Blowout prevention comprehensive safety device for coal seam gas extraction

Through the multi-layer separation and sealing structure of the coal seam gas extraction and spray-proof comprehensive safety device, combined with the PLC control system and hydrogen sulfide reduction function, the problem of gas injection hole phenomenon and insufficient sealing is solved, and the safety of gas extraction and Improve efficiency.

CN118933990APending Publication Date: 2024-11-12CHINA COAL TECH & ENG GRP SHENYANG ENG CO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411098457.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-12
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

There is gas injection phenomenon in existing gas extraction drilling construction, resulting in safety hazards and low production efficiency. The traditional device is insufficiently sealed and cannot effectively control the gas concentration.

Method used

A comprehensive safety device for gas extraction and spraying prevention in coal seam was designed, including a front casing anti-blasting device, a primary and secondary anti-blasting water slag separation device, a waste box and a hydrogen sulfide reduction spraying device, combined with a PLC control system and a pipe The road system uses multi-layer separation and sealing structures to monitor and warning in real time, spray and eliminate chemical solutions to reduce gas concentration.

Benefits of technology

Effectively prevent gas injection holes, improve drilling operation safety, reduce gas concentration, improve gas extraction efficiency and coal mine production safety, enhance monitoring and early warning capabilities, and improve working environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933990A_ABST
    Figure CN118933990A_ABST
Patent Text Reader

Abstract

The invention discloses a coal seam gas extraction blowout prevention comprehensive safety device which comprises a front sleeve blowout prevention device, a primary air injection prevention water-slag separation device, a secondary air injection prevention water-slag separation device, a waste removal box, a hydrogen sulfide reduction spraying device, a PLC control system and a pipeline system. The PLC control system is electrically connected with a wireless pressure transmitter arranged on the front casing blowout preventer; the primary anti-jet water-slag separation device is connected with the front sleeve anti-jet device; the primary and secondary anti-jet water-slag separation devices are connected; the waste removal box is respectively connected with the primary and secondary anti-jet water-slag separation devices; the hydrogen sulfide reduction spraying device is connected with a hydrogen sulfide reduction spraying device nozzle in the primary air injection prevention water slag separation device; and the extraction main pipeline is respectively connected with the primary anti-jet water-slag separation device, the secondary anti-jet water-slag separation device and the waste removal box. Gas, gas water and muck are effectively separated through the primary and secondary anti-jet water-slag separation devices, the gas concentration in a roadway is reduced, the extraction efficiency is improved, and potential safety hazards are eliminated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coal mine safety, in particular to a comprehensive safety device for preventing and controlling gas blowout during coal seam extraction. Background Art

[0002] Gas extraction is one of the effective means of preventing and controlling gas, and drilling extraction accounts for about 70% of gas extraction. Affected by factors such as gas pressure, coal thickness changes and geological structure, gas blowouts often occur during the construction of gas extraction drilling. Blowouts will cause a large amount of gas to gush out of the borehole, which will not only trigger the alarm of the methane sensor and power outage, resulting in construction interruption, but also pose safety hazards such as gas explosion and gas asphyxiation, seriously affecting the normal production of coal mines and personnel safety.

[0003] The existing gas extraction drilling construction has deficiencies in blowout prevention technology and cannot effectively solve the safety problems caused by gas blowout holes. In the drilling process of traditional devices, the gas, water and slag mixture cannot be effectively separated, and the gas escapes into the airflow of the tunnel, increasing the gas concentration and further increasing the safety risk. In addition, the existing device is not airtight enough, and the phenomenon of gas spraying during the drilling operation is difficult to completely suppress, and the gas concentration in the tunnel is difficult to control within a safe range. Increase the safety risk of the mine.

[0004] Based on an in-depth analysis of the gas blowout principle and blowout prevention technology, and targeting the shortcomings of existing devices, a comprehensive safety device for gas blowout prevention in extraction drilling holes was developed. Summary of the invention

[0005] In view of the problems existing in the above-mentioned prior art, the present invention discloses a comprehensive safety device for coal seam gas extraction and blowout prevention, which effectively solves the gas blowout phenomenon and improves the safety and efficiency of coal mine production.

[0006] The invention discloses a comprehensive safety device for preventing gas blowout in coal seam extraction, comprising: a front casing blowout prevention device, a primary anti-blowout water-slag separation device, a secondary anti-blowout water-slag separation device, a waste removal box, a hydrogen sulfide reduction spraying device, a PLC control system and a pipeline system;

[0007] Among them, the front casing blowout prevention device fixed to the coal wall is equipped with a wireless pressure transmitter, and the PLC control system is electrically connected to the wireless pressure transmitter to monitor the internal and external pressure changes of the front casing blowout prevention device;

[0008] The primary anti-air-blowout water-slag separation device is connected to the front casing anti-blowout device for introducing gas and water-slag; the primary anti-air-blowout water-slag separation device is provided with a nozzle of a hydrogen sulfide reduction spraying device for spraying a chemical solution for reducing hydrogen sulfide;

[0009] The secondary air-jet-proof water-slag separation device is connected to the primary air-jet-proof water-slag separation device, and is used to further separate and process the air-water slag after the first separation;

[0010] The waste removal box is connected to the primary air jet prevention water slag separation device and the secondary air jet prevention water slag separation device respectively, so that the separated waste is introduced into the waste removal box;

[0011] The hydrogen sulfide abatement spray device is connected to the hydrogen sulfide abatement spray device nozzle;

[0012] The main extraction pipeline of the pipeline system is respectively connected to the primary anti-air jet water-slag separation device, the secondary anti-air jet water-slag separation device and the waste removal box, and is used to introduce the gas into the main extraction pipeline.

