Slope reliability evaluation method
Through comprehensive geological survey, physical model tests and numerical simulation, combined with monitoring system, the problem of insufficient accuracy of traditional slope evaluation methods is solved, efficient evaluation of slope stability and risk assessment is achieved, and the safety of slope engineering is ensured. and reliability.
Patent Information
- Application Number
- CN202411074474.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-06
- Publication Date
- 2024-11-29
AI Technical Summary
The traditional slope reliability evaluation method relies on empirical judgment and simple geological survey, and it is difficult to comprehensively and accurately reflect the actual stress conditions and potential risks of the slope under complex working conditions, resulting in insufficient accuracy.
A comprehensive method is adopted, including geological survey, data analysis and modeling, physical model building, physical model testing, numerical simulation and verification, monitoring system design and deployment, risk assessment and early warning, decision support and optimization adjustment, and post-maintenance and continuation Improved, evaluating slope stability and risk through high-precision measurement, data integration, physical model simulation and numerical simulation, combined with real-time data analysis of the monitoring system.
It improves the accuracy and reliability of slope stability evaluation, provides scientific and reasonable decision-making support, dynamic adjustment of maintenance plans, and ensures the long-term stability and safety of slope projects.
Smart Images

Figure CN119047156A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of xx, and in particular to a slope reliability evaluation method. Background Art
[0002] With the rapid development of infrastructure construction, especially in the fields of transportation, water conservancy, mining and other engineering fields, the stability and safety of slope engineering have become increasingly prominent. As an indispensable part of these projects, the reliability of slopes is directly related to the safe operation of the entire project and the safety of people's lives and property. However, the geological conditions of slopes are complex and changeable, and they are affected by various natural factors such as rainfall, earthquakes, and weathering. Its stability assessment has become a very challenging task.
[0003] Traditional slope reliability evaluation methods often rely on empirical judgment, simple geological surveys and static mechanical calculations. However, the factors affecting slope reliability have many uncertainties, and it is difficult to fully and accurately reflect the actual stress conditions and potential risks of the slope under complex working conditions. The accuracy is insufficient. Therefore, a slope reliability evaluation method is proposed in this invention. Summary of the invention
[0004] In view of the shortcomings of the prior art, the present invention provides a slope reliability evaluation method, which solves the problem that traditional slope reliability evaluation methods often rely on empirical judgment, simple geological surveys and static mechanical calculations, but the factors affecting slope reliability have many uncertainties, making it difficult to fully and accurately reflect the actual stress conditions and potential risks of the slope under complex working conditions, and the problem of insufficient accuracy.
[0005] The above technical objectives of the present invention are achieved through the following technical solutions:
[0006] A slope reliability evaluation method comprises the following steps: geological survey, data analysis and modeling, physical model construction, physical model test, test result analysis, numerical simulation and verification, monitoring system design and deployment, monitoring data collection and analysis, risk assessment and early warning, decision support and optimization adjustment, and later maintenance and continuous improvement; the geological survey comprises the following steps, S1: using high-precision measuring instruments such as theodolite, total station and drone aerial survey to measure the geometric dimensions of the slope; S1.1: using the angle measurement function of the theodolite or total station to measure the angle and distance between the center line of the slope and the design center line, and calculate the center line deviation; S1.2: using the total station three-dimensional coordinate measurement, by calculating the width difference and height difference between the top and bottom of the slope, the slope of the slope is obtained; S1.3: using drone remote sensing and other technical means to obtain high-resolution images or spectral data of the slope and its surrounding areas. Through image processing and interpretation technology, the geomorphological characteristics, vegetation coverage and other information of the slope can be extracted to provide assistance for geological feature analysis; S1.4: Organize geological engineers to conduct field surveys to observe the rock type, structural surface characteristics, weathering degree, etc. of the slope.Through on-site sampling and test analysis, the physical and mechanical property parameters of the slope rock and soil are obtained; S1.5: Drilling and sampling are carried out at different positions and depths of the slope to obtain rock cores or soil samples for indoor test analysis. Through rock core compilation and soil sample analysis, the internal structure and geological characteristics of the slope can be understood; S1.6: Using the changing characteristics of seismic waves, the geological structure of the slope is detected through seismic exploration methods, revealing the faults, broken zones and other unfavorable geological bodies inside the slope, and providing a basis for slope stability evaluation; The data analysis and modeling include the following steps, S2: Summarize all relevant data obtained by on-site measurement, geological survey, geophysical exploration and remote sensing technology, remove duplicate, erroneous or invalid data records, ensure data accuracy and consistency, convert data from different sources and formats into a unified format for subsequent processing and analysis, standardize numerical data, eliminate dimensional differences, and make different data comparable. Using the data integration function of GIS software, the pre-processed data is imported into the GIS platform to establish a unified spatial database; S2 .1: Based on geological survey and geophysical exploration data, identify and draw the main geological interfaces, use the 3D modeling function of GIS software to construct a preliminary 3D geological framework, fill in the corresponding lithology, physical and mechanical parameters and other attributes for different geological bodies in the 3D geological model according to the core compilation and soil sample analysis results, and refine and optimize the 3D geological model in combination with remote sensing images and on-site photos to ensure the authenticity and accuracy of the model. S2.2: According to the specific conditions of the slope and engineering requirements, select the appropriate stability analysis method, and establish the corresponding stability analysis model in the GIS platform or numerical simulation software according to the 3D geological model of the slope. In the GIS platform or numerical simulation software, establish the corresponding stability analysis model according to the 3D geological model of the slope, and input the geometric dimensions of the slope, physical and mechanical parameters of the rock and soil body, groundwater level, rainfall intensity and other boundary conditions. S2.3: Compare and verify the model calculation results with the on-site monitoring data to ensure the accuracy and reliability of the analysis model, and make necessary corrections and improvements to the model based on the verification results.
