet 23 and the anti-scour sheet 21 through the fastening bolts 26 and the connecting groove 27.

[0059] By setting the fixing bolt 25, the overlapping fixing effect of the mounting pad 2, the anti-scouring sheet 21 and the elastic metal sheet 23 is enhanced to prevent the anti-scouring component from falling off the slope net 1. The setting of the connecting groove 27 and the fastening bolt 26 makes the telescopic strip 24 detachably connected to the elastic metal sheet 23 and the anti-scouring sheet 21. Therefore, after the manufacturing is completed, the telescopic strip 24 is not assembled first. At this time, the elastic metal sheet 23 is not subjected to external force and is in a straight sheet-like structure, which is convenient for folding, winding and storing the slope net 1. Before use, the staff assembles the telescopic strip 24 on the elastic metal sheet 23 and the anti-scouring sheet 21 one by one through the fastening bolts 26, thereby winding the elastic metal sheet 23 and the anti-scouring sheet 21, thereby enhancing the convenience of use of the device.

[0060] As a preferred embodiment of the present invention, a turnover net 3 is fixedly installed on the side wall of the installation pad 2, and a traction rope 31 is fixedly installed on the side of the turnover net 3 away from the installation pad 2, and two upper and lower adjacent traction ropes 31 are fixedly connected to each other.

[0061] The flip net 3 extends upward away from one end of the mounting pad 2. The flip net 3 is made of a flexible three-dimensional net material. In the initial state, the flip net 3 deflects downward under the action of gravity, and the flip net 3 blocks the corresponding anti-scour sheet 21.

[0062] When spraying the mixed slurry of soil and grass seeds, in order to further enhance its fixing effect, a flip net 3 is set, the flip net 3 is located between two adjacent mounting pads 2, and the bottom end of the flip net 3 is fixedly connected to the mounting pad 2. After the slope net 1 is hung, the flip net 3 flips downward under the action of gravity. On the one hand, the flip net 3 blocks the cylindrical anti-scour sheet 21, and when spraying the slurry, the probability of the slurry being sprayed on the anti-scour sheet 21 is reduced. On the other hand, the anti-scour sheet 21 supports the flip net 3, causing the flip net 3 to expand in space, cooperate with the slope net 1, increase the slurry spraying and adhesion area, and after the slurry spraying is completed, the workers The staff manually pulls the traction rope 31, and under the pulling of the traction rope 31, the flip net 3 gradually fits with the slope net 1, and at this time, the attachment surface of the slurry on the flip net 3 and the slope net 1 is located between the flip net 3 and the slope net 1. On the one hand, compared with direct surface spraying, this design increases the depth of the slurry and facilitates the fixation of the slurry. It should be noted that in other embodiments of the present application, after the flip net 3 is flipped, the flip net 3 can be sprayed again to further increase the fixed thickness of the slurry on the slope. On the other hand, under the interception effect of the flip net 3, the probability of the slurry falling off the flip net 3 and the slope net 1 after being washed by rainwater is reduced.

[0063] As a preferred embodiment of the present invention, a wire loop 4 is fixedly installed on the anchor rod 11 by a clamp, a conical groove 41 is opened on the inner wall of the wire loop 4, a symmetrically designed friction block 42 is elastically installed in the conical groove 41 by a spring 43, the traction rope 31 passes through the gap of the friction block 42, and the wire loop 4 is used to lock the traction rope 31 in one direction.

[0064] The width of the installation pad 2 and the anti-scour sheet 21 are all smaller than the width of the slope net 1, and the edges of two adjacent groups of the slope nets 1 are overlapped;

[0065] By installing the wire loop 4, when the traction rope 31 is not pulled, the excess length of the traction rope 31 is large, so that the flip net 3 is not restricted, and when the traction rope 31 is pulled upward, under the action of friction, the friction block 42 pushes the spring 43 to move upward, and when the traction rope 31 has a tendency to move downward, the friction block 42 moves to the bottom end of the conical groove 41, and under the restriction of the conical groove 41, the friction block 42 gradually approaches, thereby increasing the friction force on the traction rope 31, and then unidirectionally locking the traction rope 31, so that the flip net 3 cannot be flipped again after it fits the slope net 1, and at this time, under the action of the traction rope 31 and the wire loop 4, the flip net 3 is indirectly connected to the anchor rod 11, and the anchor rod 11 cooperates with the fixation of the slope net 1 to further enhance the fixing effect of the device on the slope.

