Land LNG (Liquefied Natural Gas) double-loading-arm precise positioning butt joint system and butt joint method

By setting cameras and markers on the LNG dual-installation arm and using PLC and D-H methods for step-by-step positioning, the problem of low docking accuracy in the existing technology is solved, and higher docking accuracy and success rate are achieved, and the The smoothness of the loading arm and the service life of the motor.

CN118959853AActive Publication Date: 2024-11-15CHINA PETROLEUM & CHEMICAL CORP +1
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202411010527.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-11-15
Estimated Expiration
2044-07-26

AI Technical Summary

Technical Problem

The existing LNG double-installed car arms have low accuracy when docking and positioning, which can easily lead to docking errors.

Method used

The onshore LNG double-installed vehicle arm fine positioning docking system and method are adopted to set up cameras and markers at the ends of liquid and gas-phase arms, and coordinate systems are established using PLC control and D-H method, and move to the virtual flange position in steps, combining with Positioning of column cameras and liquid phase cameras gradually realizes docking and improves docking accuracy.

Benefits of technology

The docking accuracy is improved, and the guide rod first touches the tank flange, which improves the docking success rate, and extends the service life through smooth motion trajectory and reasonable motor control, reducing energy consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118959853A_ABST
    Figure CN118959853A_ABST
Patent Text Reader

Abstract

The invention discloses an onshore LNG double-loading-arm fine positioning butt joint system which comprises LNG double loading arms, a stand column camera is arranged on the upper portion of a supporting stand column, a liquid-phase camera and a liquid-phase marker are arranged on a hard pipe at the tail end of a liquid-phase arm, and a gas-phase camera and a gas-phase marker are arranged on a hard pipe at the tail end of a gas-phase arm; a liquid phase arm flange used for being in butt joint with a tank car liquid phase flange is arranged at the tail end of the liquid phase arm, and a gas phase arm flange used for being in butt joint with a tank car gas phase flange is arranged at the tail end of the gas phase arm. The invention further discloses a precise positioning and butt joint method for the onshore LNG double loading arms. According to the method, the position of the first virtual flange serves as a rough positioning end point, the three virtual flanges are arranged behind the first virtual flange in the direction of the central axis of the tank car liquid phase flange to serve as transition positions for precise positioning step-by-step butt joint, multi-step control step-by-step butt joint in the precise positioning process is achieved through step-by-step positioning butt joint, and the butt joint precision is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of LNG loading arm docking, and in particular relates to an onshore LNG double loading arm precise positioning docking system and a docking method. Background Art

[0002] When loading and unloading at the LNG receiving station, it is necessary to use LNG double loading arms, where the structure of the LNG double loading arm includes a support column and a liquid phase arm and a gas phase arm installed on the support column. The liquid phase arm and the gas phase arm include five joints and five hard pipes respectively. Each joint is driven by a servo motor. The structural principles of each joint are the same, mainly including a servo motor, a reducer, a driving gear and a driven gear. Each servo motor has a built-in explosion-proof encoder, which can transmit the movement angle of each joint to the upper computer in real time. When loading and unloading, the control system controls the liquid phase arm to reach the position of the liquid phase flange of the tank truck through the corresponding actuator to complete the docking, or controls the gas phase arm to reach the position of the gas phase flange of the tank truck to complete the docking.

[0003] At present, the docking between the LNG double loading arm and the target flange at the rear of the tank truck is mostly completed through rough positioning and fine positioning. After the rough positioning is completed, the fine positioning is completed by one-step motion control, that is, from the end point of the rough positioning to the tank truck target flange position, the loading arm is controlled to move to the tank truck target flange position in one time. This one-step motion control fine positioning docking method has the defect of low docking positioning accuracy and is prone to docking errors.