[0007] Preferably, the physical model construction includes the following steps: S3: designing the size and proportion of the physical model according to the actual geometric size and geological characteristics of the slope. Common similarity ratio symbol values may be 60 or other appropriate values to ensure that the model can reflect the key features of the prototype; S3.1: According to the results of geological survey, select materials with similar physical and mechanical properties to the original slope rock and soil to construct the model. These materials should have similar density, strength, deformation characteristics, etc.; S3.2: Use steel frames, wooden boards or other solid materials to build the basic framework of the model to ensure the stability and durability of the model structure; S3.3: According to the rock and soil sequence revealed in the geological survey, fill similar materials layer by layer and use special tools to compact them to simulate the rock and soil structure and density of the original slope; S3.4: Set displacement, stress and other monitoring points at key parts of the model, such as potential slip surfaces, slope surfaces, etc., so as to observe and record the deformation of the model in subsequent tests; S3.5 According to the test requirements, install appropriate loading systems, such as hydraulic loading devices, gravity loading devices, etc., so as to simulate the slope stress conditions under different working conditions during the test.
[0008] Preferably, the physical model test includes the following steps: S4: Before the formal test, preload and debug the loading system to ensure the stability and accuracy of the loading process, check the operating status of the monitoring equipment, and ensure the accuracy and reliability of data recording. S4.1: Apply load to the model step by step according to the preset loading scheme. The loading rate and step length should be controlled during the loading process to avoid impact effects, and the deformation of the model after each loading step should be recorded; S4.2: During the loading process, the deformation and damage of the model should be closely observed. Use measuring instruments to record data changes at key monitoring points, such as displacement meters, stress gauges, etc., and record other phenomena during the test, such as crack generation and expansion; S4.3: According to the different working conditions that need to be simulated, such as rainfall, earthquakes, etc., adjust the loading method and loading amount. When simulating rainfall conditions, the rainwater infiltration process can be simulated by spraying water mist on the surface of the model; when simulating earthquake conditions, the propagation and effect of seismic waves can be simulated by equipment such as vibration tables.
[0009] Preferably, the test result analysis includes the following steps: S5: sorting and processing the data recorded during the test, including data cleaning, denoising, interpolation and other steps. Ensure the accuracy and reliability of the data; S5.1: Analyze the deformation of the model at different loading stages, including the change trend and characteristics of parameters such as displacement and strain. By comparing the data of different monitoring points, the overall deformation law and local damage characteristics of the slope can be understood; S5.2: Based on the test data and analysis results, the stability of the slope is evaluated. The safety factor method, limit equilibrium method and other methods can be used to calculate the safety factor or stability reserve factor of the slope, and the stability state of the slope can be comprehensively judged in combination with the damage characteristics and deformation law of the slope; S5.3: Risk assessment and early warning are carried out according to the stability evaluation results and the actual working conditions of the slope. Formulate corresponding risk prevention measures and emergency plans to deal with possible slope instability problems; S5.4: Summarize and analyze the test results, extract conclusions and suggestions that are instructive for actual projects, and feed back the test results to the design, construction and maintenance of slope projects to improve the safety and reliability of the project.
[0010] Preferably, the numerical simulation and verification includes the following steps: S6: according to the specific characteristics of the slope, such as geological structure, material properties, potential failure mode, etc., select appropriate numerical simulation software, such as FLAC3D, ABAQUS, PLAXIS, etc., install and configure the selected software on the computer; S6.1: based on geological survey data and physical model test results, construct a geometric model of the slope in the numerical simulation software, including stratum distribution, faults, joints, etc., according to laboratory test results and geological survey data, assign corresponding physical and mechanical parameters to various materials in the model, such as elastic modulus, Poisson's ratio, shear strength, etc.; according to the loading conditions of the physical model test, set the boundary conditions and loading method of the numerical model to ensure consistency with the physical test; S6.2: start the numerical simulation calculation, observe and record the changes in stress, strain, displacement, etc. of the slope during the simulation process, and ensure that the simulation calculation reaches the convergence standard, that is, continuous iteration. The difference in results between generations is within an acceptable range; S6.3: Compare the numerical simulation results with the physical model test results, including key indicators such as deformation morphology, failure mode, stress distribution, etc., analyze the differences between the two and their possible causes, such as model simplification, material property differences, loading condition differences, etc., evaluate the accuracy and reliability of the numerical simulation based on the comparison results, and adjust and optimize the numerical model when necessary; S6.4: By changing the key parameters in the numerical model, such as material properties, boundary conditions, etc., analyze their impact on the simulation results, determine the sensitive factors, and optimize the numerical model based on the sensitivity analysis results to improve the accuracy and reliability of the simulation; S6.5: Organize the process, results, comparative analysis, sensitivity analysis and optimization measures of the numerical simulation and verification into a report, summarize the conclusions of the numerical simulation and verification, and put forward suggestions on slope stability evaluation, monitoring system design and subsequent maintenance.
