Grouting rectification method for building with deformation joint

By forming curtain walls and slurry partitions at the deformation joints of the building, combined with the grouting method of composite lifting layers, the problem of deformation joints not being effectively processed in traditional technology is solved, and the stability and impermeability of the building are achieved. The lifting protects the deformed seam function and completes safe lifting and reinforcement.

CN118997246APending Publication Date: 2024-11-22BEIJING HENGXIANG HONGYE FOUND REINFORCEMENT TECH CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411343879.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-25
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The failure of the prior art to effectively pay attention to and deal with deformation joints when grouting and lifting the grouting of buildings may lead to secondary damage or fail to meet the design requirements, and the traditional solutions fail to effectively prevent the slurry from infiltrating the deformation joints, affecting the stability of the foundation.

Method used

Two curtain walls separated by each other are formed at the deformation joints of the building, and grouting is penetrated between the curtain walls to form a slurry partition to prevent the slurry from infiltrating into the deformation joints. At the same time, grouting and lifting is carried out through the composite lifting layer, combined with fine lifting. The body and the whole are combined to complete the building's tilt and reinforcement.

Benefits of technology

It effectively improves the overall stability and permeability of the soil, prevents slurry from seeping into the deformation joints, protects the foundation of the building, meets the design requirements of the deformation joints, and realizes safe and effective lifting and reinforcement of the building.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997246A_ABST
    Figure CN118997246A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building foundation lifting and reinforcing, and provides a grouting and inclination rectifying method for a building with a deformation joint, which comprises the following steps: grouting a foundation corresponding to the deformation joint of the building to form two spaced curtain walls; permeating and grouting between the two curtain walls to form a slurry interlayer for preventing slurry from permeating into the deformation joint; and grouting rectification is conducted on the buildings on the two sides of the deformation joint. According to the scheme, the double curtain walls and the slurry interlayer are formed below the foundation corresponding to the deformation joint through grouting, the design and use requirements of the deformation joint of the building can be fully guaranteed, and meanwhile the situation that the slurry permeates into the deformation joint in the lifting and inclination rectifying process, and consequently the function of the deformation joint fails is avoided. According to the method, rectification lifting is carried out in a mode of combining fine lifting and overall lifting, so that the lifting requirement is met, and the weak part of the deformation joint is protected.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building foundation lifting and reinforcement, and in particular to a grouting inclination correction method for a building with a deformation joint. Background Art

[0002] In order to deal with problems such as uneven foundation settlement, uneven building deformation and earthquake effects, some large and complex buildings usually set expansion joints in the building structure. At present, the research on building expansion joints is mostly focused on the devices and methods of anti-seepage and plugging of underground engineering, but lacks attention to the expansion joints of weak links when grouting and lifting buildings to correct inclination. Although the traditional scheme involves grouting through expansion joints, grouting through expansion joints is usually for water stoppage and plugging. The traditional scheme does not involve grouting and lifting buildings based on expansion joints, nor does it involve special treatment methods for buildings during lifting.

[0003] Moreover, when the buildings on both sides of the deformation joint tilt and need to be grouted to correct the tilt, improper correction may cause the buildings on both sides of the deformation joint to collide and cause secondary damage, or the deformation joint may not meet its design requirements after correction. Therefore, a grouting correction method for buildings with deformation joints is urgently needed. Summary of the invention

[0004] The purpose of the present invention is to solve at least one technical problem in the background technology and to provide a grouting and inclination correction method for a building containing a deformation joint.

[0005] To achieve the above object, the present invention provides a grouting and tilt correction method for a building with a deformation joint, comprising:

[0006] Grouting is performed at the foundation corresponding to the deformation joint of the building to form two curtain walls spaced apart from each other;

[0007] Penetration grouting is performed between two curtain walls to form a grout barrier for preventing grout from penetrating into the deformation joint;

[0008] Grouting is carried out on the buildings on both sides of the expansion joints to correct the inclination.