[0004] Based on the above problems, this application proposes an onshore LNG double loading arm precision positioning docking system and docking method to achieve multi-step controlled gradual docking between the LNG double loading arm and the target flange at the rear of the tank truck after rough positioning, thereby improving the docking accuracy. Summary of the invention

[0005] The purpose of the present invention is to overcome the above-mentioned deficiencies of the prior art and to provide an onshore LNG double loading arm precise positioning docking system and docking method.

[0006] To achieve the above object, the present invention adopts the following technical solution:

[0007] A land-based LNG double loading arm precision positioning docking system comprises a LNG double loading arm, the LNG double loading arm comprises a supporting column and a liquid phase arm and a gas phase arm mounted on the supporting column, the liquid phase arm and the gas phase arm respectively comprise five joints and five hard pipes, each joint being driven by a servo motor; a column camera is arranged on the upper portion of the supporting column, a liquid phase camera and a liquid phase marker are arranged on the hard pipe at the end of the liquid phase arm, and a gas phase camera and a gas phase marker are arranged on the hard pipe at the end of the gas phase arm; a liquid phase arm flange for docking with a liquid phase flange of a tank truck is arranged at the end of the liquid phase arm, and a gas phase arm flange for docking with a gas phase flange of a tank truck is arranged at the end of the gas phase arm.

[0008] The invention also discloses a method for precisely positioning and docking double-loading arms of LNG on land.

[0009] A land LNG double loading vehicle arm precise positioning docking method is implemented by using a land LNG double loading vehicle arm precise positioning docking system, comprising the following steps:

[0010] For the Liquid Phase Arm:

[0011] Step 1: determine four virtual flanges between the end of the liquid phase arm and the liquid phase flange of the tank truck along the central axis direction of the liquid phase flange of the tank truck. The position of the first virtual flange is the end point of the rough positioning, and the positions of the remaining three virtual flanges and the liquid phase flange of the tank truck are the target positions of the liquid phase arm precise positioning step-by-step movement;

[0012] Step 2, controlling the end of the liquid phase arm to move to the first virtual flange position through PLC;

[0013] Step 3, the liquid phase arm remains stationary, the column camera photographs the liquid phase marker, and the liquid phase camera photographs the liquid phase flange of the tank truck at the same time, and the column camera positions the liquid phase flange of the tank truck based on the two photos taken at the same time;

[0014] Step 4, establishing the liquid phase arm coordinate system based on the DH method;

[0015] Step 5, using i to represent the sequence number, let i=2;

[0016] Step 6: Read the current angle value of each joint of the liquid phase arm and calculate the homogeneous transformation matrix of each joint Get the position matrix of the liquid phase arm end coordinate system relative to the earth coordinate system As shown in formula (1):

[0017]

[0018] Step 7: Collect the position matrix of the tank truck's liquid phase flange relative to the liquid phase arm end coordinate system based on the column camera

[0019] Step 8: According to the pose matrix of the liquid phase arm end coordinate system relative to the earth coordinate system Combined with the position matrix of the tank truck liquid phase flange relative to the liquid phase arm end coordinate system Calculate the position matrix of the tank truck liquid phase flange relative to the geodetic coordinate system As shown in formula (2);

[0020]

[0021] Step 9: Pose matrix based on target position i Calculate the pose matrix of target position i with respect to the earth coordinate system As shown in formula (3);

[0022]

[0023] Step 10, inversely solve to obtain the angles of each joint when the end of the liquid phase arm reaches the target position i;

[0024] Step 11, controlling the end of the liquid phase arm to move from the current position to the target position i through PLC;

[0025] Step 12, obtaining the distance between the current end of the liquid phase arm and the target position i through the column camera;

[0026] If the distance between the end of the current liquid phase arm and the target position i is less than the error setting value, the liquid phase arm reaches the target position i, and then enters step 13;

[0027] Otherwise, repeat steps 6 to 12;

[0028] Step 13, when i<5, set i=i+1, take the position of the end of the liquid phase arm as the current position, and repeat steps 6 to 12;

[0029] Otherwise, the docking operation is terminated;

[0030] For the gas phase arm, the process is the same as above.

