Full-matching formwork construction method for house formwork engineering

Through the full-format construction method, the problems of low efficiency, high cost and difficult to guarantee quality in traditional formwork construction methods are solved, and efficient, safe and environmentally friendly residential formwork construction is achieved, construction efficiency and quality are improved, and costs and materials are reduced. waste.

CN118911420APending Publication Date: 2024-11-08THE FIRST CONSTR ENG COMPANY LTD OF CHINA CONSTR SECOND ENG BUREAU +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411242510.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-05
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

Traditional formwork construction methods have problems such as difficult to ensure processing accuracy, long on-site assembly, easy to be affected by weather, low construction efficiency, high cost and serious material waste, which affects the forming quality and construction safety of concrete structures.

Method used

Adopt the full-formed construction method, including formwork construction preparation, installation, support installation, concrete pouring, demolition and cleaning. Through precise measurement and reasonable support for design and reinforcement measures, ensure the stability of the formwork and construction sequence, and optimize the formwork design to reduce cutting and waste.

Benefits of technology

It improves construction efficiency and quality, reduces costs, enhances construction safety and environmental protection effects, reduces material waste and waste gas generation, and ensures the standardization and modularity of the template.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911420A_ABST
    Figure CN118911420A_ABST
Patent Text Reader

Abstract

The invention relates to a full-matched formwork construction method for house formwork engineering, which belongs to the technical field of matched formwork construction and comprises the following steps: S1, formwork construction preparation; s2, formwork construction and installation; s3, template support installation; s4, concrete pouring; s5, the formwork is dismantled; s6, the formwork is cleaned and maintained; and S7, quality inspection and acceptance. According to the fully-matched formwork construction method for the house formwork project, through reasonable supporting design and reinforcing measures, it is guaranteed that safety accidents such as collapse of the formwork cannot occur in the concrete pouring process, the safety risk caused by misoperation or negligence of workers is effectively reduced, and the construction safety can be effectively improved; the utilization rate of materials is increased, loss is reduced, waste can be effectively reduced, natural resources are saved, waste is reduced, and the environmental protection effect of construction is improved; and the advantages of high construction safety and good construction environment-friendly effect are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of formwork construction, in particular to a full formwork construction method for residential formwork engineering. Background Art

[0002] Formwork engineering is an important part of building construction, which has a significant impact on the molding quality, construction safety and construction efficiency of concrete structures. The selection, design, installation and removal of formworks need to be strictly controlled to ensure the dimensional accuracy, surface flatness and overall stability of concrete structures.

[0003] As an emerging formwork construction technology, the full formwork construction method has been widely used in residential formwork projects due to its standardized and modular characteristics. Traditional formwork construction methods often use on-site processing and assembly methods, which have the following problems:

[0004] 1. The processing accuracy is difficult to guarantee, resulting in large deviations in the formwork size, affecting the molding quality of the concrete structure; 2. The on-site assembly workload is large, time-consuming, and easily affected by weather, environmental and other factors, resulting in low construction efficiency; 3. The formwork material is seriously wasted and the cost is high, which is not conducive to resource conservation and sustainable development.

[0005] With the acceleration of urbanization and the continuous growth of housing construction demand, the importance of formwork engineering in construction has become increasingly prominent. Traditional formwork construction methods have problems such as low efficiency, high cost, and difficulty in ensuring construction quality. Therefore, it is particularly important to explore an efficient, economical and reliable formwork construction method. Summary of the invention

[0006] In view of the shortcomings of the prior art, the present invention provides a full-formwork construction method for residential formwork projects, which has the advantages of high construction efficiency, high construction quality, low construction cost, high construction safety and good construction environmental protection effect, and solves the problems of low efficiency, high cost and difficulty in ensuring construction quality in traditional formwork construction methods.

