Basin and region flood control and drainage scheme combination design method and system

Through technical means such as multi-source data fusion and adaptive multi-scale hydrological models, data heterogeneity and uncertainty in the flood control and drainage schemes in the basin and regional areas are solved, multi-scale collaborative simulation and standard coordination are realized, and scientific decision-making is provided. Support has improved the design quality and implementation effect of flood control and drainage plans.

CN119005065APending Publication Date: 2024-11-22NANJING HYDRAULIC RES INST
View PDF 0 Cites 8 Cited by

Patent Information

Application Number
CN202411225049.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-03
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

Existing flood control and drainage schemes in the existing basin and regional flood control and drainage schemes have challenges in the fusion of multi-source heterogeneous data, uncertainty quantification, multi-scale hydrological and hydrodynamic process coupling simulation accuracy and coordination of different spatial scale standards, and it is difficult to fully consider long-term climate change and society. Economic development and ecological environment needs.

Method used

A unified social-ecological-hydrological system data set was generated using a multi-source data fusion algorithm, and a multi-scale hydrological model and a multi-level coupled hydrodynamic model were used for simulation, combining the multi-objective flood control and drainage coordination evaluation model and multi-source uncertainty Sexual communication model, generate the optimal combination of flood control and drainage standards, and provide decision support through a multi-objective engineering benefit evaluation model and decision support system.

Benefits of technology

It significantly improves the design quality and implementation effect of flood control and drainage plans in the basin and regional areas, realizes the full process optimization from data processing to final decision-making, improves the scientificity and reliability of the design, and ensures the coordination and adaptability of the plan.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119005065A_ABST
    Figure CN119005065A_ABST
Patent Text Reader

Abstract

The invention relates to a watershed and regional flood control and drainage scheme combination design method and system. The method comprises the steps that multi-source data fusion and uncertainty analysis are carried out; performing multi-scale hydrological hydrodynamic simulation and influence evaluation; optimizing a multi-dimensional flood control and drainage standard; engineering layout and scheduling strategy optimization; and comprehensive benefit evaluation and decision support. According to the method, social-ecological-hydrological system data are creatively integrated, a self-adaptive multi-scale model is adopted for simulation, a multi-objective optimization algorithm is applied to generate an optimal scheme, and influences of climate changes and human activities are considered. The core of the method lies in multi-scale and multi-target integral consideration and whole-course analysis of uncertainty, and a comprehensive scientific basis is provided for flood control and drainage decisions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to water conservancy technology, in particular to a combined design method and system for basin and regional flood control and drainage schemes. Background Art

[0002] The combined design of river basin and regional flood control and drainage schemes has important research significance in the current context of climate change and rapid urbanization. With the frequent occurrence of extreme weather events and the intensification of urban expansion, the traditional single-scale, single-objective flood control and drainage schemes have been unable to cope with complex hydrological conditions and diversified social needs. Scientific and reasonable river basin and regional flood control and drainage schemes are not only related to the safety of people's lives and property, but also directly affect regional economic development and ecological and environmental protection. A coordinated and unified combination of river basin and regional flood control and drainage schemes is of great significance for improving the overall efficiency of the flood control and drainage system and achieving the coordinated development of water security, water ecology, and water environment.

[0003] The current research status mainly focuses on the following aspects: first, the improvement and application of hydrological and hydrodynamic models, such as the coupling of distributed hydrological models and two-dimensional hydrodynamic models; second, the application of multi-objective optimization methods in the layout of flood control and drainage projects, such as genetic algorithms, particle swarm algorithms, etc.; third, quantitative research on the impact of climate change and human activities on hydrological processes; fourth, flood control and drainage risk assessment methods based on GIS and remote sensing technology; fifth, research on eco-friendly flood control and drainage measures, such as the application of the sponge city concept. These studies provide important theoretical and technical support for the design of basin and regional flood control and drainage plans.

[0004] However, there are still some technical problems that need to be solved in existing research. For example, the effective fusion of multi-source heterogeneous data and the quantification of uncertainty remain a challenge, especially at the large-scale watershed level. For another example, the accuracy of coupled simulation of multi-scale hydrological and hydrodynamic processes needs to be improved, especially at the junction of cities, regions and watersheds. For another example, the coordination problem of flood control and drainage standards at different spatial scales (watersheds, regions, cities) has not been effectively solved. In addition, the methods for optimizing engineering layout and formulating scheduling strategies considering multiple objectives (flood control, drainage, ecology) still need to be improved; how to comprehensively consider long-term climate change, socio-economic development and ecological and environmental needs in program evaluation, and provide decision makers with intuitive and operational decision support tools, is still an important challenge. Summary of the invention

[0005] The purpose of the invention is to provide a combined design method and system for river basin and regional flood control and drainage schemes, in order to solve the above-mentioned problems existing in the prior art.

[0006] The technical solution provides a combined design method for flood control and drainage solutions for watersheds and regions, including the following steps: Step S1, obtaining multi-source data including climate-human activities, ecosystem services and multi-scale hydrology, and performing standardization processing and feature extraction to generate respective standardized data sets; using data fusion algorithms to integrate different types of data sets to form a unified social-ecological-hydrological system data set; performing uncertainty analysis on the fused data set, and outputting a comprehensive data set with uncertainty estimates; Step S2, obtaining a comprehensive data set with uncertainty estimates, using an adaptive multi-scale hydrological model to construct hydrological models at three scales, namely, watershed, region, and city, to generate hydrological process simulation results; based on the hydrological simulation results, applying a multi-level coupled hydrodynamic model to perform hydrodynamic simulation, and outputting watershed-region-city multi-scale hydrodynamic simulation results; using a multi-scale flood feedback analysis system to analyze the hydrodynamic simulation results, and obtaining a quantitative indicator set describing the watershed-region-city flood feedback relationship; combining pre-stored flood control and drainage engineering data, using a multi-objective flood control and drainage coordination assessment model to perform an assessment, and outputting flood control and drainage coordination assessment results; based on climate-human activity data, applying a climate-human activity-hydrological coupling impact analysis model to obtain quantitative assessment results of climate change and human activity impacts; using a multi-source uncertainty propagation and accumulation model to perform uncertainty propagation analysis on the entire simulation process, and outputting a comprehensive simulation result containing uncertainty estimates; Step S3, obtaining comprehensive simulation results including uncertainty estimation, using a multi-dimensional standard combination generation algorithm to generate a series of possible basin, regional and urban flood control and drainage standard combination schemes; using a multi-scale standard impact assessment model to evaluate these schemes and analyze their effects and feasibility; using a standard connectivity analysis algorithm to perform standard connectivity analysis, quantifying the degree of connectivity and potential conflicts between standards of different scales; applying a multi-objective standard optimization model to perform multi-objective standard optimization, combining the flood control and drainage coordination assessment results, to obtain the optimal flood control and drainage standard combination scheme; based on the climate change and human activity impact assessment results, using a standard adaptability assessment system to evaluate the long-term adaptability of the standard scheme, and outputting an adaptability assessment report for the standard scheme; Step S4, obtaining the optimal standard combination scheme, combining the pre-stored existing flood control and drainage engineering data, using the engineering facility adaptability assessment model to assess the adaptability and transformation needs of existing engineering facilities under the new standard; based on the assessment results, using the multi-scale engineering layout optimization algorithm to generate a series of possible engineering layout schemes; using the multi-objective engineering benefit assessment model to conduct multi-objective benefit assessment on these schemes; combining the hydrological and hydrodynamic simulation results, applying the adaptive engineering scheduling strategy generation system to formulate corresponding engineering scheduling strategies; using the engineering-scheduling collaborative optimization model to perform collaborative optimization of engineering layout and scheduling, and outputting the engineering layout optimization scheme and supporting scheduling strategy; Step S5, obtain the engineering layout optimization plan and supporting scheduling strategy, as well as the standard combination plan, and use the multidimensional benefit evaluation system to conduct a comprehensive benefit evaluation; combine the uncertainty estimation data, and use the multi-scenario risk assessment model to analyze the risk and uncertainty of the plan; based on the pre-stored socio-economic data, use the stakeholder impact analysis system to evaluate the impact of the plan on different stakeholders; based on the above evaluation results, apply the adaptive plan optimization algorithm to optimize and adjust the plan; summarize the key results of all steps, use the multidimensional decision support system to generate comprehensive decision support information, and output a decision support report.

[0007] According to another aspect of the present application, a combined design system for river basin and regional flood control and drainage schemes is also provided, comprising: at least one processor; and, a memory communicatively connected to at least one of the processors; wherein, The memory stores instructions that can be executed by the processor, and the instructions are used to be executed by the processor to implement the combined design method of watershed and regional flood control and drainage schemes described in any of the above technical solutions.

[0008] Beneficial effects: Through the coordinated application of innovative algorithms and models, and through simulation and actual verification, the entire process from data processing to final decision-making has been optimized, significantly improving the design quality and implementation effect of river basin and regional flood control and drainage schemes. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] Figure 1 It is a flow chart of the present invention.

[0010] Figure 2 It is a flow chart of step S1 of the present invention.

[0011] Figure 3 It is a flow chart of step S2 of the present invention.

[0012] Figure 4 It is a flow chart of step S3 of the present invention.

[0013] Figure 5 It is a flow chart of step S4 of the present invention.

[0014] Figure 6 It is a flow chart of step S5 of the present invention. DETAILED DESCRIPTION