[0031] Preferably, in step 1, the pose matrix of the first virtual flange is The first virtual flange position is a position 250 mm away from the tank truck liquid phase flange plane along the center axis of the tank truck liquid phase flange;

[0032] The pose matrix of the second virtual flange is The second virtual flange position is a position 150 mm away from the tank truck liquid phase flange plane along the center axis of the tank truck liquid phase flange;

[0033] The pose matrix of the third virtual flange is The third virtual flange position is a position 100 mm away from the tank truck liquid phase flange plane along the center axis of the tank truck liquid phase flange;

[0034] The pose matrix of the fourth virtual flange is The fourth virtual flange position is a position 50 mm away from the tank truck liquid phase flange plane along the center axis of the tank truck liquid phase flange;

[0035] The position matrix of the tank truck liquid phase flange is:

[0036] Preferably, step 10 uses Newton's iteration method to solve inverse kinematics.

[0037] Preferably, the step 11 includes the following sub-steps:

[0038] Step 11.1, calculate the difference between the current joint angle and the corresponding joint angle at the target position i, and record it as the joint angle difference;

[0039] Step 11.2, setting the ratio of the joint speeds to the ratio of the joint angle differences to be consistent, and determining the speed of the corresponding servo motor according to the ratio of the joint speeds;

[0040] Step 11.3, driving the liquid phase arm to move for a time t according to the rotation speed of each servo motor;

[0041] Preferably, in step 11.3, t is 0.5 s.

[0042] Preferably, in step 12, the error setting value is 0.1 mm.

[0043] The beneficial effects of the present invention are:

[0044] (1) The present invention uses the first virtual flange position as the rough positioning end point, and sets three virtual flanges along the central axis direction of the tank car liquid phase flange after the first virtual flange as transition positions for precise positioning step-by-step docking, wherein the step-by-step positioning docking realizes multi-step control and gradual docking in the precise positioning process, thereby improving docking accuracy.

[0045] (2) The present invention sets a virtual flange along the central axis of the tank truck's liquid phase flange, so that the liquid phase arm and the tank truck's liquid phase flange are first aligned during the step-by-step docking process; during the final docking, if the alignment is not performed first, the guide rod will touch the tank truck's liquid phase flange first. When the guide rod touches the tank truck's liquid phase flange first, the liquid phase arm will no longer be able to move, ultimately leading to docking failure. The present application sets a virtual flange along the central axis of the tank truck's liquid phase flange, so that the guide rod will touch the tank truck's liquid phase flange first by first performing the alignment, thereby improving the docking success rate.

[0046] (3) In the present invention, three virtual flanges are set along the central axis direction of the tank truck's liquid phase flange after the first virtual flange as transition positions for precise positioning and step-by-step docking. When controlling from the current position to the target position, after the current angle of each joint and the angle of each joint at the corresponding target position are determined, the planned trajectory is realized by controlling the speed of each joint. This control method can make the loading arm movement smoother, avoid jamming during the movement process and frequent starting and stopping of the motor, increase the service life of the motor, and avoid energy loss.

[0047] (4) In the present invention, after the liquid phase arm reaches the first virtual flange and completes the rough positioning, the column camera photographs the liquid phase marker while the liquid phase arm is stationary, and at the same time, the liquid phase camera photographs the liquid phase flange of the tank truck, and the column camera positions the liquid phase flange based on the two photos taken at the same time; since the liquid phase arm is in a stationary state, the two pictures collected by the two cameras are pictures at the same time, which avoids the time asynchronism during dynamic collection and enables more accurate positioning. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] The drawings in the specification, which constitute a part of the present application, are used to provide further understanding of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute improper limitations on the present application.

[0049] Figure 1 It is a structural schematic diagram of the onshore LNG double loading vehicle arm precise positioning docking system of the present invention.