[0007] To achieve the above object, the present invention provides the following technical solution: a fully matched formwork construction method for a residential formwork project, comprising the following steps:

[0008] S1. Formwork construction preparation: the formwork construction preparation includes material preparation, equipment inspection, scheme design and measurement and layout; first, ensure that all materials required for formwork construction are complete, maintain and inspect the construction equipment to ensure its normal operation, and then formulate a detailed formwork construction plan according to the construction environment, and then measure and layout each part of the building according to the construction drawings to determine the plane position and elevation of the formwork;

[0009] S2. Formwork construction and installation: the formwork construction and installation includes wall formwork installation, beam formwork installation and floor formwork installation;

[0010] The wall formwork installation comprises the following steps:

[0011] S2-1-1. Install the wall formwork according to the measured and laid-out positions;

[0012] S2-1-2. Adjust the verticality and horizontality of the template to ensure that the template is installed firmly;

[0013] S2-1-3, Use tension screws and steel pipe support materials to reinforce the formwork;

[0014] The beam formwork installation comprises the following steps:

[0015] S2-2-1. First determine the elevation of the beam bottom formwork to make it consistent with the design elevation;

[0016] S2-2-2. Install the beam bottom formwork and side formwork, ensuring that they are tightly connected to the wall formwork;

[0017] S2-2-3. Set up arches as needed to prevent excessive deflection;

[0018] The floor formwork installation comprises the following steps:

[0019] S2-3-1. Install the floor formwork according to the size and design elevation of the floor;

[0020] S2-3-2. Ensure that the formwork is level and adjust the elevation to meet the design requirements;

[0021] S2-3-3. Use supporting structures to reinforce the formwork to ensure stability;

[0022] S3. Formwork support installation: Select appropriate support materials and specifications according to the size and weight of the formwork; install the support system under the formwork to ensure the stability of the formwork; locate the position and spacing of the steel bars according to the construction drawings and design requirements; then tie the steel bars to ensure that the steel bars are firmly fixed to the formwork;

[0023] S4. Concrete pouring: The concrete pouring includes pre-pouring inspection and concrete pouring. Before pouring concrete, the formwork, supporting structure and steel bars are comprehensively inspected to ensure that there are no omissions or errors. After the inspection, concrete pouring is carried out to ensure that the concrete is poured evenly and vibrated to make it dense.

[0024] S5. Formwork removal: The formwork can be removed only after the concrete reaches a certain strength;

[0025] S6. Template cleaning and maintenance: The template cleaning and maintenance includes template cleaning and template maintenance;

[0026] S7. Quality inspection and acceptance: During the construction process and after the formwork is removed, quality inspection is carried out to ensure that the construction quality of the formwork project meets the specifications, and then relevant personnel are organized to conduct acceptance to ensure that the formwork project is qualified before proceeding to the next process.

[0027] Furthermore, the required materials in S1 include formwork, supporting steel pipes, fasteners, release agents and measuring tools, and the construction equipment in S1 includes tower cranes and scaffolding.

[0028] Furthermore, the template construction plan in S1 includes the selection of templates, the configuration of supporting structures and the construction sequence.

[0029] Furthermore, the measurement and layout in S1 requires setting control lines at the template installation position to facilitate the installation and correction of the template.

[0030] Furthermore, the formwork support installation in S3 should meet the requirements of bearing capacity and stability.

[0031] Furthermore, the order of removing the formwork in S5 needs to be as follows: first the non-load-bearing formwork, then the load-bearing formwork, and care must be taken during removal to avoid damaging the concrete structure and the formwork.

[0032] Furthermore, the template cleaning in S6 requires cleaning the dismantled template to remove concrete residues and dirt.

[0033] Furthermore, the template maintenance in S6 requires maintenance of the template to facilitate next use, and the template maintenance method can be to apply a release agent to the outer surface of the template for maintenance.

