Pneumatic conveying frequency adjusting method and device, electronic equipment and storage medium
By dynamically adjusting the conveying parameters of the pneumatic ash removal system and judging the circulation state based on the system parameters and pressure change curve, the problem of untimely adjustment of the cycle cycle in the existing technology is solved, and an efficient and energy-saving conveying process is achieved.
Patent Information
- Application Number
- CN202411443446.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-16
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-10-16
AI Technical Summary
The existing pneumatic ash removal system cannot adjust the cycle in real time when the ash production changes, resulting in energy waste and equipment wear, especially in the absence of full-time operating personnel in most power plants.
By obtaining the system parameters of the pneumatic ash removal system, inputting the parameter empirical model, adjusting the initial conveying parameters, and judging the cycle state according to the conveying pressure change curve, and dynamically adjusting the parameters of the next cycle to achieve an adaptive and efficient safety state.
It realizes accurate adjustment of the pneumatic delivery frequency, reduces energy consumption, extends the service life of the equipment, and reduces the dependence of manual adjustment.
Smart Images

Figure CN118954080A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of energy-saving technology, and in particular to a method, device, electronic device and storage medium for regulating the frequency of pneumatic conveying. Background Art
[0002] Pneumatic ash removal system is a common ash conveying method in power plant environmental dust removal system. It uses the energy of compressed air to convey the fly ash collected in the dust collector to the ash storage bin. Existing pneumatic ash removal systems usually adopt a time-controlled operation mode, that is, a fixed cycle is pre-set, and the system repeats the "waiting-feeding-conveying-reset" working cycle according to this cycle.
[0003] The specific operation process is: the system waits, and the feed valve and exhaust valve remain closed; when the cycle timer expires, the feed valve and exhaust valve open, and the silo pump starts feeding; when the feed valve opening set time expires or the material level in the silo pump is triggered, the feed valve and exhaust valve are closed; the air intake valve is opened to transport the ash to the ash bin; when the pressure in the conveying pipeline drops to the set value, indicating that the ash has been transported, the air intake valve and discharge valve are closed; the system resets and waits for the next cycle.
[0004] Under this control mode, the shorter the set cycle period, the more cycles per unit time, the greater the system output, and vice versa. The cycle period value is usually set and adjusted by the operator in the operation interface according to the actual situation. However, due to the frequent changes in the load and coal quality of the power plant units, the ash production will change frequently, and the operator needs to closely track and adjust the cycle period value at any time to match the current ash production. But the actual situation is that most power plants do not have full-time ash removal system operators and cannot make real-time adjustments. As a result, the usual practice is to estimate a smaller cycle period value as a fixed set value according to the high-output condition to ensure that all the ash produced can be transported in time.
[0005] Although this fixed high-frequency conveying setting can meet actual needs, it also has some shortcomings: when the ash production is small, it will still maintain frequent and large-scale conveying, resulting in huge waste of energy, increased operating power consumption, and increased wear. Summary of the invention
[0006] The present application provides a pneumatic conveying frequency adjustment method, device, electronic device and storage medium, which are used to automatically adjust the pneumatic conveying frequency to reduce energy consumption and reduce the workload of operators.
[0007] In a first aspect, the present application provides a method for adjusting the frequency of pneumatic conveying, the method comprising: Obtaining system parameters of a target pneumatic ash removal system, inputting the system parameters into a preset parameter empirical model, and outputting initial conveying parameters; The pneumatic ash removal system is started according to the initial conveying parameters to complete a conveying cycle, and an initial conveying pressure change curve of the conveying pressure changing with time during the cycle is obtained; Based on the initial delivery pressure change curve, the initial delivery pressure parameter is determined, and the cycle state is determined according to the initial delivery pressure parameter, the initial delivery parameter and the preset cycle period threshold, and the delivery parameter of the next cycle process is adjusted according to the cycle state to obtain the target delivery parameter.
[0008] In the above technical scheme, the system parameters of the target pneumatic ash removal system are first obtained, such as pipeline length, pipe diameter, number and volume of conveying pumps, material characteristics, etc., and these system parameters are input into the pre-established parameter empirical model to output a set of initial conveying parameters. Then, according to these initial conveying parameters (such as cycle time, feed valve opening time, etc.), the system is started to run, a complete conveying cycle is completed, and the curve of the conveying pressure change over time during the cycle is recorded, that is, the initial conveying pressure change curve. Next, based on the obtained initial conveying pressure change curve, the initial conveying pressure parameters reflecting the conveying situation are determined, such as the total conveying cycle time, the time when the conveying pressure exceeds the standard setting value, etc. At the same time, combined with the previous initial conveying parameters and the pre-set cycle thresholds (such as the upper and lower limits of the total conveying cycle time, the upper and lower limits of the pressure exceeding the standard time ratio, etc.), the state of this conveying cycle is judged, such as different states such as high conveying risk, low efficiency or normal conveying.
[0009] According to the determined cycle status, the parameters of the next conveying cycle (such as cycle time, feed valve opening time, etc.) are adjusted accordingly to obtain new target conveying parameters. For example, if the conveying risk is relatively high (cycle time is too long or pressure exceeds the standard for too long), the next cycle and feed time are appropriately shortened; if the conveying efficiency is relatively low (cycle time is too short or pressure never exceeds the standard), the next parameter value is appropriately extended; if the conveying status is normal, the parameters are kept unchanged.
[0010] In this way, the system can dynamically and adaptively adjust the next conveying parameters according to the actual situation of each conveying cycle, so that the entire conveying process can always maintain a better efficient and safe state, avoiding the waste or risk that may be caused by fixed high-frequency or low-frequency conveying settings. Compared with manual experience settings, this adaptive adjustment method can more accurately and timely adapt the conveying frequency and output to actual needs. While meeting the conveying needs, it also reduces energy consumption and extends the service life of the equipment, thereby achieving the purpose of energy saving.
[0011] In a second aspect of the present application, a pneumatic conveying frequency regulating device is provided, comprising: Data acquisition module 1, used to acquire system parameters of the target pneumatic ash removal system, input the system parameters into a preset parameter empirical model, and output initial conveying parameters; An initial conveying pressure variation curve acquisition module 2 is used to start the pneumatic ash removal system according to the initial conveying parameters to complete a conveying cycle, and to obtain an initial conveying pressure variation curve of the conveying pressure changing with time during the cycle; The parameter adjustment module 3 is used to determine the initial delivery pressure parameters based on the initial delivery pressure change curve, and determine the cycle state according to the initial delivery pressure parameters, the initial delivery parameters and the preset cycle period threshold, and adjust the delivery parameters of the next cycle process according to the cycle state to obtain the target delivery parameters.