[0013] Furthermore, the front casing blowout prevention device specifically comprises:

[0014] Iron round casing;

[0015] The expansion rubber is located on the outer wall of the iron circular casing and can be expanded and contracted by the expansion rubber control wrench during operation to ensure close contact with the coal wall;

[0016] A flange for fixing the coal wall is installed at the front end of the outer wall of the iron circular sleeve and is used to fix the iron circular sleeve on the coal wall;

[0017] The expansion rubber control wrench is used to control the expansion and contraction of the expansion rubber, and is connected to the expansion rubber through a control interface provided on the outer wall of the iron circular sleeve;

[0018] A fixing buckle is located at the connection between the iron circular sleeve and the primary anti-air jet water slag separation device, and is used to prevent the iron circular sleeve from shifting during use;

[0019] The casing connection port is connected to the connection port of the front casing blowout prevention device in the primary blowout prevention water-slag separation device.

[0020] Furthermore, the wireless pressure transmitter is installed at the front end opening of the iron circular casing to monitor the pressure changes inside and outside the iron circular casing in real time and provide an alarm signal when the pressure is abnormal; the measurement range of the wireless pressure transmitter is 0-10MPa, and the accuracy is ±0.1MPa;

[0021] The PLC control system and the wireless pressure transmitter use wireless signal transmission to convert the pressure signal into an electrical signal; the transmission distance of the wireless signal transmission does not exceed 150 meters to ensure signal strength and response speed;

[0022] The PLC control system is used to activate the alarm function when the detected pressure value exceeds the preset safety threshold, and alarm in the form of a high-brightness red warning light and a high-decibel warning sound;

[0023] The PLC control system is connected with a control handle for setting the pressure value; the PLC control system is also connected with a methane concentration sensor through a wire.

[0024] Furthermore, the primary air jet prevention water-slag separation device specifically comprises:

[0025] The front fixing buckle is used to fix the primary anti-blowout water-slag separation device at the connection port of the front casing blowout prevention device;

[0026] The front casing blowout prevention device connection port is located at the front end of the primary anti-air jet water-slag separation device and is connected to the front casing blowout prevention device through the front fixing buckle to achieve the introduction of gas and water slag;

[0027] The hanging ring is used to connect the box of the primary air jet prevention water slag separation device to the coal wall through the hanging ring with a rope, playing the role of fixed support;

[0028] The first extraction pipeline interface is used to connect the extraction main pipeline to introduce the separated gas into the extraction main pipeline;

[0029] A secondary air-jet-proof water-slag separation device pipeline connection port is connected to the secondary air-jet-proof water-slag separation device and is used to further process the air-water slag after the first separation;

[0030] The box cover of the primary anti-air-jet water-slag separation device covers the side of the box of the primary anti-air-jet water-slag separation device and is used to seal and protect the internal structure; a rubber gasket is provided at the connection between the box cover of the primary anti-air-jet water-slag separation device and the box of the primary anti-air-jet water-slag separation device to play a sealing role and prevent gas and liquid from leaking out;

[0031] The nozzle of the hydrogen sulfide reduction spraying device is installed inside the box of the primary anti-air jet water-slag separation device and is used to spray a chemical solution for reducing hydrogen sulfide;

[0032] The cover plate sealing buckle is used to fix the box cover of the primary anti-air jet water-slag separation device to ensure that it does not shift under high pressure environment;

[0033] Drilling is used to insert the drill rod to drill on the coal wall, which can ensure the smooth passage of the drill rod and the drilling operation;

[0034] The drill inlet protection rubber gasket is located in the drill hole and is surrounded by a circle of industrial insulating brushes to prevent spraying, ensuring that gas and water slag will not spray out under high pressure;

[0035] The waste removal box connection port is connected to the waste removal box and is used to guide the separated waste into the waste removal box;

[0036] The box body of the primary anti-air jet water-slag separation device is the main part of the primary anti-air jet water-slag separation device. The internal space presents an irregular cylindrical structure, which can effectively buffer unexpected high-pressure spraying.

[0037] Furthermore, the secondary air jet prevention water-slag separation device specifically comprises:

[0038] A connecting port of the primary air-blow-proof water-slag separation device, used to be connected to the primary air-blow-proof water-slag separation device to achieve further separation of the air-water-slag introduced from the primary air-blow-proof water-slag separation device;

[0039] A second extraction pipeline interface is connected to the second extraction pipeline and is used to introduce the secondary separated gas into the extraction main pipeline;

[0040] A second waste removal tank connection port is connected to the waste removal tank and is used to guide the secondary separated waste into the waste removal tank;

[0041] The secondary air jet prevention water-slag separation device box is the main part of the secondary air jet prevention water-slag separation device, and a multi-layer separation structure is arranged inside to further improve the separation efficiency of gas, water and slag.

[0042] Further, the waste box is removed, specifically including:

[0043] The first waste removal connection port is connected to the primary air jet prevention water slag separation device and is used to guide the separated waste into the waste removal box;

[0044] The third extraction pipeline interface is connected to the extraction main pipeline and is used to introduce the residual gas in the waste removal box into the extraction main pipeline;

[0045] The second waste removal connection port is used to connect to the downstream waste treatment system to further process or discharge the waste in the waste removal tank;

[0046] The water and slag removal port is set at the bottom of the waste removal box to regularly discharge the water and slag accumulated in the box;

[0047] The water removal and slag removal port cover is used to close the water removal and slag removal port to prevent water leakage and slag leakage in the non-discharge state;

[0048] The circular rotary joint of the cover plate connects the water removal and slag removal port cover plate and the waste removal box, so that the water removal and slag removal port cover plate 405 can be easily rotated to open and close;

[0049] The waste removal box body is the main part of the waste removal box, and is used to store the imported waste.

[0050] Furthermore, the hydrogen sulfide reduction spraying device specifically comprises:

[0051] The medicine box is used to store chemical agents for reducing hydrogen sulfide. An isolation layer is provided inside the medicine box to prevent the agents from agglomerating and ensure smooth output of the agents.