[0011] Preferably, the design and deployment of the monitoring system includes the following steps: S7: According to the actual situation of the slope and the requirements for stability evaluation, clarify the main monitoring objectives, such as displacement, stress, groundwater level, etc., and determine the specific parameters that need to be monitored and their accuracy requirements; S7.1: According to the geological structure of the slope, potential risk areas and monitoring objectives, select representative monitoring point locations on the slope. These locations should be able to fully reflect the deformation and stability of the slope. According to the scale and complexity of the slope, reasonably determine the number of monitoring points to ensure the comprehensiveness and accuracy of the monitoring data; S7.2.: According to the requirements of the monitoring parameters, select appropriate sensor types, such as displacement sensors, such as GPS, total stations, inclinometers, stress sensors, such as strain gauges, pressure boxes, groundwater level sensors, select high-precision and high-stability data acquisition equipment for real-time collection of sensor data. According to the requirements of the monitoring system, select wired or wireless data transmission methods to ensure that the monitoring data can be transmitted to the data center in real time and accurately; S7.3: Design the overall architecture of the monitoring system, including sensor networks, Data acquisition and processing system, data transmission and storage system, early warning and alarm system, etc., design data processing and analysis algorithms to clean, preprocess, analyze and mine the collected monitoring data, extract key information for slope stability assessment, design early warning and alarm mechanism, automatically trigger early warning or alarm signal according to the set threshold and the change trend of monitoring data, and remind relevant personnel to take timely measures; S7.4: According to the design plan, install sensors and data acquisition equipment on the slope, and conduct on-site debugging and testing to ensure that the equipment can work normally, integrate the equipment of each monitoring point with the data center to realize real-time transmission and sharing of data, and train and guide on-site operators so that they can master the operation and maintenance skills of the monitoring system; S7.5: Start the monitoring system, start daily monitoring work, regularly record and analyze monitoring data, regularly maintain and service the monitoring system, including checking the working status of sensors, replacing damaged parts, cleaning data storage devices, etc., establish data backup and security management mechanism to ensure the security and integrity of monitoring data.
[0012] Preferably, the monitoring data collection and analysis includes the following steps: S8: Use the slope monitoring system to collect data from each monitoring point in real time, including displacement, stress, groundwater level, etc., to ensure the stability and real-time nature of data transmission, and use wireless communication technology or wired communication to transmit the data to the data center; S8.1: Clean the collected raw data to remove noise, outliers and duplicate data, and perform data preprocessing, including data format conversion, missing value filling, data compression, etc., to improve data quality and processing efficiency; S8.2: Use data analysis technology to conduct in-depth analysis of the preprocessed data and extract key information, such as slope deformation trends, stress distribution characteristics, groundwater level changes, etc., for evaluating the current state of the slope; S8.3: Generate monitoring reports regularly to summarize the changes in monitoring data and the analysis results. The report should include graphical display of monitoring data, key indicator analysis, slope state assessment, etc.
[0013] Preferably, the risk assessment and early warning include the following steps: S9: construct a risk assessment model based on historical monitoring data, geological information, slope engineering experience, etc. The model should be able to comprehensively consider multiple influencing factors of the slope, such as geological conditions, rainfall, human activities, etc.; S9.1: use the risk assessment model to classify the risk level of the slope, such as low risk, medium risk, high risk, etc., and set early warning thresholds corresponding to different risk levels; S9.2: when the monitoring data exceeds the set early warning threshold, the early warning signal is automatically triggered, and the early warning signal can be sent to relevant personnel via SMS, email, APP push, etc.; S9.3: formulate corresponding emergency plans for different risk levels and early warning situations. The emergency plan should include emergency response procedures, personnel evacuation plans, emergency rescue measures and other contents.
[0014] Preferably, the decision support and optimization adjustment include the following steps: S10: providing a visual decision support system to intuitively display the monitoring data, analysis results and risk assessment results in the form of charts, maps, etc., to assist decision makers to quickly understand the slope conditions and formulate scientific and reasonable decision plans; S10.1: formulating decision plans such as slope maintenance plans and reinforcement measures based on the monitoring data and risk assessment results. The decision plans should comprehensively consider factors such as technical feasibility, economy and social benefits; S10.2: dynamically adjusting the slope maintenance plan and optimization design plan based on real-time changes in monitoring data and risk assessment results to ensure the long-term stability and safety of the slope project.
[0015] Preferably, the post-maintenance and continuous improvement include the following steps: S11: Implement the post-maintenance plan for the slope, including optimization of the drainage system, implementation of reinforcement measures, etc., and regularly inspect and maintain the slope engineering facilities to ensure their normal operation and effectiveness; S11.1: Regularly review and evaluate the slope, verify the maintenance effect and adjust the maintenance plan, evaluate the stability and safety of the slope project, and promptly discover and deal with potential problems; S11.2: Summarize the project lessons learned, including the experience and deficiencies in monitoring system design, data analysis, risk assessment, decision support, etc., continuously improve the evaluation methods and technical means, and improve the scientificity and effectiveness of slope engineering management.
[0016] In summary, the present invention mainly has the following beneficial effects:
[0017] By adopting the slope reliability evaluation method, through detailed geological surveys, including investigations on geological structure, rock and soil properties, hydrogeological conditions, etc., basic data and information are collected, and the data are analyzed. Based on the survey results, the geological drawing model of the slope is drawn using computer-aided design software. The model should accurately reflect the geological structure, stratigraphic distribution, potential risk areas and other information of the slope, providing a basis for subsequent analysis. According to the geological survey data, a physical model similar to the actual geological structure of the slope is built in the laboratory or on-site using similar materials or technologies. The model should be able to simulate the key geological characteristics and potential risk areas of the slope. By loading the built physical model, the stress conditions of the slope under different working conditions, such as rainfall, earthquake, etc., are simulated, and the deformation, destruction and other processes of the model are observed and recorded. Through the data and observations of the physical model test, the stability performance of the slope under different working conditions is analyzed, and the potential slip surface and risk area are identified. The slope is further analyzed and verified using numerical simulation software, and the numerical simulation results are compared with the physical model test results to ensure the accuracy and reliability of the evaluation.