[0012] In a third aspect of the present application, a computer storage medium is provided, wherein the computer storage medium stores a plurality of instructions, and the instructions are suitable for being loaded by a processor and executing the above method steps.
[0013] In a fourth aspect of the present application, an electronic device is provided, comprising: a processor and a memory; wherein the memory stores a computer program, and the computer program is suitable for being loaded by the processor and executing the above-mentioned method steps.
[0014] In summary, one or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages: 1. This application first obtains the system parameters of the target pneumatic ash removal system, such as pipeline length, pipe diameter, number and volume of delivery pumps, material characteristics, etc., and inputs these system parameters into a pre-established parameter empirical model to output a set of initial delivery parameters. Then, according to these initial delivery parameters (such as cycle time, feed valve opening time, etc.), the system is started to run, a complete delivery cycle is completed, and the curve of the delivery pressure change over time during the cycle is recorded, that is, the initial delivery pressure change curve. Next, based on the obtained initial delivery pressure change curve, the initial delivery pressure parameters reflecting the delivery situation are determined, such as the total delivery cycle time, the time when the delivery pressure exceeds the standard setting value, etc. At the same time, combined with the previous initial delivery parameters and the pre-set cycle thresholds (such as the upper and lower limits of the total delivery cycle time, the upper and lower limits of the pressure exceeding the standard time ratio, etc.), the state of this delivery cycle is judged, such as different states such as high delivery risk, low efficiency or normal delivery.
[0015] According to the determined cycle status, the parameters of the next conveying cycle (such as cycle time, feed valve opening time, etc.) are adjusted accordingly to obtain new target conveying parameters. For example, if the conveying risk is relatively high (cycle time is too long or pressure exceeds the standard for too long), the next cycle and feed time are appropriately shortened; if the conveying efficiency is relatively low (cycle time is too short or pressure never exceeds the standard), the next parameter value is appropriately extended; if the conveying status is normal, the parameters are kept unchanged.
[0016] In this way, the system can dynamically and adaptively adjust the next conveying parameters according to the actual situation of each conveying cycle, so that the entire conveying process can always maintain a better efficient and safe state, avoiding the waste or risk that may be caused by fixed large or small output settings. Compared with manual experience settings, this adaptive adjustment method can more accurately and timely adapt the conveying frequency and output to actual needs. While meeting the conveying needs, it also reduces energy consumption and extends the service life of the equipment, thereby achieving the purpose of energy saving.
[0017] 2. Before obtaining the initial delivery parameters, the implementation method of the present application first obtains the optimal delivery parameter sample data under different system parameter conditions. These sample data can come from the statistical analysis of actual operation data, or the best parameter combination obtained through trial operation. Then, these sample data are classified according to the corresponding system parameter information (such as pipeline length, pipe diameter, etc.), and the sample data with the same system parameters are classified into one category. The purpose of this step is to group data with inherent similarities in preparation for subsequent data processing. Next, for each type of sample data with the same system parameters, the least squares method and polynomial regression algorithm are used to fit them to obtain the optimal delivery parameter sample data after fitting. Through fitting, the inherent mathematical laws of the sample data can be excavated and described by a fitting curve or function, thereby removing noise and outliers in the original data and improving the accuracy and credibility of the data.
[0018] Finally, based on the optimal transport parameter sample data after fitting, a preset parameter empirical model is constructed. This model is actually a mapping relationship that can take system parameters as input and output the corresponding optimal transport parameter combination, providing a reference for subsequent actual operation.
[0019] By constructing the parameter experience model in the above way, historical operation data and expert experience can be well integrated, and the blindness and uncertainty of relying solely on experience can be overcome. The model is based on a large amount of actual data, has strong universal applicability, and can provide relatively accurate initial transmission parameter preset values for operation under different system parameter conditions.
[0020] 3. In the design and optimization process of the pneumatic conveying system, the present application can achieve an in-depth understanding and effective management of the system operating characteristics by determining the initial total conveying cycle time and the time when the conveying pressure exceeds the standard set value based on the initial conveying pressure change curve. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 A schematic diagram of a method for adjusting the frequency of pneumatic conveying provided in an embodiment of the present application; Figure 2 A schematic diagram of a pneumatic conveying frequency regulating device provided in an embodiment of the present application; Figure 3 A schematic diagram of the structure of an electronic device provided in this application; Figure 4 This is an initial delivery pressure change curve provided for this application. DETAILED DESCRIPTION
[0022] In order to enable technicians in this field to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this application, not all of the embodiments.
[0023] In the description of the embodiments of the present application, words such as "for example" or "for example" are used to indicate examples, illustrations or explanations. Any embodiment or design described as "for example" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "for example" or "for example" is intended to present related concepts in a specific way.
[0024] In the description of the embodiments of the present application, the term "multiple" means two or more. For example, multiple devices refer to two or more devices, and multiple screen terminals refer to two or more screen terminals. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the indicated technical features. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. The terms "include", "comprise", "have" and their variations all mean "including but not limited to", unless otherwise specifically emphasized.
[0025] In order to facilitate understanding of the method and device provided by the embodiments of the present application, before introducing the embodiments of the present application, the background of the embodiments of the present application is first introduced.
[0026] The pneumatic ash removal system is a key dust removal component in the environmental protection facilities of power plants. It mainly uses the power of compressed air to transport the fly ash collected in the dust collector to the ash storage bin. In the traditional operation mode, this type of system usually adopts a fixed time control cycle operation strategy, that is, by presetting a fixed cycle, the system executes the "waiting-feeding-transporting-reset" operation process according to this cycle.
[0027] Specifically, the system keeps the feed valve and exhaust valve closed during the "waiting" stage; when the cycle timer is triggered, the feed valve and exhaust valve are opened to start the silo pump to feed. The feed valve is closed after the set opening time ends or the material level in the silo pump reaches the standard, and then the air intake valve is opened to start the ash conveying process. When the pressure in the conveying pipeline drops to the preset level, it indicates that the ash conveying is completed. At this time, the air intake valve and the discharge valve are closed, and the system is reset immediately to prepare for the next cycle.
