Anti-seepage construction method for hidden and reverse ridges of balcony

Through the balcony dark reverse ridge construction method, the problems of uneven waterproof coatings and structural deformation during balcony anti-ridge construction were solved. The combination of dark reverse ridge steel bars and templates was adopted to ensure the leakage prevention effect of balcony dark reverse ridge and self-waterproofing of structural Functions avoid common quality problems and improve construction quality and cost-effectiveness.

CN118997502AActive Publication Date: 2024-11-22CHINA MCC22 GROUP CORP LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411340895.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-25
Publication Date
2024-11-22
Estimated Expiration
2044-09-25

AI Technical Summary

Technical Problem

The existing balcony anti-sill construction process is prone to leakage at uneven waterproof coatings or construction joints, and the anti-sill construction is prone to deformation, displacement, mold rise or mold run, resulting in poor construction quality and anti-slit effect.

Method used

The construction method of anti-leakage on the balcony is adopted, including binding of the lower structural plate and structural beam steel bars, setting up of dark reverse steel bars and formwork, pouring concrete, and binding and supporting the upper reverse steel bars after the concrete strength reaches. Fixed aluminum mold reinforcement and fixing the template to avoid screw hole sealing and ensure bonding and acceptance.

Benefits of technology

It achieves efficient anti-leakage of the balcony anti-barrier, avoids quality problems such as anti-barrier displacement, mold increase, and mold running, improves construction quality and structural self-waterproofing function, and saves labor costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997502A_ABST
    Figure CN118997502A_ABST
Patent Text Reader

Abstract

The invention provides an anti-seepage construction method for a hidden and reverse sill of a balcony. The anti-seepage construction method comprises the following steps that a lower-layer structural plate and structural beam steel bars are bound, and a formwork is erected; arranging hidden and reverse ridge reinforcing steel bars on a structural beam at a balcony, and erecting a hidden and reverse ridge template; concrete is poured into the lower-layer structural slab, the structural beam and the hidden reverse ridge; after the lower-layer structural plate, the structural beam and the hidden reverse ridge reach the strength, reinforcing steel bar binding and formwork erecting of the upper reverse ridge of the balcony are conducted at the position of the hidden reverse ridge; and concrete is poured on the upper reverse ridge of the balcony. Compared with the prior art, the construction method has the beneficial effects that the anti-leakage construction process for the balcony reverse ridge is improved, the construction method is simple and easy to implement, convenient to operate and low in cost, leakage of the balcony reverse ridge can be eradicated to a great extent, meanwhile, labor can be saved, and the construction quality can be guaranteed. And meanwhile, by means of the construction method, common quality problems such as reverse ridge displacement, formwork expansion and formwork shifting are avoided, the self-waterproof construction requirement of the structure is met, leakage of the balcony is greatly eradicated, and the construction quality of the reverse ridge of the balcony is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of balcony anti-slope construction, and in particular to a balcony hidden anti-slope leakage construction method. Background Art

[0002] With the rapid development of my country's construction industry, people's requirements for the quality of construction projects are getting higher and higher. Since it is directly related to the vital interests of the people, it has become a major issue related to social stability. Leakage is a relatively concentrated quality defect in residential and commercial projects. It is related to the normal use function of the building and the service life of the building. Therefore, it is particularly important to strengthen the self-waterproof function of the structure.

[0003] The balcony anti-slope refers to the waterproof protruding structure at the junction of the roof and the balcony. It is an important structure to prevent rainwater from flowing back into the room. Its construction quality and details directly affect the safety and comfort of living. To improve the construction quality of the balcony anti-slope and achieve the self-waterproofing function of the structure, the conventional construction process is: ① Reserve a construction joint on the balcony roof and cast the anti-slope for the second time. If the waterproof coating is uneven or not in place, this construction process is prone to leakage at the construction joint after about 3 years of use. ② The balcony anti-slope is constructed once with the underlying structure, and the anti-slope is prone to deformation and displacement. If the reinforcement is not in place, the mold will expand or run. When it is chiseled for the second time, the construction quality is extremely poor and the anti-leakage effect is poor. Therefore, in order to solve the above two problems, the balcony anti-slope waterproof hidden anti-slope technology is designed. Summary of the invention

[0004] In order to solve the above technical problems, the present invention provides a construction method for preventing leakage of hidden balcony sills, and improves the construction process of preventing leakage of balcony sills. The method is simple, easy to operate, and low in cost. It can prevent leakage of balcony sills to a great extent, and at the same time can save labor and ensure construction quality.

