Large-section tunnel underground excavation lining trolley and lining construction method

By integrating liquid level sensing components and automatic vibration device on the tunnel lining trolley, the bubble problem during grouting is solved, the construction quality and efficiency are improved, the construction operation is simplified, and the construction risks are reduced.

CN119062364APending Publication Date: 2024-12-03BEIJING ZHONGYI SHUNDA CONSTRUCTION ENGINEERING CO LTD
View PDF 0 Cites 4 Cited by

Patent Information

Application Number
CN202411479008.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-23
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

During the tunnel lining construction process, existing lining trolleys are prone to bubbles during grouting, resulting in poor construction quality and safety risks in temporary support removal process. The existing technology has failed to effectively solve these problems.

Method used

A large-section tunnel concealed lining trolley was designed, using liquid level sensing components and automatic vibration device, monitoring the grouting liquid level through the liquid level sensing components, and using a motor to drive the reel and vibrating rod for automatic vibration to reduce the Bubble formation and construction operations are simplified by hydraulic jack system and hoist.

Benefits of technology

It effectively reduces the generation of bubbles during grouting, improves the quality of lining, simplifies construction operations, reduces construction risks, and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119062364A_ABST
    Figure CN119062364A_ABST
Patent Text Reader

Abstract

The invention relates to a large-section tunnel underground excavation lining trolley and a lining construction method.The trolley comprises a beam frame assembly and a needle beam assembly arranged in the beam frame assembly, and a walking mechanism for controlling the beam frame assembly and the needle beam assembly to move relatively is arranged between the beam frame assembly and the needle beam assembly; a template assembly is arranged on the beam frame assembly, a hydraulic jack system is arranged between the template assembly and the beam frame assembly, an anti-floating device is further arranged on the beam frame assembly, supports are arranged at the front end and the rear end of the needle beam assembly respectively, the template assembly comprises a bottom mold, a left mold, a right mold and a top mold, and the left mold, the right mold and the top mold can be driven by the hydraulic jack system to perform demolding action. Multiple rows of transverse grouting openings are formed in the left mold and the right mold, stirring openings are formed in the middle positions of the left mold and the right mold, and stirring assemblies capable of extending out of the outer sides of the left mold and the right mold are arranged at the stirring openings; the lining trolley has the technical effect that bubble residues can be reduced conveniently when the lining trolley conducts grouting treatment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of dark-cut tunnels for sewage treatment, and in particular to a dark-cut lining trolley for large-section tunnels and a lining construction method. Background Art

[0002] Lining trolleys are widely used in subways, highways, railways and other fields. Lining trolleys effectively reduce the intensity of manual labor and improve the efficiency of secondary lining construction. At present, the structure of lining trolleys is basically similar, mainly composed of formwork system, hydraulic system, walking system, support system, etc., which are connected by welding and bolts to form a whole.

[0003] When applying typical tunnel construction methods such as CRD method (cross partition wall method) and CD method, a temporary support system needs to be reserved during the construction process to maintain the stability of the tunnel. However, the temporary support needs to be removed during the secondary lining construction process, resulting in an unsupported air period during the removal of the temporary support, which increases the construction risk. A subway tunnel lining trolley is disclosed in China with patent number "201510245418.3", which only considers the construction space problem in the tunnel, and does not consider the safety problem of the temporary support removal process; the lining trolley disclosed in China with patent number "201510573530.X" fully considers the trolley's own weight and cost issues, but lacks consideration of the impact of temporary support during the construction process.

[0004] The mechanical properties of existing trolleys are constantly improving. However, when grouting is carried out through the lining trolley, single-point grouting is generally used on the same side, and the slurry upper liquid surface of the current side wall is vibrated as flat as possible. However, if unevenness occurs, bubbles are easily generated when grouting continues on the upper layer, affecting the construction quality. Summary of the invention

[0005] In order to solve the above technical problems, the present application provides a large-section tunnel excavation lining trolley, which has the advantage of fewer bubbles in grouting.

[0006] One of the solutions of this application is to provide a large-section tunnel dark excavation lining trolley, which adopts the following technical solution: A large-section tunnel lining trolley comprises a beam frame assembly and a needle beam assembly arranged in the beam frame assembly, a walking mechanism for controlling the relative movement of the beam frame assembly and the needle beam assembly is arranged between the beam frame assembly and the needle beam assembly, an anti-floating device is also arranged on the beam frame assembly, supports are arranged at both the front and rear ends of the needle beam assembly, the template assembly comprises a bottom template, a left template, a right template and a top template, the left template and the right template are respectively hinged on both sides of the bottom template, and the top template is hinged on the right template; the left template, the right template and the top template can all be demoulded under the drive of the hydraulic jack system, and the left template and the right template are provided with multiple rows of transverse A grouting port, a vibrating device is arranged at the grouting port position at both ends of each row of grouting ports, the vibrating device includes a vibrating rod, a winding drum is arranged on the inner wall of the upper side of the grouting port, a winding wire is wound on the winding drum, the vibrating rod is fixedly connected to one end of the winding wire, the end of the vibrating rod close to the winding wire is hemispherical and a plurality of power-assisting grooves are opened at the end, a motor assembly for winding the winding wire is arranged on the winding wire assembly, a sealing plate for closing the grouting port is arranged at the grouting port, and the lower edge of the grouting port is inclined toward the corresponding inner surface of the left mold or the right mold; both sides of the outer annular surface of the left mold and the right mold are provided with receiving grooves arranged along the annular surface, and a liquid level sensing assembly is arranged in the receiving groove.