[0050] Figure 2 It is a schematic diagram of the angle between the gas phase III hard tube and the gas phase IV joint of the gas phase arm;

[0051] Figure 3 It is a schematic diagram of the angle between the liquid phase III hard tube and the liquid phase IV joint of the liquid phase arm;

[0052] Figure 4 It is a schematic diagram of the liquid phase arm flange and the tank truck liquid phase flange.

[0053] Figure 5 It is a schematic diagram of the liquid phase arm DH coordinate system of the present invention.

[0054] Figure 6 It is a schematic flow chart of the onshore LNG double loading vehicle arm precise positioning docking method of the present invention.

[0055] in:

[0056] 1- Support column;

[0057] 2-liquid phase arm, 21-liquid phase I joint, 22-liquid phase I hard tube, 23-liquid phase III hard tube, 24-liquid phase IV joint, 25-liquid phase II joint, 26-liquid phase II hard tube, 27-liquid phase III joint, 28-liquid phase V joint, 29-liquid phase V hard tube, 210-liquid phase IV hard tube;

[0058] 3-gas phase arm, 31-gas phase I joint, 32-gas phase I hard tube, 33-gas phase III hard tube, 34-gas phase IV joint, 35-gas phase II joint, 36-gas phase II hard tube, 37-gas phase III joint, 38-gas phase V joint, 39-gas phase V hard tube, 310-gas phase IV hard tube;

[0059] 4-liquid phase actuator, 41-liquid phase arm flange, 42-guide rod, 5-gas phase actuator;

[0060] 6- Tank car liquid phase flange;

[0061] 71 - gas phase camera, 72 - gas phase marker, 73 - liquid phase camera, 74 - liquid phase marker, 75 - column camera. DETAILED DESCRIPTION

[0062] It should be noted that the following detailed descriptions are illustrative and are intended to provide further explanation of the present application. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present application belongs.

[0063] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0064] In the present invention, the directions or positional relationships indicated by terms such as "upper", "lower", "bottom", "top", etc. are based on the directions or positional relationships shown in the accompanying drawings. They are relational words determined only for the convenience of describing the structural relationships of the various parts or elements of the present invention. They do not specifically refer to any part or element in the present invention and cannot be understood as limitations on the present invention.

[0065] In the present invention, terms such as "connected" and "connection" should be understood in a broad sense, indicating that the connection can be fixed, integral or detachable; it can be directly connected or indirectly connected through an intermediate medium. Relevant scientific research or technical personnel in this field can determine the specific meaning of the above terms in the present invention according to specific circumstances, and they should not be understood as limiting the present invention.

[0066] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0067] Embodiment 1:

[0068] An onshore LNG double loading arm precision positioning docking system includes a LNG double loading arm, such as Figure 1-3As shown, the LNG double loading arm includes a support column 1 and a liquid phase arm 2 and a gas phase arm 3 installed on the support column 1. The liquid phase arm 2 and the gas phase arm 3 respectively include five joints and five hard pipes, and each joint is driven by a servo motor; a column camera 75 is arranged on the upper part of the support column 1, a liquid phase camera 73 and a liquid phase marker 74 are arranged on the hard pipe at the end of the liquid phase arm 2, and a gas phase camera 71 and a gas phase marker 72 are arranged on the hard pipe at the end of the gas phase arm 3; a liquid phase arm flange 41 for docking with the liquid phase flange 6 of the tank truck is arranged at the end of the gas phase arm 3, and a gas phase arm flange for docking with the gas phase flange of the tank truck is arranged at the end of the gas phase arm 3. The radial outer sides of the liquid phase arm flange 41 and the radial outer sides of the gas phase arm flange are both arranged with guide rods 42 for centering.

