Steel bar planting device for roadbed slab gap control and application method

By installing a rebar installation device between the track slab and the invert backfill layer, and utilizing the rebar rods of the helical spring and support strip structure to rotate and extend to enhance adhesion, the problems of gaps and water seepage between the track slab and the invert backfill layer were solved, thus achieving safe operation and economic benefits for the railway.

CN118958067APending Publication Date: 2024-11-15中国铁路兰州局集团有限公司 +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411387732.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-07
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

In existing technologies, there are problems such as gaps, water seepage, and rebar slippage between the track slab and the backfill layer of the invert arch in railway integral track beds, which leads to difficulties in railway operation and maintenance.

Method used

The rebar installation device includes rebar pipes, upper rebars, and lower rebars. By setting rebar grooves in the track bed slab and the backfill layer of the invert arch, the rebar rods are rotated and extended horizontally under the action of external force using the spiral springs and support strips in the rebar grooves, which enhances the bonding effect with the concrete and limits the occurrence of separation joints.

Benefits of technology

It effectively controls the gap between the track bed slab and the backfill layer of the invert arch, enhances the bonding strength, promotes safe railway operation, and has a simple and economical structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958067A_ABST
    Figure CN118958067A_ABST
Patent Text Reader

Abstract

The invention discloses a steel bar planting device for roadbed slab gap control and an application method. The steel bar planting device comprises a steel bar planting pipe, an upper steel bar planting part and a lower steel bar planting part. The embedded steel bar pipe vertically penetrates through the roadbed slab and the inverted arch backfill layer, and embedded steel bar grooves are formed in the pipe wall of the embedded steel bar pipe and comprise the upper embedded steel bar groove and the lower embedded steel bar groove. The upper embedded steel bar is placed in an upper embedded steel bar groove in the wall of the embedded steel bar pipe and comprises an upper embedded steel bar rod, a rotating shaft A, a spiral spring A, a supporting barrier strip A and a rotating shaft B. A front rod of the upper embedded steel bar rod can rotate from bottom to top. The lower embedded steel bar is placed in a lower embedded steel bar groove in the wall of the embedded steel bar pipe and comprises a lower embedded steel bar rod, a rotating shaft C, a spiral spring B, a supporting barrier strip B and a rotating shaft D. A front rod of the lower embedded steel bar rod can rotate from bottom to top. The application method comprises the following steps: (1) determining the number of the upper embedded steel bars and the lower embedded steel bars and the length of the embedded steel bar pipe; (2) the embedded steel bar pipes are installed, and embedded steel bars are sequentially opened; (3) filling concrete outside the embedded steel bar pipe, and filling mortar in the embedded steel bar pipe; and (4) regularly checking in the application process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of railway track bed slab separation control. Background Art

[0002] As a form of ballast structure, the railway monolithic ballast is widely used in railway tunnel sections due to its advantages of good integrity and small deformation. However, in practice, due to some defects in the tunnel, problems such as separation and water seepage between the ballast plate and the backfill layer of the invert of the railway monolithic ballast, as well as the empty suspension of the monolithic ballast, have a great impact on the operation and maintenance of the railway.

[0003] In the current process of treating the defects of railway track slab separation and empty hanging in tunnels, low viscosity grouting resin is mainly injected between the track slab and the backfill layer of the invert for bonding, and then the separation section of the track slab and the backfill layer is anchored with rebars, which has achieved certain results. However, due to the defects of drainage measures in some tunnels, water still penetrates inward along the interface between the track slab and the backfill layer of the invert, and the repeated action of train loads causes the interface to crack again. On the other hand, since the bonding strength between the rebars and the track slab is not high, the steel bars and concrete slip, resulting in further development of the separation. Therefore, a device that can effectively control the development of the separation between the integral track slab and the backfill layer of the invert is urgently needed on site. Summary of the invention

[0004] The object of the present invention is to provide a reinforcement planting device for controlling the development of the gap between the roadbed plate and the backfill layer of the invert arch, and the device can effectively bond the roadbed plate and the backfill layer of the invert arch together to control the development of the gap.