[0034] Compared with the prior art, the present invention provides a fully matched formwork construction method for residential formwork engineering, which has the following beneficial effects:

[0035] 1. The residential formwork project uses a full-formwork construction method. By adopting the above-mentioned formwork construction method to match the residential formwork, reasonable support design and reinforcement measures are taken to ensure that the formwork will not collapse or cause other safety accidents during the concrete pouring process, effectively reducing the safety risks caused by improper operation or negligence of workers, and can effectively improve construction safety; by improving the utilization rate of materials and reducing losses, it can effectively reduce the generation of waste gas. The full-formwork construction method helps to save natural resources, reduce waste, and improve the environmental protection effect of construction; it achieves the advantages of high construction safety and good construction environmental protection effect.

[0036] 2. The residential formwork project uses a full-formwork construction method. By adopting the above-mentioned formwork construction method to match the residential formwork, the standardization and modularization of the residential formwork can be effectively improved, and the construction efficiency can be effectively improved; through precise measurement and layout, the position and size of the formwork are ensured to be accurate, which can effectively improve the construction quality; by optimizing the formwork design and configuration, the cutting and waste of the formwork are reduced, the utilization rate of materials is improved, and the construction cost can be effectively reduced; the advantages of high construction efficiency, high construction quality and low construction cost are achieved, and the problems of low efficiency, high cost and difficult to ensure construction quality in traditional formwork construction methods are solved. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 The present invention is a construction flow chart of a fully matched formwork construction method for a residential formwork project. DETAILED DESCRIPTION

[0038] The following will be combined with the embodiments of the present invention and the accompanying drawings to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0039] See also Figure 1 In this embodiment, a fully matched formwork construction method for a residential formwork project comprises the following steps:

[0040] S1. Formwork construction preparation: Formwork construction preparation includes material preparation, equipment inspection, scheme design and measurement and layout. First, ensure that all materials required for formwork construction are complete, maintain and inspect the construction equipment to ensure its normal operation, and then formulate a detailed formwork construction plan based on the construction environment. Then, according to the construction drawings, measure and layout each part of the building to determine the plane position and elevation of the formwork.

[0041] S2. Formwork construction and installation: Formwork construction and installation include wall formwork installation, beam formwork installation and floor formwork installation;

[0042] Wall formwork installation includes the following steps:

[0043] S2-1-1. Install the wall formwork according to the measured and laid-out positions;

[0044] S2-1-2. Adjust the verticality and horizontality of the template to ensure that the template is installed firmly;

[0045] S2-1-3, Use tension screws and steel pipe support materials to reinforce the formwork;

[0046] Beam formwork installation includes the following steps:

[0047] S2-2-1. First determine the elevation of the beam bottom formwork to make it consistent with the design elevation;

[0048] S2-2-2. Install the beam bottom formwork and side formwork, ensuring that they are tightly connected to the wall formwork;

[0049] S2-2-3. Set up arches as needed to prevent excessive deflection;

[0050] The installation of floor formwork includes the following steps:

[0051] S2-3-1. Install the floor formwork according to the size and design elevation of the floor;

[0052] S2-3-2. Ensure that the formwork is level and adjust the elevation to meet the design requirements;

[0053] S2-3-3. Use supporting structures to reinforce the formwork to ensure stability;

[0054] S3. Formwork support installation: Select appropriate support materials and specifications according to the size and weight of the formwork; install the support system under the formwork to ensure the stability of the formwork; locate the position and spacing of the steel bars according to the construction drawings and design requirements; then tie the steel bars to ensure that the steel bars are firmly fixed to the formwork;

[0055] S4. Concrete pouring: Concrete pouring includes pre-pouring inspection and concrete pouring. Before pouring concrete, the formwork, supporting structure and steel bars are fully inspected to ensure that there are no omissions or errors. After the inspection, concrete pouring is carried out to ensure that the concrete is poured evenly and vibrated to make it dense.