[0018] By designing an automated slope monitoring system, including the arrangement of multi-parameter monitoring points such as displacement, stress, and groundwater level, high-precision sensors and data acquisition equipment are selected to ensure the accuracy and real-time nature of the monitoring data. The monitoring system is deployed in key areas of the slope to collect monitoring data in real time, conduct preliminary data cleaning and preprocessing, extract key information using data analysis technology, evaluate the current state of the slope, and regularly generate monitoring reports. Based on the monitoring data and test results, the risk assessment model is used to classify the risk level of the slope, set an early warning threshold, and automatically trigger an early warning signal when the monitoring data exceeds the threshold. An emergency plan is formulated, providing a visual decision support system to assist decision makers in quickly understanding the slope conditions and formulating scientific and reasonable decision-making plans. The slope maintenance plan and optimization design plan are dynamically adjusted according to the monitoring data and risk assessment results, and the post-maintenance plan for the slope is implemented, including drainage system optimization, reinforcement measures implementation, etc. The slope is regularly reviewed and evaluated to verify the maintenance effect and adjust the maintenance plan. Project experience and lessons learned are summarized to continuously improve evaluation methods and technical means. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the process of the present invention. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0021] The following examples are used to illustrate the present invention, but they cannot be used to limit the scope of protection of the present invention. The conditions in the examples can be further adjusted according to specific conditions. Simple improvements to the method of the present invention under the premise of the concept of the present invention belong to the scope of protection claimed in the present invention.
[0022] The technical solution of this patent is further described in detail below in conjunction with specific implementation methods.
[0023] Embodiment 1
[0024] A slope reliability evaluation method, including geological survey, data analysis and modeling, physical model construction, physical model test, test result analysis, numerical simulation and verification, monitoring system design and deployment, monitoring data collection and analysis, risk assessment and early warning, decision support and optimization adjustment, and post-maintenance and continuous improvement;
[0025] The geological survey comprises the following steps: S1: using high-precision measuring instruments such as theodolite, total station and drone aerial survey to measure the geometric dimensions of the slope;
[0026] S1.1: Use the angle measurement function of theodolite or total station to calculate the centerline deviation by measuring the angle and distance between the slope centerline and the design centerline;
[0027] S1.2: Use the total station to measure the three-dimensional coordinates and calculate the width difference and height difference between the top and bottom of the slope to obtain the slope gradient;
[0028] S1.3: Use UAV remote sensing and other technical means to obtain high-resolution images or spectral data of the slope and its surrounding areas. Through image processing and interpretation technology, the geomorphological characteristics and vegetation coverage of the slope can be extracted to assist in the analysis of geological characteristics;
[0029] S1.4: Organize geological engineers to conduct field surveys to observe the rock type, structural surface characteristics, weathering degree, etc. of the slope. Obtain the physical and mechanical property parameters of the slope rock and soil through on-site sampling and test analysis;
[0030] S1.5: Drill holes at different locations and depths of the slope to obtain rock cores or soil samples for indoor test analysis. Through core logging and soil sample analysis, the internal structure and geological characteristics of the slope can be understood;
[0031] S1.6: Using the changing characteristics of seismic waves, the geological structure of the slope is detected through seismic exploration, revealing the faults, fracture zones and other unfavorable geological bodies inside the slope, providing a basis for slope stability evaluation;
[0032] The data analysis and modeling includes the following steps: S2: Summarize all relevant data obtained from field measurements, geological surveys, geophysical explorations and remote sensing technology, remove duplicate, erroneous or invalid data records, ensure data accuracy and consistency, convert data from different sources and in different formats into a unified format to facilitate subsequent processing and analysis, standardize numerical data, eliminate dimensional differences, make different data comparable, use the data integration function of GIS software, import the pre-processed data into the GIS platform, and establish a unified spatial database;
[0033] S2.1: Based on geological survey and geophysical exploration data, identify and draw the main geological interfaces, use the 3D modeling function of GIS software to build a preliminary 3D geological framework, fill in the corresponding lithology, physical and mechanical parameters and other attributes for different geological bodies in the 3D geological model according to the results of core logging and soil sample analysis, and refine and optimize the 3D geological model in combination with remote sensing images and on-site photos to ensure the authenticity and accuracy of the model
[0034] S2.2: Select appropriate stability analysis methods according to the specific conditions of the slope and engineering requirements, and establish corresponding stability analysis models in GIS platform or numerical simulation software according to the three-dimensional geological model of the slope. According to the three-dimensional geological model of the slope, establish corresponding stability analysis models in GIS platform or numerical simulation software, and input boundary conditions such as the geometric dimensions of the slope, physical and mechanical parameters of the rock and soil mass, groundwater level, rainfall intensity, etc.
[0035] S2.3: Compare and verify the model calculation results with the field monitoring data to ensure the accuracy and reliability of the analysis model. According to the verification results, make necessary corrections and improvements to the model;
[0036] The physical model construction includes the following steps: S3: designing the size and proportion of the physical model according to the actual geometric size and geological characteristics of the slope. The common similarity ratio symbol value may be 60 or other appropriate values to ensure that the model can reflect the key features of the prototype.