[0005] The present invention relates to a reinforcing bar device and an application method for controlling the separation of a ballast plate. The reinforcing bar device comprises a reinforcing bar pipe 1, an upper reinforcing bar 2 and a lower reinforcing bar 3. The reinforcing bar pipe 1 vertically penetrates a ballast plate 4 and an inverted arch backfill layer 5. A reinforcing bar groove 7 is arranged on a pipe wall 6 of the reinforcing bar pipe 1, comprising an upper reinforcing bar groove 7-1 and a lower reinforcing bar groove 7-2. The upper reinforcing bar groove 7-1 is located in the ballast plate 4 area, and the lower reinforcing bar groove 7-2 is located in the inverted arch backfill layer 5 area. The number of reinforcing bar grooves 7 arranged in the ballast plate 4 and the inverted arch backfill layer 5 by the reinforcing bar pipe 1 is determined by the magnitude of the force controlling the separation of the ballast plate 4 and the inverted arch backfill layer 5. One or more layers of reinforcing bar grooves 7 can be arranged in the vertical direction according to the number of reinforcing bar grooves 7. Each layer of reinforcing bar grooves 7 should be symmetrically arranged with respect to the reinforcing bar pipe 1.

[0006] The application method of the above-mentioned reinforcing bar planting device for controlling the gap of the track bed plate comprises the following steps: Step (1): determining the number of upper embedded bars (2) and lower embedded bars (3) in the ballast plate (4) and the backfill layer (5), and then determining the length of the embedded bar pipe (1) buried in the ballast plate (4) and the backfill layer (5); Step (2): placing the reinforcement tube (1) into the holes set in the ballast plate (4) and the backfill layer (5), and then using a thin rod to press down the rear end A (11-2) of the support bar A (11) and the rear end B (16-2) of the support bar B (16) in the reinforcement tube (1) from top to bottom, so that the upper reinforcement (2) and the lower reinforcement (3) are rotated and extended out of the reinforcement tube wall (6) until the upper reinforcement (2) and the lower reinforcement (3) are horizontal; Step (3): Fill the holes outside the reinforcement tube (1) with fine-grained concrete, and during the filling process, pay attention to keeping the vertical axis of the reinforcement tube (1) perpendicular to the upper surface of the ballast plate (4); after the pouring is completed, pour non-shrinkage mortar into the reinforcement tube (1); Step (4): During train operation, the embedded reinforcement pipe (1) and the surrounding concrete should be regularly checked for cracks, subsidence, etc. If any of the above conditions are found, they should be checked and handled in a timely manner.

[0007] The beneficial effect of the present invention is that the reinforcing bar implanting device for controlling the gap between the ballast plate can achieve better bonding effect between the concrete at the implanting part and the reinforcing bar implanting device by setting upper and lower reinforcing bars, thereby better limiting the occurrence of gaps between the ballast plate and the backfill layer of the invert, and playing a good role in promoting the safe operation of the railway. The structure of the patent is relatively simple, practical, and has significant economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0008] Figure 1 This is a three-dimensional diagram of the reinforcement device for controlling the gap between the ballast slabs. Figure 2 This is the II cross-sectional view when the implanted reinforcement has not extended out of the implanted reinforcement tube wall. Figure 3 This is the detailed structural diagram of the upper reinforcement part. Figure 4 This is the detailed structural diagram of the lower reinforcement area. Figure 5 It is the II cross-sectional view when the implanted rebar extends out of the implanted rebar tube wall. DETAILED DESCRIPTION

