Fabricated slope support waterproof system

By combining prefabricated support steel plates, concrete support plates and drainage components in the slope support waterproofing system, a waterproofing system is formed, which solves the problems of soil erosion and safety hazards, and improves the stability and safety of the slope. Suitable for construction in areas with high groundwater levels.

CN118958323APending Publication Date: 2024-11-15YUNNAN AGRICULTURAL UNIVERSITY +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411191063.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

When facing the influence of groundwater level and rainwater, existing prefabricated slope support waterproofing systems are prone to soil erosion and safety hazards. Traditional slope support is less waterproofing, which leads to unstable slope foot and easily leads to settlement and deformation.

Method used

The prefabricated slope support waterproofing system is adopted, including prefabricated support steel plate units and concrete support plate units, and combined with the support pier mechanism, foundation pit bottom drainage mechanism, slope drainage components, precipitation pipes and waterproof walls, a complete waterproofing system is formed. Waterproofing effect is achieved through components such as flexible rubber water stop ring and filter layer, and the stability of the slope is enhanced by integrated fixing fasteners and hooks.

Benefits of technology

Effectively prevent external rainwater and groundwater from eroding the slope, ensure the stability of the slope, simplify construction technology, improve the stability and safety of slope support, is suitable for rainy season construction and areas with high groundwater levels, and has a good economy Recycling value.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958323A_ABST
    Figure CN118958323A_ABST
Patent Text Reader

Abstract

The invention discloses an assembly type slope support waterproof system, and relates to the technical field of slope support waterproof construction of underground structure engineering, and the assembly type slope support waterproof system comprises a slope A and a foundation pit bottom B. A buttress mechanism is arranged at the bending position of the slope A and the foundation pit bottom B. A foundation pit bottom drainage mechanism is arranged in the foundation pit bottom B. The assembly type slope support waterproof mechanism is used for achieving assembly of a slope support waterproof system. The assembly type slope support waterproof mechanism comprises a prefabricated support steel plate unit; prefabricating the concrete support plate units; the supporting steel plate and the concrete supporting plate are applied in a combined mode, compared with a pure concrete supporting plate, the complexity of hoisting supporting is reduced, the concrete buttress arranged at the slope bottom is beneficial to assisting slope supporting of the concrete supporting plate, and therefore a good stable slope supporting foundation is formed; and further, the integrated fixing fastener, the hook and other assemblies are used for reinforcing fixed connection, so that the side slope plays a relatively stable role.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of slope support and waterproofing construction of underground structure engineering, and in particular to an assembled slope support and waterproofing system. Background Art

[0002] The slope support and waterproofing system is a comprehensive engineering measure designed to ensure that underground projects remain stable and safe during construction and operation, especially in environments that are greatly affected by groundwater levels and rainwater.

[0003] According to the public number: CN114934524A, a recyclable assembled slope support system and its construction method are disclosed. The support system includes: a plurality of recyclable anchor rods driven into the soil of the slope, arranged at intervals in the horizontal and vertical directions, and the top ends form installation ends; upper and lower plywoods sleeved on the installation ends; a plurality of flexible slope protection surface layers attached to the surface of the slope, the corners are clamped between the upper and lower plywoods, and two adjacent flexible slope protection surface layers are butt-connected; waterproof inserts are embedded in the butt joints of two adjacent flexible slope protection surface layers; a fastening rope is passed through the installation ends of the recyclable anchor rods arranged in the horizontal and vertical directions, and the ends are fixed at the corresponding positions of the slopes after tensioning. The recyclable anchor rods and the flexible slope protection surface layers in the slope support system of the present invention are assembled through nodes, and can be dismantled, recycled and reused as a whole after use, realizing the green construction of foundation pit slope support, accelerating the construction cycle, and can be recycled and circulated, saving construction costs.