[0056] S5. Formwork removal: The formwork can be removed only after the concrete reaches a certain strength;

[0057] S6. Template cleaning and maintenance: Template cleaning and maintenance include template cleaning and template maintenance;

[0058] S7. Quality inspection and acceptance: During the construction process and after the formwork is removed, quality inspection is carried out to ensure that the construction quality of the formwork project meets the specifications, and then relevant personnel are organized to conduct acceptance to ensure that the formwork project is qualified before proceeding to the next process.

[0059] In this embodiment, by adopting the above-mentioned formwork construction method to assemble the residential formwork, the construction safety can be effectively improved, the generation of waste gas can be effectively reduced, and the full formwork construction method helps to save natural resources, reduce waste, improve the environmental protection effect of construction, effectively improve construction efficiency, effectively improve construction quality, and effectively reduce construction costs; it achieves the advantages of high construction efficiency, high construction quality, low construction cost, high construction safety and good construction environmental protection effect.

[0060] Specifically, the required materials in S1 include formwork, supporting steel pipes, fasteners, release agents and measuring tools, and the construction equipment in S1 includes tower cranes and scaffolding.

[0061] Specifically, the formwork construction plan in S1 includes the selection of formwork, the configuration of the supporting structure and the construction sequence.

[0062] Specifically, the measurement and layout in SS1 requires setting control lines at the template installation position to facilitate the installation and correction of the template.

[0063] Specifically, the formwork support installation in S3 should meet the bearing capacity and stability requirements.

[0064] Specifically, the order of removing the formwork in S5 needs to be as follows: first remove the non-load-bearing formwork, then the load-bearing formwork. Be careful during removal to avoid damaging the concrete structure and the formwork.

[0065] Specifically, the formwork cleaning in S6 requires cleaning the dismantled formwork to remove concrete residues and dirt.

[0066] Specifically, the template maintenance in S6 requires maintenance of the template to facilitate next use, and the template maintenance method can be to apply a release agent to the outer surface of the template for maintenance.

[0067] The beneficial effects of the present invention are:

[0068] The residential formwork project uses a full-formwork construction method. By adopting the above-mentioned formwork construction method to match the residential formwork, reasonable support design and reinforcement measures are taken to ensure that the formwork will not collapse or other safety accidents during the concrete pouring process, effectively reducing the safety risks caused by improper operation or negligence of workers, and can effectively improve construction safety; by improving material utilization and reducing loss, it can effectively reduce the generation of waste gas. The full-formwork construction method helps to save natural resources, reduce waste, and improve the environmental protection effect of construction; it achieves the advantages of high construction safety and good construction environmental protection effect.

[0069] The residential formwork project uses a full-formwork construction method. By adopting the above-mentioned formwork construction method to match the residential formwork, the standardization and modularization of the residential formwork can be effectively improved, and the construction efficiency can be effectively improved; by precise measurement and layout, the position and size of the formwork are ensured to be accurate, which can effectively improve the construction quality; by optimizing the formwork design and configuration, the cutting and waste of the formwork are reduced, the utilization rate of materials is improved, and the construction cost can be effectively reduced; the advantages of high construction efficiency, high construction quality and low construction cost are achieved, and the problems of low efficiency, high cost and difficult to ensure construction quality in the traditional formwork construction method are solved.

[0070] Those skilled in the art will readily appreciate other embodiments of the present disclosure after considering the specification and practicing the invention disclosed herein. The present disclosure is intended to cover any variations, uses or adaptations of the present disclosure that follow the general principles of the present disclosure and include common knowledge or customary techniques in the art that are not disclosed in the present disclosure. The description and examples are to be considered exemplary only, and the true scope and spirit of the present disclosure are indicated by the following claims.

[0071] The above description is only a preferred embodiment of the present disclosure and is not intended to limit the present disclosure. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present disclosure shall be included in the scope of protection of the present disclosure.