[0037] S3.1: Based on the geological survey results, select materials with similar physical and mechanical properties to the original slope rock and soil to construct the model. These materials should have similar density, strength, deformation characteristics, etc.;
[0038] S3.2: Use steel frames, wooden boards or other solid materials to build the basic framework of the model to ensure the stability and durability of the model structure;
[0039] S3.3: Fill similar materials layer by layer according to the rock and soil sequence revealed in the geological survey and compact them using special tools to simulate the rock and soil structure and density of the original slope;
[0040] S3.4: Set up displacement, stress and other monitoring points at key locations of the model, such as potential slip surfaces, slope surfaces, etc., so as to observe and record the deformation of the model in subsequent tests;
[0041] S3.5 According to the test requirements, install appropriate loading systems, such as hydraulic loading devices, gravity loading devices, etc., to simulate the slope stress conditions under different working conditions during the test;
[0042] The physical model test includes the following steps: S4: before the formal test, pre-load and debug the loading system to ensure the stability and accuracy of the loading process, check the operating status of the monitoring equipment, and ensure the accuracy and reliability of data recording;
[0043] S4.1: Apply loads to the model step by step according to the preset loading scheme. The loading rate and step length should be controlled during the loading process to avoid impact effects, and the deformation of the model after each loading step should be recorded;
[0044] S4.2: During the loading process, closely observe the deformation and damage of the model. Use measuring instruments to record the data changes of key monitoring points, such as displacement meters, stress gauges, etc., and record other phenomena during the test, such as crack generation and expansion;
[0045] S4.3: Adjust the loading method and loading amount according to the different working conditions to be simulated, such as rainfall, earthquake, etc. When simulating rainfall conditions, the rainwater infiltration process can be simulated by spraying water mist on the surface of the model; when simulating earthquake conditions, the propagation and effect of seismic waves can be simulated by using equipment such as a vibration table;
[0046] The test result analysis includes the following steps: S5: arranging and processing the data recorded during the test, including data cleaning, denoising, interpolation and other steps to ensure the accuracy and reliability of the data;
[0047] S5.1: Analyze the deformation of the model at different loading stages, including the changing trends and characteristics of parameters such as displacement and strain. By comparing the data from different monitoring points, we can understand the overall deformation law and local failure characteristics of the slope;
[0048] S5.2: Based on the test data and analysis results, the stability of the slope is evaluated. The safety factor method, limit equilibrium method and other methods can be used to calculate the safety factor or stability reserve factor of the slope, and the stability state of the slope can be comprehensively judged by combining the failure characteristics and deformation law of the slope;
[0049] S5.3: Conduct risk assessment and early warning based on the stability evaluation results and the actual working conditions of the slope. Formulate corresponding risk prevention measures and emergency plans to deal with possible slope instability problems;
[0050] S5.4: Summarize and analyze the test results, extract conclusions and suggestions that are of guiding significance to the actual project, and feed the test results back to the design, construction and maintenance of the slope project to improve the safety and reliability of the project;
[0051] The numerical simulation and verification includes the following steps: S6: according to the specific characteristics of the slope, such as geological structure, material properties, potential failure mode, etc., select appropriate numerical simulation software, such as FLAC3D, ABAQUS, PLAXIS, etc., and install and configure the selected software on the computer;
[0052] S6.1: Based on the geological survey data and the results of the physical model test, a geometric model of the slope is constructed in the numerical simulation software, including the distribution of strata, faults, joints, etc. According to the laboratory test results and geological survey data, the various materials in the model are given corresponding physical and mechanical parameters, such as elastic modulus, Poisson's ratio, shear strength, etc.; according to the loading conditions of the physical model test, the boundary conditions and loading methods of the numerical model are set to ensure consistency with the physical test;
[0053] S6.2: Start the numerical simulation calculation, observe and record the changes in the stress, strain, displacement, etc. of the slope during the simulation process, and ensure that the simulation calculation reaches the convergence standard, that is, the difference in the results between consecutive iterations is within an acceptable range;
[0054] S6.3: Compare the numerical simulation results with the physical model test results, including key indicators such as deformation morphology, failure mode, and stress distribution, and analyze the differences between the two and their possible causes, such as model simplification, material property differences, and loading condition differences. Evaluate the accuracy and reliability of the numerical simulation based on the comparison results, and adjust and optimize the numerical model if necessary;
[0055] S6.4: By changing key parameters in the numerical model, such as material properties, boundary conditions, etc., analyze their impact on the simulation results, determine sensitive factors, and optimize and adjust the numerical model based on the sensitivity analysis results to improve the accuracy and reliability of the simulation;
[0056] S6.5: Organize the process, results, comparative analysis, sensitivity analysis and optimization measures of numerical simulation and verification into a report, summarize the conclusions of numerical simulation and verification, and put forward suggestions on slope stability evaluation, monitoring system design and subsequent maintenance.
[0057] Embodiment 2
[0058] The design and deployment of the monitoring system includes the following steps: S7: according to the actual situation of the slope and the stability evaluation requirements, the main monitoring targets, such as displacement, stress, groundwater level, etc., are clarified, and the specific parameters to be monitored and their accuracy requirements are determined;
[0059] S7.1: Select representative monitoring points on the slope based on the geological structure, potential risk areas and monitoring objectives. These locations should be able to fully reflect the deformation and stability of the slope. According to the scale and complexity of the slope, the number of monitoring points should be reasonably determined to ensure the comprehensiveness and accuracy of the monitoring data;
[0060] S7.2.:According to the requirements of monitoring parameters, select appropriate sensor types, such as displacement sensors, such as GPS, total station, inclinometer, stress sensors, such as strain gauges, pressure cells, groundwater level sensors, select high-precision and high-stability data acquisition equipment for real-time collection of sensor data, and select wired or wireless data transmission methods according to the requirements of the monitoring system to ensure that the monitoring data can be transmitted to the data center in real time and accurately;
[0061] S7.3: Design the overall architecture of the monitoring system, including sensor networks, data acquisition and processing systems, data transmission and storage systems, early warning and alarm systems, etc. Design data processing and analysis algorithms to clean, preprocess, analyze and mine the collected monitoring data, extract key information for slope stability assessment, and design early warning and alarm mechanisms to automatically trigger early warning or alarm signals based on set thresholds and changing trends of monitoring data, reminding relevant personnel to take timely measures;
[0062] S7.4: Install sensors and data acquisition equipment on the slope according to the design plan, and conduct on-site debugging and testing to ensure that the equipment can work properly. Integrate the equipment at each monitoring point with the data center to achieve real-time transmission and sharing of data. Provide training and guidance to on-site operators so that they can master the operation and maintenance skills of the monitoring system.