[0028] In this control mode, the length of the cycle directly affects the output capacity of the system: the shorter the cycle, the more cycles per unit time, and the stronger the output capacity of the system. Normally, the set value of the cycle needs to be adjusted by the operator according to the actual operating conditions of the power plant. However, due to the frequent changes in the load and coal quality of the power plant units, the ash production may change frequently, which requires the operator to continuously monitor and adjust the cycle in real time to adapt to the current ash production. But in reality, most power plants do not have full-time ash removal system operators and cannot achieve fine control. The common practice is to set a longer cycle to ensure that all ash can be handled in time during peak ash production.
[0029] After the background introduction of the above content, those skilled in the art can understand the problems existing in the prior art. The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments.
[0030] Based on the above background technology, please refer to Figure 1 , Figure 1 The present invention provides an architecture diagram of a method for adjusting the frequency of pneumatic conveying provided in an embodiment of the present invention. The device can be implemented by a computer program or can be run as an independent tool application. Specifically, in an embodiment of the present invention, the method can be applied to a controller, but can also be applied to electronic devices such as servers. A method for adjusting the frequency of pneumatic conveying includes the following steps: S101, obtaining system parameters of a target pneumatic ash handling system, inputting the system parameters into a preset parameter empirical model, and outputting initial conveying parameters; Specifically, before obtaining the initial delivery parameters, the implementation method first obtains the optimal delivery parameter sample data under different system parameter conditions. These sample data can come from the statistical analysis of actual operation data, or the best parameter combination obtained through trial operation. Then, these sample data are classified according to the corresponding system parameter information (such as pipeline length, pipe diameter, etc.), and the sample data with the same system parameters are classified into one category. The purpose of this step is to group data with inherent similarities in preparation for subsequent data processing. Next, for each type of sample data with the same system parameters, the least squares method and polynomial regression algorithm are used to fit them to obtain the optimal delivery parameter sample data after fitting. Through fitting, the inherent mathematical laws of the sample data can be excavated and described by a fitting curve or function, thereby removing noise and outliers in the original data and improving the accuracy and credibility of the data.
[0031] Finally, based on the optimal transport parameter sample data after fitting, a preset parameter empirical model is constructed. This model is actually a mapping relationship that can take system parameters as input and output the corresponding optimal transport parameter combination, providing a reference for subsequent actual operation.
[0032] By constructing the parameter experience model in the above way, historical operation data and expert experience can be well integrated, and the blindness and uncertainty of relying solely on experience can be overcome. The model is based on a large amount of actual data, has strong universal applicability, and can provide relatively accurate initial transmission parameter preset values for operation under different system parameter conditions.
[0033] In the actual transportation process, the preset initial parameters are used as the reference value for adjustment, which can enable the system to quickly enter the optimal operating state area, greatly shorten the process of "blind optimization", and improve the system's adaptive ability and response speed. At the same time, because the model has built-in mathematical laws, it has strong robustness and can avoid the arbitrariness that may be caused by human experience judgment.
[0034] Based on the above embodiment, as an optional embodiment, before inputting the system parameters into a preset parameter empirical model and outputting the initial transport parameters, the process includes: S201, obtaining optimal conveying parameter sample data of a pneumatic ash removal system with different system parameters; Specifically, before constructing the parameter empirical model, it is necessary to first obtain the optimal conveying parameter sample data of the pneumatic ash handling system under different system parameter conditions. This step is necessary because the establishment of the parameter empirical model requires a large amount of real and reliable historical data as a basis. Only when sufficient sample data is obtained can the model have strong universal applicability.
[0035] When implementing this step, it is necessary to first clarify the main system parameters of the pneumatic ash handling system, such as the total length of the pipeline, the diameter of the pipeline, the number and volume of the conveying pumps, and the material characteristics. Then, the optimal conveying parameter sample data of the pneumatic ash handling system under different parameter combinations is obtained through various means. These sample data can be obtained from the statistical analysis of historical data of actual long-term operation, or through targeted trial operation tests.
[0036] Specifically, for actual operation data, the operation records for a period of time (such as half a year or a year) can be exported from the field data acquisition system, including system parameters, transmission parameter setting values, and pressure change curves for each period. By analyzing these data, the safest and most efficient parameter combination for the transmission process under various working conditions can be found, which is the optimal transmission parameter sample data.
[0037] For the trial operation test data, different combinations of conveying parameters can be set manually for different system parameters (such as pipeline length, pipe diameter, etc.), the ash removal system can be started and the pressure change curve can be recorded. By analyzing and comparing multiple sets of data, the best combination of conveying parameters that can meet both safety and efficiency under various parameters can be found as sample data.
[0038] S202, classifying the optimal conveying parameter sample data of the pneumatic ash handling systems with different system parameters based on the system parameter information, and classifying the optimal conveying parameter sample data with the same system parameters into one category; Specifically, after obtaining the optimal transmission parameter sample data under different system parameter conditions, it is necessary to classify these sample data according to the system parameter information, and classify the sample data with the same system parameters into one category. This step is required because for the construction of the parameter experience model, it is necessary to group data with inherent similarities to avoid mutual interference between different data, thereby improving the accuracy of subsequent data processing.
[0039] When implementing this step, it is necessary to first determine the main system parameters that affect the conveying effect of the pneumatic ash removal system, such as the total length of the pipeline, the diameter of the pipeline, the number and volume of the conveying pumps, the material characteristics, etc. These parameters will not only affect the initial conveying parameter settings, but also have a great impact on the actual conveying pressure change process.
[0040] Next, all the obtained optimal transmission parameter sample data are traversed to extract the system parameter information, such as the pipeline length is 500 meters, the pipe diameter is 200 mm, etc. Then, according to different combinations of these system parameter information, the sample data with exactly the same parameters are classified into one category.
[0041] After obtaining the optimal transmission parameter sample data under different system parameter conditions, it is necessary to classify these sample data according to the system parameter information, and classify the sample data with the same system parameters into one category. This step is necessary because for the construction of the parameter experience model, it is necessary to group data with inherent similarities to avoid mutual interference between different data, thereby improving the accuracy of subsequent data processing.
[0042] When implementing this step, it is necessary to first determine the main system parameters that affect the conveying effect of the pneumatic ash removal system, such as the total length of the pipeline, the diameter of the pipeline, the number and volume of the conveying pumps, the material characteristics, etc. These parameters will not only affect the initial conveying parameter settings, but also have a great impact on the actual conveying pressure change process.
[0043] Next, all the obtained optimal transmission parameter sample data are traversed to extract the system parameter information, such as the pipeline length is 500 meters, the pipe diameter is 200 mm, etc. Then, according to different combinations of these system parameter information, the sample data with exactly the same parameters are classified into one category.