[0052] A medicine delivery hose, connected to the medicine box and the nozzle of the hydrogen sulfide reduction spraying device, is used to deliver chemical agents for reducing hydrogen sulfide;

[0053] The grouting pump is installed in the chemical loading box and is used to transport chemicals from the chemical loading box to the nozzle of the hydrogen sulfide reduction spraying device; the rated flow rate of the grouting pump is 10L / min and the working pressure is 0.6MPa; the grouting pump is equipped with an automatic control system, which can adjust the spraying amount of the agent according to needs to ensure the spraying effect and safety.

[0054] Furthermore, the pipeline system includes a main extraction pipeline, and further includes:

[0055] A first extraction pipeline, wherein the first extraction pipeline interface is connected to the extraction main pipeline through the first extraction pipeline; the first extraction pipeline interface is connected to the first extraction pipeline through a threaded connection;

[0056] A first hose, a pipeline connecting port of the secondary air jet prevention water-slag separation device is connected to the secondary air jet prevention water-slag separation device through the first hose;

[0057] A second hose, the waste removal box connection port is connected to the waste removal box through the second hose;

[0058] The second extraction pipeline, the second extraction pipeline interface and the second extraction pipeline are used to introduce the gas separated from the second extraction into the extraction main pipeline;

[0059] A third hose, the second waste removal box connection port is connected to the waste removal box through the third hose;

[0060] The third extraction pipeline, the third branch extraction pipeline interface is connected to the main extraction pipeline through the third extraction pipeline.

[0061] The present invention has at least the following beneficial effects:

[0062] (1) Effectively prevent gas blowout: The synergistic effect of the front casing blowout prevention device and the primary and secondary anti-gas water-slag separation devices effectively prevents the occurrence of gas blowout. The expansion rubber in the front casing blowout prevention device and the flange for fixing the coal wall ensure close contact and sealing with the coal wall, and can maintain good sealing performance under high pressure environment, prevent gas from escaping from the borehole, and improve the safety of drilling operations. This design effectively reduces gas leakage, reduces gas concentration, and improves the safety of the construction site.

[0063] (2) Improve gas extraction efficiency and reduce safety hazards: The primary anti-air jet water-slag separation device and the secondary anti-air jet water-slag separation device respectively realize the primary and secondary separation of gas, water and slag. Through the multi-layer separation structure and efficient sealing performance, the mixed escape of gas, gas, water and slag is reduced, thereby reducing the gas concentration in the tunnel and reducing the probability of gas probe alarms and power outages. This separation system significantly improves the overall efficiency of gas extraction, reduces safety hazards, and improves the production efficiency and safety of the mine.

[0064] (3) Enhanced on-site monitoring and early warning capabilities: Through the real-time monitoring and early warning system of wireless pressure transmitters, methane concentration sensors and PLC control systems, accurate detection of pressure changes during gas extraction is achieved. When abnormal pressure is detected, the PLC control system can promptly emit a high-brightness red warning light and a high-decibel warning sound to remind operators to take emergency measures. The sensitivity and accuracy of this early warning system have greatly improved the safety management level of coal mine gas extraction operations and ensured the safety of the construction site.

[0065] (4) Integrated hydrogen sulfide reduction function to improve the working environment: The hydrogen sulfide reduction spraying device sprays chemical agents to reduce hydrogen sulfide during gas extraction, effectively reducing the concentration of harmful gases in the air and improving the working environment of the mine. The device adjusts the spraying volume through an automatic control system to ensure the effective reduction of hydrogen sulfide and reduce the health risks of construction workers caused by harmful gases. This function further ensures the safety of the working environment and provides healthier working conditions for mine workers.

[0066] Other beneficial effects of the present invention will be described in detail in the specific implementation section. BRIEF DESCRIPTION OF THE DRAWINGS

[0067] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0068] Figure 1 It is a structural principle diagram of the coal seam gas extraction and blowout prevention comprehensive safety device disclosed in the present invention.

[0069] Figure 2 It is a structural principle diagram of a primary air jet prevention water-slag separation device disclosed in the present invention.

[0070] Figure 3 It is an enlarged structural diagram of the connection between the front casing blowout prevention device and the primary blowout prevention water-slag separation device disclosed in the present invention.

[0071] Figure 4 It is a structural schematic diagram of the front casing blowout prevention device disclosed in the present invention.

[0072] In the figure: 1-front casing blowout prevention device, 101-iron round casing, 102-expansion rubber, 103-flange for fixing the coal wall, 104-expansion rubber control wrench, 105-fixing buckle, 106-wireless pressure transmitter, 107-casing connection port, 108-methane concentration sensor, 2-primary anti-air jet water-slag separation device, 201-front end fixing buckle, 202-front casing blowout prevention device connection port, 2 03-the first extraction pipeline interface, 204-the secondary anti-air jet water-slag separation device pipeline connection port, 205-the primary anti-air jet water-slag separation device box cover, 206-the hydrogen sulfide reduction spraying device nozzle, 207-the cover plate sealing buckle, 208-the drilling hole, 209-the drilling mouth protection rubber gasket, 210-the waste box connection port, 211-the primary anti-air jet water-slag separation device box, 212-the hanging ring, 3-the secondary anti-air jet water Slag separation device, 301-connecting port of the first anti-air jet water slag separation device, 302-interface of the second extraction pipeline, 303-connecting port of the second waste removal box, 304-box of the second anti-air jet water slag separation device, 4-waste removal box, 401-No. 1 waste removal connection port, 402-interface of the third extraction pipeline, 403-No. 2 waste removal connection port, 404-water removal and slag cleaning port, 405-water removal and slag cleaning port cover, 406-circular rotation of the cover Connector, 407-waste removal box body, 5-hydrogen sulfide reduction spraying device, 501-medicine box, 502-medicine delivery hose, 503-grouting pump, 6-PLC control system, 601-control handle, 7-pipeline system, 701-first extraction pipeline, 702-first hose, 703-second hose, 704-second extraction pipeline, 705-extraction main pipeline, 706-third hose, 707-third extraction pipeline. DETAILED DESCRIPTION

[0073] To make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be described in detail below. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other implementation methods obtained by ordinary technicians in this field without creative work belong to the scope of protection of the present invention.