[0069] Specifically, the liquid phase arm 2 includes a liquid phase I joint 21, a liquid phase I hard tube 22, a liquid phase II joint 25, a liquid phase II hard tube 26, a liquid phase III joint 27, a liquid phase III hard tube 23, a liquid phase IV joint 24, a liquid phase IV hard tube 210, a liquid phase V joint 28, a liquid phase V hard tube 29 and a liquid phase actuator 4 connected in sequence, and a liquid phase camera 73 and a liquid phase marker 74 are arranged on the liquid phase V hard tube 29; the gas phase arm 3 includes a gas phase I joint 31, a gas phase I hard tube 32, a gas phase II joint 35, a gas phase II hard tube 36, a gas phase III joint 37, a gas phase III hard tube 33, a gas phase IV joint 34, a gas phase IV hard tube 310, a gas phase V joint 38, a gas phase V hard tube 39 and a gas phase actuator 5 connected in sequence, and a gas phase camera 71 and a gas phase marker 72 are arranged on the gas phase V hard tube 39.

[0070] like Figure 4 As shown, the liquid phase actuator 4 docks the liquid phase arm flange 41 with the tank truck liquid phase flange 6 by rotating the joints of the liquid phase arm 2. Similarly, the gas phase actuator 5 docks the gas phase arm flange with the tank truck gas phase flange by rotating the joints of the gas phase arm 3.

[0071] Embodiment 2:

[0072] A land LNG double loading vehicle arm precise positioning docking method is implemented using the land LNG double loading vehicle arm precise positioning docking system in Example 1, such as Figure 6 As shown, the following steps are included:

[0073] For the Liquid Phase Arm:

[0074] Step 1: Determine four virtual flanges between the end of the liquid phase arm and the liquid phase flange 6 of the tank truck along the central axis of the liquid phase flange of the tank truck. The position of the first virtual flange is the end point of the rough positioning, and the remaining three virtual flanges and the position of the liquid phase flange of the tank truck are the target positions of the liquid phase arm precise positioning step-by-step movement;

[0075] Specifically, in step 1, the pose matrix of the first virtual flange is The first virtual flange position is a position 250 mm away from the tank truck liquid phase flange plane along the center axis of the tank truck liquid phase flange;

[0076] Specifically, in step 1, the pose matrix of the second virtual flange is The second virtual flange position is a position 150 mm away from the tank truck liquid phase flange plane along the center axis of the tank truck liquid phase flange;

[0077] Specifically, in step 1, the pose matrix of the third virtual flange is The third virtual flange position is a position 100 mm away from the tank truck liquid phase flange plane along the center axis of the tank truck liquid phase flange;

[0078] Specifically, in step 1, the pose matrix of the fourth virtual flange is The fourth virtual flange position is a position 50 mm away from the tank truck liquid phase flange plane along the center axis of the tank truck liquid phase flange;

[0079] Specifically, in step 1, the posture matrix of the tank truck liquid phase flange 6 is

[0080] In the present application, the first virtual flange position is used as the rough positioning end point, and three virtual flanges are set after the first virtual flange along the central axis direction of the tank truck liquid phase flange as transition positions for precise positioning and step-by-step docking, wherein the step-by-step positioning docking realizes multi-step control and step-by-step docking in the precise positioning process, thereby improving the docking accuracy.

[0081] In addition, the method of setting a virtual flange along the central axis direction of the tank truck liquid phase flange enables the alignment between the liquid phase arm 2 and the tank truck liquid phase flange 6 to be first achieved during the step-by-step docking process. In the final docking, if the alignment is not performed first, the guide rod 42 will touch the tank truck liquid phase flange 6 first. When the guide rod 42 touches the tank truck liquid phase flange 6 first, the liquid phase arm 2 will no longer be able to move, and eventually the docking will fail. The method of setting a virtual flange along the central axis direction of the tank truck liquid phase flange of the present application avoids the occurrence of the guide rod 42 touching the tank truck liquid phase flange 6 first by first aligning, thereby improving the success rate of docking.