[0063] S7.5: Start the monitoring system, start daily monitoring work, regularly record and analyze monitoring data, regularly maintain and service the monitoring system, including checking the working status of sensors, replacing damaged parts, cleaning data storage devices, etc., and establish data backup and security management mechanisms to ensure the security and integrity of monitoring data;
[0064] The monitoring data collection and analysis includes the following steps: S8: using the slope monitoring system to collect data from each monitoring point in real time, including displacement, stress, groundwater level, etc., to ensure the stability and real-time performance of data transmission, and using wireless communication technology or wired communication to transmit the data to a data center;
[0065] S8.1: Clean the collected raw data, remove noise, outliers and duplicate data, and perform data preprocessing, including data format conversion, missing value filling, data compression, etc., to improve data quality and processing efficiency;
[0066] S8.2: Use data analysis techniques to conduct in-depth analysis of the preprocessed data and extract key information, such as slope deformation trends, stress distribution characteristics, groundwater level changes, etc., to assess the current state of the slope;
[0067] S8.3: Generate monitoring reports regularly to summarize changes in monitoring data and analysis results. The reports should include graphical presentation of monitoring data, analysis of key indicators, and slope condition assessment;
[0068] The risk assessment and early warning includes the following steps: S9: constructing a risk assessment model based on historical monitoring data, geological data, slope engineering experience, etc. The model should be able to comprehensively consider multiple influencing factors of the slope, such as geological conditions, rainfall, human activities, etc.;
[0069] S9.1: Use the risk assessment model to classify the risk levels of the slopes, such as low risk, medium risk, high risk, etc., and set warning thresholds corresponding to different risk levels;
[0070] S9.2: When the monitoring data exceeds the set warning threshold, the warning signal is automatically triggered, and the warning signal can be sent to relevant personnel via SMS, email, APP push, etc.;
[0071] S9.3: Develop corresponding emergency plans for different risk levels and warning situations. The emergency plans should include emergency response procedures, personnel evacuation plans, emergency rescue measures, etc.
[0072] The decision support and optimization adjustment includes the following steps: S10: providing a visual decision support system to visually display monitoring data, analysis results and risk assessment results in the form of charts, maps, etc., to assist decision makers to quickly understand the slope conditions and formulate scientific and reasonable decision plans;
[0073] S10.1: Based on the monitoring data and risk assessment results, formulate decision-making plans such as slope maintenance plans and reinforcement measures. The decision-making plans should comprehensively consider factors such as technical feasibility, economic efficiency and social benefits;
[0074] S10.2: Dynamically adjust slope maintenance plans and optimize design plans based on real-time changes in monitoring data and risk assessment results to ensure the long-term stability and safety of slope projects;
[0075] The post-maintenance and continuous improvement include the following steps: S11: Implement the post-maintenance plan for the slope, including optimization of the drainage system, implementation of reinforcement measures, etc., and regularly inspect and maintain the slope engineering facilities to ensure their normal operation and effectiveness;
[0076] S11.1: Regularly review and evaluate slopes, verify maintenance results and adjust maintenance plans, evaluate the stability and safety of slope projects, and promptly identify and address potential problems;
[0077] S11.2: Summarize the project experience and lessons learned, including the experience and deficiencies in monitoring system design, data analysis, risk assessment, decision support, etc., and continuously improve evaluation methods and technical means to improve the scientificity and effectiveness of slope engineering management.
[0078] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A slope reliability evaluation method, characterized in that: It includes the following steps: geological survey, data analysis and modeling, physical model construction, physical model testing, test result analysis, numerical simulation and verification, monitoring system design and deployment, monitoring data collection and analysis, risk assessment and early warning, decision support and optimization adjustment, and post-maintenance and continuous improvement; The geological survey comprises the following steps: S1: using high-precision measuring instruments such as theodolite, total station and drone aerial survey to measure the geometric dimensions of the slope; S1.1: Use the angle measurement function of theodolite or total station to calculate the centerline deviation by measuring the angle and distance between the slope centerline and the design centerline; S1.2: Use the total station to measure the three-dimensional coordinates and calculate the width difference and height difference between the top and bottom of the slope to obtain the slope gradient; S1.3: Use UAV remote sensing and other technical means to obtain high-resolution images or spectral data of the slope and its surrounding areas. Through image processing and interpretation technology, the geomorphological characteristics and vegetation coverage of the slope can be extracted to assist in the analysis of geological characteristics; S1.4: Organize geological engineers to conduct field surveys to observe the rock type, structural surface characteristics, weathering degree, etc. of the slope. Obtain the physical and mechanical property parameters of the slope rock and soil through on-site sampling and test analysis; S1.5: Drill holes at different locations and depths of the slope to obtain rock cores or soil samples for indoor test analysis. Through core logging and soil sample analysis, the internal structure and geological characteristics of the slope can be understood; S1.6: Using the changing characteristics of seismic waves, the geological structure of the slope is detected through seismic exploration, revealing the faults, fracture zones and other unfavorable geological bodies inside the slope, providing a basis for slope stability evaluation; The data analysis and modeling includes the following steps: S2: Summarize all relevant data obtained from field measurements, geological surveys, geophysical explorations and remote sensing technology, remove duplicate, erroneous or invalid data records, ensure data accuracy and consistency, convert data from different sources and in different formats into a unified format to facilitate subsequent processing and analysis, standardize numerical data, eliminate dimensional differences, make different data comparable, use the data integration function of GIS software, import the pre-processed data into the GIS platform, and establish a unified spatial database; S2.1: Based on geological survey and geophysical exploration data, identify and draw the main geological interfaces, use the 3D modeling function of GIS software to build a preliminary 3D geological framework, fill in the corresponding lithology, physical and mechanical parameters and other attributes for different geological bodies in the 3D geological model according to the results of core logging and soil sample analysis, and refine and optimize the 3D geological model in combination with remote sensing images and on-site photos to ensure the authenticity and accuracy of the model S2.2: Select appropriate stability analysis methods according to the specific conditions of the slope and engineering requirements, and establish corresponding stability analysis models in GIS platform or numerical simulation software according to the three-dimensional geological model of the slope. According to the three-dimensional geological model of the slope, establish corresponding stability analysis models in GIS platform or numerical simulation software, and input boundary conditions such as the geometric dimensions of the slope, physical and mechanical parameters of the rock and soil mass, groundwater level, rainfall intensity, etc. S2.3: Compare and verify the model calculation results with the field monitoring data to ensure the accuracy and reliability of the analysis model, and make necessary corrections and improvements to the model based on the verification results.