[0074] Embodiment 1

[0075] like Figures 1 to 4 As shown, this embodiment discloses a comprehensive safety device for preventing blowouts in coal seam gas extraction, comprising: a front casing blowout prevention device 1, a primary blowout prevention water-slag separation device 2, a secondary blowout prevention water-slag separation device 3, a waste removal box 4, a hydrogen sulfide reduction spraying device 5, a PLC control system 6 and a pipeline system 7.

[0076] The front casing blowout prevention device 1 fixed to the coal wall is provided with a wireless pressure transmitter 106, and the PLC control system 6 is electrically connected to the wireless pressure transmitter 106 to monitor the internal and external pressure changes of the front casing blowout prevention device 1;

[0077] The primary anti-air-blowout water-slag separation device 2 is connected to the front casing anti-blowout device 1, and is used to introduce gas and water-slag; the primary anti-air-blowout water-slag separation device 2 is provided with a hydrogen sulfide reduction spraying device nozzle 206, which is used to spray a chemical solution for reducing hydrogen sulfide;

[0078] The secondary air-jet-proof water-slag separation device 3 is connected to the primary air-jet-proof water-slag separation device 2, and is used to further separate and process the air-water slag after the first separation;

[0079] The waste removal box 4 is connected to the primary air jet prevention water slag separation device 2 and the secondary air jet prevention water slag separation device 3 respectively, so that the separated waste is introduced into the waste removal box 4;

[0080] The hydrogen sulfide reduction spray device 5 is connected to the hydrogen sulfide reduction spray device nozzle 206;

[0081] The extraction main pipeline 705 of the pipeline system 7 is respectively connected to the primary anti-air jet water-slag separation device 2 , the secondary anti-air jet water-slag separation device 3 , and the waste removal box 4 , and is used to introduce gas into the extraction main pipeline 705 .

[0082] In this embodiment, the pre-casing blowout prevention device 1 is used to seal the coal seam drilling hole to prevent gas from blowing out during the drilling process and ensure construction safety. Specifically, it includes:

[0083] The iron round sleeve 101 has a sleeve diameter of 140 mm and is made of high-strength iron material. The surface is rust-proofed and has good pressure resistance and corrosion resistance. The sleeve length can be customized according to actual needs, and the conventional length is 1 m.

[0084] The expansion rubber 102 is located on the outer wall of the iron circular casing 101 and is made of a special rubber material with high elasticity and wear resistance, and can maintain good sealing performance under high pressure. The expansion rubber 102 has a thickness of 20 mm and can expand and contract through the expansion rubber control wrench 104 during operation to ensure close contact with the coal wall.

[0085] The flange 103 for fixing the coal wall is installed at the front end of the outer wall of the iron circular sleeve 101 and is used to fix the iron circular sleeve 101 on the coal wall. The flange has a diameter of 180 mm and a thickness of 10 mm. It is made of high-strength steel and has high strength and durability.

[0086] The expansion rubber control wrench 104 is used to control the expansion and contraction of the expansion rubber 102. It is connected to the expansion rubber 102 via a control interface on the outer wall of the iron circular sleeve 101. It is easy to operate and can quickly achieve expansion and contraction functions.

[0087] The fixing buckle 105 is located at the connection between the iron circular sleeve 101 and the primary air jet anti-water slag separation device 2 to prevent the iron circular sleeve 101 from shifting during use. The fixing buckle 105 is made of stainless steel and has good corrosion resistance.

[0088] The wireless pressure transmitter 106 is installed at the front end opening of the iron circular sleeve 101, and is used to monitor the pressure changes inside and outside the iron circular sleeve 101 in real time, and provide an alarm signal when the pressure is abnormal. The measurement range of the wireless pressure transmitter 106 is 0-10MPa, and the accuracy is ±0.1MPa.

[0089] The casing connection port 107 is connected to the front casing blowout preventer connection port 202 .

[0090] The PLC control system 6 and the wireless pressure transmitter 106 use wireless signal transmission. The wireless pressure transmitter 106 detects the gas pressure changes inside the borehole in real time and converts the pressure signal into an electrical signal. The transmission distance can be adjusted according to the actual needs of the coal mine, generally not exceeding 150m, to ensure signal strength and response speed. The PLC control system 6 receives the electrical signal transmitted by the wireless pressure transmitter 106, and analyzes and processes the signal. When the detected pressure value exceeds the preset safety threshold, the PLC control system 6 will start the alarm function, equipped with a high-brightness red warning light and a high-decibel warning sound. When the pressure exceeds the set value, the red light flashes and is accompanied by a sound, reminding the operator to pay attention to safety and transmit the danger signal to the working drill to take emergency measures to stop drilling and increase the extraction rate. The pressure threshold set by the PLC control system 6 can be set and adjusted according to specific needs, and the on-site operator can set the pressure value through the control handle 601 of the PLC control system 6. The PLC control system 6 is connected to the methane concentration sensor 108 through a wire.

[0091] In this embodiment, the primary anti-air-jet water-slag separation device 2 is used to preliminarily separate gas, water and slag to prevent the mixture from entering the downstream system. A hydrogen sulfide reduction spray device nozzle 206 is provided inside to spray a chemical solution to reduce hydrogen sulfide. Specifically including: a front-end fixing buckle 201, a front casing anti-blowout device connection port 202, a first extraction pipeline interface 203, a secondary anti-air-jet water-slag separation device pipeline connection port 204, a primary anti-air-jet water-slag separation device box cover 205, a hydrogen sulfide reduction spray device nozzle 206, a cover plate sealing buckle 207, a drilling hole 208, a drilling hole protection rubber gasket 209, a waste removal box connection port 210, a primary anti-air-jet water-slag separation device box 211, and a hanging ring 212.