[0015] like Figure 1 As shown, a combined design method for flood control and drainage schemes for watersheds and regions is provided, comprising the following steps: Step S1, obtaining multi-source data including climate-human activities, ecosystem services and multi-scale hydrology, and performing standardization processing and feature extraction to generate respective standardized data sets; using data fusion algorithms to integrate different types of data sets to form a unified social-ecological-hydrological system data set; performing uncertainty analysis on the fused data set, and outputting a comprehensive data set with uncertainty estimates; Step S2, obtaining a comprehensive data set with uncertainty estimates, using an adaptive multi-scale hydrological model to construct hydrological models at three scales, namely, watershed, region, and city, to generate hydrological process simulation results; based on the hydrological simulation results, applying a multi-level coupled hydrodynamic model to perform hydrodynamic simulation, and outputting watershed-region-city multi-scale hydrodynamic simulation results; using a multi-scale flood feedback analysis system to analyze the hydrodynamic simulation results, and obtaining a quantitative indicator set describing the watershed-region-city flood feedback relationship; combining pre-stored flood control and drainage engineering data, using a multi-objective flood control and drainage coordination assessment model to perform an assessment, and outputting flood control and drainage coordination assessment results; based on climate-human activity data, applying a climate-human activity-hydrological coupling impact analysis model to obtain quantitative assessment results of climate change and human activity impacts; using a multi-source uncertainty propagation and accumulation model to perform uncertainty propagation analysis on the entire simulation process, and outputting a comprehensive simulation result containing uncertainty estimates; Step S3, obtaining comprehensive simulation results including uncertainty estimation, using a multi-dimensional standard combination generation algorithm to generate a series of possible basin, regional and urban flood control and drainage standard combination schemes; using a multi-scale standard impact assessment model to evaluate these schemes and analyze their effects and feasibility; using a standard connectivity analysis algorithm to perform standard connectivity analysis, quantifying the degree of connectivity and potential conflicts between standards of different scales; applying a multi-objective standard optimization model to perform multi-objective standard optimization, combining the flood control and drainage coordination assessment results, to obtain the optimal flood control and drainage standard combination scheme; based on the climate change and human activity impact assessment results, using a standard adaptability assessment system to evaluate the long-term adaptability of the standard scheme, and outputting an adaptability assessment report for the standard scheme; Step S4, obtaining the optimal standard combination scheme, combining the pre-stored existing flood control and drainage engineering data, using the engineering facility adaptability assessment model to assess the adaptability and transformation needs of existing engineering facilities under the new standard; based on the assessment results, using the multi-scale engineering layout optimization algorithm to generate a series of possible engineering layout schemes; using the multi-objective engineering benefit assessment model to conduct multi-objective benefit assessment on these schemes; combining the hydrological and hydrodynamic simulation results, applying the adaptive engineering scheduling strategy generation system to formulate corresponding engineering scheduling strategies; using the engineering-scheduling collaborative optimization model to perform collaborative optimization of engineering layout and scheduling, and outputting the engineering layout optimization scheme and supporting scheduling strategy; Step S5, obtain the engineering layout optimization plan and supporting scheduling strategy, as well as the standard combination plan, and use the multidimensional benefit evaluation system to conduct a comprehensive benefit evaluation; combine the uncertainty estimation data, and use the multi-scenario risk assessment model to analyze the risk and uncertainty of the plan; based on the pre-stored socio-economic data, use the stakeholder impact analysis system to evaluate the impact of the plan on different stakeholders; based on the above evaluation results, apply the adaptive plan optimization algorithm to optimize and adjust the plan; summarize the key results of all steps, use the multidimensional decision support system to generate comprehensive decision support information, and output a decision support report.

[0016] In this embodiment, multi-source data acquisition and fusion technology solves the problems of data heterogeneity and uncertainty, and provides a high-quality and consistent data foundation for subsequent analysis. In particular, the application of spatiotemporal adaptive interpolation algorithm and heterogeneous data adaptive fusion algorithm significantly improves the spatiotemporal consistency and reliability of data. Multi-scale hydrological and hydrodynamic simulation and feedback relationship analysis technology breaks through the limitations of traditional single-scale simulation and realizes the coordinated simulation of three scales: basin, region and city. The innovative application of adaptive multi-scale hydrological model and multi-level coupled hydrodynamic model makes the simulation results more accurately reflect the complex hydrological and hydrodynamic process. Multi-scale flood control and drainage standard combination design technology solves the problem of coordination of standards at different scales. The application of multi-dimensional standard combination generation algorithm and multi-objective standard optimization model ensures the scientificity and coordination of design standards. Engineering layout optimization and scheduling strategy formulation technology realizes the spatial optimization and operation efficiency improvement of flood control and drainage projects. The innovation of multi-scale engineering layout optimization algorithm and adaptive engineering scheduling strategy generation system significantly improves the overall efficiency of engineering system. Comprehensive evaluation and decision support technology of schemes provide decision makers with comprehensive and intuitive decision-making basis. The application of multi-dimensional benefit evaluation system and multi-scenario risk assessment model ensures the scientificity and reliability of the final plan. Overall, this method realizes the optimization of the whole process from data processing to final decision-making through the coordinated application of innovative algorithms and models, and significantly improves the design quality and implementation effect of basin and regional flood control and drainage plans.

[0017] like Figure 2 As shown, the step S2 is further as follows: Step S11, obtaining historical meteorological data, multi-temporal satellite remote sensing images and socio-economic statistical data, and processing them using a spatiotemporal adaptive interpolation algorithm; performing Kriging interpolation on all data using the constructed spatiotemporal weight matrix to generate unified gridded data; evaluating the interpolation accuracy through cross-validation, and iteratively adjusting the weight matrix; outputting a standardized climate-human activity spatiotemporal data set, including time series of meteorological elements, land cover and socio-economic indicators on a unified grid; Step S12: Obtain land use data, biodiversity survey data and water quality monitoring data, and process them using a multidimensional ecosystem service assessment model; calculate biomass and primary productivity based on land use type, calculate the biodiversity index using species distribution data, and assess water purification capacity; combine the above indicators to calculate the comprehensive ecosystem service value of each grid unit; output a gridded ecosystem service assessment data set, including the values ​​of various ecosystem service indicators for each grid unit; Step S13, obtain DEM data, hydrological station observation data and drainage network data, and process them using a multi-scale hydrological feature extraction algorithm; construct a multi-scale feature pyramid to extract hydrological features at different spatial scales; perform consistency checks on hydrological features at different scales, and use scale conversion functions to adjust hydrological parameters between different scales; output a multi-scale consistent hydrological data set, including consistent hydrological features and parameters at different spatial scales; Step S14, obtaining the output data sets of steps S11, S12 and S13, and processing them using a heterogeneous data adaptive fusion algorithm; applying principal component analysis to each feature cluster to extract the main features; constructing an adaptive weight function to adjust the weight according to the information gain and principal component contribution of the features; using a weighted fusion method to integrate the features of different data sets into a unified feature space; outputting a fused social-ecological-hydrological system data set, which includes comprehensive features that integrate the information of each subsystem; Step S15, obtain the fused data set output by step S14 and the pre-stored historical prediction error data, and process them using a multi-source uncertainty propagation model; use the Monte Carlo method to generate multiple groups of simulation samples, perform propagation analysis on each group of samples, and calculate the uncertainty range of the results; based on the result distribution, calculate the confidence interval and probability density function of each output variable; generate an uncertainty report, including sensitivity analysis and identification of key uncertainty sources; output a comprehensive data set with uncertainty estimates, including the value of each feature and its associated uncertainty quantification results.

[0018] In this embodiment, the spatiotemporal adaptive interpolation algorithm effectively captures the dynamic characteristics of climate change and human activities by introducing adaptive weights in the time dimension when processing climate-human activity data, so that the interpolation results more accurately reflect the trend of spatiotemporal changes. This is particularly important in the design of flood control and drainage schemes for watersheds and regions, because it can more accurately reflect the impact of climate change and human activities on hydrological processes, thereby providing more reliable input data for subsequent scheme design. The multidimensional ecosystem service assessment model (MESAM) better reflects the interactions and trade-offs between ecosystem services by introducing a dynamic weight system. This is particularly important at the watershed and regional scales, because different flood control and drainage schemes may have different impacts on ecosystem services. MESAM can comprehensively evaluate these impacts and help design more environmentally friendly schemes. The multiscale hydrological feature extraction algorithm (MHFEA) realizes feature extraction and consistency processing of hydrological data of different scales by constructing a multiscale feature pyramid. This solves a key problem in the design of watershed and regional flood control and drainage schemes: how to effectively integrate and utilize hydrological data of different scales (such as watersheds, sub-basins, and cities). MHFEA ensures that the hydrological characteristics at both macro and micro scales can be considered during the scheme design process, thus improving the overall coordination of the scheme. In addition, the heterogeneous data adaptive fusion algorithm (HADFA) automatically identifies the potential associations between data by constructing a multi-level data relationship graph, and performs adaptive weight allocation and fusion. This is of great significance in the combined design of watershed and regional flood control and drainage schemes, because it can effectively integrate data from different sources and scales, such as hydrological, geographical, socio-economic and other data, to provide comprehensive and consistent data support for scheme design. The multi-source uncertainty propagation model (MUPM) quantifies various types of uncertainties in the process of data collection, processing and fusion by constructing a multi-level uncertainty propagation network. This is particularly important in the design of watershed and regional flood control and drainage schemes, because it can help designers understand the reliability and potential risks of the data, so that these uncertainties can be considered in the scheme design, improving the robustness and adaptability of the scheme.

[0019] like Figure 3 As shown, the step S2 is further as follows: Step S21, obtaining the terrain, land use and rainfall data in the comprehensive data set output by step S1, and using the adaptive multi-scale hydrological model to construct hydrological models at three scales: basin, region and city; establishing a confluence model to simulate the movement of water in the river channel and on the surface; designing scale adaptive parameters to adjust the parameter sensitivity of models at different scales; realizing automatic calibration of model parameters, and performing model verification; outputting the simulation results of hydrological processes at three scales, including flow process lines at each scale, and water level process lines; Step S22, obtain the hydrological process simulation results output by step S21 and the river and pipe network data in the comprehensive data set of step S1, and process them using a multi-level coupled hydrodynamic model; design a dynamic boundary interaction algorithm to achieve water volume exchange between different models; integrate the three models to form a unified multi-level coupled model; perform model parameter sensitivity analysis, and use observation data to calibrate and verify the coupled model; output basin-region-city multi-scale hydrodynamic simulation results, including river water level, flow velocity distribution and water accumulation depth; Step S23, obtaining the hydrodynamic simulation results outputted in step S22, and processing them using a multi-scale flood feedback analysis system; evaluating the impact of urban drainage on regional floods and the supporting effect of regional floods on urban waterlogging; analyzing the joint dispatching effect of flood control projects at different scales; generating a flood feedback relationship matrix to quantify the impact intensity between different scales; and outputting a quantitative indicator set describing the basin-region-city flood feedback relationship, including the impact coefficient and critical threshold between each scale; Step S24, obtaining the flood-waterlogging mutual feedback relationship indicator set outputted in step S23 and the pre-stored flood control and drainage engineering data, and processing them using a multi-objective flood control and drainage coordination evaluation model; calculating the achievement and coordination of each objective, identifying potential conflicts; performing sensitivity analysis, determining key factors affecting coordination; generating a coordination evaluation report; and outputting the flood control and drainage coordination evaluation results, including an overall coordination index and coordination scores of each subsystem; Step S25, obtaining the simulation and analysis results of steps S21 to S24 and the climate-human activity data set of step S1, and processing them using the climate-human activity-hydrology coupling impact analysis model; calculating the contribution rate of climate change and human activities to the hydrological process; analyzing the interaction between climate change and human activities, and identifying nonlinear effects; generating an impact assessment report; and outputting the quantitative assessment results of the impact of climate change and human activities, including the impact weight and critical threshold of each factor; Step S26, obtain the impact assessment results output from step S25 and the uncertainty estimation data from step S1, and process them using a multi-source uncertainty propagation and accumulation model; perform a complete model simulation on each sample to obtain the result distribution; calculate the statistical characteristics of each output variable; perform a global sensitivity analysis to identify key sources of uncertainty; generate an uncertainty analysis report; and output a comprehensive simulation result containing uncertainty estimates, which includes the expected values ​​and uncertainty ranges of all simulation variables.