[0009] like Figure 1 , Figure 2As shown, the reinforcing bar device for controlling the gap of the ballast plate of the present invention comprises a reinforcing bar pipe 1, an upper reinforcing bar 2 and a lower reinforcing bar 3. The reinforcing bar pipe 1 vertically penetrates the ballast plate 4 and the backfill layer 5 of the inverted arch. A reinforcing bar groove 7 is provided on the pipe wall 6 of the reinforcing bar pipe 1, including an upper reinforcing bar groove 7-1 and a lower reinforcing bar groove 7-2; wherein the upper reinforcing bar groove 7-1 is located in the area of ​​the ballast plate 4, where the upper reinforcing bar 2 is placed, and the lower reinforcing bar groove 7-2 is located in the area of ​​the backfill layer 5 of the inverted arch, where the lower reinforcing bar 3 is placed. The number of reinforcing bar grooves 7 of the reinforcing bar pipe 1 in the ballast plate 4 and the backfill layer 5 of the inverted arch is determined by the magnitude of the force that controls the gap between the ballast plate 4 and the backfill layer 5 of the inverted arch, and one or more layers of reinforcing bar grooves 7 can be arranged in the vertical direction according to the number of reinforcing bar grooves 7; each layer of reinforcing bar grooves 7 should be symmetrically arranged with respect to the reinforcing bar pipe 1 to ensure that the reinforcing bar pipe 1 is only subjected to axial tension without additional bending moment.

[0010] like Figure 2 , Figure 3 , Figure 5 As shown, the upper reinforcement bar 2 is placed in the upper reinforcement bar groove 7-1 of the wall 6 of the reinforcement bar tube 1, and the upper reinforcement bar 2 includes an upper reinforcement bar rod 8, a rotation axis A9, a coil spring A10, a support bar A11, and a rotation axis B12. The upper reinforcement bar rod 8 includes a front bar A8-1 and a rear bar A8-2. The support bar A11 can rotate around the rotation axis B12; the front end A11-1 of the support bar supports the rear bar A8-2 of the upper reinforcement bar 8 to control the rotation of the upper reinforcement bar 8, and the rear end A11-2 of the support bar extends into the interior of the reinforcement bar tube 1. The end of the front end A11-1 of the support bar A11 is set to be arc-shaped to ensure that during the rotation of the support bar A11, the end of the front end A11-1 and the contact surface of the rear bar A8-2 of the upper reinforcement bar 8 slides more smoothly. One end of the coil spring A10 is fixed on the rotation axis A9, and the other end is fixed on the root of the front rod A8-1 of the upper reinforcing rod 8. The placement direction of the coil spring A10 makes the front rod A8-1 rotate counterclockwise from bottom to top when the upper reinforcing rod 8 rotates around the rotation axis A9; when the support bar A11 produces a counterclockwise rotation of the rear end A11-2 downward around the rotation axis B12 under the action of external force, the upper reinforcing rod 8 can rotate counterclockwise around the rotation axis A9 under the action of the coil spring A10 until the upper reinforcing rod 8 is horizontal. At this time, the upper reinforcing rod 8 is limited by the groove wall of the upper reinforcing groove 7-1 and the rotation axis A9, and can no longer continue to rotate counterclockwise. When the upper reinforcing rod 8 is bonded to the surrounding filling concrete, it can prevent the reinforcing tube 1 from being pulled downward in the roadbed slab 4.