[0009] According to one aspect of the present invention, the method of grouting at the foundation corresponding to the deformation joint of the building to form two curtain walls spaced apart from each other includes:

[0010] Two sets of curtain wall grouting holes parallel to each other are arranged at the foundation corresponding to the deformation joint of the building, and the two sets of curtain wall grouting holes are composed of a plurality of holes spaced apart from each other;

[0011] Firstly, vertical grouting is performed through the middle holes of the two groups of curtain wall grouting holes, and then vertical grouting is performed in sequence through the holes on both sides of the middle holes to form two curtain walls.

[0012] According to one aspect of the present invention, the curtain wall grouting holes and the deformation joint are arranged at intervals, and the distance between the curtain wall grouting holes and the deformation joint is 3 to 5 times the width of the deformation joint.

[0013] According to one aspect of the present invention, the width of the curtain wall is greater than or equal to 5 times the width of the deformation joint;

[0014] The depth of the curtain wall is greater than or equal to the design depth of the building's tilt correction and reinforcement.

[0015] According to one aspect of the present invention, the grouting between two curtain walls is used to form a grout barrier for preventing the grout from penetrating into the deformation joint:

[0016] The grouting layer is formed by obliquely penetrating and grouting between the two curtain walls through each of the holes;

[0017] The grout barrier has the same depth as the two curtain walls.

[0018] According to one aspect of the present invention, the method of performing grouting to correct the inclination of buildings on both sides of the deformation joint comprises:

[0019] Holes are placed and grouting is performed under the buildings on both sides of the two curtain walls to form a shallow reinforcement area;

[0020] Grouting is performed below the shallow reinforcement zone to form a deep reinforcement zone, wherein the deep reinforcement zone is located on the bearing rock layer, and a composite lifting layer is formed between the deep reinforcement zone and the shallow reinforcement zone;

[0021] Grouting and lifting are carried out through the composite lifting layer to complete the grouting and tilt correction of the building.

[0022] According to one aspect of the present invention, the shallow reinforcement zone and the deep reinforcement zone are connected to the curtain wall on one side facing the curtain wall, and the other sides extend beyond the projection of the building raft foundation.

[0023] According to one aspect of the present invention, grouting lifting is performed through the composite lifting layer, comprising:

[0024] Local grouting is performed on the composite lifting layer near the curtain wall to form a refined lifting body for lifting the side of the building near the deformation joint;

[0025] After the side of the building close to the deformation joint is lifted by the refined lifting body, overall joint grouting is carried out on other parts of the composite lifting layer to complete the overall lifting of the buildings on both sides of the deformation joint.

[0026] According to one aspect of the present invention, a maximum lifting height is preset, and when grouting lifting is performed through the composite lifting layer, each lifting height is less than the maximum lifting height.

[0027] According to one aspect of the present invention, the composite lifting layer extends away from the side edge of the curtain wall to outside the projection of the building raft foundation.

[0028] According to one solution of the present invention, two curtain walls spaced apart from each other are formed by grouting at the foundation corresponding to the deformation joint of the building, including: arranging two groups of curtain wall grouting holes parallel to each other on both sides of the deformation joint at the foundation corresponding to the deformation joint of the building, and the two groups of curtain wall grouting holes are composed of a plurality of mutually spaced holes; firstly vertically grouting through the middle holes of the two groups of curtain wall grouting holes, and then vertically grouting through the holes on both sides of the middle holes in sequence to form two curtain walls. With such an arrangement, the double curtain wall can improve the overall stability and impermeability of the soil, and the lifting slurry on both sides of the double curtain wall can be blocked from penetrating into the deformation joint during grouting correction, so as to prevent the deformation joint function from being destroyed due to the filling of the slurry in the deformation joint during the later uneven settlement. Moreover, when grouting the double curtain wall, firstly vertically grouting through the middle holes of the two groups of curtain wall grouting holes, and then vertically grouting through the holes on both sides of the middle holes in sequence, which can effectively avoid damage to the building during the grouting process.

[0029] According to one solution of the present invention, the slurry barrier layer formed by penetration grouting between two curtain walls to prevent the slurry from penetrating into the deformation joint is formed by: the slurry barrier layer is formed by oblique penetration grouting between the two curtain walls through each hole position; the depth of the slurry barrier layer is the same as that of the two curtain walls. In this way, the slurry barrier layer can be prevented from penetrating into the deformation joint during the grouting lifting process. The slurry barrier layer is grouted by penetration grouting, which has a relatively small effect on the improvement of soil strength, but can effectively improve the overall stability and impermeability of the soil.