[0004] Based on the above-mentioned prior art, the currently existing prefabricated slope support and waterproofing systems still have the following problems: underground projects are often affected by groundwater levels and rainwater, and slope support is particularly critical. Traditional slope support pays little attention to waterproofing, which can easily lead to soil erosion and safety hazards. With the development of prefabricated structures, their flexibility and reusability are suitable for application in slope support, and combined with construction technology, they can effectively prevent landslides. At the same time, the bottom of the slope is easily affected by rainwater, and the unstable foot of the slope can easily lead to settlement and deformation. For this reason, the present invention provides an prefabricated slope support and waterproofing system. Summary of the invention

[0005] In view of the shortcomings of the prior art, the present invention provides an assembled slope support and waterproofing system, which solves the following problems that exist in the existing assembled slope support and waterproofing systems: underground projects are often affected by groundwater levels and rainwater, and slope support is particularly critical. Traditional slope support pays little attention to waterproofing, which can easily lead to soil erosion and safety hazards. With the development of prefabricated structures, their flexibility and reusability are suitable for application in slope support, and combined with construction technology, they can effectively prevent landslides. At the same time, the bottom of the slope is easily affected by rainwater, and an unstable slope foot can easily lead to settlement and deformation.

[0006] To achieve the above purpose, the present invention is implemented through the following technical solutions: an assembled slope support and waterproof system, including a slope A and a foundation pit bottom B, a pier mechanism is provided at the bending point of the slope A and the foundation pit bottom B, a foundation pit bottom drainage mechanism is provided inside the foundation pit bottom B, and an assembled slope support and waterproof mechanism is provided on the side of the slope, the assembled slope support and waterproof mechanism is used to realize the assembly of the slope support and waterproof system, and the assembled slope support and waterproof mechanism includes: The prefabricated support steel plate unit is arranged on the side of the slope A, and comprises a prefabricated support steel plate, wherein longitudinal and transverse stiffening ribs are fixedly installed inside the prefabricated support steel plate, a number of welded high-strength bolts are welded at equal intervals on the edges around the upper surface of the prefabricated support steel plate, and welded metal hanging rings are welded on the four corners of the upper surface of the prefabricated support steel plate, and an integrated fixing fastener is arranged on the surface of the prefabricated support steel plate; Precast concrete support plate units are set on the side of slope A; The fixed unit is arranged inside the slope A.

[0007] Preferably, the prefabricated support steel plate connection is provided with a flexible rubber socket for the support steel plate, the surface of the prefabricated support steel plate is provided with an integrated fixing fastener, a cylindrical flexible rubber water stop ring for the support steel plate is fixedly installed in the cross seam of the prefabricated support steel plate splicing, and a slope drainage assembly is provided at the splicing of the prefabricated support steel plate.

[0008] Preferably, the precast concrete support plate unit includes a precast concrete support plate fixedly installed on the side of slope A, a plurality of precast concrete support plates are evenly spaced around the edges of the upper surface of the precast concrete support plate, and precast metal rings are fixedly installed at the four corners of the precast concrete support plate.

[0009] Preferably, the connecting assembly includes a base pad fixedly mounted on the prefabricated supporting steel plate, and a spring bar fastener is fixedly mounted on the surface of the prefabricated supporting steel plate, and the base pad and the spring bar fastener are installed in an alternate arrangement, a fixed high-strength bolt is rotatably mounted on the internal thread of the welded high-strength bolt, and the spring bar fastener slides and is clamped with the spring bar fastener and fixed by the fixed high-strength bolt, and a gasket is fixedly mounted between the contact surface of the spring bar fastener and the fixed high-strength bolt.

[0010] Preferably, the slope drainage assembly includes a slope drainage trough fixedly installed at the joint of the prefabricated supporting steel plates, a drainage hole is fixedly installed inside the slope drainage trough, a flexible rubber water stop strip is fixedly installed between the slope drainage trough and the prefabricated supporting steel plates, and a filter layer is fixedly installed on the outer circle of the drainage hole.

[0011] Preferably, the fixing unit comprises a steel pipe fixedly inserted and installed inside the slope A, the outer ring of the steel pipe is welded with four angle steel barbs, and the outer ring of the steel pipe is provided with a plurality of grouting holes.