[0082] Step 2, controlling the end of the liquid phase arm to move to the first virtual flange position by PLC, that is, completing the rough positioning, wherein the specific implementation method of controlling the end of the liquid phase arm to move to the first virtual flange position by PLC is the prior art, and its specific implementation method will not be repeated here;

[0083] Step 3, the liquid phase arm remains stationary, the column camera 75 photographs the liquid phase marker 74, and the liquid phase camera 73 photographs the tank truck liquid phase flange 6, and the column camera 75 positions the tank truck liquid phase flange 6 based on the two photographs taken simultaneously;

[0084] In the present application, the first virtual flange position satisfies that the liquid phase camera 73 can take a picture of the tank truck liquid phase flange 6 and the column camera 75 can take a picture of the liquid phase marker 74;

[0085] During the shooting process of each camera at the first virtual flange position, the liquid phase arm 2 is in a stationary state, and the two images collected by the two cameras are images at the same time, which avoids the time asynchrony during dynamic collection and enables more accurate positioning;

[0086] Step 4, establishing the liquid phase arm coordinate system based on the DH method;

[0087] Taking the liquid phase arm as an example, the loading arm coordinate system is established based on the DH method. Figure 3 It can be known that the end of the liquid phase V hard tube 29 of the present invention is fixedly connected with a liquid phase actuator 4, and a liquid phase arm flange 41 is fixedly connected in the liquid phase actuator 4. The present invention adds a virtual rotation joint between the liquid phase actuator 4 and the liquid phase arm flange 41, so that the liquid phase arm flange 41 can be virtually rotated around the axis of the liquid phase actuator 4, and further virtualizes the liquid phase arm flange 41 as an independent liquid phase arm flange joint, and establishes an independent liquid phase arm flange joint coordinate system, and the Z axis of the liquid phase arm flange joint coordinate system is collinear with the axis of the liquid phase actuator 4; in this application, the liquid phase arm 2 is a series open-chain robotic arm, and the three-dimensional model of the liquid phase arm 2 is simplified. The liquid phase arm joint is replaced by a pie column, and the liquid phase arm hard tube is replaced by a cylindrical connecting rod, so as to facilitate the study of the actual liquid phase arm 2. The coordinate system established by the present invention is as follows Figure 5 As shown, it includes a 0-link coordinate system, a 1-link coordinate system, a 2-link coordinate system, a 3-link coordinate system, a 4-link coordinate system, a 5-link coordinate system, and a 6-link coordinate system which are established in sequence from the end of the support column 1 to the end of the liquid phase arm.

[0088] Step 5, using i to represent the sequence number, let i=2;

[0089] Step 6: Read the current angle value of each joint of the liquid phase arm and calculate the pose matrix of the liquid phase arm end coordinate system relative to the earth coordinate system.

[0090] Specifically, read the current angle value of each joint of the liquid phase arm 2 and calculate the homogeneous transformation matrix of each joint Then calculate the pose matrix of the liquid phase arm end coordinate system relative to the earth coordinate system As shown in formula (1):

[0091]

[0092] in is the homogeneous transformation matrix between the 1-link coordinate system and the 0-link coordinate system, is the homogeneous transformation matrix between the 2-link coordinate system and the 1-link coordinate system, is the homogeneous transformation matrix between the 3-link coordinate system and the 2-link coordinate system, is the homogeneous transformation matrix between the 4-link coordinate system and the 3-link coordinate system, is the homogeneous transformation matrix between the 5-link coordinate system and the 4-link coordinate system, is the homogeneous transformation matrix between the 6-link coordinate system and the 5-link coordinate system;

[0093] Step 7: Based on the column camera 75, the position matrix of the tank truck liquid phase flange 6 relative to the liquid phase arm end coordinate system is collected.