[0030] According to one solution of the present invention, by providing a slurry barrier, when uneven settlement of the building occurs in the later stage, shear damage can be preferentially caused to the slurry barrier, thereby protecting the foundation of the original building.

[0031] According to one solution of the present invention, grouting is performed on the buildings on both sides of the deformation joint to correct the inclination, including: arranging holes for grouting under the buildings on both sides of the two curtain walls to form a shallow reinforcement zone; grouting is performed below the shallow reinforcement zone to form a deep reinforcement zone, the deep reinforcement zone is located on the bearing rock layer, and a composite lifting layer is formed between the deep reinforcement zone and the shallow reinforcement zone; grouting and lifting are performed through the composite lifting layer to complete the grouting correction of the building. In this way, the shallow reinforcement zone is used to protect the building raft foundation from secondary damage during the lifting process on the one hand, and to reinforce the soil and improve the overall stability of the foundation on the other hand. The deep reinforcement zone is used to increase the depth of the bearing layer and provide lifting support. Finally, the composite lifting layer is grouted to effectively form lifting reinforcement.

[0032] According to one solution of the present invention, grouting and lifting are performed through a composite lifting layer, including: local grouting is performed near the curtain wall at the composite lifting layer to form a refined lifting body for lifting the side of the building near the deformation joint; after the side of the building near the deformation joint is lifted by the refined lifting body, overall joint grouting is performed at other parts of the composite lifting layer to complete the overall lifting of the building on both sides of the deformation joint. With such an arrangement, the side of the building near the deformation joint can be locally and finely lifted first by the refined lifting body, which can effectively avoid the extrusion damage to the double curtain wall and the deformation joint, effectively improve the effect of the overall lifting and reinforcement of the building, and ensure that the deformation joint is not damaged.

[0033] According to the solution of the present invention, a double curtain wall and a slurry barrier are formed by grouting under the foundation corresponding to the deformation joint, which can fully ensure the design and use requirements of the building's deformation joint while avoiding the slurry from seeping into the deformation joint during the lifting and tilt correction process, causing the deformation joint to fail. The tilt correction lifting is carried out by combining a refined lifting body with an overall lifting method, which not only meets the lifting requirements, but also realizes the protection of the weak parts of the deformation joint. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 A flow chart schematically showing a grouting tilt correction method for a building containing a deformation joint according to an embodiment of the present invention;

[0035] Figure 2 A schematic cross-sectional view of a structure for forming a curtain wall and a slurry barrier according to Embodiment 1 of the present invention;

[0036] Figure 3 A schematic diagram showing the arrangement of holes for forming a curtain wall and a slurry barrier according to Example 1 of the present invention;

[0037] Figure 4 A schematic diagram showing the layout of the lifting grouting holes for lifting and tilt correction according to Embodiment 1 of the present invention;

[0038] Figure 5 A cross-sectional view schematically shows a structure of a lifting and tilt-correcting device according to Embodiment 1 of the present invention. DETAILED DESCRIPTION

[0039] The present invention will now be discussed with reference to exemplary embodiments. It should be understood that the embodiments discussed are only to enable those skilled in the art to better understand and thus implement the present invention, rather than implying any limitation on the scope of the present invention.

[0040] As used herein, the term “including” and variations thereof are to be interpreted as open-ended terms meaning “including, but not limited to.” The term “based on” is to be interpreted as “based, at least in part, on.” The terms “one embodiment” and “an embodiment” are to be interpreted as “at least one embodiment.”

[0041] Figure 1 The flowchart of the grouting correction method for a building with a deformation joint according to one embodiment of the present invention is schematically shown. Figure 1 As shown, in this embodiment, the grouting correction method for a building with a deformation joint includes:

[0042] Grouting is performed at the foundation corresponding to the deformation joint of the building to form two curtain walls spaced apart from each other;

[0043] Penetration grouting is performed between two curtain walls to form a grout barrier for preventing grout from penetrating into the deformation joint;

[0044] Grouting is carried out on the buildings on both sides of the expansion joints to correct the inclination.