[0012] Preferably, the fixing unit also includes a soil nail rod body fixedly inserted into the steel pipe, a plurality of soil nail rod body brackets are fixedly installed on the outer ring of the soil nail rod body, a straight thread sleeve is threadedly rotatably installed on one end of the soil nail rod body, a hook is threadedly rotatably installed on the inner thread of the straight thread sleeve, and an anti-detachment barb is fixedly installed on one end of the hook.

[0013] Preferably, the pier mechanism includes a concrete pier fixedly installed at the bend of the slope A and the bottom B of the foundation pit, a fixing ring is fixedly installed on one side of the concrete pier, a fixing hook is installed on the inner hook of the fixing ring, and a concrete pier guard plate is fixedly installed on one end of the fixing hook.

[0014] Preferably, the foundation pit bottom drainage mechanism includes a concrete grille fixedly installed inside the foundation pit bottom B, a cement brick wall is fixedly installed inside the foundation pit bottom B, and a support rod is fixedly installed between the concrete grille and the cement brick wall.

[0015] Preferably, a downcomer is inserted into the top of the slope A, a filter layer is provided at the bottom end of the downcomer and filter holes are opened, a slope top intercepting ditch is fixedly installed inside the top of the slope A, and a retaining wall is fixedly installed on the top of the slope A.

[0016] The present invention provides an assembled slope support waterproofing system. Compared with the prior art, it has the following beneficial effects: 1. The assembled slope support waterproofing system, through the combined application of support steel plates and concrete support plates, reduces the tediousness of lifting support compared to pure concrete support plates, and the concrete piers set at the bottom of the slope are conducive to assisting the slope support of the concrete support plates, thereby forming a good and stable slope support foundation, and then through integrated fixing fasteners and hooks and other components to strengthen the fixed connection, so that the slope plays a more stable role.

[0017] 2. The assembled slope support waterproofing system, through the combined application of support steel plates and concrete support plates, reduces the tediousness of lifting support compared to pure concrete support plates. The concrete piers set at the bottom of the slope are conducive to assisting the slope support of the concrete support plates, thereby forming a good and stable slope support foundation, and then strengthened and fixed connections are made through integrated fixing fasteners and hooks and other components, so that the slope plays a more stable role.

[0018] 3. The prefabricated slope support and waterproofing system strengthens the slope support system through a series of components for fixing the slope, making the prefabricated slope support structure easy to disassemble and assemble. After disassembly, the slope can maintain its original topography, which is more conducive to the backfilling of the foundation pit and avoids uneven settlement or deformation caused by the different materials of the slope and the backfill soil. It is also more conducive to the compaction of the backfill, further ensuring the safety of underground projects.

[0019] 4. The prefabricated slope support waterproof system forms a complete set of good waterproof system through slope drainage grooves, slope top intercepting ditches, retaining walls, foundation pit bottom drainage ditches and downpipes. In addition, the flexible rubber waterproof connection between the supporting steel plate and the concrete supporting plate socket prevents the erosion of the slope by external rainwater, and also avoids the influence of groundwater on the stability of the slope, thus playing a significant role in the stability of the slope support.