[0092] Among them, the front end fixing buckle 201 is located at the front end of the device, which is used to firmly fix the primary anti-air jet water-slag separation device 2 at the front casing anti-blowout device connection port 202. It is made of high-strength stainless steel and has good corrosion resistance and durability, ensuring the stability of the device under high-pressure environment.

[0093] The front casing blowout prevention device connection port 202 is located at the front end of the primary air jet prevention water-slag separation device 2, and is connected to the front casing blowout prevention device 1 through the front end fixing buckle 201 to achieve the introduction of gas and water-slag. The front casing blowout prevention device connection port 202 is made of high-strength alloy material, has good sealing performance, and prevents gas and liquid leakage.

[0094] The hanging ring 212 can connect the box body of the primary air jet prevention water-slag separation device 2 to the coal wall through the hanging ring 212 with a rope, thereby playing a role of fixed support.

[0095] The first extraction pipeline interface 203 is used to connect the gas extraction pipeline to introduce the separated gas into the extraction system. The first extraction pipeline interface 203 is connected to the first extraction pipeline 701 through a threaded connection, and is made of corrosion-resistant alloy and can be used for a long time in harsh environments.

[0096] The pipeline connecting port 204 of the secondary air-blow-proof water-slag separation device is connected to the secondary air-blow-proof water-slag separation device 3 through the first hose 702, and is used for further processing the air-water slag after the first separation.

[0097] The box cover 205 of the primary anti-air-jet water-slag separation device covers the right box of the primary anti-air-jet water-slag separation device 2, and is used to seal and protect the internal structure. A drilling inlet protection rubber gasket 209 is provided at the connection between the box cover 205 of the primary anti-air-jet water-slag separation device and the box 211 of the primary anti-air-jet water-slag separation device, which plays a good sealing role and prevents gas and liquid from leaking out. The box cover 205 of the primary anti-air-jet water-slag separation device is made of high-strength material and can withstand high-pressure environment.

[0098] The nozzle 206 of the hydrogen sulfide reduction spraying device is installed inside the primary anti-air jet water-slag separation device box 211, and is used to spray a chemical solution for reducing hydrogen sulfide. The nozzle 206 of the hydrogen sulfide reduction spraying device is made of corrosion-resistant materials to ensure long-term use in harsh environments.

[0099] The cover plate sealing buckle 207 is used to fix the box cover 205 of the primary air jet prevention water slag separation device to ensure that it does not shift under high pressure. The cover plate sealing buckle 207 is made of high-strength stainless steel, has good corrosion resistance and strength, and can ensure the tight connection between the box cover 205 of the primary air jet prevention water slag separation device and the corresponding box.

[0100] The drilling hole 208 is used to insert a drill rod to drill on the coal wall, which can ensure that the drill rod passes smoothly and performs the drilling operation. The drilling hole 208 is made of pressure-resistant material.

[0101] The drill inlet protection rubber gasket 209 is located in the drill hole, and is surrounded by a circle of industrial insulating brushes to prevent spraying, ensuring that gas and water slag will not spray out under high pressure. The drill inlet protection rubber gasket 209 is made of high pressure resistant and wear-resistant special rubber, and can maintain good sealing performance in harsh environments.

[0102] The waste removal box connection port 210 is connected to the waste removal box 4 through the second hose 703, and is used to introduce the separated waste into the waste removal box 4. The waste removal box connection port 210 is made of corrosion-resistant alloy.

[0103] The primary anti-air jet water-slag separation device housing 211 is the main part of the primary anti-air jet water-slag separation device 2, and the internal space presents an irregular cylindrical structure, which can effectively buffer unexpected high-pressure spraying. The primary anti-air jet water-slag separation device housing 211 is made of SA-516Gr 70 high-strength steel with an allowable stress of 260MPa, and has good pressure resistance and corrosion resistance, ensuring the stable operation of the device under high-pressure environment.

[0104] In this embodiment, the secondary anti-air-jet water-slag separation device 3 is used to further separate the gas-water-slag mixture that has been processed once, improve the purity and separation effect of the gas, and make the gas extraction more efficient. Specifically, it includes: a primary anti-air-jet water-slag separation device connection port 301, a second extraction pipeline interface 302, a second waste removal box connection port 303, and a secondary anti-air-jet water-slag separation device box body 304.

[0105] The primary anti-air-jet water-slag separation device connecting port 301 is used to connect with the primary anti-air-jet water-slag separation device 2 to further separate the gas-water slag introduced from the primary anti-air-jet water-slag separation device 2. The connecting port is made of high-strength alloy material and has good sealing performance to prevent gas and liquid leakage. The connecting port has a diameter of 100 mm and is connected in a flange connection to ensure stability and sealing under high pressure.

[0106] The second extraction pipeline interface 302 is used to connect the second extraction pipeline 704 to introduce the secondary separated gas into the extraction main pipeline 705. The second extraction pipeline interface 302 is made of corrosion-resistant alloy, with an interface diameter of 80 mm and a threaded connection method, and can be used for a long time in harsh environments.

[0107] The second waste removal box connection port 303 is made of corrosion-resistant alloy and has a diameter of 120 mm. It is used to introduce the secondary separated waste into the waste removal box 4 through the third hose 706 in a clamp connection manner.

[0108] The secondary anti-air jet water-slag separation device box 304 is the main part of the secondary anti-air jet water-slag separation device 3, and a multi-layer separation structure is provided inside to further improve the separation efficiency of gas, water and slag. The secondary anti-air jet water-slag separation device box 304 is made of high-strength alloy material, and the surface is anti-corrosion treated, and has good pressure resistance and corrosion resistance. The box is made of SA-516-Gr-70 high-strength steel with an allowable stress of 260MPa, which has good pressure resistance and corrosion resistance, ensuring the stable operation of the secondary anti-air jet water-slag separation device 3 under high-pressure environment.