[0020] In this embodiment, through multi-scale hydrological and hydrodynamic simulation and feedback relationship analysis, a comprehensive and in-depth understanding of the basin and regional flood control and drainage system is achieved, providing a solid scientific basis for the scheme combination design. This effect is mainly achieved through the following technical innovations: First, the adaptive multi-scale hydrological model (AMHM) can automatically adjust the parameter sensitivity and calculation accuracy according to the simulation scale by introducing scale adaptive parameters. This is of great significance in the design of basin and regional flood control and drainage schemes, because it can simultaneously consider the hydrological processes at the three scales of basin, region and city, ensuring the integrity and coordination of the scheme design. Especially when dealing with cross-scale flood control and drainage problems, AMHM can provide more accurate and consistent simulation results, which is helpful to design more effective cross-scale collaborative flood control and drainage strategies. The multi-level coupled hydrodynamic model (MCHM) innovatively vertically couples the one-dimensional river channel model, the two-dimensional surface flow model and the urban pipe network model, and realizes the dynamic exchange between water bodies at different levels through the dynamic boundary interaction algorithm. This solves a key problem in the design of basin and regional flood control and drainage schemes: how to accurately simulate complex hydrodynamic processes, especially the hydrodynamic behavior at the interface of cities, regions and basins. The coupled simulation capability of MCHM enables designers to better understand and predict the propagation and interaction of floods between different systems, so as to formulate more targeted flood control and drainage strategies. The Multiscale Flood Interaction Analysis System (MFIAS) identifies the flood interaction relationships between different scales by constructing a multi-level flood propagation network based on complex network theory and causal inference methods. This is of great significance in the combined design of basin and regional flood control and drainage schemes, because it can reveal the flood influence mechanism between upstream and downstream and between urban and rural areas, and provide a scientific basis for the formulation of coordinated flood control and drainage strategies. For example, through MFIAS, designers can better understand the impact of upstream flood control measures on downstream flood risks, or the impact of urban drainage on surrounding rural areas, so as to fully consider these interaction relationships in the scheme design. In addition, the Multi-Objective Flood Control and Drainage Coordination Evaluation Model (MOFCEM) evaluates the degree of coordination between different scales and different objectives by constructing the dynamic balance equation of the flood control and drainage system. This solves a key problem in the design of basin and regional flood control and drainage scheme combinations: how to balance multiple goals such as flood control, drainage, and ecological protection. MOFCEM can help designers identify potential conflicts of objectives and find the best balance point, so as to design more comprehensive and sustainable flood control and drainage schemes. The Climate-Human Activity-Hydrology Coupled Impact Analysis Model (CHAHIM) and the Multi-Source Uncertainty Propagation and Accumulation Model (MUPCM) quantify the coupled effects of climate change and human activities on flood processes, as well as the propagation and accumulation of uncertainties in the multi-scale hydrological and hydrodynamic simulation process.This is of great significance in the design of river basin and regional flood control and drainage schemes, as it can help designers understand and predict the impact of long-term climate change and human activities on flood control and drainage systems, while taking into account various uncertainties, thereby designing more adaptive and robust schemes.

[0021] like Figure 4 As shown, the step S3 is further as follows: Step S31, obtaining flood characteristics and risk information in the comprehensive simulation results output by step S2, and using a multi-dimensional standard combination generation algorithm to generate a standard combination scheme; preliminarily screening the generated combinations to eliminate obviously unreasonable schemes; calculating the preliminary feasibility score of each scheme; selecting the top-N schemes according to the score ranking; and outputting a series of potential standard combination schemes, each of which contains specific standard values ​​at three scales: watershed, region, and town; Step S32, obtaining the standard combination scheme generated in step S31, and processing it using the multi-scale standard impact assessment model; calculating the score of each scheme on each indicator; conducting a cost-benefit analysis to evaluate the economic rationality of the scheme; comprehensively ranking each scheme, considering the weights of multiple indicators; generating a scheme evaluation report; outputting the quantitative evaluation results of each standard combination scheme, including the score and comprehensive ranking of each indicator; Step S33, obtaining the evaluation result of step S32, and processing it using the standard coherence analysis algorithm; identifying potential conflict points and coordination points between standards; evaluating the coordination degree of the overall standard system; performing sensitivity analysis to identify key factors affecting coherence; generating a coherence analysis report; and outputting the standard coherence analysis results, including a coherence matrix, a list of conflict points, and an overall coordination score; Step S34, obtaining the connectivity analysis result of step S33 and the flood control and drainage coordination evaluation result of step S24, and processing them using a multi-objective standard optimization model; generating a Pareto optimal solution set; applying a fuzzy decision-making method to select the best solution in the Pareto solution set; performing a sensitivity analysis of the solution to evaluate its robustness; generating an optimization result report; and outputting the optimal flood control and drainage standard combination solution, including specific standard values ​​and expected effects of each scale; Step S35, obtain the optimal standard combination solution output by step S34 and the climate change and human activity impact assessment results of step S25, and process them using the standard adaptability assessment system; calculate the adaptability index value under each scenario; identify the vulnerability and adaptability threshold of the standard solution; generate suggestions for improving the adaptability of the solution; generate an adaptability assessment report; output the adaptability assessment report of the standard solution, including the adaptability score and improvement suggestions under each scenario.

[0022] In this embodiment, the multidimensional standard combination generation algorithm (MSCGA) automatically generates a standard combination that meets certain constraints by constructing a multidimensional standard space and applying combinatorial optimization theory. This solves a key problem in the design of flood control and drainage schemes for watersheds and regions: how to coordinate the setting of flood control and drainage standards at three scales: watershed, region and town. MSCGA can consider the characteristics and needs of different scales and generate a series of feasible standard combination schemes, providing a wealth of alternatives for subsequent optimization and selection. The multi-scale standard impact assessment model (MSIEM) is based on system dynamics and risk assessment theory, and evaluates the effect and feasibility of each scheme by simulating the flood process and impact under different standard combinations. This is of great significance in the design of flood control and drainage schemes for watersheds and regions, because it can comprehensively evaluate the long-term impact of different standard combinations, including flood control effects, drainage capacity, ecological impacts and other aspects. The multi-scenario simulation capability of MSIEM enables designers to foresee the performance of different standard combinations in various possible situations, so as to select the most suitable standard combination. The Standard Connectivity Analysis Algorithm (SCIA) is based on graph theory and network flow theory. It constructs a standard connectivity network to quantify the degree of connectivity and potential conflicts between standards at different scales. This solves a key problem in the design of flood control and drainage scheme combinations at the basin and regional level: how to ensure the coordination and consistency between flood control and drainage standards at different scales. SCIA can identify potential conflict points and synergy points between standards, providing a scientific basis for the coordination and optimization of standards. For example, it can help identify the inconsistency between the flood control standards of the upstream basin and the flood control standards of the downstream city, so as to make targeted adjustments. In addition, the Multi-Objective Standard Optimization Model (MOSOM) is based on a multi-objective evolutionary algorithm and fuzzy decision theory. It optimizes the standard combination scheme by setting multiple objectives such as flood control, drainage, and ecological protection. This is of great significance in the design of flood control and drainage schemes at the basin and regional level because it can find the best balance between multiple objectives. The Pareto optimal solution set of MOSOM provides a series of trade-offs for decision makers, allowing them to choose the most appropriate standard combination according to their specific circumstances and preferences. The Standard Adaptability Assessment System (SAES) is based on adaptive management theory and scenario analysis methods. It evaluates the long-term adaptability of standard solutions by simulating the implementation effects of standards under different climate and socio-economic scenarios. This solves a key problem in the design of river basin and regional flood control and drainage solutions: how to ensure that the designed standards remain effective in the long term. SAES can identify the vulnerability and adaptability thresholds of standard solutions, providing a scientific basis for the formulation of long-term and effective flood control and drainage standards. For example, it can assess whether existing standards are still applicable under extreme climate change scenarios, so as to formulate adaptive strategies in advance.

[0023] like Figure 5 As shown, step S4 is specifically as follows: Step S41: obtain the pre-stored existing flood control and drainage engineering data and the optimal standard combination scheme output in step S3, and process them using the engineering facility adaptability assessment model; perform life cycle analysis to predict the long-term performance of the facilities; identify key facilities that need to be renovated or upgraded; estimate the renovation costs and benefits; generate a facility assessment report; and output an existing engineering facility assessment report, including the adaptability score and renovation requirements of each facility; Step S42: Obtain the engineering facility assessment report of step S41 and the standard combination scheme of step S3, and process them using a multi-scale engineering layout optimization algorithm; apply a heuristic algorithm to optimize the project location and scale; evaluate the technical feasibility and economic rationality of the scheme; screen and sort the schemes; output a series of potential engineering layout schemes, each of which contains specific information on the project location, type and scale; Step S43, obtaining the engineering layout plan generated in step S42, and processing it using a multi-objective engineering benefit evaluation model; evaluating the ecological and environmental impact of the plan; calculating the economic cost and benefit of the plan; performing a multi-objective comprehensive scoring; generating a plan evaluation report; and outputting the quantitative evaluation results of the engineering layout plan, including the scores and comprehensive rankings of various indicators; Step S44, obtaining the engineering layout evaluation result of step S43 and the hydrological and hydrodynamic simulation result of step S2, and processing them using the adaptive engineering scheduling strategy generation system; using the reinforcement learning algorithm to optimize the scheduling strategy; conducting multi-scenario simulation to test the adaptability of the scheduling strategy; evaluating the operability and robustness of the scheduling strategy; generating a scheduling manual; outputting a set of engineering scheduling strategies for different scenarios, including specific scheduling rules for each engineering facility; Step S45, obtain the scheduling strategy set of step S44 and the engineering layout evaluation result of step S43, and process them using the engineering-scheduling collaborative optimization model; use the multi-agent reinforcement learning algorithm to perform collaborative optimization; evaluate the overall performance and synergy effect of the optimization plan; perform sensitivity analysis to identify key influencing factors; generate an optimization report; output the engineering layout optimization plan and supporting scheduling strategy, including a specific engineering layout diagram and a scheduling rule set.

[0024] In this embodiment, the Engineering Facility Adaptability Assessment Model (EFAEM) evaluates the adaptability and transformation needs of existing engineering facilities under the new standards based on reliability theory and life cycle analysis. This solves a key problem in the design of basin and regional flood control and drainage schemes: how to effectively utilize and transform existing engineering facilities. EFAEM can identify key facilities that need to be transformed or upgraded and provide transformation priority recommendations, which helps to optimize resource allocation and ensure the overall effectiveness of flood control and drainage systems. The Multi-Scale Engineering Layout Optimization Algorithm (MELOA) is based on spatial optimization theory and geographic information systems. By considering factors such as topography, land use, and hydrological characteristics, it automatically generates engineering layout plans that meet the requirements of the new standards. This is of great significance in the design of basin and regional flood control and drainage schemes because it can coordinate engineering layouts at multiple spatial scales to ensure the overall effectiveness of flood control and drainage projects. The multi-level optimization capability of MELOA enables designers to consider the needs of basin, regional, and urban scales at the same time, thereby designing more coordinated and efficient engineering layout plans. The Multi-Objective Engineering Benefit Evaluation Model (MOPEEM) is based on benefit-cost analysis and life cycle assessment methods. It simulates the flood control and drainage effects, ecological impacts and economic costs under different engineering layouts, and comprehensively evaluates the comprehensive benefits of each scheme. This solves a key problem in the design of basin and regional flood control and drainage schemes: how to find the best balance between multiple objectives. MOPEEM can help decision makers fully understand the advantages and disadvantages of each engineering layout scheme, so as to make more scientific and reasonable choices. In addition, the Adaptive Engineering Scheduling Strategy Generation System (AODSGS) generates the optimal engineering scheduling strategy by simulating the system response under different scheduling strategies based on reinforcement learning and model predictive control theory. This is of great significance in the design of basin and regional flood control and drainage schemes because it can improve the operating efficiency and emergency response capabilities of flood control and drainage systems. The adaptive learning ability of AODSGS enables the scheduling strategy to be adjusted according to real-time conditions, so as to better cope with complex and changeable flood conditions. For example, it can automatically adjust the opening degree of downstream gates according to upstream rainfall and reservoir water levels to achieve coordinated scheduling within the basin. The Engineering-Dispatching Collaborative Optimization Model (EDCOM) is based on multi-agent systems and game theory. It achieves the collaborative optimization of engineering layout and scheduling strategy by simulating the interaction between engineering layout and scheduling strategy. This solves a key problem in the design of basin and regional flood control and drainage schemes: how to ensure the coordination and consistency of engineering layout and scheduling strategy. EDCOM can consider the impact of engineering layout on scheduling strategy, as well as the feedback of scheduling strategy on engineering performance, so as to design a more coordinated and efficient overall solution. For example, it can consider the flexibility of scheduling strategy when optimizing reservoir layout, or consider the constraints of engineering layout when designing scheduling strategy.