[0045] Further, according to an embodiment of the present invention, two curtain walls spaced apart from each other are formed by grouting at the foundation corresponding to the deformation joint of the building, including:

[0046] Two sets of curtain wall grouting holes parallel to each other are arranged at the foundation corresponding to the deformation joint of the building, and the two sets of curtain wall grouting holes are composed of a plurality of holes spaced apart from each other;

[0047] First, vertical grouting is performed through the middle holes of the two groups of curtain wall grouting holes, and then vertical grouting is performed through the holes on both sides of the middle holes in sequence to form two curtain walls. With this arrangement, the double curtain wall can improve the overall stability and impermeability of the soil. When grouting to correct the inclination, the slurry used for lifting on both sides of the double curtain wall can be blocked from penetrating into the deformation joints, preventing the deformation joint function from being destroyed due to the slurry filling the deformation joints during uneven settlement in the later stage. Moreover, when grouting the double curtain wall, vertical grouting is performed through the middle holes of the two groups of curtain wall grouting holes, and then vertical grouting is performed through the holes on both sides of the middle holes in sequence, which can effectively avoid damage to the building during the grouting process.

[0048] In this embodiment, when grouting is performed to form a double curtain wall, the double curtain wall should be formed by grouting vertically downward, from deep to shallow, and connecting points into a surface. When grouting, the curtain wall can be formed on one side first, or the curtain wall can be formed by grouting on both sides at the same time.

[0049] Furthermore, according to an embodiment of the present invention, the curtain wall grouting holes are arranged at intervals from the deformation joints, and the distance between the curtain wall grouting holes and the deformation joints is 3 to 5 times the width of the deformation joints. This arrangement can facilitate construction operations and prevent damage to the deformation joints.

[0050] Further, according to an embodiment of the present invention, the width of the curtain wall is greater than or equal to 5 times the width of the deformation joint;

[0051] The depth of the curtain wall is greater than or equal to the design depth of the building's tilt correction and reinforcement. This arrangement can ensure that the curtain wall has sufficient support strength, and while the curtain wall can provide stable support, it can also effectively protect the deformation joint from damage during the subsequent grouting and lifting process.

[0052] Further, according to one embodiment of the present invention, the grouting between the two curtain walls is used to form a grout barrier for preventing the grout from penetrating into the deformation joint:

[0053] The grouting is performed through each hole in an inclined manner toward the space between the two curtain walls to form a slurry barrier;

[0054] The depth of the grout barrier is the same as that of the two curtain walls.

[0055] In this embodiment, the slurry barrier is provided to prevent the slurry from seeping into the deformation joint during the grouting lifting process. The slurry barrier is grouted by infiltration grouting. Infiltration grouting has a relatively small effect on the strength of the soil, but can effectively improve the overall stability and impermeability of the soil. The grouting holes still use the various hole positions of the curtain wall grouting holes, and the grouting pipe is used for inclined grouting. The specific inclination angle can be determined according to the actual situation.

[0056] Furthermore, by setting up the slurry barrier, when uneven settlement occurs in the later building, the slurry barrier can be preferentially sheared, thereby protecting the foundation of the original building. That is, settlement of the subsequent building or settlement at the deformation joint will cause squeezing or shearing of the deformation joint, resulting in damage to the slurry barrier.

[0057] Furthermore, the slurry partition is located between the double curtain walls, and the slurry partition should fill up the space between the double curtain walls, and its depth should be consistent with that of the double curtain walls.

[0058] Further, according to an embodiment of the present invention, grouting is performed on the buildings on both sides of the deformation joint to correct the inclination, including:

[0059] Holes are placed and grouting is performed under the buildings on both sides of the two curtain walls to form a shallow reinforcement area;

[0060] Grouting is performed below the shallow reinforcement zone to form a deep reinforcement zone, the deep reinforcement zone is located on the bearing rock layer, and a composite lifting layer is formed between the deep reinforcement zone and the shallow reinforcement zone;

[0061] Grouting and lifting are carried out through the composite lifting layer to complete the grouting and tilt correction of the building. In this way, the shallow reinforcement area is used to protect the building raft foundation from secondary damage during the lifting process, and to reinforce the soil and improve the overall stability of the foundation. The deep reinforcement area is used to increase the depth of the bearing layer and provide lifting support. Finally, grouting of the composite lifting layer is carried out to effectively form lifting reinforcement.