[0109] Preferably, the main structures of the primary air jet prevention water-slag separation device 2 and the secondary air jet prevention water-slag separation device 3 are approximately cylindrical, and the wall thickness thereof is calculated using the Laplace formula:

[0110]

[0111] In the formula: P is the required buffer pressure, R is the tank radius, and σ is the allowable stress of the material.

[0112] Preferably, the volumes of the primary anti-blowout water-slag separation device 2 and the secondary anti-blowout water-slag separation device 3 can be adjusted according to actual blowout prevention buffer pressure requirements.

[0113] V 圆柱 =πR 2 L

[0114]

[0115] In this formula: V 圆柱 is the volume of the primary anti-air jet water-slag separation device, m 3; R is the radius of the primary anti-air jet water-slag separation device, m; L is the height of the primary anti-air jet water-slag separation device, m; V 圆台 is the volume of the secondary anti-air jet water-slag separation device, m 3 ; h is the height of the secondary air jet prevention water-slag separation device, m; R1 is the upper radius of the secondary air jet prevention water-slag separation device, m; R2 is the lower radius of the secondary air jet prevention water-slag separation device, m.

[0116] In this embodiment, the waste removal box 4 is used to collect and store waste separated from the separation device to prevent it from affecting the environment and equipment. Through multiple connection ports, the waste is introduced into the waste removal box, and the water and slag accumulated in the box are cleaned regularly. Specifically including: No. 1 waste removal connection port 401, the third extraction pipeline interface 402, No. 2 waste removal connection port 403, water removal and slag removal port 404, water removal and slag removal port cover plate 405, cover plate circular rotary joint 406, and waste removal box body 407.

[0117] Among them, the No. 1 waste removal connection port 401 is located on one side of the waste removal box 4, and is used to connect with the primary anti-air jet water slag separation device 2 to introduce the separated waste into the waste removal box 4 through the second hose 703. The No. 1 waste removal connection port 401 is made of high-strength alloy material with a diameter of 120mm and a clamp connection method to ensure a stable and tight connection.

[0118] The third extraction pipeline interface 402 is used to connect the extraction main pipeline 705 through the third extraction pipeline 707 to introduce the residual gas in the waste removal box 4 into the extraction main pipeline. The interface material is corrosion-resistant alloy with a diameter of 80mm and a threaded connection method is adopted to ensure the stability of the pipeline connection.

[0119] The No. 2 waste removal connection port 403 is used to connect with the downstream waste treatment system to further process or discharge the waste in the waste removal box. The connection port is made of corrosion-resistant alloy with a diameter of 120mm and adopts flange connection to ensure the connection is stable and sealed.

[0120] The water and slag removal port 404 is arranged at the bottom of the waste removal box, and is used to regularly discharge the water and slag accumulated in the box.

[0121] The water removal and slag removal port cover plate 405 is used to close the water removal and slag removal port 404 to prevent water leakage and slag leakage in a non-discharge state. The cover plate is made of high-strength stainless steel material and has good pressure resistance and corrosion resistance.

[0122] The circular rotary joint 406 of the cover plate connects the water removal and slag cleaning port cover plate 405 with the waste removal box 4, so that the water removal and slag cleaning port cover plate 405 can be easily rotated to open and close. The circular rotary joint 406 of the cover plate is made of wear-resistant alloy material and is designed as a 180-degree rotatable structure to ensure flexibility and convenience of operation.

[0123] The waste box body 407 is the main part of the waste box, and is used to store the waste introduced from the separation device. The waste box body 407 is made of high-strength alloy material, and the surface is anti-corrosive treated. The size is 1m long, 0.8m wide, 1.2m high, and is designed as a rectangular structure with a volume of about 0.96m 3 , which can meet the storage needs of large-capacity waste.

[0124] In this embodiment, the hydrogen sulfide reduction spraying device 5 is used to spray chemical agents during the gas extraction process to reduce hydrogen sulfide in the air and improve the working environment and air quality. The automatic control system adjusts the spraying amount to ensure the effective reduction of hydrogen sulfide. Specifically, it includes: a drug box 501, a drug delivery hose 502, and a grouting pump 503.

[0125] The medicine box 501 is used to store chemical agents for reducing hydrogen sulfide. The medicine box 501 has a sealing performance to ensure the long-term storage of the agent. The size of the medicine box 501 is 1m long, 0.6m wide, and 0.8m high. It is designed as a rectangular structure with a volume of about 0.48m 3 An isolation layer is provided inside the medicine box 501 to prevent the medicine from agglomerating and ensure smooth output of the medicine.

[0126] The medicine delivery hose 502 connects the medicine box 501 and the nozzle 206 of the hydrogen sulfide reduction spraying device, and is used to deliver chemical agents for reducing hydrogen sulfide. The medicine delivery hose is made of a special rubber material that is corrosion-resistant and high-pressure-resistant, with an inner diameter of 20 mm and an outer diameter of 28 mm. The length can be customized according to actual needs, and the conventional length is 1.5 m. The hose has good flexibility and wear resistance, ensuring smooth delivery of the agent.

[0127] Grouting pump 503: installed in the medicine box, used to transport chemicals from the medicine box 501 to the nozzle 206 of the hydrogen sulfide reduction spraying device. The grouting pump 503 is made of high-strength corrosion-resistant materials, with a rated flow rate of 10L / min and a working pressure of 0.6MPa. The grouting pump 503 is equipped with an automatic control system that can adjust the spraying amount of the agent according to needs to ensure the spraying effect and safety.