[0025] like Figure 6As shown, the step S5 is specifically as follows: Step S51: Obtain the engineering layout optimization plan and supporting scheduling strategy outputted in step S4, and the standard combination plan of step S3, and process them using a multi-dimensional benefit evaluation system; calculate the benefit index of each evaluation dimension; conduct a cost-benefit analysis to evaluate the economic feasibility of the plan; evaluate the social impact and environmental benefits of the plan; generate a comprehensive benefit evaluation report; and output the comprehensive benefit evaluation report of the plan, including the scores of each evaluation dimension and the overall benefit evaluation; Step S52: Obtain the comprehensive benefit evaluation report of step S51 and the uncertainty estimation data of step S2, and process them using a multi-scenario risk assessment model; calculate the probability of occurrence and potential impact of various risks; analyze the vulnerability of the scheme and identify key risk points; evaluate the robustness and adaptability of the scheme; generate a risk and uncertainty analysis report; output the risk and uncertainty analysis report, including quantitative assessment of major risks and response strategies; Step S53, obtain the comprehensive benefit evaluation report of step S51 and the pre-stored socio-economic data, and process them using the stakeholder impact analysis system; conduct multi-agent simulation to predict the reactions and interactions of different groups; evaluate the degree and direction of the impact of the plan on each group; identify potential conflicts of interest and synergy points; generate a stakeholder impact assessment report; output the stakeholder impact assessment report, including the impact score of each group and possible reaction predictions.

[0026] Step S54, obtaining the evaluation results of steps S51, S52 and S53, and processing them using an adaptive solution optimization algorithm; performing sensitivity analysis to identify key influencing factors; selecting the optimal adjustment solution and making fine adjustments; generating a solution optimization report; and outputting an optimized flood control and drainage solution, including an adjusted engineering layout, scheduling strategy and standard settings; Step S55, obtain the optimized plan of step S54, summarize the key results of all previous steps, and use a multidimensional decision support system for processing; design an interactive visualization interface to intuitively display key information; formulate emergency plans and adaptive management strategies; generate a comprehensive decision support report; output a decision support report including plan details, benefit analysis, risk assessment and implementation recommendations.

[0027] In this embodiment, the multi-dimensional benefit evaluation system (MBES) is based on multi-criteria decision analysis and system dynamics, and comprehensively evaluates its comprehensive benefits in flood control and disaster reduction, ecological protection, economic development, etc. by simulating the long-term effects of the scheme after implementation. This solves a key problem in the design of basin and regional flood control and drainage schemes: how to comprehensively and objectively evaluate the long-term effects of the scheme. The multi-scenario simulation capability of MBES enables decision makers to understand the performance of the scheme under different conditions, so as to make more informed choices. For example, it can evaluate the long-term benefits of a flood control project under different climate change scenarios, or analyze the potential impact of an eco-friendly drainage scheme on regional economic development. The multi-scenario risk assessment model (MSRAM) is based on probabilistic risk assessment and fuzzy set theory, and evaluates the risk and robustness of the scheme under different conditions by generating and analyzing multiple possible future scenarios. This is of great significance in the design of basin and regional flood control and drainage schemes, because it can help decision makers understand the potential risks and uncertainties of the scheme. The scenario analysis capability of MSRAM enables decision makers to identify the vulnerabilities and key risk points of the scheme, so as to formulate corresponding risk response strategies. For example, it can assess the failure risk of a flood control scheme under extreme rainfall scenarios, or analyze the adaptability of a drainage system under rapid urban expansion scenarios. Based on social network analysis and multi-agent modeling methods, the Stakeholder Impact Analysis System (SIAS) evaluates the impact of the scheme on each party and possible conflicts by simulating the reactions and interactions of different stakeholders. This solves a key problem in the design of basin and regional flood control and drainage schemes: how to balance the interests of different groups and improve the social acceptance of the scheme. The social network simulation capability of SIAS enables decision makers to foresee the social reactions that may occur after the implementation of the scheme, so as to formulate corresponding coordination and communication strategies in advance. It can analyze the different impacts of large-scale flood control projects on upstream and downstream residents, or evaluate the differences in attitudes of agricultural producers and environmental protection organizations for an ecological drainage scheme. In addition, the Adaptive Alternative Optimization Algorithm (APOA) is based on adaptive control theory and robust optimization methods, and finally fine-tunes and optimizes the scheme by weighing different evaluation dimensions. This is of great significance in the design of basin and regional flood control and drainage schemes, because it can find the optimal balance point based on comprehensive consideration of multiple factors. APOA's adaptive optimization capability enables the solution to be precisely adjusted for specific situations while maintaining the overall effect. For example, it can fine-tune certain engineering parameters to reduce ecological impacts, or adjust scheduling strategies to improve economic benefits while ensuring the overall flood control effect. The multidimensional decision support system (MDSS) is based on knowledge graphs and visualization technology. By integrating and visualizing various types of information, it provides decision makers with comprehensive and intuitive decision support information. This solves a key problem in the design of basin and regional flood control and drainage solutions: how to transform complex technical information into easy-to-understand and easy-to-use decision support tools.MDSS’s knowledge graph construction and visualization capabilities enable decision makers to quickly grasp key information and understand the potential impact of different decisions. For example, it can intuitively display the distribution of flood risks under different flood control standards, or allow decision makers to simulate the effects of different scheduling strategies through an interactive interface.

[0028] In this embodiment, the data processing flow is as follows.

[0029] Step S1 includes obtaining climate-human activity data, ecosystem service data and multi-scale hydrological data, standardizing and fusing these data, and quantifying the uncertainty of the data. First, climate-human activity data are obtained, including historical meteorological data, satellite remote sensing images and socioeconomic statistics, and these data are standardized and gridded to obtain a standardized climate-human activity spatiotemporal data set. Then, ecosystem service data are obtained, including land use data, biodiversity survey data and water quality monitoring data, and these data are quantified to obtain a gridded ecosystem service assessment data set. Next, multi-scale hydrological data are obtained, including DEM data, hydrological site observation data and drainage network data, and these data are processed for consistency to obtain a multi-scale consistent hydrological data set. Afterwards, the above three data sets are fused to obtain a fused social-ecological-hydrological system data set. Combined with historical prediction error data, the uncertainty of the fused data set is quantified to obtain a comprehensive data set with uncertainty estimation.

[0030] Step S11: Climate-human activity data collection and processing Step S11 first obtains historical meteorological data from the meteorological department, including rainfall, temperature, evaporation, etc. Then, obtains multi-temporal satellite remote sensing images from the remote sensing database. Next, obtains socioeconomic statistics from the Statistics Bureau. After that, the data is processed using a spatiotemporal adaptive interpolation algorithm, which includes the following sub-steps: Step S111: Perform time series analysis on historical meteorological data to identify long-term trends and cyclical changes.

[0031] Step S112: Using satellite remote sensing images, extract the land cover type and change information.

[0032] Step S113: Associating socio-economic statistical data with geographic spatial information to generate spatial socio-economic indicators.

[0033] Step S114: construct a spatiotemporal weight matrix based on the determined time trends and spatial features.

[0034] Step S115: Use the constructed weight matrix to perform Kriging interpolation on all data to generate unified gridded data.

[0035] Step S116: cross-validate the interpolation results to evaluate the interpolation accuracy.

[0036] Step S117: Iteratively adjust the weight matrix according to the verification result until a predetermined accuracy threshold is reached. Output a standardized climate-human activity spatiotemporal dataset, which contains time series of meteorological elements, land cover, and socioeconomic indicators on a unified grid.

[0037] Step S12: Ecosystem service data collection and quantification Step S12 first obtains land use data from the land resource management department. Then, obtains biodiversity survey data and water quality monitoring data from the environmental protection department. Then, the multidimensional ecosystem service assessment model (MESAM) is used to process these data, which includes the following sub-steps: Step S121: classify and encode the land use data to generate a land use type layer.

[0038] Step S122: Associating the biodiversity survey data with the spatial location to generate a species distribution layer.

[0039] Step S123: perform spatial interpolation on the water quality monitoring data to generate a water quality distribution layer.

[0040] Step S124: Calculate the biomass and primary productivity of each grid unit based on the land use type.

[0041] Step S125: Calculate the biodiversity index of each grid unit using the species distribution data.

[0042] Step S126: Based on the water quality data and land use type, the water purification capacity of each grid unit is evaluated.

[0043] Step S127: Calculate the comprehensive ecosystem service value of each grid unit by combining the above indicators, and output a gridded ecosystem service assessment data set, which contains the values ​​of various ecosystem service indicators of each grid unit.

[0044] Step S13: Multi-scale hydrological data collection and consistency processing Step S13 first obtains DEM data, hydrological site observation data and drainage network data from the water conservancy department. Then, the multi-scale hydrological feature extraction algorithm (MHFEA) is used to process these data, which includes the following sub-steps: Step S131: Extract watershed boundaries, river network structures and sub-watershed divisions based on DEM data.

[0045] Step S132: Perform quality control on the hydrological station observation data, remove outliers and fill in missing values.

[0046] Step S133: Overlay the drainage network data with the DEM data to generate a comprehensive water network including natural and artificial drainage systems.

[0047] Step S134: construct a multi-scale feature pyramid to extract hydrological features at different spatial scales.

[0048] Step S135: Perform consistency check on hydrological features at different scales to identify differences and conflicts between scales.

[0049] Step S136: Use the scale conversion function to adjust the hydrological parameters between different scales to achieve scale consistency.

[0050] Step S137: Generate a multi-scale consistent hydrological parameter set, including confluence time, discharge coefficient, etc. Output a multi-scale consistent hydrological data set, which contains consistent hydrological features and parameters at different spatial scales.

[0051] Step S14: Social-ecological-hydrological system data fusion Step S14 first obtains the output data sets of steps S11, S12 and S13. Then, the data are processed using a heterogeneous data adaptive fusion algorithm (HADFA), which includes the following sub-steps: Step S141: construct a multi-level data relationship diagram to represent the potential relationship between different data sets.