2. A slope reliability evaluation method according to claim 1, characterized in that: The physical model construction includes the following steps: S3: designing the size and proportion of the physical model according to the actual geometric size and geological characteristics of the slope. The common similarity ratio symbol value may be 60 or other appropriate values to ensure that the model can reflect the key features of the prototype. S3.1: Based on the geological survey results, select materials with similar physical and mechanical properties to the original slope rock and soil to construct the model. These materials should have similar density, strength, deformation characteristics, etc.; S3.2: Use steel frames, wooden boards or other solid materials to build the basic framework of the model to ensure the stability and durability of the model structure; S3.3: Fill similar materials layer by layer according to the rock and soil sequence revealed in the geological survey and compact them using special tools to simulate the rock and soil structure and density of the original slope; S3.4: Set up displacement, stress and other monitoring points at key locations of the model, such as potential slip surfaces, slope surfaces, etc., so as to observe and record the deformation of the model in subsequent tests; S3.5 According to the test requirements, install appropriate loading systems, such as hydraulic loading devices, gravity loading devices, etc., to simulate the slope stress conditions under different working conditions during the test.
3. A slope reliability evaluation method according to claim 1, characterized in that: The physical model test includes the following steps: S4: before the formal test, pre-load and debug the loading system to ensure the stability and accuracy of the loading process, check the operating status of the monitoring equipment, and ensure the accuracy and reliability of data recording; S4.1: Apply loads to the model step by step according to the preset loading scheme. The loading rate and step length should be controlled during the loading process to avoid impact effects, and the deformation of the model after each loading step should be recorded; S4.2: During the loading process, closely observe the deformation and damage of the model. Use measuring instruments to record the data changes of key monitoring points, such as displacement meters, stress gauges, etc., and record other phenomena during the test, such as crack generation and expansion; S4.3: Adjust the loading method and loading amount according to the different working conditions that need to be simulated, such as rainfall, earthquake, etc. When simulating rainfall conditions, the rainwater infiltration process can be simulated by spraying water mist on the model surface; when simulating earthquake conditions, the propagation and effect of seismic waves can be simulated by using equipment such as vibration tables.
4. A slope reliability evaluation method according to claim 1, characterized in that: The test result analysis includes the following steps: S5: arranging and processing the data recorded during the test, including data cleaning, denoising, interpolation and other steps to ensure the accuracy and reliability of the data; S5.1: Analyze the deformation of the model at different loading stages, including the changing trends and characteristics of parameters such as displacement and strain. By comparing the data from different monitoring points, we can understand the overall deformation law and local failure characteristics of the slope; S5.2: Based on the test data and analysis results, the stability of the slope is evaluated. The safety factor method, limit equilibrium method and other methods can be used to calculate the safety factor or stability reserve factor of the slope, and the stability state of the slope can be comprehensively judged by combining the failure characteristics and deformation law of the slope; S5.3: Conduct risk assessment and early warning based on the stability evaluation results and the actual working conditions of the slope. Formulate corresponding risk prevention measures and emergency plans to deal with possible slope instability problems; S5.4: Summarize and analyze the test results, extract conclusions and suggestions that are of guiding significance to actual projects, and feed the test results back to the design, construction and maintenance of slope projects to improve the safety and reliability of the projects.
5. A slope reliability evaluation method according to claim 1, characterized in that: The numerical simulation and verification includes the following steps: S6: according to the specific characteristics of the slope, such as geological structure, material properties, potential failure mode, etc., select appropriate numerical simulation software, such as FLAC3D, ABAQUS, PLAXIS, etc., and install and configure the selected software on the computer; S6.1: Based on the geological survey data and the results of the physical model test, a geometric model of the slope is constructed in the numerical simulation software, including the distribution of strata, faults, joints, etc. According to the laboratory test results and geological survey data, the various materials in the model are given corresponding physical and mechanical parameters, such as elastic modulus, Poisson's ratio, shear strength, etc.; according to the loading conditions of the physical model test, the boundary conditions and loading methods of the numerical model are set to ensure consistency with the physical test; S6.2: Start the numerical simulation calculation, observe and record the changes in the stress, strain, displacement, etc. of the slope during the simulation process, and ensure that the simulation calculation reaches the convergence standard, that is, the difference in the results between consecutive iterations is within an acceptable range; S6.3: Compare the numerical simulation results with the physical model test results, including key indicators such as deformation morphology, failure mode, and stress distribution, and analyze the differences between the two and their possible causes, such as model simplification, material property differences, and loading condition differences. Evaluate the accuracy and reliability of the numerical simulation based on the comparison results, and adjust and optimize the numerical model if necessary; S6.4: By changing key parameters in the numerical model, such as material properties, boundary conditions, etc., analyze their impact on the simulation results, determine sensitive factors, and optimize and adjust the numerical model based on the sensitivity analysis results to improve the accuracy and reliability of the simulation; S6.5: Organize the process, results, comparative analysis, sensitivity analysis and optimization measures of numerical simulation and verification into a report, summarize the conclusions of numerical simulation and verification, and put forward suggestions on slope stability evaluation, monitoring system design and subsequent maintenance.