[0044] S203, performing fitting processing on the optimal transport parameter sample data with the same system parameters by using the least square method and the polynomial regression algorithm to obtain the optimal transport parameter sample data after fitting processing; Specifically, after classifying the optimal transport parameter sample data according to the system parameters, it is necessary to fit each type of sample data with the same system parameters, and obtain the optimal transport parameter sample data after fitting through the least squares method and polynomial regression algorithm. This step is necessary because the original sample data often contains some noise and abnormal points, and direct use will affect the accuracy of the subsequent model. It is necessary to mine the intrinsic laws of the data through fitting.
[0045] S204 constructs the preset parameter empirical model according to the transport parameter sample data after the fitting process.
[0046] Specifically, after completing the fitting process of the sample data of the optimal transport parameters of different categories, the preset parameter experience model can be constructed based on these fitting results. The reason for building this model is that it can express the mapping relationship between system parameters and optimal transport parameters in the form of mathematical functions or curves, which provides an important basis for obtaining reasonable initial transport parameters in actual operation.
[0047] When implementing this step, it is first necessary to organize the various fitting functions or curves obtained previously and construct a complete parameter empirical model. This model is actually composed of multiple sub-models, each of which corresponds to a specific set of system parameters and describes the functional relationship between the optimal transmission parameters and system parameters under the parameter conditions.
[0048] S102, starting the pneumatic ash removal system according to the initial conveying parameters to complete a conveying cycle, and obtaining an initial conveying pressure change curve of the conveying pressure changing with time during the cycle; For details, please refer to Figure 4 According to the above scheme, after obtaining the initial delivery parameters, it is necessary to start the system according to these parameter values, complete a complete delivery cycle, and at the same time obtain the curve of the pressure change in the pipeline over time during the cycle, that is, the initial delivery pressure change curve. This step is required because although the initial delivery parameters are predicted based on the empirical model, in the actual operation process, due to the existence of various unknown interference factors, the operation effect may deviate from the theoretical expectations. Only by obtaining the real pressure change data through actual operation can the actual performance of the parameter combination under specific system conditions be reflected.
[0049] When implementing this step, the initial conveying parameters such as cycle time and feed valve opening time need to be input into the control system first, and then the pneumatic ash removal system is started to perform a normal "waiting-feeding-conveying-reset" work cycle. At the same time, a data acquisition module needs to be configured to sample and record the pressure value in the pipeline in real time, and combine the pressure value with the corresponding time information to finally form a complete pressure-time change curve of the conveying cycle.
[0050] By obtaining the initial delivery pressure change curve, the operating performance of the delivery parameter combination under actual working conditions can be clearly and intuitively reflected. For example, if the curve exceeds the pressure standard for a long time, it means that the delivery risk is greater; if the curve never exceeds the pressure standard, it means that the delivery efficiency is low, etc. This provides key data support for the subsequent judgment of the operating status and the adjustment of the delivery parameters.
[0051] It should be noted that the pneumatic ash removal system is an environmental protection equipment system that uses the kinetic energy of compressed air to transport the fly ash collected by the dust collector to the ash storage bin.
[0052] Conveying parameters: Parameters that control the conveying process of the pneumatic ash removal system, such as cycle time, feed valve opening time, etc.
[0053] Initial conveying parameters: The parameter combination used to start the first conveying cycle obtained based on system parameters and parameter experience model.
[0054] Delivery pressure change curve: a graph showing the change of pressure in the pipeline over time during the delivery cycle.
[0055] Initial delivery pressure change curve: The pressure-time curve of the first delivery cycle obtained by running according to the initial delivery parameters.
[0056] S103, based on the initial delivery pressure change curve, determining an initial delivery pressure parameter, and determining a cycle state according to the initial delivery pressure parameter, the initial delivery parameter and a preset cycle period threshold, and adjusting the delivery parameter of the next cycle process according to the cycle state to obtain a target delivery parameter; Specifically, according to the above steps, after obtaining the initial delivery pressure change curve, it is necessary to determine a set of initial delivery pressure parameters reflecting the delivery status based on the curve. This step is required because it is difficult to judge the delivery status directly from the pressure change curve, and it is necessary to extract key data indicators as a basis for judgment.
[0057] When implementing this step, the initial delivery pressure change curve can be analyzed to calculate parameter values such as total delivery time, the proportion of time when the pressure exceeds the standard value, the pressure peak value, and the average pressure. These parameters can reflect the actual situation of the delivery process from different aspects. For example, if the total delivery time is long, there may be a risk of blockage; if the pressure never exceeds the standard, it means that the delivery efficiency is low.
[0058] Next, it is necessary to combine the initial delivery parameters obtained earlier (such as cycle time, etc.) and a set of pre-set cycle thresholds to judge the specific status of the delivery. For example, if the total delivery time exceeds the upper limit, and the proportion of the pressure exceeding the standard time also exceeds the upper limit, it can be determined that there is a greater risk in this delivery; if the total delivery time is lower than the lower limit, and the pressure has never exceeded the standard, it can be determined that the delivery efficiency is low; if these parameter values are within a reasonable range, it is determined to be a normal delivery state.
[0059] After determining the cycle state of the conveying in the above way, the parameters of the next conveying can be adjusted according to the corresponding state to obtain new target conveying parameters. For example, for a state with a higher risk, it is necessary to shorten the next cycle time and reduce the feeding time to reduce the risk; for a state with low efficiency, it is necessary to extend the relevant parameter value to increase the output next time; for a normal state, the parameters can be kept unchanged.
[0060] It should be noted that the initial delivery pressure parameters are obtained based on the analysis of the initial delivery pressure change curve, and are used to judge the pressure-related parameters of the delivery status, such as the total delivery time, the proportion of pressure exceeding the standard time, etc.
[0061] Cycle threshold: A pre-set evaluation standard for determining the delivery status, such as the upper and lower limits of the total delivery time, the upper and lower limits of the proportion of pressure exceeding the standard time, etc.
[0062] Cycle status: The status of the transport process determined based on initial parameters and thresholds, such as normal transport, high transport risk, low transport efficiency, etc.
[0063] Target conveying parameters: The new conveying parameter combination obtained after adjusting the next conveying according to the cycle status.
[0064] Based on the above embodiment, as an optional embodiment, the initial delivery pressure parameters include: the initial delivery pressure parameters include: the initial total delivery cycle time , The time when the delivery pressure exceeds the standard setting value , based on the initial delivery pressure variation curve, determining the initial delivery pressure parameter, including: S301, based on the initial delivery pressure change curve, determine a first time point at a first zero pressure and a second time point at a second zero pressure, and determine the initial total delivery cycle time based on the first time point and the second time point ; S302, determining the time when the delivery pressure exceeds the standard setting value according to the preset standard pressure value and the initial delivery pressure change curve ; S303, the initial total transport cycle time and the time when the delivery pressure exceeds the standard setting value As the initial delivery pressure parameter.