[0052] Step S142: Calculate the correlation matrix between data sets and identify strongly correlated and weakly correlated feature pairs.

[0053] Step S143: Calculate the information gain of each data feature based on information entropy theory.

[0054] Step S144: Use a graph segmentation algorithm to group data features to form feature clusters.

[0055] Step S145: Apply principal component analysis to each feature cluster to extract main features.

[0056] Step S146: construct an adaptive weight function and adjust the weight according to the information gain and principal component contribution of the feature.

[0057] Step S147: Use a weighted fusion method to integrate the features of different data sets into a unified feature space, and output a fused social-ecological-hydrological system data set, which contains comprehensive features that integrate information from each subsystem.

[0058] Step S15: Uncertainty quantification Step S15 first obtains the fused data set output by S14 and the pre-stored historical prediction error data. Then, it is processed using a multi-source uncertainty propagation model (MUPM), which includes the following sub-steps: Step S151: Perform statistical analysis on historical prediction error data to extract error distribution characteristics.

[0059] Step S152: construct a Bayesian network to represent the uncertainty propagation path in the data processing flow.

[0060] Step S153: For each processing step, define the uncertainty source and propagation function.

[0061] Step S154: Use the Monte Carlo method to generate multiple groups of simulation samples.

[0062] Step S155: perform propagation analysis on each group of samples and calculate the uncertainty range of the final result.

[0063] Step S156: Calculate the confidence interval and probability density function of each output variable based on the result distribution.

[0064] Step S157: Generate an uncertainty report, including sensitivity analysis and identification of key uncertainty sources, and output a comprehensive data set with uncertainty estimates, which contains the value of each feature and its associated uncertainty quantification results.

[0065] Step S2: Multi-scale hydrological and hydrodynamic simulation and feedback relationship analysis Step S2 first obtains the comprehensive data set with uncertainty estimation output by step S1. Then, a multi-scale hydrological model is constructed to obtain the simulation results of hydrological processes at three scales. Next, a hydrodynamic model is constructed based on the hydrological simulation results, and the multi-scale hydrodynamic simulation results of the basin-region-city are output. After that, the flood-waterlogging mutual feedback relationship of the hydrodynamic simulation results is analyzed to obtain a set of quantitative indicators describing the flood-waterlogging mutual feedback relationship of the basin-region-city. Then, combined with the flood control and drainage project data, a flood control and drainage coordination assessment is performed, and the flood control and drainage coordination assessment results are output. Then, combined with the climate-human activity data, the impact of climate change and human activities is analyzed to obtain a quantitative assessment result of the impact. The uncertainty in the entire simulation process is propagated and analyzed, and a comprehensive simulation result containing uncertainty estimation is output.

[0066] Step S21: Multi-scale hydrological model construction Step S21 first extracts terrain, land use, rainfall and other data from the comprehensive data set output by step S1. Then, an adaptive multi-scale hydrological model (AMHM) is used to construct hydrological models at three scales: basin, region and city. The processing of AMHM includes the following sub-steps: Step S211: Divide the watershed, sub-watershed and catchment unit based on the DEM data.

[0067] Step S212: Determine the underlying surface parameters of each watershed unit based on the land use data.

[0068] Step S213: construct a rainfall-runoff conversion module, including loss calculation and runoff calculation.

[0069] Step S214: Establish a confluence model to simulate the movement of water in the river channel and on the ground surface.

[0070] Step S215: design scale adaptive parameters to adjust parameter sensitivity of models of different scales.

[0071] Step S216: Automatically calibrate the model parameters and optimize the model parameters using historical observation data.

[0072] Step S217: perform model verification to evaluate the simulation accuracy of the model at different scales. Output the hydrological process simulation results at three scales, including flow process lines, water level process lines, etc. at each scale.

[0073] Step S22: Construction of hydrodynamic model Step S22 first obtains the hydrological process simulation results output by S21, and extracts the river channel, pipe network and other data from the comprehensive data set of step S1. Then, the multi-level coupled hydrodynamic model (MCHM) is used for processing. The processing of MCHM includes the following sub-steps: Step S221: construct a one-dimensional river model to simulate the water flow movement of the main river.

[0074] Step S222: Establish a two-dimensional overland flow model to simulate the spread of floods in the plain area.

[0075] Step S223: Create a city pipe network model to simulate the operation of the city drainage system.

[0076] Step S224: design a dynamic boundary interaction algorithm to achieve water exchange between different models.

[0077] Step S225: Integrate the three models to form a unified multi-level coupling model.

[0078] Step S226: Perform model parameter sensitivity analysis to identify key parameters.

[0079] Step S227: Calibrate and verify the coupling model using observation data, and output the basin-region-city multi-scale hydrodynamic simulation results, including river water level, flow velocity distribution, water depth, etc.

[0080] Step S23: Analysis of flood mutual feedback relationship Step S23 first obtains the hydrodynamic simulation results output by S22. Then, it is processed using the Multi-scale Flood Feedback Analysis System (MFIAS). The processing of MFIAS includes the following sub-steps: Step S231: construct a multi-level flood propagation network to represent the water volume transfer relationship between different scales.

[0081] Step S232: Calculate the traffic balance of each node in the network and identify the key transmission path.

[0082] Step S233: Analyze the upstream and downstream flood peak propagation characteristics, including flood peak reduction and time lag.

[0083] Step S234: Evaluate the impact of urban drainage on regional flooding, including runoff increase and changes in confluence time.

[0084] Step S235: quantify the supporting effect of regional floods on urban waterlogging.

[0085] Step S236: Analyze the joint scheduling effect of flood control projects of different scales.

[0086] Step S237: Generate a flood mutual feedback relationship matrix to quantify the impact intensity between different scales. Output a quantitative indicator set describing the flood mutual feedback relationship between the basin, region and city, including the impact coefficient and critical threshold between each scale.

[0087] Step S24: Flood control and drainage coordination assessment Step S24 first obtains the flood-waterlogging mutual feedback relationship indicator set output by S23, and reads the flood control and drainage project data from the pre-stored database. Then, the multi-objective flood control and drainage coordination evaluation model (MOFCEM) is used for processing. The processing process of MOFCEM includes the following sub-steps: Step S241: construct a dynamic equilibrium equation of the flood control and drainage system to represent the interaction between the subsystems.

[0088] Step S242: define multiple assessment targets, including flood control safety, drainage efficiency, ecological impact, etc.

[0089] Step S243: design a coordination index system to quantify the degree of coordination between different goals.

[0090] Step S244: Perform multi-scenario simulation to evaluate system responses under different conditions.

[0091] Step S245: Calculate the achievement and coordination of each goal and identify potential conflicts.

[0092] Step S246: Perform sensitivity analysis to determine key factors affecting coordination.

[0093] Step S247: Generate a coordination assessment report, including coordination scores and improvement suggestions. Output the flood control and drainage coordination assessment results, including the overall coordination index, coordination scores of each subsystem, etc.

[0094] Step S25: Analysis of the impact of climate change and human activities Step S25 first obtains the simulation and analysis results of S21 to S24, and extracts the climate-human activity dataset from step S1. Then, it is processed using the Climate-Human Activity-Hydrology Coupled Impact Analysis Model (CHAHIM). The processing of CHAHIM includes the following sub-steps: Step S251: construct a multi-level causal network to represent the interaction between climate, human activities and hydrological processes.

[0095] Step S252: Design a set of climate change scenarios, including temperature and precipitation change patterns.

[0096] Step S253: Create a human activity scenario set, including land use change and water resource utilization patterns.

[0097] Step S254: Perform scenario-driven hydrological and hydrodynamic simulation to evaluate system response.

[0098] Step S255: Calculate the contribution of climate change and human activities to the hydrological process.

[0099] Step S256: Analyze the interaction between climate change and human activities and identify nonlinear effects.

[0100] Step S257: Generate an impact assessment report, including the impact degree and trend forecast of each factor. Output the quantitative assessment results of climate change and human activity impacts, including the impact weights and critical thresholds of each factor.

[0101] Step S26: uncertainty propagation analysis Step S26 first obtains the impact assessment results output by S25 and extracts the uncertainty estimation data from step S1. Then, it is processed using the Multi-Source Uncertainty Propagation and Accumulation Model (MUPCM). The processing of MUPCM includes the following sub-steps: S261. Construct an uncertainty propagation chain to represent the transmission path of uncertainty in the model.

[0102] Step S262: define the uncertainty transfer function of each link and describe the changing law of uncertainty.

[0103] Step S263: Generate a large number of simulation samples using the Monte Carlo method.

[0104] Step S264: Perform a complete model simulation on each sample to obtain a result distribution.

[0105] Step S265: Calculate the statistical characteristics of each output variable, including mean, variance, quantile, etc.

[0106] Step S266: Perform a global sensitivity analysis to identify key sources of uncertainty.

[0107] Step S267: Generate an uncertainty analysis report, including error bands and confidence intervals, and output a comprehensive simulation result containing uncertainty estimates, which includes the expected values ​​and uncertainty ranges of all simulation variables.

[0108] Step S3: Multi-scale flood control and drainage standard combination design Step S3 first obtains the comprehensive simulation results including uncertainty estimation output by step S2. Then, a series of possible combination schemes of flood control and drainage standards for river basins, regions and towns are generated. Then, these schemes are evaluated to analyze their effectiveness and feasibility. After that, standard connectivity analysis is performed to quantify the degree of connectivity and potential conflicts between standards of different scales. Then, multi-objective standard optimization is performed to obtain the optimal combination scheme of flood control and drainage standards. The long-term adaptability of the standard scheme is evaluated, and an adaptability evaluation report of the standard scheme is output.

[0109] Step S31: Generate standard combination scheme Step S31 first extracts flood characteristics and risk information from the comprehensive simulation results output in step S2. Then, a multidimensional standard combination generation algorithm (MSCGA) is used to generate a standard combination scheme. The processing process of MSCGA includes the following sub-steps: Step S311: define a multidimensional standard space, including three dimensions: watershed, region, and town.

[0110] Step S312: Set the value range and step size of each dimension to form a discrete standard value set.

[0111] Step S313: construct a set of constraint conditions, including technical feasibility, economic rationality, etc.

[0112] Step S314: Use a combinatorial optimization algorithm to generate all possible combinations that satisfy the constraints.

[0113] Step S315: Preliminary screening is performed on the generated combinations to eliminate obviously unreasonable solutions.

[0114] Step S316: Calculate the preliminary feasibility score of each solution.

[0115] Step S317: Select the top-N solutions as output according to the score sorting, and output a series of potential standard combination solutions, each of which contains specific standard values ​​at three scales: watershed, region, and town.

[0116] Step S32: Standard combination scheme evaluation Step S32 first obtains the standard combination scheme generated in S31. Then, it is processed using the Multi-Scale Standard Impact Assessment Model (MSIEM). The processing of MSIEM includes the following sub-steps: Step S321: construct a system dynamics model to simulate flood processes under different standards.

[0117] Step S322: Design an evaluation index system, including flood control effects, drainage capacity, ecological impact, etc.