[0005] To achieve this technical purpose, the present invention adopts the following scheme: A balcony hidden anti-leakage construction method comprises the following steps: S1. Tie up the reinforcement and formwork for the lower structural slab and structural beams; S2. Install hidden anti-slope steel bars on the structural beams at the balcony and support hidden anti-slope formwork; S3, pour concrete for lower structural slab, structural beam and concealed counter-slope; S4. After the concrete strength poured in step S3 reaches the requirement, the steel bars of the balcony are tied and the formwork is supported at the hidden counter-sill; S5. Pour concrete on the balcony.

[0006] Compared with the prior art, the present invention has the following beneficial effects: The present invention provides a construction method for preventing leakage of a balcony hidden anti-sill, improves the construction process of anti-leakage of the balcony anti-sill, and the construction method of the present invention is simple and easy to operate, easy to operate, and low in cost, and can greatly prevent leakage of the balcony anti-sill, while saving labor and ensuring construction quality. At the same time, the construction method of the present invention avoids common quality problems such as anti-sill displacement, mold expansion, and mold running, and meets the construction requirements of structural self-waterproofing, greatly prevents leakage of the balcony, and improves the construction quality of the balcony anti-sill.

[0007] Furthermore, in step S2, the hidden counter-ridge is reinforced with a shaped aluminum mold.

[0008] Furthermore, in step S2, upper anti-ridge steel bars are reserved when the hidden anti-ridge steel bars are tied.

[0009] Furthermore, in step S3, 5 to 6 hours after pouring the concrete, the dark anti-ridge position is roughened to ensure effective bonding between the upper and lower layers.

[0010] Furthermore, in step S4, after the steel bars of the upper counter-slope are tied and the formwork is erected, the steel bars, formwork and reinforcement at the counter-slope are inspected and accepted to ensure the construction quality of the balcony counter-slope.

[0011] Furthermore, the template is fixed by a clamp. In the present invention, screws cannot be used for reinforcement to avoid leakage when the screw holes are not properly sealed. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 This is a schematic diagram of the lower structural plate, structural beam, and hidden anti-ridge formwork of an embodiment of the present invention; Figure 2 This is a schematic diagram of the lower structural plate, structural beam, and hidden counter-ridge after demoulding in an embodiment of the present invention; Figure 3 This is a schematic diagram of the anti-ridge formwork on the balcony according to an embodiment of the present invention; Figure 4 The overall structure diagram of the balcony after the mold is removed is shown in FIG. The markings in the figure are: 1. Structural plate; 2. Structural beam; 3. Formwork; 4. Hidden counter-ridge; 5. Shaped aluminum mold; 6. Upper counter-ridge. DETAILED DESCRIPTION

[0013] In order to fully understand the purpose, features and effects of the present invention, the present invention is described in detail through the following specific implementation methods, but the present invention is not limited thereto.

[0014] It should be noted that when an element is referred to as being "fixed to" or "set on" another element, it can be directly on the other element or indirectly on the other element. When an element is referred to as being "connected to" or "laid on" another element, it can be directly connected to the other element or indirectly connected to the other element.

[0015] It should be understood that the orientation or position relationship indicated by terms such as "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0016] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, "multiple" and "several" mean two or more, unless otherwise clearly and specifically defined.

[0017] See also Figures 1 to 4 The present invention provides a balcony hidden anti-leakage construction method, comprising the following steps: S1, the lower structure plate 1, the structural beam 2 are reinforced and the formwork 3 is supported. The formwork 3 is fixed with a clamp. In the embodiment of the present invention, it is prohibited to use screw reinforcement to avoid leakage when the screw hole is not properly sealed; S2. Set up the hidden ridge 4 steel bars on the structural beam 2 at the balcony, and support the hidden ridge 4 template 3. When the hidden ridge 4 steel bars are tied, reserve the upper ridge 6 steel bars. The hidden ridge 4 is reinforced with a fixed aluminum mold 5; S3, pour concrete on the lower structure plate 1, the structure beam 2, and the hidden ridge 4; 5 to 6 hours after pouring the concrete, roughen the position of the hidden ridge 4 to ensure effective bonding between the upper and lower layers; S4. After the concrete strength poured in step S3 reaches the requirement, the steel bars of the balcony upper ridge 6 are tied and the formwork 3 is set at the hidden ridge 4; then the steel bars, formwork 3 and reinforcement at the ridge are inspected and accepted to ensure the construction quality of the balcony ridge. S5. Pour concrete on the anti-slope 6 on the balcony.