[0065] Specifically, according to the above steps, after obtaining the initial delivery pressure change curve, two key parameters, namely the initial total delivery cycle time and the time when the delivery pressure exceeds the standard setting value, need to be extracted from the curve as initial delivery pressure parameters. The reason why these two parameters need to be determined is that they reflect the safety and efficiency of the delivery state from the two dimensions of delivery cycle time and delivery pressure.
[0066] When implementing step S301, it is first necessary to find two zero pressure moments on the initial delivery pressure change curve, the first zero pressure point corresponds to the delivery start time, and the second zero pressure point corresponds to the delivery end time. Their time points are recorded as the first time point and the second time point respectively. Then the difference between the two time points is calculated to determine the initial total delivery cycle time of the delivery. A longer total delivery time may mean that there is a risk of blockage, etc.; otherwise, the efficiency may be low.
[0067] When implementing step S302, a standard pressure value needs to be set in advance as a threshold for judging the delivery status. Then, on the initial delivery pressure change curve, the sum of all time periods when the pressure value exceeds the standard value is calculated, which is the time when the delivery pressure exceeds the standard setting value. The longer this time is, the more time there is risk in this delivery, and the higher the risk level.
[0068] Finally, in step S303, the initial total delivery cycle time and the time during which the delivery pressure exceeds the standard set value obtained by the above calculation are used as two components of the initial delivery pressure parameter.
[0069] By analyzing the initial delivery pressure change curve and extracting these two parameters, we can avoid directly judging the entire complex curve and evaluate it based on quantitative indicators, which is more objective and accurate. At the same time, these two parameters cover the two key factors of time and pressure and can fully reflect the delivery status.
[0070] It should be noted that the initial delivery pressure variation curve is a curve of the pipeline pressure variation over time obtained when a complete delivery cycle is run according to the initial delivery parameters.
[0071] Zero pressure: The state in which the pressure in the pipeline is zero at the beginning and end of the conveying cycle.
[0072] First time point, second time point: time points corresponding to the start and end moments of the conveying cycle.
[0073] Initial Total Conveying Cycle Time: The total time it takes for a complete conveying cycle to occur from start to finish.
[0074] Standard pressure value: Pre-set pressure threshold for judging the delivery status.
[0075] The time that the delivery pressure exceeds the standard setting value: The cumulative time that the pipeline pressure is higher than the standard pressure value in a delivery cycle.
[0076] Initial delivery pressure parameter: An indicator parameter obtained based on the analysis of the initial delivery pressure change curve, used to judge the delivery status of the delivery.
[0077] Based on the above embodiment, as an optional embodiment, the initial delivery parameters include the initial cycle time and initial feed valve opening time value The preset cycle threshold includes a preset value m, a preset value n, and an upper limit threshold of the total delivery cycle time. , Total conveying cycle time lower limit threshold , Maximum value of conveying cycle , minimum conveying cycle , Maximum opening time of feed valve and minimum opening time of feed valve The target delivery parameters include the target cycle time and target feed valve opening time value , wherein the preset value m is greater than the preset value n; the cycle state is determined according to the initial delivery pressure parameter, the initial delivery parameter and the preset cycle period threshold, and the delivery parameter of the next cycle process is adjusted according to the cycle state to obtain the target delivery parameter, including: When the initial total delivery cycle time Greater than the total delivery cycle time upper limit threshold or the time when the delivery pressure exceeds the standard setting value The initial total conveying cycle time Ratio When it is greater than a preset value m, it is determined that the circulation state is a high risk of transportation; When the cycle state is that the transport risk is high and the initial cycle time is Greater than the minimum value of the conveying cycle , then according to the preset cycle time coefficient , for the initial cycle time Adjust to obtain the target cycle time , when the circulation state is that the transportation risk is large and the initial feed valve opening time value is Greater than the minimum value of the conveying cycle , according to the preset opening time coefficient The initial feed valve opening time value Adjust to get the target feed valve opening time value , where the target cycle time = - , the target feed valve opening time value = - ; When the initial total delivery cycle time Less than the lower limit threshold of the total conveying cycle time or the time when the delivery pressure exceeds the standard setting value The initial total conveying cycle time Ratio When it is less than a preset value n, it is determined that the circulation state is low in conveying efficiency; When the cycle state is low in transport efficiency and the initial cycle time is Less than the maximum value of the conveying cycle When the preset cycle time coefficient , for the initial cycle time Adjust to obtain the target cycle time , when the circulation state is low in conveying efficiency and the initial feed valve opening time value Less than the maximum opening time of the feed valve , according to the preset opening time coefficient The initial feed valve opening time value Adjust to get the target feed valve opening time value , where the target cycle time = + , the target feed valve opening time value = + ; When the initial total delivery cycle time Greater than the preset lower limit threshold of the total conveying cycle time , which is less than the preset upper limit threshold of the total conveying cycle time When the delivery pressure exceeds the standard setting value The initial total conveying cycle time Ratio When it is greater than a preset value n and less than a preset value m, it is determined that the circulation state is a normal conveying state; When the cycle state is the normal conveying state, the target cycle time Equal to the initial cycle time , the target feed valve opening time value Initial feed valve opening time value .
[0078] Specifically, after obtaining the initial conveying pressure parameters and the initial conveying parameters, the current circulation state is judged by comparing with the preset thresholds. When the initial total conveying cycle time is greater than the upper limit threshold of the total conveying cycle time, or the proportion of the conveying pressure exceeding the standard time is greater than the preset value m, it indicates that the conveying risk of the current cycle is relatively large, and there may be excessive dust accumulation in the ash hopper or blockage in the conveying pipeline. At this time, if the initial cycle time is greater than the minimum value of the conveying cycle, it is shortened and adjusted according to the preset cycle time coefficient to obtain the target cycle time. At the same time, if the initial feed valve opening time value is also greater than the minimum value of the conveying cycle, it is shortened according to the preset start time coefficient to obtain the target feed valve opening time value. By reducing the cycle and feed time, the ash delivery frequency can be increased and the risk of ash accumulation can be reduced.