[0118] Step S323: Perform Monte Carlo simulation to consider system responses under different scenarios.

[0119] Step S324: Calculate the score of each solution on each indicator.

[0120] Step S325: Conduct a cost-benefit analysis to evaluate the economic feasibility of the solution.

[0121] Step S326: comprehensively rank the various solutions, taking into account the weights of multiple indicators.

[0122] Step S327: Generate a solution evaluation report, including an analysis of the advantages and disadvantages of each solution, and output the quantitative evaluation results of each standard combination solution, including the scores and comprehensive rankings of each indicator.

[0123] Step S33: Standard connectivity analysis Step S33 first obtains the evaluation result of S32. Then, the standard connectivity analysis algorithm (SCIA) is used for processing. The processing of SCIA includes the following sub-steps: Step S331: construct a standard connection network to represent the relationship between different scale standards.

[0124] Step S332: define connectivity indicators, including consistency, complementarity and conflict.

[0125] Step S333: Calculate the connectivity index values ​​between each pair of standards.

[0126] Step S334: Identify potential conflict points and coordination points between standards.

[0127] Step S335: Evaluate the coordination level of the overall standard system.

[0128] Step S336: Perform sensitivity analysis to identify key factors affecting connectivity.

[0129] Step S337: Generate a coherence analysis report, including improvement suggestions. Output standard coherence analysis results, including a coherence matrix, a list of conflict points, and an overall coordination score.

[0130] Step S34: Multi-objective standard optimization Step S34 first obtains the connectivity analysis results of S33 and the flood control and drainage coordination evaluation results of step S2. Then, a multi-objective standard optimization model (MOSOM) is used for processing. The processing process of MOSOM includes the following sub-steps: Step S341, define multiple optimization objectives, including flood control safety, drainage efficiency, ecological protection, etc.

[0131] Step S342: construct an objective function to quantify the degree of achievement of each objective.

[0132] Step S343: Set constraints, including technical, economic and policy restrictions.

[0133] Step S344: Use a multi-objective evolutionary algorithm to generate a Pareto optimal solution set.

[0134] Step S345: Apply the fuzzy decision-making method to select the best solution in the Pareto solution set.

[0135] Step S346: Perform a sensitivity analysis of the solution to evaluate its robustness.

[0136] Step S347: Generate an optimization result report, including the optimal solution and its characteristics. Output the optimal flood control and drainage standard combination solution, including the specific standard values ​​and expected effects of each scale.

[0137] Step S35: Standard solution suitability assessment Step S35 first obtains the optimal standard combination scheme output by S34 and the climate change and human activity impact assessment results of step S2. Then, the Standard Adaptability Assessment System (SAES) is used for processing. The SAES processing process includes the following sub-steps: Step S351: construct a long-term scenario set, including climate change and socio-economic development scenarios.

[0138] Step S352: Design adaptability evaluation indicators, including stability, flexibility and sustainability.

[0139] Step S353: Conduct long-term simulation to evaluate the performance of the standard solution under different scenarios.

[0140] Step S354: Calculate the adaptability index value in each scenario.

[0141] Step S355: Identify the vulnerability and adaptability thresholds of the standard solution.

[0142] Step S356: Propose suggestions for improving the adaptability of the solution.

[0143] Step S357: Generate an adaptability assessment report, including long-term risk analysis. Output the adaptability assessment report of the standard solution, including adaptability scores and improvement suggestions for each scenario.

[0144] Step S4: Engineering layout optimization and scheduling strategy formulation Step S4 first evaluates the adaptability and transformation needs of existing engineering facilities under the new standards. Then, a series of possible engineering layout plans are generated. Then, these plans are evaluated for multi-objective benefits. After that, the corresponding engineering scheduling strategy is formulated. The engineering layout and scheduling are coordinated and optimized, and the final engineering layout optimization plan and supporting scheduling strategy are output.

[0145] Step S41: Assessment of existing engineering facilities Step S41 first reads the existing flood control and drainage project data from the pre-stored database and obtains the optimal standard combination scheme output by step S3. Then, the Engineering Facility Adaptability Assessment Model (EFAEM) is used for processing. The processing process of EFAEM includes the following sub-steps: Step S411: construct a list of engineering facilities, including information such as type, scale, and location.

[0146] Step S412: Calculate the design level of each facility under the new standard.

[0147] Step S413: Evaluate the structural safety and functional adaptability of the facility.

[0148] Step S414: Perform life cycle analysis to predict the long-term performance of the facility.

[0149] Step S415: Identify key facilities that need to be modified or upgraded.

[0150] Step S416: Estimate transformation costs and benefits.

[0151] Step S417: Generate a facility assessment report, including a modification priority recommendation. Output an existing engineering facility assessment report, including the adaptability score and modification requirements of each facility.

[0152] Step S42: Project layout plan generation Step S42 first obtains the engineering facility assessment report of S41 and the standard combination plan of step S3. Then, the multi-scale engineering layout optimization algorithm (MELOA) is used for processing. The processing of MELOA includes the following sub-steps: Step S421: construct a multi-level engineering layout space, including watershed, regional and city scales.

[0153] Step S422: Set engineering layout constraints, including terrain, land use restrictions, etc.

[0154] Step S423: Generate an initial engineering layout solution set.

[0155] Step S424: Apply heuristic algorithm to optimize the project location and scale.

[0156] Step S425: Evaluate the technical feasibility and economic rationality of the solution.

[0157] Step S426: Screen and sort the solutions.

[0158] Step S427: Output the top-N potential project layout solutions. Output a series of potential project layout solutions, each of which contains specific project location, type and scale information.

[0159] Step S43: Engineering layout plan evaluation Step S43 first obtains the engineering layout plan generated in S42. Then, it is processed using a multi-objective engineering benefit evaluation model (MOPEEM). The processing of MOPEEM includes the following sub-steps: Step S431: Construct a benefit-cost analysis framework, including direct and indirect benefits.

[0160] Step S432: Design an evaluation index system covering flood control, drainage, ecology and other aspects.

[0161] Step S433: Conduct hydrological and hydrodynamic simulation to evaluate the flood control and drainage effect of the scheme.

[0162] Step S434: Evaluate the ecological and environmental impact of the plan.

[0163] Step S435: Calculate the economic cost and benefit of the solution.

[0164] Step S436: perform multi-objective comprehensive scoring.

[0165] Step S437: Generate a scheme evaluation report, including a SWOT analysis of each scheme, and output the quantitative evaluation results of the engineering layout scheme, including the scores and comprehensive rankings of various indicators.

[0166] Step S44: Project scheduling strategy formulation Step S44 first obtains the engineering layout evaluation results of S43 and the hydrological and hydrodynamic simulation results of step S2. Then, the adaptive engineering scheduling strategy generation system (AODSGS) is used for processing. The processing process of AODSGS includes the following sub-steps: Step S441: construct an engineering system operation model to simulate the operation status of each engineering facility.

[0167] Step S442: design the scheduling objective function, including flood control safety, drainage efficiency, etc.

[0168] Step S443: Generate an initial scheduling rule set.

[0169] Step S444: Use a reinforcement learning algorithm to optimize the scheduling strategy.

[0170] Step S445: Perform multi-scenario simulation to test the adaptability of the scheduling strategy.

[0171] Step S446: Evaluate the operability and robustness of the scheduling strategy.

[0172] Step S447: Generate a scheduling manual, including operation guides for different scenarios, and output a set of engineering scheduling strategies for different scenarios, including specific scheduling rules for each engineering facility.

[0173] Step S45: Collaborative optimization of project layout and scheduling Step S45 first obtains the scheduling strategy set of S44 and the engineering layout evaluation result of S43. Then, the engineering-scheduling collaborative optimization model (EDCOM) is used for processing. The processing process of EDCOM includes the following sub-steps: Step S451: construct a coupling model of project layout and scheduling.

[0174] Step S452: Design a collaborative optimization objective function to balance engineering benefits and scheduling efficiency.

[0175] Step S453: Generate an initial project-scheduling plan combination.

[0176] Step S454: Use a multi-agent reinforcement learning algorithm to perform collaborative optimization.

[0177] Step S455: Evaluate the overall performance and synergy effect of the optimization scheme.

[0178] Step S456: Perform sensitivity analysis to identify key influencing factors.

[0179] Step S457: Generate a final optimization report, including detailed descriptions of the project layout and scheduling strategy. Output the final project layout optimization plan and supporting scheduling strategy, including a specific project layout diagram and a scheduling rule set.

[0180] Step S5: Comprehensive evaluation of solutions and decision support Step S5 first conducts a comprehensive benefit evaluation of the final project layout and scheduling strategy. Then, analyzes the risks and uncertainties of the plan. Next, evaluates the impact of the plan on different stakeholders. After that, the plan is finally optimized and adjusted based on the above evaluation results. Generate comprehensive decision support information.

[0181] Step S51: Comprehensive benefit evaluation Step S51 first obtains the engineering layout optimization plan and supporting scheduling strategy output by step S4, as well as the standard combination plan of step S3. Then, the multidimensional benefit evaluation system (MBES) is used for processing. The processing process of MBES includes the following sub-steps: Step S511: construct a multi-criteria evaluation framework, including dimensions such as flood prevention and disaster reduction, ecological protection, and economic development.

[0182] Step S512: Design a long-term benefit simulation model to predict the long-term impact after the implementation of the plan.

[0183] Step S513: Perform multi-scenario simulation to evaluate the performance of the solution under different conditions.

[0184] Step S514: Calculate the benefit index of each evaluation dimension.

[0185] Step S515: Conduct a cost-benefit analysis to evaluate the economic feasibility of the solution.

[0186] Step S516: Evaluate the social impact and environmental benefits of the plan.

[0187] Step S517: Generate a comprehensive benefit evaluation report, including the quantitative scores and qualitative analysis of each dimension. Output a comprehensive benefit evaluation report of the solution, including the scores of each evaluation dimension and the overall benefit evaluation.

[0188] Step S52: Risk and uncertainty analysis Step S52 first obtains the comprehensive benefit evaluation report of S51 and the uncertainty estimation data of step S2. Then, it is processed using the multi-scenario risk assessment model (MSRAM). The processing of MSRAM includes the following sub-steps: Step S521: Build a risk assessment framework and identify major risk factors.

[0189] Step S522: Generate multiple possible future scenarios, including extreme climate events, socio-economic changes, etc.

[0190] Step S523: Perform Monte Carlo simulation to evaluate the performance of the solution under different scenarios.

[0191] Step S524: Calculate the occurrence probability and potential impact of various risks.

[0192] Step S525: Analyze the vulnerability of the solution and identify key risk points.

[0193] Step S526: Evaluate the robustness and adaptability of the solution.

[0194] Step S527: Generate a risk and uncertainty analysis report, including a risk map and response suggestions. Output a risk and uncertainty analysis report, including a quantitative assessment of major risks and response strategies.

[0195] Step S53: Stakeholder impact assessment Step S53 first obtains the comprehensive benefit evaluation report of S51 and reads the socio-economic data from the pre-stored database. Then, the Stakeholder Impact Analysis System (SIAS) is used for processing. The SIAS processing process includes the following sub-steps: Step S531: Identify major stakeholder groups, including government, residents, and enterprises.