[0066] An ecological restoration and management method for green mine construction, the method comprising the following steps:

[0067] S1. Mine slope cleaning: Workers clean the mine slope to be repaired. During cleaning, the slope surface is impacted by machinery or high-pressure airflow, causing loose rocks on the slope surface to fall off and the slope surface flatness to improve;

[0068] S2, anchor structure installation: after the repair process is determined, according to the predetermined distribution of anchor points, anchor holes are drilled on the mine, and the anchor rods 11 are inserted into the anchor holes and fixed by concrete pouring;

[0069] S3, assembling the hanging net: unfold and level the treatment device, then the staff manually connects the two ends of the telescopic strip 24 with the fixing bolt 25 and the elastic metal sheet 23, and manually assists the anti-scour sheet 21 to wind during the connection process, and then lays the treatment device from the top of the slope downward;

[0070] S4, anchoring and deployment: during the laying process of the treatment device, the slope net 1 is hung on the anchor rod 11 through the mesh, and the wire loop 4 is fixed to the anchor rod 11 through the clamp. At the same time, during the laying process, the net 3 is manually turned downward to cover the anti-scour sheet 21;

[0071] S5, spraying and covering: spraying the grass seeds, soil, nutrients, etc. in a mixed state on the surface of the slope net 1 and the flip net 3 by a sprayer, and after the spraying is completed, manually pull the traction rope 31, the traction rope 31 pulls the flip net 3 to flip, so that the sprayed side of the flip net 3 is in contact with the slope net 1;

[0072] S6. Long-term maintenance: After laying, the grass seeds gradually grow and develop. During this process, water mist and nutrient solution are regularly sprayed on the treatment device to provide a suitable environment for the growth of grass seeds.

[0073] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. An ecological restoration and management device for green mine construction, comprising a slope net (1) and an anchor rod (11), wherein the slope net (1) covers a steep slope of a mine, and the anchor rod (11) is fixedly installed on the steep slope of the mine, and the slope net (1) and the anchor rod (11) are fixedly connected; Features: It also includes an anti-scouring component, which is fixedly mounted on the slope net (1) and is used to prevent rainwater from scouring the slope net (1); The anti-scour assembly comprises mounting pads (2), and the mounting pads (2) are fixedly mounted on the slope net (1) at equal intervals; Anti-scour sheets (21), wherein the anti-scour sheets (21) are evenly distributed and fixedly mounted on one side of the mounting pad (2) away from the slope net (1), and the length of the anti-scour sheets (21) is greater than the distance between two adjacent mounting pads (2); Interception ring pieces (22), the anti-scour sheet (21) is fixedly mounted with uniformly distributed interception ring pieces (22), the interception ring pieces (22) cooperate with the anti-scour sheet (21) to form a bagged structure, and the interception ring pieces (22) are designed to be open above the mounting pad (2); An elastic support member, wherein the elastic support member is mounted on the anti-scour sheet (21), the elastic support member is fixedly mounted on the anti-scour sheet (21) at equal intervals, the elastic support sheet is used to elastically support the anti-scour sheet (21), and the anti-scour sheet (21) is rolled up under the support of the elastic support member.

2. The ecological restoration and management device for green mine construction according to claim 1 is characterized in that: The anti-scour sheet (21) is made of a slow-permeability fiber material, and the anti-scour sheet (21) is rolled up into an incomplete cylindrical structure, and the incomplete cylindrical structure is designed to be open upward.