Claims

1. A full-form construction method for residential formwork engineering, characterized in that: The following steps are involved: S1. Formwork construction preparation: the formwork construction preparation includes material preparation, equipment inspection, scheme design and measurement and layout; first, ensure that all materials required for formwork construction are complete, maintain and inspect the construction equipment to ensure its normal operation, and then formulate a detailed formwork construction plan according to the construction environment, and then measure and layout each part of the building according to the construction drawings to determine the plane position and elevation of the formwork; S2. Formwork construction and installation: the formwork construction and installation includes wall formwork installation, beam formwork installation and floor formwork installation; The wall formwork installation comprises the following steps: S2-1-1. Install the wall formwork according to the measured and laid-out positions; S2-1-2. Adjust the verticality and horizontality of the template to ensure that the template is installed firmly; S2-1-3, Use tension screws and steel pipe support materials to reinforce the formwork; The beam formwork installation comprises the following steps: S2-2-1. First determine the elevation of the beam bottom formwork to make it consistent with the design elevation; S2-2-2. Install the beam bottom formwork and side formwork, ensuring that they are tightly connected to the wall formwork; S2-2-3. Set up arches as needed to prevent excessive deflection; The floor slab formwork installation comprises the following steps: S2-3-1. Install the floor formwork according to the size and design elevation of the floor; S2-3-2. Ensure that the formwork is level and adjust the elevation to meet the design requirements; S2-3-3. Use supporting structures to reinforce the formwork to ensure stability; S3. Formwork support installation: Select appropriate support materials and specifications according to the size and weight of the formwork; install the support system under the formwork to ensure the stability of the formwork; locate the position and spacing of the steel bars according to the construction drawings and design requirements; then tie the steel bars to ensure that the steel bars are firmly fixed to the formwork; S4. Concrete pouring: The concrete pouring includes pre-pouring inspection and concrete pouring. Before pouring concrete, the formwork, supporting structure and steel bars are comprehensively inspected to ensure that there are no omissions or errors. After the inspection, concrete pouring is carried out to ensure that the concrete is poured evenly and vibrated to make it dense. S5. Formwork removal: The formwork can be removed only after the concrete reaches a certain strength; S6. Template cleaning and maintenance: The template cleaning and maintenance includes template cleaning and template maintenance; S7. Quality inspection and acceptance: During the construction process and after the formwork is removed, quality inspection is carried out to ensure that the construction quality of the formwork project meets the specifications, and then relevant personnel are organized to conduct acceptance to ensure that the formwork project is qualified before proceeding to the next process.

2. A fully matched formwork construction method for residential formwork engineering according to claim 1, characterized in that: The required materials in S1 include formwork, supporting steel pipes, fasteners, release agents and measuring tools, and the construction equipment in S1 includes tower cranes and scaffolding.

3. The method for fully matching formwork for residential formwork engineering according to claim 1 is characterized in that: The template construction plan in S1 includes the selection of templates, the configuration of supporting structures and the construction sequence.

4. The method for constructing a fully matched formwork for a residential formwork project according to claim 1, characterized in that: The measurement and layout in S1 requires setting control lines at the template installation position to facilitate the installation and correction of the template.

5. The method for fully matching formwork for residential formwork engineering according to claim 1 is characterized in that: The formwork support installation in S3 should meet the bearing capacity and stability requirements.

6. A fully matched formwork construction method for residential formwork engineering according to claim 1, characterized in that: The order of removing the formwork in S5 should be as follows: first remove the non-load-bearing formwork and then the load-bearing formwork. Be careful when removing to avoid damaging the concrete structure and the formwork.

7. A fully matched formwork construction method for residential formwork engineering according to claim 1, characterized in that: The template cleaning in S6 requires cleaning the removed template to remove concrete residues and dirt.

8. A fully matched formwork construction method for residential formwork engineering according to claim 1, characterized in that: The template maintenance in S6 requires maintenance of the template to facilitate next use, and the template maintenance method can be to apply a release agent to the outer surface of the template for maintenance.

Citation Information

Patent Citations

  • Construction method for building buildings by aluminum templates

    CN102561695A

  • Fabricated aluminum alloy formwork system construction method

    CN103206089A

  • AU5287198A