[0018] In the embodiment of the present invention, firstly, the lower structural plate 1 and the structural beam 2 are tied with steel bars, and then the formwork 3 is installed, and the formwork 3 is fixed with a special clamp; the hidden anti-step 4 steel bars are arranged on the structural beam 2 at the balcony, and the hidden anti-step 4 formwork 3 is installed, and the upper anti-step 6 steel bars are reserved when the hidden anti-step 4 steel bars are tied, and the hidden anti-step 4 is reinforced with a fixed aluminum mold 5, and the size of the fixed aluminum mold 5 is 100mm wide and 50mm high. The clamp for reinforcing the hidden anti-step 4 is an angle steel L80*80*5mm; the first concrete pouring is carried out, and 5 to 6 hours after the pouring, the anti-step is roughened with a roughening hammer to ensure effective bonding of the bonding surface; after the concrete strength reaches the requirement, the steel bars of the upper anti-step 6 of the balcony are tied on the hidden anti-step 4 and the formwork 3 is installed. After the formwork 3 is installed, the steel bars, formwork 3 and reinforcement at the anti-step are inspected and accepted, and the second concrete pouring is carried out after the acceptance is qualified.

[0019] Compared with the prior art, the present invention has the following beneficial effects: The present invention provides a construction method for preventing leakage of a balcony hidden anti-sill 4, improves the anti-leakage construction process of the balcony anti-sill, and the construction method of the present invention is simple and easy to operate, easy to operate, and low in cost, and can greatly prevent leakage of the balcony anti-sill, while saving labor and ensuring construction quality. At the same time, the construction method of the present invention avoids common quality problems such as anti-sill displacement, mold expansion, and mold running, and meets the construction requirements of structural self-waterproofing, greatly prevents leakage of the balcony, and improves the construction quality of the balcony anti-sill.

[0020] Finally, it should be noted that the above are only preferred embodiments of the present invention. Of course, those skilled in the art can make changes and modifications to the present invention. If these modifications and variations fall within the scope of the claims of the present invention and their equivalent technologies, they should be considered to be within the scope of protection of the present invention.

Claims

1. A balcony hidden anti-leakage construction method, characterized in that: The following steps are involved: S1. Tie up the reinforcement and formwork for the lower structural slab and structural beams; S2. Install hidden anti-slope steel bars on the structural beams at the balcony and support hidden anti-slope formwork; S3, pour concrete for lower structural slab, structural beam and concealed counter-slope; S4. After the concrete strength poured in step S3 reaches the requirement, the steel bars of the balcony are tied and the formwork is supported at the hidden counter-sill; S5. Pour concrete on the balcony.

2. The balcony hidden anti-leakage construction method according to claim 1 is characterized in that: In step S2, the hidden counter-ridge is reinforced with a shaped aluminum mold.

3. The balcony hidden anti-leakage construction method according to claim 1 is characterized in that: In step S2, upper anti-ridge reinforcement is reserved when the hidden anti-ridge reinforcement is tied.

4. The balcony hidden anti-leakage construction method according to claim 1 is characterized in that: In step S3, 5 to 6 hours after pouring the concrete, the dark counter-embankment position is roughened.

5. The balcony hidden anti-leakage construction method according to claim 1 is characterized in that: In step S4, after the steel bars of the upper counter-bend are tied and the formwork is set up, the steel bars, formwork and reinforcement at the counter-bend are inspected and accepted.

6. The balcony hidden anti-leakage construction method according to claim 1 is characterized in that: The template is fixed with a clamp.

Citation Information

Patent Citations

  • Bathroom inverse bank one-time forming template supporting method

    CN107083840A

  • Roof expansion joint structure and construction method

    CN113309245A

  • One-time pouring forming construction method for reinforcing concrete reverse ridge through aluminum formwork

    CN116816075A

  • Reverse ridge anti-leakage die

    CN211114816U

  • Balcony reverse ridge template reinforcing structure

    CN218234347U