[0128] Embodiment 2

[0129] The present invention also discloses a method for using a comprehensive safety device for preventing blowout of coal seam gas extraction. The method is implemented based on the comprehensive safety device for preventing blowout of coal seam gas extraction described above. The method specifically includes:

[0130] S1: Customize and select equipment according to actual needs;

[0131] S2: Connect each interface with pipelines according to the design;

[0132] S3: Set the alarm threshold of PLC control system 6;

[0133] S4: When there is a distinct smell of rotten eggs in the air, the grouting pump 503 should be turned on to spray the orifice with alkali solution.

[0134] Furthermore, the step S1 further includes:

[0135] S101. According to the gas situation at the working face of the mine, it is necessary to prevent the instantaneous release of the gas pressure of 5 MPa. According to the technical solution disclosed in Example 1, the size, volume and wall thickness of the primary anti-air-jet water-slag separation device 2 and the secondary anti-air-jet water-slag separation device 3 are designed.

[0136] According to the formula:

[0137] Where: P is 5 MPa, R is 0.5 m, and σ is 250 MPa.

[0138]

[0139] For the primary air jet prevention water-slag separation device 2 and the secondary air jet prevention water-slag separation device 3, the volume formulas are:

[0140] V 圆柱 =πR 2 L

[0141]

[0142] Calculation of primary anti-air jet water-slag separation device 2:

[0143] V 圆柱 =π×(0.5) 2 ×2=π×0.25×2=0.5π≈1.57m 3

[0144] Calculation of secondary anti-air jet water-slag separation device 3:

[0145]

[0146] Among them, V 圆柱 is the volume of the primary anti-air jet water-slag separation device, m 3 ; R is the radius of the primary anti-air jet water-slag separation device, m; L is the height of the primary anti-air jet water-slag separation device, m; V 圆台 is the volume of the secondary anti-air jet water-slag separation device, m 3 ; h is the height of the secondary air jet prevention water-slag separation device, m; R1 is the upper radius of the secondary air jet prevention water-slag separation device, m; R2 is the lower radius of the secondary air jet prevention water-slag separation device, m.

[0147] In this embodiment, the primary blowout prevention device is cylindrical, with a radius of 0.5m, a length of 2m, a wall thickness of 10mm, and a volume of approximately 1.57m 3 Secondary blowout prevention device: truncated cone, bottom radius 0.5m, upper bottom radius 0.3m, height 1m, wall thickness 10mm, volume about 0.77m 3 .

[0148] Furthermore, the step S3 further includes:

[0149] S301: During the extraction of coal seam gas, the common concentration range outside the borehole is generally between 0% and 0.5%. The specific pressure value of the gas in the borehole will vary depending on the geological conditions of the coal seam and the extraction equipment. The alarm threshold is set to 2.5MPa in the PLC control system.

[0150] The above description is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A comprehensive safety device for preventing blowout during coal seam gas extraction, characterized in that: include: Pre-casing blowout prevention device, primary blowout prevention water-slag separation device, secondary blowout prevention water-slag separation device, waste removal box, hydrogen sulfide reduction spraying device, PLC control system and piping system; Among them, the front casing blowout prevention device fixed to the coal wall is equipped with a wireless pressure transmitter, and the PLC control system is electrically connected to the wireless pressure transmitter to monitor the internal and external pressure changes of the front casing blowout prevention device; The primary anti-air-blowout water-slag separation device is connected to the front casing anti-blowout device for introducing gas and water-slag; the primary anti-air-blowout water-slag separation device is provided with a hydrogen sulfide reduction spraying device nozzle for spraying a chemical solution for reducing hydrogen sulfide; The secondary air-jet-proof water-slag separation device is connected to the primary air-jet-proof water-slag separation device, and is used to further separate and process the air-water slag after the first separation; The waste removal box is connected to the primary air jet prevention water slag separation device and the secondary air jet prevention water slag separation device respectively, so that the separated waste is introduced into the waste removal box; The hydrogen sulfide abatement spray device is connected to the hydrogen sulfide abatement spray device nozzle; The main extraction pipeline of the pipeline system is respectively connected to the primary anti-air jet water-slag separation device, the secondary anti-air jet water-slag separation device and the waste removal box, and is used to introduce the gas into the main extraction pipeline.

2. The comprehensive safety device for preventing blowout during coal seam gas extraction according to claim 1 is characterized in that: The front casing blowout preventer includes: Iron round casing; The expansion rubber is located on the outer wall of the iron circular casing and can be expanded and contracted by the expansion rubber control wrench during operation to ensure close contact with the coal wall; A flange for fixing the coal wall is installed at the front end of the outer wall of the iron circular sleeve and is used to fix the iron circular sleeve on the coal wall; The expansion rubber control wrench is used to control the expansion and contraction of the expansion rubber, and is connected to the expansion rubber through a control interface provided on the outer wall of the iron circular sleeve; A fixing buckle is located at the connection between the iron circular sleeve and the primary anti-air jet water slag separation device, and is used to prevent the iron circular sleeve from shifting during use; The casing connection port is connected to the connection port of the front casing blowout prevention device in the primary blowout prevention water-slag separation device.

3. The comprehensive safety device for preventing blowout during coal seam gas extraction according to claim 2 is characterized in that: The wireless pressure transmitter is installed at the front end of the iron circular casing to monitor the pressure changes inside and outside the iron circular casing in real time and provide an alarm signal when the pressure is abnormal; the measurement range of the wireless pressure transmitter is 0-10MPa, and the accuracy is ±0.1MPa; The PLC control system and the wireless pressure transmitter use wireless signal transmission to convert the pressure signal into an electrical signal; the transmission distance of the wireless signal transmission does not exceed 150 meters to ensure signal strength and response speed; The PLC control system is used to activate the alarm function when the detected pressure value exceeds the preset safety threshold, and alarm in the form of a high-brightness red warning light and a high-decibel warning sound; The PLC control system is connected with a control handle for setting the pressure value; the PLC control system is also connected with a methane concentration sensor through a wire.