[0020] 5. The prefabricated slope support and waterproofing system simplifies the multi-step construction process of slope support at the construction site. Through the coordination of the lifting construction process, the slope and the support structure can be integrated to form a relatively stable and reliable support system, which has the advantages of firm installation, high strength, good integrity, not easy to damage, and drainage prevention. It is of great significance to ensure the safety of underground engineering construction and prevent the safety hazards caused by slope instability, especially for construction in rainy season and areas with high groundwater level. It has good economic recycling value. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a cross-sectional schematic diagram of the assembled slope support and waterproofing system of the present invention; Figure 2 It is a schematic plan view of the assembled slope support and waterproofing system of the present invention; Figure 3 This is a schematic diagram of the prefabricated support plates of the present invention being connected and fixed to each other; Figure 4 It is a schematic diagram of the structure of the prefabricated supporting steel plate and the concrete supporting plate of the present invention; Figure 5 It is a schematic diagram of the socket connection between the prefabricated support plates of the present invention; Figure 6 It is a schematic diagram of the structure of the cylindrical flexible rubber water stop ring at the cross intersection of the prefabricated support plate of the present invention; Figure 7 It is a schematic elevation diagram of the integrated fixing fastener connection between the prefabricated support panels of the present invention; Figure 8 It is a schematic diagram of the slope drainage trough structure of the present invention; Fig. 9 It is a structural schematic diagram of the water leakage hole of the present invention; Fig.10 It is a schematic diagram of the connection structure between the soil nail rod body and the prefabricated supporting plate of the present invention; Fig.11 It is a schematic diagram of the connection structure between the concrete pier and the concrete supporting plate of the present invention; Fig.12 It is a schematic diagram of the grouting flower tube of the present invention; Fig.13It is a side cross-sectional schematic diagram of the grouting flower tube of the present invention; Fig.14 It is a schematic diagram of the soil nail rod body of the present invention; Fig.15 It is a drainage ditch diagram at the bottom of the foundation pit of the present invention; Fig.16 It is a schematic diagram of a partial cross-sectional structure of a drainage ditch at the bottom of a foundation pit of the present invention; Fig.17 It is a schematic elevation diagram of the slope top intercepting ditch of the present invention.

[0022] In the figure: 1. Prefabricated support steel plate; 11. Longitudinal and transverse stiffening ribs; 12. Welded high-strength bolts; 13. Welded metal lifting rings; 14. Integrated fixing fasteners; 141. Fixed high-strength bolts; 142. Base pad; 143. Spring clip fasteners; 144. Gaskets; 15. Flexible rubber sockets of support steel plates; 16. Cylindrical flexible rubber water stop rings of support steel plates; 2. Prefabricated concrete support plates; 21. Embedded high-strength bolts; 22. Embedded metal sleeves; 23. Flexible rubber sockets of concrete support plates; 3. Slope drainage grooves; 31. Flexible rubber water stop strips; 32. Flexible rubber water stop rings; 33. Drain holes; 3 4. Filter layer; 4. Soil nail anchor rod; 41. Soil nail rod body; 411. Hook; 412. Straight thread sleeve; 413. Soil nail rod body bracket; 414. Anti-slip hook; 42. Grouting flower pipe; 421. Steel pipe; 422. Angle steel barb; 423. Grouting hole; 5. Concrete pier; 51. Concrete pier guard plate; 52. Fixed hook; 53. Fixed collar; 6. Drainage mechanism at the bottom of foundation pit; 61. Concrete grille; 62. Support rod; 63. Cement brick wall; 7. Cut-off ditch at the top of slope; 8. Retaining wall; 9. Downflow pipe; 91. Filter layer; 10. Groundwater level; A. Slope; B. Bottom of foundation pit. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0024] See also Figure 1-Figure 17 , the present invention provides a technical solution: An assembled slope support and waterproofing system includes a slope A and a foundation pit bottom B. A pier mechanism is provided at the bend between the slope A and the foundation pit bottom B. A foundation pit bottom drainage mechanism 6 is provided inside the foundation pit bottom B. An assembled slope support and waterproofing mechanism is provided on the side of the slope. The assembled slope support and waterproofing mechanism is used to realize the assembly of the slope support and waterproofing system. The assembled slope support and waterproofing mechanism includes: The prefabricated support steel plate unit is arranged on the side of the slope A, and comprises a prefabricated support steel plate 1, wherein longitudinal and transverse stiffening ribs 11 are fixedly installed inside the prefabricated support steel plate 1, a plurality of welded high-strength bolts 12 are welded at equal intervals around the edges of the upper surface of the prefabricated support steel plate 1, and welded metal hanging rings 13 are welded at the four corners of the upper surface of the prefabricated support steel plate 1, and an integrated fixing fastener 14 is arranged on the surface of the prefabricated support steel plate 1; Precast concrete support plate units are set on the side of slope A; The fixed unit is arranged inside the slope A.