[0196] Step S532: construct a social network model to represent the relationships between different groups.

[0197] Step S533: design impact assessment indicators, including economic benefits, quality of life, environmental impact, etc.

[0198] Step S534: Conduct multi-agent simulation to predict the reactions and interactions of different groups.

[0199] Step S535: Evaluate the impact degree and direction of the program on each group.

[0200] Step S536: Identify potential conflicts of interest and points of synergy.

[0201] Step S537: Generate a stakeholder impact assessment report, including attitude predictions and suggestions for each group. Output the stakeholder impact assessment report, including the impact score of each group and possible response predictions.

[0202] Step S54: Scheme optimization and adjustment Step S54 first obtains the evaluation results of S51, S52 and S53. Then, the adaptive solution optimization algorithm (APOA) is used for processing. The processing of APOA includes the following sub-steps: Step S541: Comprehensively analyze the results of each evaluation dimension to identify the advantages and disadvantages of the solution.

[0203] Step S542: Design an optimization objective function to balance benefits, risks and interests of all parties.

[0204] Step S543: Generate a set of possible adjustment solutions.

[0205] Step S544: Use a robust optimization method to evaluate the stability of the adjustment solution.

[0206] Step S545: perform sensitivity analysis to identify key influencing factors.

[0207] Step S546: Select the optimal adjustment plan and perform fine-tuning.

[0208] Step S547: Generate a plan optimization report, detailing the adjustment content and reasons, and output the final optimized flood control and drainage plan, including the adjusted project layout, scheduling strategy and standard settings.

[0209] Step S55: Decision support information generation Step S55 first obtains the final solution after optimization in S54 and summarizes the key results of all previous steps. Then, a multidimensional decision support system (MDSS) is used for processing. The processing of MDSS includes the following sub-steps: Step S551, construct a knowledge graph to integrate all relevant information and analysis results.

[0210] Step S552: Design a multi-level decision support framework, including strategic, tactical and operational levels.

[0211] Step S553: ​​Generate a plan implementation roadmap, including short-term, medium-term and long-term goals.

[0212] Step S554: design an interactive visualization interface to intuitively display key information.

[0213] Step S555: Write an executive summary, highlighting the core advantages and potential challenges of the solution.

[0214] Step S556: Develop emergency response plans and adaptive management strategies.

[0215] Step S557: Generate a comprehensive decision support report, including technical, economic and policy recommendations. Output the final decision support report, including comprehensive information such as program details, benefit analysis, risk assessment, implementation recommendations, etc., to provide decision makers with a scientific and systematic basis for decision making.

[0216] According to another aspect of the present application, a combined design system for river basin and regional flood control and drainage schemes is also provided, comprising: at least one processor; and, a memory communicatively connected to at least one of the processors; wherein, The memory stores instructions that can be executed by the processor, and the instructions are used to be executed by the processor to implement the combined design method of watershed and regional flood control and drainage schemes described in any of the above technical solutions.

[0217] The preferred embodiments of the present invention are described in detail above; however, the present invention is not limited to the specific details in the above embodiments. Within the technical concept of the present invention, various equivalent transformations can be made to the technical solutions of the present invention, and these equivalent transformations all belong to the protection scope of the present invention.

Claims

1. A combined design method for flood control and drainage schemes in a river basin and a region, characterized in that: The steps include: Step S1, obtaining multi-source data including climate-human activities, ecosystem services and multi-scale hydrology, and performing standardization processing and feature extraction to generate respective standardized data sets; using data fusion algorithms to integrate different types of data sets to form a unified social-ecological-hydrological system data set; performing uncertainty analysis on the fused data set, and outputting a comprehensive data set with uncertainty estimates; Step S2, obtaining a comprehensive data set with uncertainty estimates, using an adaptive multi-scale hydrological model to construct hydrological models at three scales, namely, watershed, region, and city, to generate hydrological process simulation results; based on the hydrological simulation results, applying a multi-level coupled hydrodynamic model to perform hydrodynamic simulation, and outputting watershed-region-city multi-scale hydrodynamic simulation results; using a multi-scale flood feedback analysis system to analyze the hydrodynamic simulation results, and obtaining a quantitative indicator set describing the watershed-region-city flood feedback relationship; combining pre-stored flood control and drainage engineering data, using a multi-objective flood control and drainage coordination assessment model to perform an assessment, and outputting flood control and drainage coordination assessment results; based on climate-human activity data, applying a climate-human activity-hydrological coupling impact analysis model to obtain quantitative assessment results of climate change and human activity impacts; using a multi-source uncertainty propagation and accumulation model to perform uncertainty propagation analysis on the entire simulation process, and outputting a comprehensive simulation result containing uncertainty estimates; Step S3, obtaining comprehensive simulation results including uncertainty estimation, using a multi-dimensional standard combination generation algorithm to generate a series of possible basin, regional and urban flood control and drainage standard combination schemes; using a multi-scale standard impact assessment model to evaluate these schemes and analyze their effects and feasibility; using a standard connectivity analysis algorithm to perform standard connectivity analysis, quantifying the degree of connectivity and potential conflicts between standards of different scales; applying a multi-objective standard optimization model to perform multi-objective standard optimization, combining the flood control and drainage coordination assessment results, to obtain the optimal flood control and drainage standard combination scheme; based on the climate change and human activity impact assessment results, using a standard adaptability assessment system to evaluate the long-term adaptability of the standard scheme, and outputting an adaptability assessment report for the standard scheme; Step S4, obtaining the optimal standard combination scheme, combining the pre-stored existing flood control and drainage engineering data, using the engineering facility adaptability assessment model to assess the adaptability and transformation needs of the existing engineering facilities under the new standards; based on the assessment results, using the multi-scale engineering layout optimization algorithm to generate a series of possible engineering layout schemes; using the multi-objective engineering benefit assessment model to conduct multi-objective benefit assessment on these schemes; combining the hydrological and hydrodynamic simulation results, using the adaptive engineering scheduling strategy generation system to formulate corresponding engineering scheduling strategies; Use the engineering-scheduling collaborative optimization model to coordinate the optimization of engineering layout and scheduling, and output the engineering layout optimization plan and supporting scheduling strategy; Step S5: Obtain the engineering layout optimization plan and supporting scheduling strategy, as well as the standard combination plan, and use the multi-dimensional benefit evaluation system to conduct a comprehensive benefit evaluation; combine the uncertainty estimation data, and use a multi-scenario risk assessment model to analyze the risks and uncertainties of the plan; Based on pre-stored socio-economic data, the impact of the scheme on different stakeholders is assessed using a stakeholder impact analysis system; Based on the above evaluation results, the adaptive solution optimization algorithm is used to optimize and adjust the solution; the key results of all steps are summarized, and the multidimensional decision support system is used to generate comprehensive decision support information and output a decision support report.

2. A combined design method for flood control and drainage schemes for river basins and regions as claimed in claim 1, characterized in that: The step S1 is specifically as follows: Step S11, obtaining historical meteorological data, multi-temporal satellite remote sensing images and socio-economic statistical data, and processing them using a spatiotemporal adaptive interpolation algorithm; performing Kriging interpolation on all data using the constructed spatiotemporal weight matrix to generate unified gridded data; evaluating the interpolation accuracy through cross-validation, and iteratively adjusting the weight matrix; outputting a standardized climate-human activity spatiotemporal data set, including time series of meteorological elements, land cover and socio-economic indicators on a unified grid; Step S12: Obtain land use data, biodiversity survey data and water quality monitoring data, and process them using a multidimensional ecosystem service assessment model; calculate biomass and primary productivity based on land use type, calculate the biodiversity index using species distribution data, and assess water purification capacity; combine the above indicators to calculate the comprehensive ecosystem service value of each grid unit; output a gridded ecosystem service assessment data set, including the values ​​of various ecosystem service indicators for each grid unit; Step S13, obtaining DEM data, hydrological station observation data and drainage network data, and processing them using a multi-scale hydrological feature extraction algorithm; constructing a multi-scale feature pyramid to extract hydrological features at different spatial scales; Check the consistency of hydrological features at different scales and use the scale conversion function to adjust the hydrological parameters between different scales; output a multi-scale consistent hydrological dataset, including consistent hydrological features and parameters at different spatial scales; Step S14, obtaining the output data set of steps S11, S12 and S13, and processing it using a heterogeneous data adaptive fusion algorithm; applying principal component analysis to each feature cluster to extract the main features; Construct an adaptive weight function to adjust the weight according to the information gain and principal component contribution of the feature; use the weighted fusion method to integrate the features of different data sets into a unified feature space; Output the fused social-ecological-hydrological system dataset, which contains comprehensive features integrating information from each subsystem; Step S15, obtain the fused data set output by step S14 and the pre-stored historical prediction error data, and process them using a multi-source uncertainty propagation model; use the Monte Carlo method to generate multiple groups of simulation samples, perform propagation analysis on each group of samples, and calculate the uncertainty range of the results; based on the result distribution, calculate the confidence interval and probability density function of each output variable; generate an uncertainty report, including sensitivity analysis and identification of key uncertainty sources; output a comprehensive data set with uncertainty estimates, including the value of each feature and its associated uncertainty quantification results.

3. A combined design method for flood control and drainage schemes for river basins and regions as claimed in claim 1, characterized in that: The step S2 is further as follows: Step S21, obtaining the terrain, land use and rainfall data in the comprehensive data set outputted in step S1, and using the adaptive multi-scale hydrological model to construct hydrological models at three scales: watershed, region and city; establishing a confluence model to simulate the movement of water in the river channel and on the surface; Design scale-adaptive parameters to adjust the parameter sensitivity of models at different scales; realize automatic calibration of model parameters and perform model verification; output hydrological process simulation results at three scales, including flow process lines and water level process lines at each scale; Step S22, obtain the hydrological process simulation results output by step S21 and the river and pipe network data in the comprehensive data set of step S1, and process them using a multi-level coupled hydrodynamic model; design a dynamic boundary interaction algorithm to achieve water volume exchange between different models; integrate the three models to form a unified multi-level coupled model; perform model parameter sensitivity analysis, and use observation data to calibrate and verify the coupled model; output basin-region-city multi-scale hydrodynamic simulation results, including river water level, flow velocity distribution and water accumulation depth; Step S23, obtaining the hydrodynamic simulation results outputted in step S22, and processing them using a multi-scale flood feedback analysis system; evaluating the impact of urban drainage on regional floods and the supporting effect of regional floods on urban waterlogging; analyzing the joint dispatching effect of flood control projects at different scales; generating a flood feedback relationship matrix to quantify the impact intensity between different scales; and outputting a quantitative indicator set describing the basin-region-city flood feedback relationship, including the impact coefficient and critical threshold between each scale; Step S24, obtaining the flood-waterlogging mutual feedback relationship indicator set outputted in step S23 and the pre-stored flood control and drainage engineering data, and processing them using a multi-objective flood control and drainage coordination evaluation model; calculating the achievement and coordination of each objective, and identifying potential conflicts; Conduct sensitivity analysis to identify key factors affecting compatibility; Generate a coordination assessment report; output the flood control and drainage coordination assessment results, including the overall coordination index and the coordination score of each subsystem; Step S25, obtaining the simulation and analysis results of steps S21 to S24 and the climate-human activity data set of step S1, and processing them using the climate-human activity-hydrology coupling impact analysis model; calculating the contribution rate of climate change and human activities to the hydrological process; analyzing the interaction between climate change and human activities, and identifying nonlinear effects; Generate impact assessment reports; output quantitative assessment results of climate change and human activity impacts, including the impact weights and critical thresholds of each factor; Step S26, obtaining the impact assessment results outputted from step S25 and the uncertainty estimation data from step S1, and processing them using a multi-source uncertainty propagation and accumulation model; performing a complete model simulation on each sample to obtain a result distribution; and calculating the statistical characteristics of each output variable; Conduct global sensitivity analysis to identify key sources of uncertainty; Generate an uncertainty analysis report; output comprehensive simulation results with uncertainty estimates, including expected values ​​and uncertainty ranges for all simulation variables.