[0007] By adopting the above technical solution, when the lining construction is carried out by the lining trolley, the template assembly will be pressed against the bundled steel bars, and then the grouting treatment will be carried out through the grouting port. Generally, there is one or more grouting ports in the same row of the lining trolley, and the slurry poured into each grouting port is easy to form a mountain-like structure, which makes the grouting height on both sides inconsistent. When continuing to grout the next layer, bubbles are easy to be generated, which affects the lining quality. At this time, the height of the liquid level on both sides is known through the liquid level sensing component, and then the vibrating rod is inserted into the inside for vibration treatment, so that the two sides can be kept at the same level as much as possible. On a horizontal plane, conventional vibrating devices are placed manually, and the operation process is relatively cumbersome. In this solution, when the slurry is poured, the slurry will give the booster groove an additional downward force. At this time, the motor assembly does not work, and the wire reel will continue to pay out the wire, so that the vibrating rod enters the deep part with the slurry, which is convenient for vibrating the deep part and reducing bubbles in the corresponding area. When the vibration is completed, the wire reel is driven to rotate by the set motor assembly, and then the wire is driven to reel in to retract the vibrating rod. This solution automatically pays out the wire through the set wire reel, which can facilitate vibration and improve the quality of the dark excavation lining.

[0008] Preferably, a plurality of baffles which are flipped outward to seal the two ends of the annular structure are provided on both sides of the template assembly, and a driving assembly for driving the corresponding baffle to rotate is provided between each baffle and the template assembly, and the driving assembly includes a first driving cylinder, a base of the first driving cylinder is hinged to the template assembly, a piston rod of the first cylinder is hinged with a V-shaped rotating plate, the other end of the rotating plate is hinged to the template assembly, and the baffle is fixedly connected to the V-shaped top position of the rotating plate; an integrated control module is provided on the first driving cylinder, and the integrated control module controls the staggered start or stop of the first driving cylinder.

[0009] By adopting the above technical solution, sealed baffles are set on both sides of the formwork assembly. Before grouting the section to be poured, the baffles on both sides of the formwork assembly are rotated and made close to the inner wall of the tunnel. Grouting is then carried out. When the baffles are hinged to the side of the formwork assembly, the possibility of side leakage of the poured slurry is reduced.

[0010] Preferably, the walking mechanism includes two groups of winches, and the two groups of winches are respectively located on the front and rear sides of the needle beam assembly, and the fixed end and the movable end of the winches are respectively connected to the needle beam assembly and the beam frame assembly, and the movement of the needle beam assembly relative to the beam frame assembly can be controlled by the two groups of winches; three lifting cylinders distributed in a triangular shape are fixedly connected to the upper side of the support, the fixed parts of the lifting cylinders are fixedly connected to the support, and the movable ends of the lifting cylinders are fixedly connected to the needle beam assembly, and the propulsion speeds of the three lifting cylinders are different.

[0011] By adopting the above technical solution, the movement of the needle beam assembly relative to the beam frame assembly can be conveniently controlled by the set winch, which is simple and convenient to operate and more stable and reliable; at the same time, three lifting cylinders are set to make the overall structure more stable.

[0012] Preferably, the hydraulic jack system includes a driving hydraulic cylinder and a supporting hydraulic cylinder, the driving hydraulic cylinder includes three groups and each group corresponds to the left mold, the right mold and the top mold, one end of each driving hydraulic cylinder is hinged to the beam frame assembly, and the other end is hinged to the corresponding left mold, the right mold and the top mold; the supporting hydraulic cylinder also includes three groups and each group corresponds to the left mold, the right mold and the top mold, one end of the supporting hydraulic cylinder is fixedly connected to the beam frame assembly.

[0013] By adopting the above technical solution, during normal use, when demoulding is required, the supporting hydraulic cylinder is driven to retract first, and then the hydraulic cylinder is driven to retract. When the hydraulic cylinder is driven to retract, the right mold and the top mold will rotate together, thereby realizing demoulding, which is simpler and more convenient to operate.