[0025] In this embodiment, a flexible rubber socket 15 of the supporting steel plate is provided at the connection of the prefabricated supporting steel plate 1, an integrated fixing fastener 14 is provided on the surface of the prefabricated supporting steel plate 1, a cylindrical flexible rubber water-stop ring 16 of the supporting steel plate is fixedly installed in the cross seam of the prefabricated supporting steel plate 1, and a slope drainage assembly is provided at the joint of the prefabricated supporting steel plate 1.

[0026] The prefabricated supporting steel plate 1 is 3-5 cm thick, and a lifting ring is welded on the upper surface of the prefabricated supporting steel plate 1 .

[0027] In this embodiment, the precast concrete support plate unit includes a precast concrete support plate 2 fixedly installed on the side of the slope A. A number of embedded high-strength bolts 21 are evenly spaced around the edges of the upper surface of the precast concrete support plate 2, and embedded metal rings 22 are fixedly installed at the four corners of the precast concrete support plate 2.

[0028] The precast concrete support plate 2 is 8-10cm thick, and a lifting ring is welded on the upper surface of the precast support steel plate 1, and a sleeve is embedded on the lower surface of the precast support steel plate 1. The sleeves embedded on the lower surface of the precast concrete support plate 2 are the same. The sleeves embedded on the lower surfaces of the precast support steel plate 1 and the precast concrete support plate 2 are connected to the hooks 411 on the slope soil nail rod 41; the concrete pier 5 at the bottom of the slope foot cooperates with the precast concrete support plate 2 to embed fixed sleeves 53 at equal intervals, and the concrete pier guard plate 51 at the bottom of the slope is embedded with fixed hooks 52, which are hung with the fixed hooks 52 on the concrete pier 5, and the concrete pier guard plate 51 has the same structure as the concrete support plate 2.

[0029] In this embodiment, the connecting assembly includes a base pad 142 fixedly installed on the prefabricated supporting steel plate 1, and a spring bar fastener 143 is fixedly installed on the surface of the prefabricated supporting steel plate 1, and the base pad 142 and the spring bar fastener 143 are installed in an alternate arrangement, and the internal thread of the welded high-strength bolt 12 is rotatably installed with a fixed high-strength bolt 141, and the spring bar fastener 143 slides and is clamped with the spring bar fastener 143 and fixed by the fixed high-strength bolt 141, and a gasket 144 is fixedly installed between the contact surface of the spring bar fastener 143 and the fixed high-strength bolt 141.

[0030] In this embodiment, the slope drainage assembly includes a slope drainage groove 3 fixedly installed at the joint of the prefabricated supporting steel plate 1, a drainage hole 33 is fixedly installed inside the slope drainage groove 3, a flexible rubber water stop strip 31 is fixedly installed between the slope drainage groove 3 and the prefabricated supporting steel plate 1, and a filter layer 34 is fixedly installed on the outer circle of the drainage hole 33.

[0031] The thickness of the slope drainage trough 3 is 3-5cm, and the thickness of the concrete water tank is 8-10cm; the internal corners of the water tank are prefabricated into a rounded chamfer shape, and the connection between the water tank and the prefabricated supporting steel plate 1 is sloped; a flexible rubber water stop strip 31 is added at the overlap of the water tank and the prefabricated supporting steel plate 1, and a flexible rubber socket waterproof setting is also adopted at the connection between the water tanks.

[0032] In this embodiment, the fixing unit includes a steel pipe 421 fixedly inserted and installed inside the slope A. Four angle steel barbs 422 are welded and installed on the outer ring of the steel pipe 421 . A plurality of grouting holes 423 are opened on the outer ring of the steel pipe 421 .

[0033] The non-perforated portion of the grouting flower tube 42 is not less than one third of the total length, and the angle steel barb 422 is connected to the grouting flower tube 42 by spot welding.