4. A combined design method for flood control and drainage schemes for river basins and regions as claimed in claim 1, characterized in that: The step S3 is further as follows: Step S31, obtaining flood characteristics and risk information in the comprehensive simulation results outputted in step S2, and generating a standard combination scheme using a multi-dimensional standard combination generation algorithm; performing a preliminary screening on the generated combinations, and eliminating obviously unreasonable schemes; Calculate the preliminary feasibility score of each plan; select the top-N plans according to the score ranking; output a series of potential standard combination plans, each plan contains specific standard values ​​at three scales: watershed, region and town; Step S32: Obtain the standard combination scheme generated in step S31, and process it using the multi-scale standard impact assessment model; calculate the score of each scheme on each indicator; perform a cost-benefit analysis to evaluate the economic rationality of the scheme; Comprehensively rank the various options, taking into account the weights of multiple indicators; generate a plan evaluation report; output the quantitative evaluation results of each standard combination plan, including the scores and comprehensive rankings of each indicator; Step S33, obtaining the evaluation result of step S32, and processing it using the standard coherence analysis algorithm; identifying potential conflict points and coordination points between standards; evaluating the coordination degree of the overall standard system; performing sensitivity analysis to identify key factors affecting coherence; generating a coherence analysis report; and outputting the standard coherence analysis results, including a coherence matrix, a list of conflict points, and an overall coordination score; Step S34, obtaining the connectivity analysis result of step S33 and the flood control and drainage coordination evaluation result of step S24, and processing them using a multi-objective standard optimization model; generating a Pareto optimal solution set; applying a fuzzy decision-making method to select the best solution in the Pareto solution set; performing a sensitivity analysis of the solution to evaluate its robustness; generating an optimization result report; and outputting the optimal flood control and drainage standard combination solution, including specific standard values ​​and expected effects of each scale; Step S35, obtaining the optimal standard combination scheme outputted in step S34 and the climate change and human activity impact assessment results in step S25, and processing them using a standard adaptability assessment system; calculating the adaptability index value under each scenario; identifying the vulnerability and adaptability thresholds of the standard scheme; Generate recommendations to improve solution adaptability; Generate adaptability assessment report; output adaptability assessment report of standard scheme, including adaptability score and improvement suggestions under each scenario.

5. A combined design method for flood control and drainage schemes for river basins and regions as claimed in claim 1, characterized in that: The step S4 is further as follows: Step S41: Obtain the pre-stored existing flood control and drainage engineering data and the optimal standard combination scheme output in step S3, and process them using the engineering facility adaptability assessment model; perform life cycle analysis to predict the long-term performance of the facility; and identify key facilities that need to be renovated or upgraded; Estimate renovation costs and benefits; generate facility assessment reports; output existing engineering facility assessment reports, including adaptability scores and renovation needs of each facility; Step S42: Obtain the engineering facility assessment report of step S41 and the standard combination scheme of step S3, and process them using a multi-scale engineering layout optimization algorithm; apply a heuristic algorithm to optimize the project location and scale; evaluate the technical feasibility and economic rationality of the scheme; screen and sort the schemes; output a series of potential engineering layout schemes, each of which contains specific information on the project location, type and scale; Step S43, obtaining the engineering layout plan generated in step S42, and processing it using a multi-objective engineering benefit evaluation model; evaluating the ecological and environmental impact of the plan; calculating the economic cost and benefit of the plan; performing a multi-objective comprehensive scoring; generating a plan evaluation report; and outputting the quantitative evaluation results of the engineering layout plan, including the scores and comprehensive rankings of various indicators; Step S44, obtaining the engineering layout evaluation result of step S43 and the hydrological and hydrodynamic simulation result of step S2, and processing them using the adaptive engineering scheduling strategy generation system; Use reinforcement learning algorithms to optimize scheduling strategies; conduct multi-scenario simulations to test the adaptability of scheduling strategies; evaluate the operability and robustness of scheduling strategies; generate scheduling manuals; output engineering scheduling strategy sets for different scenarios, including specific scheduling rules for each engineering facility; Step S45, obtain the scheduling strategy set of step S44 and the engineering layout evaluation result of step S43, and process them using the engineering-scheduling collaborative optimization model; use the multi-agent reinforcement learning algorithm to perform collaborative optimization; evaluate the overall performance and synergy effect of the optimization plan; perform sensitivity analysis to identify key influencing factors; generate an optimization report; output the engineering layout optimization plan and supporting scheduling strategy, including a specific engineering layout diagram and a scheduling rule set.

6. A combined design method for flood control and drainage schemes for river basins and regions as claimed in claim 1, characterized in that: The step S5 is further as follows: Step S51: Obtain the engineering layout optimization plan and supporting scheduling strategy outputted in step S4, and the standard combination plan of step S3, and process them using a multi-dimensional benefit evaluation system; calculate the benefit index of each evaluation dimension; conduct a cost-benefit analysis to evaluate the economic feasibility of the plan; evaluate the social impact and environmental benefits of the plan; generate a comprehensive benefit evaluation report; and output the comprehensive benefit evaluation report of the plan, including the scores of each evaluation dimension and the overall benefit evaluation; Step S52: Obtain the comprehensive benefit evaluation report of step S51 and the uncertainty estimation data of step S2, and process them using a multi-scenario risk assessment model; Calculate the probability of occurrence and potential impact of various risks; analyze the vulnerability of the plan and identify key risk points; Evaluate the robustness and adaptability of the solution; generate risk and uncertainty analysis reports; output risk and uncertainty analysis reports, including quantitative assessment of major risks and response strategies; Step S53: Obtain the comprehensive benefit evaluation report of step S51 and the pre-stored socio-economic data, and process them using the stakeholder impact analysis system; perform multi-agent simulation to predict the reactions and interactions of different groups; evaluate the degree and direction of the impact of the program on each group; identify potential conflicts of interest and synergy points; generate a stakeholder impact assessment report; and output the stakeholder impact assessment report, including the impact score of each group and the possible reaction prediction; Step S54, obtaining the evaluation results of steps S51, S52 and S53, and processing them using an adaptive solution optimization algorithm; performing sensitivity analysis to identify key influencing factors; selecting the optimal adjustment solution and making fine adjustments; generating a solution optimization report; and outputting an optimized flood control and drainage solution, including an adjusted engineering layout, scheduling strategy and standard settings; Step S55: Obtain the optimized solution of step S54, summarize the key results of all previous steps, and use a multidimensional decision support system to process; design an interactive visualization interface to intuitively display key information; formulate emergency plans and adaptive management strategies; Generate comprehensive decision support reports; output decision support reports include option details, benefit analysis, risk assessment and implementation recommendations.

7. A combined design method for flood control and drainage schemes for river basins and regions as claimed in claim 1, characterized in that: The step S12 is specifically as follows: Step S121, obtaining, classifying and coding land use data to generate a land use type layer; Step S122, obtaining and associating biodiversity survey data with spatial locations to generate a species distribution layer; Step S123, performing spatial interpolation on the water quality monitoring data to generate a water quality distribution layer; Step S124, calculating the biomass and primary productivity of each grid unit based on the land use type; Step S125, using species distribution data, calculating the biodiversity index of each grid cell; Step S126: Evaluate the water purification capacity of each grid unit based on the water quality data and land use type; Step S127: The comprehensive ecosystem service value of each grid unit is calculated by combining the above indicators, and a gridded ecosystem service assessment data set is output, which contains the values ​​of various ecosystem service indicators of each grid unit.

8. A combined design method for flood control and drainage schemes for river basins and regions as claimed in claim 1, characterized in that: Step S14 is specifically as follows: Step S140: Obtain the output data sets of step S11, step S12 and step S13, and process these data using a heterogeneous data adaptive fusion algorithm, as follows: Step S141, constructing a multi-level data relationship diagram to represent the potential relationship between different data sets; Step S142, calculating the correlation matrix between data sets, and identifying strongly correlated and weakly correlated feature pairs; Step S143: Calculate the information gain of each data feature based on information entropy theory; Step S144: using a graph segmentation algorithm to group data features to form feature clusters; Step S145, applying principal component analysis to each feature cluster to extract main features; Step S146: construct an adaptive weight function and adjust the weight according to the information gain and principal component contribution of the feature; Step S147: Use a weighted fusion method to integrate the features of different data sets into a unified feature space, and output a fused social-ecological-hydrological system data set, which contains comprehensive features that integrate information from each subsystem.

9. A combined design method for flood control and drainage schemes for river basins and regions as claimed in claim 1, characterized in that: The step 15 is specifically as follows: Step S150: Obtain the fused data set and the pre-stored historical prediction error data, and process them using the multi-source uncertainty propagation model, as follows: Step S151, performing statistical analysis on historical prediction error data to extract error distribution characteristics; Step S152: constructing a Bayesian network to process uncertainty propagation paths in the data processing flow; Step S153: for each processing step, construct uncertainty sources and propagation functions; Step S154, using the Monte Carlo method to generate multiple groups of simulation samples; Step S155, performing propagation analysis on each group of samples and calculating the uncertainty range of the results; Step S156: Calculate the confidence interval and probability density function of each output variable based on the result distribution; Step S157, generate an uncertainty report, including sensitivity analysis and identification of key uncertainty sources, and output a comprehensive data set with uncertainty estimates, which contains the value of each feature and each uncertainty quantification result.

10. A combined design system for flood control and drainage schemes for river basins and regions, characterized in that: include: at least one processor; as well as, a memory communicatively connected to at least one of the processors; wherein, The memory stores instructions that can be executed by the processor, and the instructions are used to be executed by the processor to implement the combined design method of watershed and regional flood control and drainage schemes as described in any one of claims 1 to 9.

Citation Information

Cited By

  • Distributed stress-based sewage interception and drainage measurement method, system, medium and equipment

    CN119394590A

  • Distributed stress quantification sewage interception and drainage measurement method, system, medium and equipment

    CN119394590B

  • Parameter optimization method and device of coupling type transformer

    CN119644765A

  • Urban inland inundation toughness evaluation method based on multi-body and system dynamics coupling modeling

    CN120012237A

  • Water conservancy planning method and system based on GIS

    CN120146624A