[0079] On the contrary, when the initial total conveying cycle time is less than the lower limit threshold of the total conveying cycle time, or the proportion of the conveying pressure exceeding the standard time is less than the preset value n, it means that the current conveying efficiency is low and the conveying capacity is surplus. At this time, if the initial cycle time is less than the maximum value of the conveying cycle, it is appropriately extended according to the preset cycle time coefficient to increase the single ash delivery amount. If the initial feed valve opening time value is also less than the maximum value of the feed valve opening time, it is also extended according to the preset start time coefficient. By increasing the cycle and feed time, the conveying frequency can be reduced and energy consumption can be saved.
[0080] Finally, when the initial total conveying cycle time is between the upper and lower limit thresholds, and the proportion of the conveying pressure exceeding the standard time is also between the two preset values, it indicates that the current conveying state is normal, all parameters are within a reasonable range, and the system operates smoothly. At this time, it is only necessary to maintain the existing conveying parameters unchanged, and the target cycle time and target feed valve opening time values are equal to the original initial values.
[0081] On the basis of the above embodiment, as an optional embodiment, the initial delivery pressure parameter is determined based on the initial delivery pressure change curve, and the cycle state is determined according to the initial delivery pressure parameter, the initial delivery parameter and the preset cycle period threshold, and the delivery parameter of the next cycle process is adjusted according to the cycle state to obtain the target delivery parameter, which also includes: When the cycle state is high risk of transport and the initial cycle time is Greater than the minimum value of the conveying cycle , then the target cycle time = - ; When the circulation state is that the transport risk is large and the initial feed valve opening time value is Greater than the minimum value of the conveying cycle , then the target feed valve opening time value = - ; When the cycle state is low in efficiency and the initial cycle time is Less than the maximum value of the conveying cycle , then the target cycle time = + ; When the cycle state is low in conveying efficiency and the initial feed valve opening time value is Less than the maximum opening time of the feed valve , then the target feed valve opening time value = + .
[0082] Specifically, the above-mentioned four newly added threshold parameters are a supplement to the previous upper and lower limits of the total delivery cycle time and the delivery pressure ratio threshold, and further limit the reasonable adjustment range of the delivery parameters.
[0083] After determining that the circulation status is "high transport risk" or "low transport efficiency", in addition to adjusting the target parameters according to the preset adjustment coefficient, it is also necessary to compare the adjusted target value with these four extreme thresholds to ensure that the adjustment result does not exceed a reasonable range.
[0084] Specifically, when the cycle status is determined to be "high risk of delivery", the target cycle time and target feed valve opening time are reduced according to the preset adjustment coefficient. However, if the reduced target value is less than the minimum threshold, it needs to be corrected to the corresponding minimum threshold. This can avoid the situation where the target value is too small and the delivery process is abnormal due to excessive reduction.
[0085] Conversely, when the cycle state is determined to be "low conveying efficiency", the target cycle time and feeding time values are expanded according to the preset adjustment coefficient. However, if the expanded target value is greater than the maximum threshold, it needs to be corrected to the corresponding maximum threshold. This can avoid the situation where the target value is too large and energy consumption is wasted due to excessive expansion.
[0086] By comparing and correcting the adjusted target value with the maximum and minimum thresholds, it can be ensured that the adjustment result always remains within a reasonable safety range, and parameter abnormalities will not occur, thus ensuring the reliable and stable operation of the system.
[0087] It should be noted that the minimum conveying cycle time is a pre-set lower limit that the conveying cycle time cannot be lowered below, to ensure that there is enough time for the conveying process.
[0088] Maximum conveying cycle time: A pre-set upper limit that the conveying cycle time cannot exceed to avoid wasting energy for too long.
[0089] Minimum opening time of feed valve: Pre-set lower limit of opening time of feed valve to ensure sufficient feed volume.
[0090] Maximum opening time of the feed valve: The upper limit of the opening time of the feed valve is pre-set to prevent the risk of blockage caused by excessive feeding.
[0091] Based on the above embodiment, as an optional embodiment, before determining the initial delivery pressure parameter based on the initial delivery pressure change curve, and determining the circulation state according to the initial delivery pressure parameter, the initial delivery parameter and the preset cycle period threshold, the method further includes: S401, acquiring historical operation data of the target pneumatic ash removal system, and performing data analysis based on the historical operation data to obtain data analysis results; Specifically, we first need to obtain the operation log data of the target pneumatic ash removal system over a period of time, mainly including the setting values of various conveying parameters, real-time pressure change curves, fault alarm records, etc. Then, we perform data cleaning, preprocessing and other steps on these data to build a standardized analysis data set. Next, we can use technical means such as data mining and machine learning to conduct in-depth analysis of these historical operation data. For example, cluster analysis can be used to explore the conveying pressure pattern under different working conditions; association rule discovery can be used to explore the intrinsic connection between conveying parameters and pressure changes; time series pattern recognition can also be used to discover the characteristic sequence of pressure changes that cause failures or inefficiencies.
[0092] S402: Setting a cycle threshold based on the data analysis result to obtain the preset cycle threshold.
[0093] Specifically, knowledge rules or patterns related to the cycle period are extracted from the data analysis results. For example, a reasonable total cycle time interval for safe and efficient transportation under different parameter combinations can be obtained; or the abnormal pressure ratio threshold range corresponding to a common failure mode can be obtained. This knowledge is often implicit in complex historical data and needs to be automatically discovered through data analysis algorithms. Secondly, the multiple rules or patterns obtained can be integrated to obtain the initial value range of the preset cycle period threshold corresponding to the actual state of the current system. For example, the safe and efficient interval and the fault risk interval can be integrated to determine a reasonable upper and lower threshold range. Thirdly, the above rough range is further optimized by introducing domain knowledge, such as adjusting the threshold accuracy based on expert experience, or incorporating theoretical model calculation results. Finally, according to actual needs, a set of specific preset cycle period thresholds are determined from the optimized range for subsequent steps, including the upper and lower limits of the total transportation cycle time, the transportation pressure ratio threshold, etc.
[0094] This method of dynamically setting the threshold based on data analysis results can not only fully integrate the actual operating history characteristics of the system and better reflect its inherent transmission rules, but also has a certain degree of adaptability and can dynamically adjust the threshold range according to changes in the system state. This "threshold self-driving" can effectively avoid the subjectivity and lag caused by human settings, making the adaptive control strategy more accurate and effective.