[0062] Further, according to an embodiment of the present invention, the shallow reinforcement area and the deep reinforcement area are connected to the curtain wall on one side facing the curtain wall, and the other side extends beyond the area where the building raft foundation is vertically projected downward. This arrangement can ensure the lifting effect and improve the overall stability.

[0063] Further, according to an embodiment of the present invention, grouting lifting is performed through a composite lifting layer, comprising:

[0064] Local grouting is performed on the composite lifting layer near the curtain wall to form a refined lifting body for lifting the side of the building near the deformation joint;

[0065] After the side of the building close to the deformation joint is lifted by the refined lifting body, the other parts of the composite lifting layer are integrally grouted to complete the overall lifting of the building on both sides of the deformation joint. In this way, the refined lifting body can first perform a local fine lifting on the side of the building close to the deformation joint, which can effectively avoid the extrusion damage to the double curtain wall and the deformation joint, effectively improve the effect of the overall lifting and reinforcement of the building, and ensure that the deformation joint is not damaged.

[0066] Furthermore, according to an embodiment of the present invention, a maximum lifting height is preset, and when the composite lifting layer is used for grouting lifting, each lifting height is less than the maximum lifting height. This arrangement takes into account the existence of weak links in the building deformation joints, making the lifting process more stable and reliable.

[0067] Further, according to an embodiment of the present invention, the composite lifting layer extends away from the side of the curtain wall to the outside of the projection of the building raft foundation. Such an arrangement can ensure the lifting effect and improve the overall stability.

[0068] According to the above scheme of the present invention, a double curtain wall and a slurry barrier are formed by grouting under the foundation corresponding to the deformation joint, which can fully ensure the design and use requirements of the building's deformation joint while avoiding the slurry from seeping into the deformation joint during the lifting and tilt correction process, causing the deformation joint to fail. The tilt correction lifting is carried out by combining a refined lifting body with an overall lifting method, which not only meets the lifting requirements, but also realizes the protection of the weak parts of the deformation joint.

[0069] Based on the above solution, the solution of the present invention is described in detail in the following in combination with the accompanying drawings in the form of a specific embodiment.

[0070] Example 1

[0071] A certain building adopts reinforced concrete frame shear wall structure. The building contains one deformation joint with a width of 180mm. The maximum settlement parallel to the construction joint is 150mm. At the same time, the building tilts toward the deformation joint. The minimum width of the deformation joint at the top of the building is 14mm. The building has 27 floors above ground and 1 floor underground. It is 79.6m long, 17.7m wide, and 83.6m high. The foundation is a raft foundation, and the deformation joint is in the middle of the length of the building. After comprehensive research and judgment, the double curtain wall method is used to protect the deformation joint, and the composite lifting reinforcement method is used to reinforce and correct the building. The specific methods include:

[0072] Step 1: Grouting on both sides of the expansion joint to form a double curtain wall:

[0073] At the corresponding foundations on both sides of the deformation joint, grouting is performed vertically downward at a distance of 900mm from the edge of the deformation joint to form a double curtain wall. The parameters of the curtain wall are: depth of 12.5m, width of 1000mm, and the spacing between grouting holes is adjusted appropriately according to the grouting parameters.

[0074] The height of the upper part of the curtain wall should be close to the building raft foundation, but it should not be bonded to the raft foundation to prevent unnecessary damage to the foundation during the subsequent lifting process.

[0075] like Figure 2 As shown, the grouting pipe 2 is vertically drilled downward below the raft foundation 6. During the grouting process, the grouting pipe is gradually pulled up, and the double curtain wall 4 is formed by grouting in a backward manner. During the grouting process, the curtain wall is formed by grouting on both sides of the deformation joint 1 at the same time, starting from the middle of the deformation joint ( Figure 2 Start from the middle of the front and back direction and gradually grout towards the edge to facilitate soil movement. Figure 3 As shown, starting from hole Z1, grouting is then performed in hole Z2, hole Z3, etc. in sequence to form a curtain wall.