[0034] In this embodiment, the fixing unit also includes a soil nail rod body fixedly inserted into the inside of the steel pipe, a plurality of soil nail rod brackets are fixedly installed on the outer ring of the soil nail rod body, a straight thread sleeve is threadedly installed on one end of the soil nail rod body, a hook is threadedly installed on the inner thread of the straight thread sleeve, and an anti-slip barb is fixedly installed on one end of the hook.

[0035] The soil nail rod support 413 at each point is made of three φ6 steel bars of the foundation pit bottom drainage mechanism 6, wherein an anti-drop barb 414 is added to the hook 411, and the connection between the hook 411 and the soil nail rod 41 is threaded for easy connection with the straight thread sleeve 412.

[0036] In this embodiment, the pier mechanism includes a concrete pier 5 fixedly installed at the bending point of the slope A and the bottom of the foundation pit B, a fixed ring 53 is fixedly installed on one side of the concrete pier 5, a fixed hook 52 is installed on the inner hook of the fixed ring 53, and a concrete pier guard plate 51 is fixedly installed on one end of the fixed hook 52.

[0037] The C25 strength concrete pier 5 is consistent with the angle of the slope A, has an irregular shape and is close to the slope A, has a width and height of about 50 cm, and the contact surface with the concrete pier guard plate 51 is set to form an inclined plane; the concrete pier 5 is connected to the slope soil nail rod body 41 and the pit bottom soil nail rod body 41 by direct embedded anchor fixation.

[0038] In this embodiment, the foundation pit bottom drainage mechanism 6 includes a concrete grille 61 fixedly installed inside the foundation pit bottom B, a cement brick wall 63 is fixedly installed inside the foundation pit bottom B, and a support rod 62 is fixedly installed between the concrete grille 61 and the cement brick wall 63.

[0039] The side of the foundation pit bottom drainage mechanism 6 close to the slope is a C20 plain concrete side wall, which is arranged in a grid-like manner at the connection position with the precast concrete support plate 2. The rest is constructed by cement bricks and plastered with cement mortar. Steel support rods are arranged on the inner side of the cement brick wall 63 for reinforcement.

[0040] In this embodiment, a downpipe 9 is inserted and installed at the top of the slope A, a filter layer 34 is provided at the bottom end of the downpipe 9 and filter holes are opened, a slope top intercepting ditch 7 is fixedly installed inside the top of the slope A, and a retaining wall 8 is fixedly installed at the top of the slope A.

[0041] The slope top intercepting ditch 7 is composed of cement brickwork and two-to-one cement mortar plastering.

[0042] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.