[0095] See also Figure 2 , Figure 2 The present invention provides a schematic diagram of a pneumatic transmission frequency adjustment device, which may include: Data acquisition module 1, used to acquire system parameters of the target pneumatic ash removal system, input the system parameters into a preset parameter empirical model, and output initial conveying parameters; An initial conveying pressure variation curve acquisition module 2 is used to start the pneumatic ash removal system according to the initial conveying parameters to complete a conveying cycle, and to obtain an initial conveying pressure variation curve of the conveying pressure changing with time during the cycle; The parameter adjustment module 3 is used to determine the initial delivery pressure parameters based on the initial delivery pressure change curve, and determine the cycle state according to the initial delivery pressure parameters, the initial delivery parameters and the preset cycle period threshold, and adjust the delivery parameters of the next cycle process according to the cycle state to obtain the target delivery parameters.
[0096] Please refer to Figure 3 The application also discloses an electronic device. Figure 3 The electronic device 300 may include: at least one processor 301 , at least one network interface 304 , a user interface 303 , a memory 305 , and at least one communication bus 302 .
[0097] The communication bus 302 is used to realize the connection and communication between these components.
[0098] The user interface 303 may include a display screen (Display) and a camera (Camera). Optionally, the user interface 303 may also include a standard wired interface and a wireless interface.
[0099] The network interface 304 may optionally include a standard wired interface or a wireless interface (such as a WI-FI interface).
[0100] Among them, the processor 301 may include one or more processing cores. The processor 301 uses various interfaces and lines to connect various parts in the entire server, and executes various functions of the server and processes data by running or executing instructions, programs, code sets or instruction sets stored in the memory 305, and calling data stored in the memory 305. Optionally, the processor 301 can be implemented in at least one hardware form of digital signal processing (Digital Signal Processing, DSP), field programmable gate array (Field~Programmable Gate Array, FPGA), and programmable logic array (Programmable Logic Array, PLA). The processor 301 can integrate one or a combination of a central processing unit (Central Processing Unit, CPU), a graphics processing unit (Graphics Processing Unit, GPU) and a modem. Among them, the CPU mainly processes the operating system, user interface and application programs; the GPU is responsible for rendering and drawing the content to be displayed on the display screen; the modem is used to process wireless communications. It can be understood that the above-mentioned modem may not be integrated into the processor 301, and it can be implemented separately through a chip.
[0101] Among them, the memory 305 may include a random access memory (Random Access Memory, RAM) and may also include a read-only memory (Read~Only Memory). Optionally, the memory 305 includes a non-transitory computer~readable storage medium. The memory 305 can be used to store instructions, programs, codes, code sets or instruction sets. The memory 305 may include a program storage area and a data storage area, wherein the program storage area may store instructions for implementing an operating system, instructions for at least one function (such as a touch function, a sound playback function, an image playback function, etc.), instructions for implementing the above-mentioned various method embodiments, etc.; the data storage area may store data involved in the above-mentioned various method embodiments, etc. The memory 305 may also be optionally at least one storage device located away from the aforementioned processor 301. Refer to Figure 3 The memory 305 as a computer storage medium may include an operating device, a network communication module, a user interface module and an application for pneumatic transmission frequency regulation.
[0102] exist Figure 3In the electronic device 300 shown, the user interface 303 is mainly used to provide an input interface for the user and obtain the data input by the user; and the processor 301 can be used to call the application program for pneumatic conveying frequency regulation stored in the memory 305. When executed by one or more processors 301, the electronic device 300 executes one or more methods in the above-mentioned embodiments. It should be noted that for the aforementioned method embodiments, for the sake of simple description, they are all expressed as a series of action combinations, but those skilled in the art should know that the present application is not limited to the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also know that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required for the present application. In the above embodiments, the descriptions of each embodiment have their own emphasis. For the parts that are not described in detail in a certain embodiment, please refer to the relevant descriptions of other embodiments.
[0103] In the several embodiments provided in this application, it should be understood that the disclosed devices can be implemented in other ways. For example, the device embodiments described above are only schematic, such as the division of units, which is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another device, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some service interfaces, and the indirect coupling or communication connection of devices or units can be electrical or other forms.
[0104] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0105] The present application also provides a computer storage medium that can store multiple instructions, which are suitable for being loaded and executed by a processor as described above. Figure 1 The pneumatic conveying frequency adjustment method of the embodiment shown in the figure can be found in the specific implementation process. Figure 1 The specific description of the illustrated embodiment will not be repeated here.
[0106] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0107] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product. The computer software product is stored in a memory, including a number of instructions for a computer device (which can be a personal computer, server or network device, etc.) to perform all or part of the steps of the various embodiments of the present application. The aforementioned memory includes: various media that can store program codes, such as USB flash drives, mobile hard drives, magnetic disks or optical disks.
[0108] The above are only exemplary embodiments of the present disclosure and cannot be used to limit the scope of the present disclosure. That is, any equivalent changes and modifications made according to the teachings of the present disclosure are still within the scope of the present disclosure. After considering the disclosure of the specification and the truth of practice, those skilled in the art will easily think of other embodiments of the present disclosure.
[0109] This application is intended to cover any variation, use or adaptation of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary technical means in the art not described in the present disclosure. The description and examples are to be regarded as exemplary only, and the scope and spirit of the present disclosure are defined by the claims.
Claims
1. A method for adjusting the frequency of pneumatic conveying, characterized in that: The method comprises: Obtaining system parameters of a target pneumatic ash removal system, inputting the system parameters into a preset parameter empirical model, and outputting initial conveying parameters; The pneumatic ash removal system is started according to the initial conveying parameters to complete a conveying cycle, and an initial conveying pressure change curve of the conveying pressure changing with time during the cycle is obtained; Based on the initial delivery pressure change curve, the initial delivery pressure parameter is determined, and the cycle state is determined according to the initial delivery pressure parameter, the initial delivery parameter and the preset cycle period threshold, and the delivery parameter of the next cycle process is adjusted according to the cycle state to obtain the target delivery parameter.
2. The method according to claim 1, characterized in that Before inputting the system parameters into a preset parameter empirical model and outputting the initial transport parameters, the method includes: Obtain sample data of optimal conveying parameters for pneumatic ash handling systems with different system parameters; Classifying the optimal conveying parameter sample data of the pneumatic ash handling systems with different system parameters based on the system parameter information, and classifying the optimal conveying parameter sample data with the same system parameters into one category; Fitting the optimal transport parameter sample data with the same system parameters by using the least square method and the polynomial regression algorithm to obtain the optimal transport parameter sample data after fitting; The preset parameter empirical model is constructed according to the transport parameter sample data after the fitting process.