[0011] like Figure 2 , Figure 4 , Figure 5As shown, the lower reinforcement bar 3 is placed in the lower reinforcement bar groove 7-2 of the wall 6 of the reinforcement bar tube 1, and the lower reinforcement bar 3 includes a lower reinforcement bar rod 13, a rotation axis C 14, a coil spring B 15, a support bar B 16, and a rotation axis D 17. The lower reinforcement bar rod 13 includes a front bar B 13-1 and a rear bar B 13-2. The support bar B 16 can rotate around the rotation axis D 17, and the front end B 16-1 of the support bar supports the rear bar B 13-2 of the lower reinforcement bar 13 to control the rotation of the lower reinforcement bar 13, and the rear end B 16-2 of the support bar B 16 extends into the interior of the reinforcement bar tube 1. The end of the front end B 16-1 of the support bar B 16 is set to be arc-shaped to ensure that during the rotation of the support bar B 16, the end of the front end B16-1 and the contact surface of the rear bar B 13-2 of the lower reinforcement bar 13 slide more smoothly. One end of the coil spring B15 is fixed on the rotation axis C14, and the other end is fixed on the root of the front rod B13-1 of the lower reinforcing rod 13. The installation direction of the coil spring B15 of the lower reinforcing rod 13 is opposite to the installation direction of the coil spring A10 of the upper reinforcing rod 8, so that when the lower reinforcing rod 13 rotates around the rotation axis C14, the front end of the front rod B13-1 rotates clockwise from top to bottom; when the support bar B16 generates a counterclockwise rotation of the rear end B16-2 downward around the rotation axis D17 under the action of external force, the lower reinforcing rod 13 can rotate clockwise around the rotation axis C14 under the action of the coil spring B15 until the lower reinforcing rod 13 is horizontal. At this time, the lower reinforcing rod 13 is limited by the groove wall of the lower reinforcing groove 7-2 and the rotation axis C14, and can no longer continue to rotate clockwise. When the lower reinforcing bar 13 is bonded to the surrounding filling concrete, it can prevent the reinforcing bar pipe 1 from being pulled upward in the invert backfill layer 5.

[0012] The application method of the above-mentioned reinforcing bar planting device for controlling the gap of the track bed plate comprises the following steps: Step (1) determines the number of upper embedded bars 2 and lower embedded bars 3 in the ballast slab 4 and the backfill layer 5 of the invert arch, and further determines the length of the embedded bar pipe 1 buried in the ballast slab 4 and the backfill layer 5 of the invert arch.

[0013] Step (2) The reinforcing bar tube 1 is placed into the holes set in the ballast slab 4 and the backfill layer 5, and then a thin rod is used to press down the rear end A11-2 of the support bar A11 and the rear end B16-2 of the support bar B16 in the reinforcing bar tube 1 from top to bottom, so that the upper reinforcing bar 2 and the lower reinforcing bar 3 rotate and extend out of the reinforcing bar tube wall 6 until the upper reinforcing bar 2 and the lower reinforcing bar 3 are horizontal.

[0014] Step (3) Fill the holes outside the reinforcement tube 1 with fine-grained concrete, and during the filling process, pay attention to keeping the vertical axis of the reinforcement tube 1 perpendicular to the upper surface of the roadbed slab 4. After the pouring is completed, pour non-shrinkage mortar into the reinforcement tube 1.

[0015] Step (4) During the operation of the train, the embedded reinforcement tube 1 and the surrounding concrete should be regularly checked for cracks, subsidence, etc. If the above situation is found, it should be checked and handled in time.

Claims

1. A reinforcing bar embedding device for controlling the gap between track slabs, comprising a reinforcing bar embedding tube (1), an upper reinforcing bar embedding (2), and a lower reinforcing bar embedding (3), characterized in that The reinforcing bar pipe (1) vertically penetrates the ballast plate (4) and the inverted arch backfill layer (5), and a reinforcing bar groove (7) is provided on the pipe wall (6) of the reinforcing bar pipe (1), including an upper reinforcing bar groove (7-1) and a lower reinforcing bar groove (7-2); wherein the upper reinforcing bar groove (7-1) is located in the ballast plate (4) region, and the lower reinforcing bar groove (7-2) is located in the inverted arch backfill layer (5) region; the number of reinforcing bar grooves (7) provided in the ballast plate (4) and the inverted arch backfill layer (5) of the reinforcing bar pipe (1) is determined by the magnitude of the force controlling the separation of the ballast plate (4) and the inverted arch backfill layer (5), and one or more layers of reinforcing bar grooves (7) can be provided in the vertical direction according to the number of reinforcing bar grooves (7); each layer of reinforcing bar grooves (7) should be symmetrically provided with respect to the reinforcing bar pipe (1).