[0076] Step 2: Penetrate and grout the space between the double curtain walls to form a slurry barrier:

[0077] The double curtain wall grouting holes are used to drill obliquely between the double curtain walls, and the grouting interlayer is formed by penetration grouting. The grouting holes are reused to reduce more drilling damage to the foundation. The penetration grouting has a relatively small effect on the strength of the soil, but it can effectively improve the overall stability and impermeability of the soil, and prevent the grout from penetrating into the deformation joint during grouting and lifting, which will interfere with the original design function of the deformation joint.

[0078] The setting of the slurry interlayer can preferentially cause shear damage to the slurry interlayer when uneven settlement occurs in the later stage of the building, thereby protecting the raft foundation of the original building.

[0079] like Figure 2 As shown, when grouting to form the slurry barrier 5, the grouting pipe 3 is tilted downward, and the inclination is adjusted according to the actual situation. The slurry barrier is still formed by gradually withdrawing and pulling up the grouting pipe from deep to shallow. The depth of the slurry barrier is consistent with the double curtain wall 4, and the width is set to fill the space between the double curtain walls.

[0080] Step 3: Grouting and tilt correction of buildings on both sides of the expansion joint:

[0081] In consideration of the protection of the expansion joints, the part of the double curtain wall close to the expansion joints is lifted by locally refined lifting bodies, while in consideration of the optimal reinforcement effect, the part far from the expansion joints is lifted by grouting using an overall lifting reinforcement method.

[0082] according to Figure 4 The hole arrangement method is used to arrange the lifting grouting holes 11, and these lifting grouting holes are used for grouting reinforcement and tilt correction. Arranging holes in this way can maximize the reasonable use of the grouting range. In this embodiment, the grouting radius of the grouting lifting and tilt correction is 2.0m.

[0083] In this embodiment, if Figure 5 As shown, firstly, grouting is performed according to the above hole arrangement to form a 5.0m thick shallow reinforcement area 7. The shallow reinforcement area 7 is used to protect the building raft foundation from secondary damage during the lifting process, and to reinforce the soil and improve the overall stability of the foundation. Grouting is still performed vertically downward, from deep to shallow, and gradually withdrawing and pulling up the grouting pipe. Figure 5 As shown, the shallow reinforcement area on one side close to the deformation joint is connected to the curtain wall, and the shallow reinforcement areas on the remaining three sides are set to expand 1.0m outward from the raft foundation.

[0084] Secondly, continue to use Figure 4 The lifting grouting holes shown are grouted to form a deep reinforcement area 8, which is used to increase the depth of the bearing layer and provide lifting support. The thickness of the deep reinforcement area is about 2.0m, and the lower part is in contact with the bearing rock layer 9. Grouting reinforcement is also carried out from deep to shallow, gradually retreating and pulling up the grouting pipe. Figure 5 As shown, the deep reinforcement area 8 close to the deformation joint is connected to the curtain wall, and the deep reinforcement areas on the remaining three sides are also set to expand 1.0m outward from the raft foundation.

[0085] Finally, the composite lifting layer 10 is grouted, and a refined lifting body 11 is formed on one side close to the curtain wall for lifting. The rest of the positions are lifted by overall combined grouting. The composite grouting lifting method combining the refined lifting body with the overall grouting of the rest of the positions can effectively reduce the extrusion damage to the curtain wall and further protect the deformation joint.

[0086] In this embodiment, during the grouting lifting process, the Figure 4 The lifting grouting hole position shown in the figure starts from the point where the settlement is the largest. In this embodiment, the settlement is the largest on the side close to the deformation joint. Figure 4 Grouting is performed at the position of the refined lifting body hole 12 shown in the figure to form a refined lifting body. After local lifting, the building should be gradually lifted by combining the means of overall lifting of the remaining parts until the overall lifting meets the relevant requirements.