[0043] During the work, firstly, a primary slope or a multi-level slope is set according to the actual excavation depth and soil conditions of the foundation pit site, and the foundation pit is excavated and the slope is trimmed according to the geological conditions shown by the geological survey, and a reasonable slope is set, and at the same time, the prefabricated assembled support waterproofing board and the connection components are made; the first preliminary work is to set the downpipe 9 on the slope A, at least to lower the water to 50cm below the bottom of the foundation pit, and after the preliminary excavation is completed, the retaining wall 8 on the top of the slope, the intercepting ditch 7 on the top of the slope and the drainage mechanism 6 at the bottom of the foundation pit are constructed, and the drainage mechanism 6 at the bottom of the foundation pit is provided with support rods 62; Secondly, the slope is excavated and supported in sections. After the slope is excavated and trimmed, the grouting flower pipe 42 and soil nail rod 41 are operated on the slope, gradually from the bottom of the foundation pit to the top of the slope. After the grouting flower pipe 42 and soil nail rod 41 at the bottom of the slope are completed, they are anchored into the concrete pier 5 of the foundation pit foot cast by the formwork. After the segmented grouting flower pipe 42 and soil nail rod 41 are completed, the straight threaded sleeve 412 and hook 411 at the end of the soil nail rod 41 are installed, the hook is tightened and pushed into the soil through a special jacking device, leaving only the hook part outside to facilitate the hanging of the support plate, and then cement slurry is injected into the grouting flower pipe 42; Furthermore, after the slurry in the grouting flower tube 42 reaches a certain strength requirement, it is hoisted by mechanical hoisting through the metal hoisting ring on the supporting plate. The first plate is first installed with the precast concrete supporting plate 2 at the bottom of the slope, which is connected to the drainage ditch at the bottom of the foundation pit and used as a supporting point. At the same time, the hook on the lower surface of the concrete pier guard plate 51 is hung with the fixed ring 53 on the concrete pier 5, and the other end of the concrete pier guard plate 51 is placed on the inclined plane of the concrete pier 5 to form a fixed form. Then the upper precast concrete supporting plate 2 is installed, and the flexible rubber sockets between the plates are used to make a dense connection, and the precast concrete supporting plate 2 is lowered. The surface collar is connected to the hook 411 on the soil nail rod 41; at this time, the prefabricated base pad 142 spring fastener 143 is staggeredly installed on the upper surface of the precast concrete support plate 2 through the pre-embedded high-strength bolts 21, and the 3 between the plates can also be installed, and a flexible rubber water stop strip 31 is set between 3 and the precast concrete support plate 2, which is also staggered and fastened by the integrated fixing fastener 14, especially after a cylindrical flexible rubber water stop ring 32 is added at the cross intersection of the precast concrete support plate 2, a drainage hole 33 is pre-buried at the place where 3 is close to the slope, a flexible rubber water stop ring 32 is added between the drainage hole 33 and 3, and an anti-filter layer 34 is pre-buried in the slope soil; Afterwards, the upper prefabricated support steel plate 1 is installed, and the connection between the support steel plate and 2 adopts a socket-type flexible rubber waterproof interface, and the part of the concrete support plate at this connection position that is wider than the support steel plate is set in a slope form to facilitate drainage. In addition, the support steel plate is connected to the hook on the soil nail rod 41 in time, and the prefabricated fixing fasteners are staggeredly installed on the upper surface of the support steel plate by welding fixed high-strength bolts 141, and then 3 between the plates is installed, and a flexible rubber water stop strip 31 is set between 3 and the support steel plate, which is also staggered and fastened by fixing fasteners, especially after a cylindrical flexible rubber water stop ring 32 is added at the cross intersection of the support steel plate, a drainage hole 33 is pre-buried at the place where 3 is close to the slope, a flexible rubber water stop ring 32 is added between the drainage hole 33 and the drainage ditch, and an anti-filter layer 34 is pre-buried in the slope soil; Finally, the support steel plates installed in sections are operated in sequence according to the process. After the operation is completed, an overall inspection of the slope support and waterproofing system is carried out to prevent water leakage at each node. After the construction of the underground infrastructure is completed, the support plates and the connecting parts of each node are removed from top to bottom.

[0044] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0045] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An assembled slope support and waterproofing system, comprising a slope A and a foundation pit bottom B, Features: A buttress mechanism is provided at the bend between the side slope A and the foundation pit bottom B, a foundation pit bottom drainage mechanism (6) is provided inside the foundation pit bottom B, and an assembled side slope support and waterproof mechanism is provided on the side of the side slope. The assembled side slope support and waterproof mechanism is used to realize the assembly of the side slope support and waterproof system. The assembled side slope support and waterproof mechanism includes: A prefabricated support steel plate unit is arranged on the side of the slope A, comprising a prefabricated support steel plate (1), wherein longitudinal and transverse stiffening ribs (11) are fixedly installed inside the prefabricated support steel plate (1), a plurality of welded high-strength bolts (12) are welded at equal intervals around the edges of the upper surface of the prefabricated support steel plate (1), and welded metal hanging rings (13) are welded at the four corners of the upper surface of the prefabricated support steel plate (1), and an integrated fixing fastener (14) is arranged on the surface of the prefabricated support steel plate (1); Precast concrete support plate units are set on the side of slope A; The fixed unit is arranged inside the slope A.