[0094] Step 8: According to the pose matrix of the liquid phase arm end coordinate system relative to the earth coordinate system Combined with the position matrix of the tank truck liquid phase flange 6 relative to the liquid phase arm end coordinate system Calculate the position matrix of the tank truck liquid phase flange 6 relative to the geodetic coordinate system As shown in formula (2);

[0095]

[0096] Step 9: Pose matrix based on target position i Calculate the pose matrix of target position i with respect to the earth coordinate system As shown in formula (3);

[0097]

[0098] Step 10, inversely solve to obtain the angles of each joint when the end of the liquid phase arm reaches the target position i;

[0099] Specifically, step 10 uses Newton's iteration method to solve inverse kinematics; the specific inverse solution method is prior art and will not be described in detail here;

[0100] Step 11, controlling the end of the liquid phase arm to move from the current position to the target position i through PLC;

[0101] Specifically, the step 11 includes the following sub-steps:

[0102] Step 11.1, calculate the difference between the current joint angle and the corresponding joint angle at the target position i, and record it as the joint angle difference;

[0103] Step 11.2, setting the ratio of the joint speeds to the ratio of the joint angle differences to be consistent, and determining the speed of the corresponding servo motor according to the ratio of the joint speeds;

[0104] Step 11.3, driving the liquid phase arm to move for a time t according to the rotation speed of each servo motor;

[0105] Specifically, in step 11.3, t is 0.5s;

[0106] Step 12, obtaining the distance between the current end of the liquid phase arm and the target position i through the column camera 75;

[0107] If the distance between the end of the current liquid phase arm and the target position i is less than the error setting value, the liquid phase arm reaches the target position i, and then enters step 13;

[0108] Otherwise, repeat steps 6 to 12;

[0109] Specifically, in step 12, the error setting value is 0.1 mm.

[0110] Step 13, when i<5, set i=i+1, take the position of the end of the liquid phase arm as the current position, and repeat steps 6 to 12;

[0111] Otherwise, the docking operation is terminated.

[0112] For the gas phase arm, the process is the same as above.

[0113] In the present application, three virtual flanges are set along the central axis direction of the liquid phase flange of the tank truck after the first virtual flange at the end point of the rough positioning as transition positions for the precise positioning and step-by-step docking. When controlling from the current position to the target position, after the current angle of each joint and the angle of each joint at the corresponding target position are determined, the planned trajectory is realized by controlling the speed of each joint. This control method will make the loading arm movement smoother, avoid jamming during the movement process and frequent starting and stopping of the motor, increase the service life of the motor, and avoid energy loss.

[0114] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not a limitation of the present invention. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art on the basis of the technical solution of the present invention without creative work are still within the protection scope of the present invention.

Claims

1. An onshore LNG double loading arm precision positioning docking system, comprising an LNG double loading arm, the LNG double loading arm comprising a support column and a liquid phase arm and a gas phase arm mounted on the support column, the liquid phase arm and the gas phase arm respectively comprising five joints and five hard pipes, each joint being driven by a servo motor; characterized in that: A column camera is arranged on the upper part of the supporting column, a liquid phase camera and a liquid phase marker are arranged on the hard tube at the end of the liquid phase arm, and a gas phase camera and a gas phase marker are arranged on the hard tube at the end of the gas phase arm; a liquid phase arm flange for docking with the liquid phase flange of the tank truck is arranged at the end of the liquid phase arm, and a gas phase arm flange for docking with the gas phase flange of the tank truck is arranged at the end of the gas phase arm.