3. The method according to claim 1, characterized in that The initial delivery pressure parameters include: initial total delivery cycle time , The time when the delivery pressure exceeds the standard setting value , based on the initial delivery pressure variation curve, determining the initial delivery pressure parameter, including: Based on the initial delivery pressure change curve, a first time point at a first zero pressure and a second time point at a second zero pressure are determined, and based on the first time point and the second time point, the initial total delivery cycle time is determined ; According to the preset standard pressure value and the initial delivery pressure change curve, determine the time when the delivery pressure exceeds the standard setting value ; The initial total delivery cycle time and the time when the delivery pressure exceeds the standard setting value As the initial delivery pressure parameter.
4. The method according to claim 3, characterized in that The initial delivery parameters include an initial cycle time and initial feed valve opening time value The preset cycle threshold includes a preset value m, a preset value n, and an upper limit threshold of the total delivery cycle time. , Total conveying cycle time lower limit threshold , Maximum value of conveying cycle , minimum conveying cycle , Maximum opening time of feed valve and minimum opening time of feed valve The target delivery parameters include the target cycle time and target feed valve opening time value , wherein the preset value m is greater than the preset value n; the cycle state is determined according to the initial delivery pressure parameter, the initial delivery parameter and the preset cycle period threshold, and the delivery parameter of the next cycle process is adjusted according to the cycle state to obtain the target delivery parameter, including: When the initial total delivery cycle time Greater than the total delivery cycle time upper limit threshold or the time when the delivery pressure exceeds the standard setting value The initial total conveying cycle time Ratio When it is greater than a preset value m, it is determined that the circulation state is a high risk of transportation; When the cycle state is that the transport risk is high and the initial cycle time is Greater than the minimum value of the conveying cycle , then according to the preset cycle time coefficient , for the initial cycle time Adjust to obtain the target cycle time , when the circulation state is that the transportation risk is large and the initial feed valve opening time value is Greater than the minimum value of the conveying cycle , according to the preset opening time coefficient The initial feed valve opening time value Adjust to get the target feed valve opening time value , where the target cycle time = - , the target feed valve opening time value = - ; When the initial total delivery cycle time Less than the lower limit threshold of the total conveying cycle time or the time when the delivery pressure exceeds the standard setting value The initial total conveying cycle time Ratio When it is less than a preset value n, it is determined that the circulation state is low in conveying efficiency; When the cycle state is low in transport efficiency and the initial cycle time is Less than the maximum value of the conveying cycle When the preset cycle time coefficient , for the initial cycle time Adjust to obtain the target cycle time , when the circulation state is low in conveying efficiency and the initial feed valve opening time value Less than the maximum opening time of the feed valve , according to the preset opening time coefficient The initial feed valve opening time value Adjust to get the target feed valve opening time value , where the target cycle time = + , the target feed valve opening time value = + ; When the initial total delivery cycle time Greater than the preset lower limit threshold of the total conveying cycle time , which is less than the preset upper limit threshold of the total conveying cycle time When the delivery pressure exceeds the standard setting value The initial total conveying cycle time Ratio When it is greater than a preset value n and less than a preset value m, it is determined that the circulation state is a normal conveying state; When the cycle state is the normal conveying state, the target cycle time Equal to the initial cycle time , the target feed valve opening time value Initial feed valve opening time value .
5. The method according to claim 4, characterized in that The method further comprises: Real-time detection of the height of the ash hopper material level. When the height of the ash hopper material level reaches the alarm threshold, the target cycle time is set Set to the minimum value of the conveying cycle , set the target feed valve opening time value Set as the minimum opening time of the feed valve .
6. The method according to claim 4, characterized in that The method further comprises: determining an initial delivery pressure parameter based on the initial delivery pressure change curve, determining a cycle state according to the initial delivery pressure parameter, the initial delivery parameter and a preset cycle period threshold, and adjusting the delivery parameter of the next cycle process according to the cycle state to obtain a target delivery parameter, and further comprising: When the cycle state is high risk of transport and the initial cycle time is Greater than the minimum value of the conveying cycle , then the target cycle time = - ; When the circulation state is that the transport risk is large and the initial feed valve opening time value is Greater than the minimum value of the conveying cycle , then the target feed valve opening time value = - ; When the cycle state is low in efficiency and the initial cycle time is Less than the maximum value of the conveying cycle , then the target cycle time = + ; When the cycle state is low in conveying efficiency and the initial feed valve opening time value is Less than the maximum opening time of the feed valve , then the target feed valve opening time value = + .
7. The method according to claim 1, characterized in that Before determining the initial delivery pressure parameter based on the initial delivery pressure change curve, and determining the circulation state according to the initial delivery pressure parameter, the initial delivery parameter and a preset cycle period threshold, the method further includes: Acquire historical operation data of the target pneumatic ash removal system, and perform data analysis based on the historical operation data to obtain data analysis results; The cycle period threshold is set based on the data analysis result to obtain the preset cycle period threshold.
8. A pneumatic conveying frequency regulating device, characterized in that: include: A data acquisition module, used to acquire system parameters of a target pneumatic ash removal system, input the system parameters into a preset parameter empirical model, and output initial conveying parameters; An initial conveying pressure variation curve acquisition module is used to start the pneumatic ash removal system according to the initial conveying parameters to complete a conveying cycle, and to obtain an initial conveying pressure variation curve of the conveying pressure changing with time during the cycle; The parameter adjustment module is used to determine the initial delivery pressure parameter based on the initial delivery pressure change curve, and determine the cycle state according to the initial delivery pressure parameter, the initial delivery parameter and a preset cycle period threshold, and adjust the delivery parameter of the next cycle process according to the cycle state to obtain the target delivery parameter.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a plurality of instructions, and the instructions are suitable for being loaded by a processor and executing the method according to any one of claims 1 to 7.
10. An electronic device, characterized in that: It includes a processor, a memory and a transceiver, the memory is used to store instructions, the transceiver is used to communicate with other devices, and the processor is used to execute the instructions stored in the memory so that the electronic device executes the method according to any one of claims 1 to 7.
Citation Information
Patent Citations
Pneumatic ash removal system and ash conveying time optimization method
CN109625980A
Coal-fired power plant ash conveying control optimization system
CN111596632A
Pneumatic ash conveying energy-saving control method for coal-fired power plant
CN112607429A
Energy-saving pneumatic conveying ash removal system
CN214827290U
Powder material feeding method and device to high- pressure vessel
JP2001139143A
Cited By
Perlite air conveying system for emulsion explosive production line
CN119898623A
Intelligent decision-making method, system and device for pneumatic conveying system
CN120406345A