2. The assembled slope support and waterproofing system according to claim 1, Features: The connection of the prefabricated support steel plate (1) is provided with a support steel plate flexible rubber socket (15), the surface of the prefabricated support steel plate (1) is provided with an integrated fixing fastener (14), a support steel plate cylindrical flexible rubber water stop ring (16) is fixedly installed in the cross seam of the prefabricated support steel plate (1), and the prefabricated support steel plate (1) is provided with a slope drainage component at the splicing point.

3. The assembled slope support and waterproofing system according to claim 1, Features: The precast concrete support plate unit comprises a precast concrete support plate (2) fixedly mounted on the side of the slope A, a plurality of precast high-strength bolts (21) are arranged at equal intervals around the edges of the upper surface of the precast concrete support plate (2), and precast metal collars (22) are fixedly mounted on the four corners of the precast concrete support plate (2).

4. The assembled slope support and waterproofing system according to claim 2, Features: The connection assembly comprises a base pad (142) fixedly mounted on the prefabricated support steel plate (1), and a spring clip fastener (143) is fixedly mounted on the surface of the prefabricated support steel plate (1), and the base pad (142) and the spring clip fastener (143) are installed in a staggered arrangement, the internal thread of the welded high-strength bolt (12) is rotatably mounted with a fixed high-strength bolt (141), and the spring clip fastener (143) is slidably engaged with the spring clip fastener (143) and fixed by the fixed high-strength bolt (141), and a gasket (144) is fixedly mounted between the contact surface of the spring clip fastener (143) and the fixed high-strength bolt (141).

5. The assembled slope support and waterproofing system according to claim 2, Features: The slope drainage assembly comprises a slope drainage groove (3) fixedly installed at the joint of the prefabricated supporting steel plate (1), a drainage hole (33) fixedly installed inside the slope drainage groove (3), a flexible rubber water stop strip (31) fixedly installed between the slope drainage groove (3) and the prefabricated supporting steel plate (1), and an anti-filter layer (34) fixedly installed on the outer ring of the drainage hole (33).

6. The assembled slope support and waterproofing system according to claim 1, Features: The fixing unit comprises a steel pipe (421) fixedly inserted and installed inside the slope A, the outer ring of the steel pipe (421) is welded with four angle steel barbs (422), and the outer ring of the steel pipe (421) is provided with a plurality of grouting holes (423).

7. The assembled slope support and waterproofing system according to claim 6, Features: The fixing unit also includes a soil nail rod body (41) fixedly inserted into the steel pipe (421), a plurality of soil nail rod body brackets (413) being fixedly mounted on the outer ring of the soil nail rod body (41), a straight thread sleeve (412) being threadedly mounted on one end of the soil nail rod body (41), a hook (411) being threadedly mounted on the inner thread of the straight thread sleeve (412), and an anti-drop barb (414) being fixedly mounted on one end of the hook (411).

8. The assembled slope support and waterproofing system according to claim 1, Features: The buttress mechanism comprises a concrete buttress (5) fixedly mounted at the bend of the side slope A and the foundation pit bottom B, a fixing collar (53) fixedly mounted on one side of the concrete buttress (5), a fixing hook (52) mounted inside the fixing collar (53), and a concrete buttress guard plate (51) fixedly mounted on one end of the fixing hook (52).

9. The assembled slope support and waterproofing system according to claim 1, Features: The foundation pit bottom drainage mechanism (6) comprises a concrete grille (61) fixedly installed inside the foundation pit bottom B, a cement brick wall (63) is fixedly installed inside the foundation pit bottom B, and a support rod (62) is fixedly installed between the concrete grille (61) and the cement brick wall (63).

10. The assembled slope support and waterproofing system according to claim 1, Features: A downcomer (9) is inserted into the top of the slope A, a filter layer (34) is provided at the bottom end of the downcomer (9) and filter holes are provided, a slope top intercepting ditch (7) is fixedly installed inside the top of the slope A, and a water retaining wall (8) is fixedly installed on the top of the slope A.