6. A slope reliability evaluation method according to claim 1, characterized in that: The design and deployment of the monitoring system includes the following steps: S7: according to the actual situation of the slope and the stability evaluation requirements, the main monitoring targets, such as displacement, stress, groundwater level, etc., are clarified, and the specific parameters to be monitored and their accuracy requirements are determined; S7.1: Select representative monitoring points on the slope based on the geological structure, potential risk areas and monitoring objectives. These locations should be able to fully reflect the deformation and stability of the slope. According to the scale and complexity of the slope, the number of monitoring points should be reasonably determined to ensure the comprehensiveness and accuracy of the monitoring data; S7.2.:According to the requirements of monitoring parameters, select appropriate sensor types, such as displacement sensors, such as GPS, total station, inclinometer, stress sensors, such as strain gauges, pressure cells, groundwater level sensors, select high-precision and high-stability data acquisition equipment for real-time collection of sensor data, and select wired or wireless data transmission methods according to the requirements of the monitoring system to ensure that the monitoring data can be transmitted to the data center in real time and accurately; S7.3: Design the overall architecture of the monitoring system, including sensor networks, data acquisition and processing systems, data transmission and storage systems, early warning and alarm systems, etc. Design data processing and analysis algorithms to clean, preprocess, analyze and mine the collected monitoring data, extract key information for slope stability assessment, and design early warning and alarm mechanisms to automatically trigger early warning or alarm signals based on set thresholds and changing trends of monitoring data, reminding relevant personnel to take timely measures; S7.4: Install sensors and data acquisition equipment on the slope according to the design plan, and conduct on-site debugging and testing to ensure that the equipment can work properly. Integrate the equipment at each monitoring point with the data center to achieve real-time transmission and sharing of data. Provide training and guidance to on-site operators so that they can master the operation and maintenance skills of the monitoring system. S7.5: Start the monitoring system, begin daily monitoring work, regularly record and analyze monitoring data, regularly maintain and service the monitoring system, including checking the working status of sensors, replacing damaged parts, cleaning data storage devices, etc., establish data backup and security management mechanisms to ensure the security and integrity of monitoring data.
7. A slope reliability evaluation method according to claim 1, characterized in that: The monitoring data collection and analysis includes the following steps: S8: using the slope monitoring system to collect data from each monitoring point in real time, including displacement, stress, groundwater level, etc., to ensure the stability and real-time performance of data transmission, and using wireless communication technology or wired communication to transmit the data to a data center; S8.1: Clean the collected raw data, remove noise, outliers and duplicate data, and perform data preprocessing, including data format conversion, missing value filling, data compression, etc., to improve data quality and processing efficiency; S8.2: Use data analysis techniques to conduct in-depth analysis of the preprocessed data and extract key information, such as slope deformation trends, stress distribution characteristics, groundwater level changes, etc., to assess the current state of the slope; S8.3: Generate monitoring reports regularly to summarize changes in monitoring data and analysis results. The reports should include graphical presentation of monitoring data, analysis of key indicators, and slope condition assessment.
8. A slope reliability evaluation method according to claim 1, characterized in that: The risk assessment and early warning includes the following steps: S9: constructing a risk assessment model based on historical monitoring data, geological data, slope engineering experience, etc. The model should be able to comprehensively consider multiple influencing factors of the slope, such as geological conditions, rainfall, human activities, etc.; S9.1: Use the risk assessment model to classify the risk levels of the slopes, such as low risk, medium risk, high risk, etc., and set warning thresholds corresponding to different risk levels; S9.2: When the monitoring data exceeds the set warning threshold, the warning signal is automatically triggered, and the warning signal can be sent to relevant personnel via SMS, email, APP push, etc.; S9.3: Develop corresponding emergency plans for different risk levels and warning situations. The emergency plans should include emergency response procedures, personnel evacuation plans, emergency rescue measures, etc.
9. A slope reliability evaluation method according to claim 1, characterized in that: The decision support and optimization adjustment includes the following steps: S10: providing a visual decision support system to visually display monitoring data, analysis results and risk assessment results in the form of charts, maps, etc., to assist decision makers to quickly understand the slope conditions and formulate scientific and reasonable decision plans; S10.1: Based on the monitoring data and risk assessment results, formulate decision-making plans such as slope maintenance plans and reinforcement measures. The decision-making plans should comprehensively consider factors such as technical feasibility, economic efficiency and social benefits; S10.2: Dynamically adjust slope maintenance plans and optimize design plans based on real-time changes in monitoring data and risk assessment results to ensure the long-term stability and safety of slope projects.
10. A slope reliability evaluation method according to claim 1, characterized in that: The post-maintenance and continuous improvement include the following steps: S11: Implement the post-maintenance plan for the slope, including optimization of the drainage system, implementation of reinforcement measures, etc., and regularly inspect and maintain the slope engineering facilities to ensure their normal operation and effectiveness; S11.1: Regularly review and evaluate slopes, verify maintenance results and adjust maintenance plans, evaluate the stability and safety of slope projects, and promptly identify and address potential problems; S11.2: Summarize the project experience and lessons learned, including the experience and deficiencies in monitoring system design, data analysis, risk assessment, decision support, etc., and continuously improve evaluation methods and technical means to improve the scientificity and effectiveness of slope engineering management.
Citation Information
Cited By
Road guardrail collision data evaluation and analysis system
CN119357753A
Method and system for judging stability of bedding slope
CN119438537A
Foundation SAR (Synthetic Aperture Radar) slope measurement data denoising method
CN119477746A
Safety risk evaluation method for granite residual soil in-service slope
CN119647967A
Geotechnical engineering earthquake sand liquefaction discrimination method and system
CN119717009A