3. An ecological restoration and management device for green mine construction according to claim 1 or 2, characterized in that: The elastic support member is composed of an elastic metal sheet (23) and a telescopic strip (24); the elastic metal sheet (23) is fixedly attached to the anti-scouring sheet (21); one end of the telescopic strip (24) is fixedly connected to the elastic metal sheet (23), and the other end is fixedly connected to the mounting pad (2).

4. The ecological restoration and management device for green mine construction according to claim 3 is characterized by: A fixing bolt (25) is installed on the installation pad (2), and the anti-scouring sheet (21) and the elastic metal sheet (23) are fixedly installed on the installation pad (2) through the fixing bolt (25). The fixing bolt (25) and the elastic metal sheet (23) are both provided with a connecting groove (27) at one end away from the slope net (1). Fastening bolts (26) are fixedly installed at both ends of the telescopic strip (24), and the telescopic strip (24) is detachably fixedly connected to the elastic metal sheet (23) and the anti-scouring sheet (21) through the fastening bolts (26) and the connecting groove (27).

5. The ecological restoration and management device for green mine construction according to claim 4 is characterized in that: The telescopic strip (24) is made of water-absorbing and swelling rubber material.

6. An ecological restoration and management device for green mine construction according to claim 1 or 5, characterized in that: A turnover net (3) is fixedly mounted on the side wall of the installation pad (2), a traction rope (31) is fixedly mounted on the side of the turnover net (3) away from the installation pad (2), and two traction ropes (31) adjacent to each other are fixedly connected to each other.

7. The ecological restoration and management device for green mine construction according to claim 6 is characterized by: The flip net (3) extends upward away from one end of the mounting pad (2); the flip net (3) is made of a flexible three-dimensional net material; in an initial state, the flip net (3) deflects downward under the action of gravity, and the flip net (3) blocks the corresponding anti-scour sheet (21).

8. The ecological restoration and management device for green mine construction according to claim 7 is characterized by: A wire ring (4) is fixedly mounted on the anchor rod (11) via a clamp, a conical groove (41) is provided on the inner wall of the wire ring (4), a symmetrically designed friction block (42) is elastically mounted in the conical groove (41) via a spring (43), the traction rope (31) passes through the gap of the friction block (42), and the wire ring (4) is used to unidirectionally lock the traction rope (31).

9. The ecological restoration and management device for green mine construction according to claim 8 is characterized by: The installation pad (2) and the anti-scouring sheet (21) are all smaller in width than the width of the slope net (1), and the edges of two adjacent slope nets (1) are overlapped.

10. An ecological restoration and management method for green mine construction, characterized by: The method is applicable to the ecological restoration and management device for green mine construction described in claim 9 above, and the method comprises the following steps: S1. Mine slope cleaning: Workers clean the mine slope to be repaired, which improves the surface smoothness of the slope; S2, anchoring structure installation: according to the predetermined anchoring point distribution position, the anchor rod (11) is fixedly installed; S3, assembling the hanging net: laying the treatment device from the top of the slope downward; S4, anchoring and unfolding: the slope net (1) is hung on the anchor rod (11) through the mesh, and the wire loop (4) is fixed on the anchor rod (11) through the clamp; S5, spray covering: spraying the mixed grass seeds, soil, nutrients, etc. onto the surface of the slope net (1) and the flip net (3) by a sprayer; S6. Long-term maintenance: Regularly spray water mist and nutrient solution onto the treatment device to provide a suitable environment for grass seed growth.

Citation Information

Patent Citations

  • Abrupt slope spray-seeding greening method

    CN104303749A

  • Erosion-proof energy dissipation system used for net hanging external-soil spray seeding protection layer

    CN105696532A

  • Protective structure used for reinforcing expansive soil slope and construction method

    CN107859045A

  • Ecological protection method for side slope

    CN109356174A

  • Natural rainfall utilization method for restoring mine ecosystem

    CN112616577A