2. The reinforcing bar embedding device for controlling the gap between the ballast plates according to claim 1 is characterized in that The upper reinforcement bar (2) is placed in the upper reinforcement bar groove (7-1) of the wall (6) of the reinforcement bar pipe (1). The upper reinforcement bar (2) comprises an upper reinforcement bar rod (8), a rotation axis A (9), a coil spring A (10), a support bar A (11), and a rotation axis B (12). The upper reinforcement bar rod (8) comprises a front bar A (8-1) and a rear bar A (8-2). The support bar A (11) can rotate around the rotation axis B (12). The front end A (11-1) of the support bar abuts against the rear bar A (8-2) of the upper reinforcement bar (8). The end of the front end A (11-1) of the support bar A (11) is arranged in an arc shape, and the rear end A (11-2) of the support bar extends into the interior of the reinforcement tube (1); one end of the coil spring A (10) is fixed on the rotation axis A (9), and the other end is fixed on the root of the front rod A (8-1) of the upper reinforcement rod (8); the installation direction of the coil spring A (10) is such that when the upper reinforcement rod (8) rotates around the rotation axis A (9), the front rod A (8-1) generates a counterclockwise rotation from bottom to top until the upper reinforcement rod (8) is horizontal.

3. The reinforcing bar embedding device for controlling the gap of the track bed slab according to claim 1 is characterized in that The lower reinforcement bar (3) is placed in the lower reinforcement bar groove (7-2) of the wall (6) of the reinforcement bar pipe (1). The lower reinforcement bar (3) includes a lower reinforcement bar rod (13), a rotation axis C (14), a coil spring B (15), a support bar B (16), and a rotation axis D (17). The lower reinforcement bar rod (13) includes a front bar B (13-1) and a rear bar B (13-2). The support bar B (16) can rotate around the rotation axis D (17). The front end B (16-1) of the support bar supports the rear bar B of the lower reinforcement bar (13). (13-2), the end of the front end B (16-1) of the support bar B (16) is arranged to be arc-shaped, and the rear end B (16-2) of the support bar B (16) extends into the interior of the reinforcement tube (1); the installation direction of the coil spring B (15) of the lower reinforcement rod (13) is opposite to the installation direction of the coil spring A (10) of the upper reinforcement rod (8), so that when the lower reinforcement rod (13) rotates around the rotation axis C (14), the front rod B (13-1) rotates clockwise from top to bottom until the lower reinforcement rod (13) is horizontal.

4. The application method of the reinforcing bar planting device for controlling the gap of the track bed slab according to claim 1 is characterized in that: The steps are: Step (1) determining the number of upper embedded bars (2) and lower embedded bars (3) in the ballast plate (4) and the backfill layer (5), and then determining the length of the embedded bar pipe (1) buried in the ballast plate (4) and the backfill layer (5); Step (2) placing the reinforcement tube (1) into the holes set in the ballast plate (4) and the backfill layer (5), and then using a thin rod to press down the rear end A (11-2) of the support bar A (11) and the rear end B (16-2) of the support bar B (16) in the reinforcement tube (1) from top to bottom, so that the upper reinforcement (2) and the lower reinforcement (3) are rotated and extended out of the reinforcement tube wall (6) until the upper reinforcement (2) and the lower reinforcement (3) are horizontal; Step (3) filling the holes outside the reinforcement tube (1) with fine-grained concrete, and during the filling process, paying attention to keeping the vertical axis of the reinforcement tube (1) perpendicular to the upper surface of the ballast plate (4); after the pouring is completed, pouring non-shrinkage mortar into the reinforcement tube (1); Step (4) During the operation of the train, the embedded reinforcement pipe (1) and the surrounding concrete should be regularly checked for cracks, subsidence, etc. If the above situation is found, it should be checked and handled in a timely manner.