4. The comprehensive safety device for coal seam gas extraction and blowout prevention according to claim 2 or 3, characterized in that: The primary anti-air jet water-slag separation device specifically comprises: The front fixing buckle is used to fix the primary anti-blowout water-slag separation device at the connection port of the front casing blowout prevention device; The front casing blowout prevention device connection port is located at the front end of the primary anti-air jet water-slag separation device and is connected to the front casing blowout prevention device through the front fixing buckle to achieve the introduction of gas and water slag; The hanging ring is used to connect the box of the primary air jet prevention water slag separation device to the coal wall through the hanging ring with a rope, playing the role of fixed support; The first extraction pipeline interface is used to connect the extraction main pipeline to introduce the separated gas into the extraction main pipeline; A secondary air-jet-proof water-slag separation device pipeline connection port is connected to the secondary air-jet-proof water-slag separation device and is used to further process the air-water slag after the first separation; The box cover of the primary anti-air-jet water-slag separation device covers the side of the box of the primary anti-air-jet water-slag separation device and is used to seal and protect the internal structure; a rubber gasket is provided at the connection between the box cover of the primary anti-air-jet water-slag separation device and the box of the primary anti-air-jet water-slag separation device to play a sealing role and prevent gas and liquid from leaking out; The nozzle of the hydrogen sulfide reduction spraying device is installed inside the box of the primary anti-air jet water-slag separation device and is used to spray a chemical solution for reducing hydrogen sulfide; The cover plate sealing buckle is used to fix the box cover of the primary anti-air jet water-slag separation device to ensure that it does not shift under high pressure environment; Drilling is used to insert the drill rod to drill on the coal wall, which can ensure the smooth passage of the drill rod and the drilling operation; The drill inlet protection rubber gasket is located in the drill hole and is surrounded by a circle of industrial insulating brushes to prevent spraying, ensuring that gas and water slag will not spray out under high pressure; The waste removal box connection port is connected to the waste removal box and is used to guide the separated waste into the waste removal box; The box body of the primary anti-air jet water-slag separation device is the main part of the primary anti-air jet water-slag separation device. The internal space presents an irregular cylindrical structure, which can effectively buffer unexpected high-pressure spraying.

5. The comprehensive safety device for preventing blowout during coal seam gas extraction according to claim 4 is characterized in that: The secondary anti-air jet water-slag separation device specifically comprises: A connecting port of the primary air-blow-proof water-slag separation device, used to be connected to the primary air-blow-proof water-slag separation device to achieve further separation of the air-water-slag introduced from the primary air-blow-proof water-slag separation device; A second extraction pipeline interface is connected to the second extraction pipeline and is used to introduce the secondary separated gas into the extraction main pipeline; A second waste removal tank connection port is connected to the waste removal tank and is used to guide the secondary separated waste into the waste removal tank; The secondary air jet prevention water-slag separation device box is the main part of the secondary air jet prevention water-slag separation device, and a multi-layer separation structure is arranged inside to further improve the separation efficiency of gas, water and slag.

6. The comprehensive safety device for preventing blowout during coal seam gas extraction according to claim 5 is characterized in that: Waste removal, including: The first waste removal connection port is connected to the primary air jet prevention water slag separation device and is used to guide the separated waste into the waste removal box; The third extraction pipeline interface is connected to the extraction main pipeline and is used to introduce the residual gas in the waste removal box into the extraction main pipeline; The second waste removal connection port is used to connect to the downstream waste treatment system to further process or discharge the waste in the waste removal tank; The water and slag removal port is set at the bottom of the waste removal box to regularly discharge the water and slag accumulated in the box; The water removal and slag removal port cover is used to close the water removal and slag removal port to prevent water leakage and slag leakage in the non-discharge state; The circular rotary joint of the cover plate connects the water removal and slag removal port cover plate and the waste removal box, so that the water removal and slag removal port cover plate 405 can be easily rotated to open and close; The waste removal box body is the main part of the waste removal box, and is used to store the imported waste.

7. The comprehensive safety device for preventing blowout during coal seam gas extraction according to claim 6 is characterized in that: Hydrogen sulfide reduction spraying device, specifically including: The medicine box is used to store chemical agents for reducing hydrogen sulfide. An isolation layer is provided inside the medicine box to prevent the agents from agglomerating and ensure smooth output of the agents. A medicine delivery hose, connected to the medicine box and the nozzle of the hydrogen sulfide reduction spraying device, is used to deliver chemical agents for reducing hydrogen sulfide; The grouting pump is installed in the chemical loading box and is used to transport chemicals from the chemical loading box to the nozzle of the hydrogen sulfide reduction spraying device; the rated flow rate of the grouting pump is 10L / min and the working pressure is 0.6MPa; the grouting pump is equipped with an automatic control system, which can adjust the spraying amount of the agent according to needs to ensure the spraying effect and safety.

8. The comprehensive safety device for preventing blowout during coal seam gas extraction according to claim 7 is characterized in that: The pipeline system includes the main extraction pipeline, and also includes: A first extraction pipeline, wherein the first extraction pipeline interface is connected to the extraction main pipeline through the first extraction pipeline; the first extraction pipeline interface is connected to the first extraction pipeline through a threaded connection; A first hose, a pipeline connecting port of the secondary air jet prevention water-slag separation device is connected to the secondary air jet prevention water-slag separation device through the first hose; A second hose, the waste removal box connection port is connected to the waste removal box through the second hose; The second extraction pipeline, the second extraction pipeline interface and the second extraction pipeline are used to introduce the gas separated from the second extraction into the extraction main pipeline; A third hose, the second waste removal box connection port is connected to the waste removal box through the third hose; The third extraction pipeline, the third branch extraction pipeline interface is connected to the main extraction pipeline through the third extraction pipeline.