2. A land LNG double loading vehicle arm precise positioning docking method, which is implemented by using the land LNG double loading vehicle arm precise positioning docking system as claimed in claim 1, characterized in that: The following steps are involved: For the Liquid Phase Arm: Step 1: determine four virtual flanges between the end of the liquid phase arm and the liquid phase flange of the tank truck along the central axis direction of the liquid phase flange of the tank truck. The position of the first virtual flange is the end point of the rough positioning, and the positions of the remaining three virtual flanges and the liquid phase flange of the tank truck are the target positions of the liquid phase arm precise positioning step-by-step movement; Step 2, controlling the end of the liquid phase arm to move to the first virtual flange position through PLC; Step 3, the liquid phase arm remains stationary, the column camera photographs the liquid phase marker, and the liquid phase camera photographs the liquid phase flange of the tank truck at the same time, and the column camera positions the liquid phase flange of the tank truck based on the two photos taken at the same time; Step 4, establishing the liquid phase arm coordinate system based on the DH method; Step 5, using i to represent the sequence number, let i=2; Step 6: Read the current angle value of each joint of the liquid phase arm and calculate the homogeneous transformation matrix of each joint Get the position matrix of the liquid phase arm end coordinate system relative to the earth coordinate system As shown in formula (1): Step 7: Collect the position matrix of the tank truck's liquid phase flange relative to the liquid phase arm end coordinate system based on the column camera Step 8: According to the pose matrix of the liquid phase arm end coordinate system relative to the earth coordinate system Combined with the position matrix of the tank truck liquid phase flange relative to the liquid phase arm end coordinate system Calculate the position matrix of the tank truck liquid phase flange relative to the geodetic coordinate system As shown in formula (2); Step 9: Pose matrix based on target position i Calculate the pose matrix of target position i with respect to the earth coordinate system As shown in formula (3); Step 10, inversely solve to obtain the angles of each joint when the end of the liquid phase arm reaches the target position i; Step 11, controlling the end of the liquid phase arm to move from the current position to the target position i through PLC; Step 12, obtaining the distance between the current end of the liquid phase arm and the target position i through the column camera; If the distance between the end of the current liquid phase arm and the target position i is less than the error setting value, the liquid phase arm reaches the target position i, and then enters step 13; Otherwise, repeat steps 6 to 12; Step 13, when i<5, set i=i+1, take the position of the end of the liquid phase arm as the current position, and repeat steps 6 to 12; Otherwise, the docking operation is terminated; For the gas phase arm, the process is the same as above.

3. The onshore LNG double loading vehicle arm precise positioning docking method as claimed in claim 2, characterized in that: In step 1, the pose matrix of the first virtual flange is The first virtual flange position is a position 250 mm away from the tank truck liquid phase flange plane along the center axis of the tank truck liquid phase flange; The pose matrix of the second virtual flange is The second virtual flange position is a position 150 mm away from the tank truck liquid phase flange plane along the center axis of the tank truck liquid phase flange; The pose matrix of the third virtual flange is The third virtual flange position is a position 100 mm away from the tank truck liquid phase flange plane along the center axis of the tank truck liquid phase flange; The pose matrix of the fourth virtual flange is The fourth virtual flange position is a position 50 mm away from the tank truck liquid phase flange plane along the center axis of the tank truck liquid phase flange; The position matrix of the tank truck liquid phase flange is:

4. The onshore LNG double loading vehicle arm precise positioning docking method as claimed in claim 3, characterized in that: Step 10: Use Newton's iteration method to solve the inverse kinematics.

5. The onshore LNG double loading vehicle arm precise positioning docking method as claimed in claim 4, characterized in that: The step 11 includes the following sub-steps: Step 11.1, calculate the difference between the current joint angle and the corresponding joint angle at the target position i, and record it as the joint angle difference; Step 11.2, setting the ratio of the joint speeds to the ratio of the joint angle differences to be consistent, and determining the speed of the corresponding servo motor according to the ratio of the joint speeds; Step 11.3, drive the liquid phase arm to move for time t according to the rotation speed of each servo motor.

6. The onshore LNG double loading vehicle arm precise positioning docking method as claimed in claim 5, characterized in that: In step 11.3, t is 0.5s.

7. The onshore LNG double loading vehicle arm precise positioning docking method as claimed in claim 2, characterized in that: In step 12, the error setting value is 0.1 mm.

Citation Information

Patent Citations

  • Method for acquiring spatial position postures of double triangular drill arms of drill jambo in real time

    CN111274696A

  • Semi-automatic tank car loading arm and control method thereof

    CN112178451A

  • Intelligent liquefied natural gas (LNG) tank car loading and unloading sledge and application method thereof

    CN113154259A

  • Automatic wireless charging system and method based on mechanical arm

    CN114701372A

  • One-button type full-automatic intelligent loading arm and control system thereof

    CN115818552A