[0087] During the lifting process, the existence of weak links in the building deformation joints was taken into consideration, and the maximum lifting height each time should be less than 10 mm based on relevant technical regulations and building-related dimension information. Similarly, in order to improve the overall stability of the reinforced building, the composite lifting layer 10 is expanded outward by 1.0 m.

[0088] Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail through the above preferred embodiments, those skilled in the art should understand that various changes can be made in form and details without departing from the scope defined by the claims of the present invention.

Claims

1. Grouting correction method for buildings with deformation joints. It is characterized in that include: Grouting is performed at the foundation corresponding to the deformation joint of the building to form two curtain walls spaced apart from each other; Penetration grouting is performed between two curtain walls to form a grout barrier for preventing grout from penetrating into the deformation joint; Grouting is carried out on the buildings on both sides of the expansion joints to correct the inclination.

2. The grouting correction method for a building with a deformation joint according to claim 1, It is characterized in that The method of injecting grout at the foundation corresponding to the deformation joint of the building to form two curtain walls spaced apart from each other comprises: Two sets of curtain wall grouting holes parallel to each other are arranged at the foundation corresponding to the deformation joint of the building, and the two sets of curtain wall grouting holes are composed of a plurality of holes spaced apart from each other; Firstly, vertical grouting is performed through the middle holes of the two groups of curtain wall grouting holes, and then vertical grouting is performed in sequence through the holes on both sides of the middle holes to form two curtain walls.

3. The grouting method for correcting inclination of a building with a deformation joint according to claim 2, It is characterized in that The curtain wall grouting holes are spaced apart from the deformation joints, and the distance between the curtain wall grouting holes and the deformation joints is 3 to 5 times the width of the deformation joints.

4. The grouting correction method for a building with a deformation joint according to claim 1, It is characterized in that The width of the curtain wall is greater than or equal to 5 times the width of the deformation joint; The depth of the curtain wall is greater than or equal to the design depth of the building's tilt correction and reinforcement.

5. The grouting correction method for a building with a deformation joint according to claim 2, It is characterized in that The grouting layer formed by the penetration grouting between the two curtain walls to prevent the grout from penetrating into the deformation joint is: The grouting layer is formed by obliquely penetrating and grouting between the two curtain walls through each of the holes; The grout barrier has the same depth as the two curtain walls.

6. The grouting correction method for a building with a deformation joint according to claim 1, It is characterized in that The grouting and tilt correction of the buildings on both sides of the deformation joints includes: Holes are placed and grouting is performed under the buildings on both sides of the two curtain walls to form a shallow reinforcement area; Grouting is performed below the shallow reinforcement zone to form a deep reinforcement zone, wherein the deep reinforcement zone is located on the bearing rock layer, and a composite lifting layer is formed between the deep reinforcement zone and the shallow reinforcement zone; Grouting and lifting are carried out through the composite lifting layer to complete the grouting and tilt correction of the building.

7. The grouting correction method for a building with a deformation joint according to claim 6, It is characterized in that The shallow reinforcement area and the deep reinforcement area are connected to the curtain wall on one side facing the curtain wall, and the other sides extend beyond the projection of the building raft foundation.

8. The grouting correction method for a building with a deformation joint according to claim 6, It is characterized in that The grouting lifting is performed through the composite lifting layer, comprising: Local grouting is performed on the composite lifting layer near the curtain wall to form a refined lifting body for lifting the side of the building near the deformation joint; After the side of the building close to the deformation joint is lifted by the refined lifting body, overall joint grouting is carried out on other parts of the composite lifting layer to complete the overall lifting of the buildings on both sides of the deformation joint.

9. The grouting correction method for a building with a deformation joint according to claim 6, It is characterized in that A maximum lifting height is preset, and when grouting lifting is performed through the composite lifting layer, each lifting height is less than the maximum lifting height.

10. The grouting correction method for a building with a deformation joint according to any one of claims 6 to 9, It is characterized in that The composite lifting layer extends away from the side of the curtain wall to outside the projection of the building raft foundation.

Citation Information

Cited By

  • Settling and lifting method and system for tunnel penetrating through ground fissures

    CN119989500A

  • Tunnel settlement and uplift method and system crossing ground fissures

    CN119989500B