[0014] Preferably, an opening is provided on the outer side of the template assembly at a position corresponding to the grouting pipe, and a resistance block protruding from the opening is provided at the opening, the resistance block is tightly fitted with the inner wall of the opening, an elastic member is provided between the resistance block and the template assembly, and when the elastic member is in a natural state, the resistance block protrudes from the outer annular surface of the template assembly.

[0015] By adopting the above technical solution, before grouting, the formwork assembly needs to be expanded to a truncated cone shape, and the grouting assembly can be pressed against the grouting pipe reserved in the tied steel bars to prevent it from being blocked by the slurry, thereby facilitating grouting operations through the grouting pipe in the future.

[0016] Preferably, a debris collection device is provided at the front end of the needle beam assembly, and the debris collection device includes a collection box, an inclined feeding plate arranged on the front side of the collection box, and a cleaning component located on the upper side of the inclined feeding plate and can be extended.

[0017] By adopting the above technical solution, during normal use, the debris collected in front can be collected by the debris collection device, and the collection can be mechanized, which reduces the cost of personnel operation and improves construction efficiency.

[0018] Preferably, the front end of the collection box is provided with an opening, and a rotating shaft is rotatably connected to the opening, a coaxially arranged gear is fixedly connected to the rotating shaft, the inclined loading plate is mounted on the gear, and a rack meshing with the relative gear is fixedly connected to the position of the inclined loading plate corresponding to the gear.

[0019] By adopting the above technical solution, the rotating shaft is driven to rotate by the arranged gear, thereby controlling the inclined feeding plate to tilt forward and poke on the ground, so as to facilitate the subsequent cleaning of debris.

[0020] Preferably, a horizontal plate is provided at the front opening of the collecting box, a connecting rod which can be extended from the collecting box is provided on the horizontal plate, a control cylinder for controlling the extension of the connecting rod is connected to the rear end of the connecting rod, a fixing rod is hinged at the front end of the connecting rod, and a claw is provided at the front end of the fixing rod.

[0021] By adopting the above technical solution, the debris in front can be cleaned more conveniently through the combination of the claws and the inclined feeding plate, and the operation is simpler and more convenient.

[0022] Preferably, an inclined water tank is provided inside the collecting box, a water pump is provided inside the water tank, a plurality of collecting grooves are opened in the inclined feeding plate, a hose is fixedly connected to the collecting groove, the other end of the hose is located in the water tank and connected to the water pump in the water tank.

[0023] By adopting the above technical solution, the sewage in the front can be easily extracted and processed through the set water tank, thereby improving the convenience of operation.

[0024] The second solution of this application is to provide a lining construction method, which adopts the following technical solution: A lining construction method comprises the following steps: Step 1: prefabricate the full ring lining steel bars and fix them to the tunnel prefabricated anchor rods, and tie the steel bars to form a section to be poured; Step 2: inserting a plurality of grouting guide pipes on the inner wall of the tunnel for backfilling grouting; Step 3, controlling the template assembly to move to the section to be poured through the walking mechanism; Step 4, controlling the template assembly to open by means of a hydraulic jack system, and making its outer surface close to the end surface of the grouting guide pipe; Step 5: Grouting is performed through the grouting ports of the left and right molds. When the grouting is nearly completed, the liquid level of the slurry on both sides is known through the liquid level sensor in the receiving tank. When the height of one side is significantly higher than that of the other side, the vibrating device is controlled to enter the slurry for vibration. Step six, control the cable reel to reverse and retract the corresponding vibrating device.

[0025] By adopting the above technical solution, when the lining construction is carried out by the lining trolley, the template assembly will be pressed against the bundled steel bars, and then the grouting treatment will be carried out through the grouting port. Generally, there is one or more grouting ports in the same row of the lining trolley, and the slurry poured into each grouting port is easy to form a mountain-like structure, which makes the grouting height on both sides inconsistent. When continuing to grout the next layer, bubbles are easy to be generated, which affects the lining quality. At this time, the height of the liquid level on both sides is known through the liquid level sensing component, and then the vibrating rod is inserted into the inside for vibration treatment, so that the two sides can be kept at the same level as much as possible. On a horizontal plane, conventional vibrating devices are placed manually, and the operation process is relatively cumbersome. In this solution, when the slurry is poured, the slurry will give the booster groove an additional downward force. At this time, the motor assembly does not work, and the wire reel will continue to pay out the wire, so that the vibrating rod enters the deep part with the slurry, which is convenient for vibrating the deep part and reducing bubbles in the corresponding area. When the vibration is completed, the wire reel is driven to rotate by the set motor assembly, and then the wire is driven to reel in to retract the vibrating rod. This solution automatically pays out the wire through the set wire reel, which can facilitate vibration and improve the quality of the dark excavation lining.

[0026] In summary, the present application includes at least one of the following beneficial technical effects: 1. When the lining trolley is used for lining construction, the template assembly will be pressed against the bundled steel bars, and then the grouting will be carried out through the grouting port. Generally, there is one or more grouting ports in the same row of the lining trolley. The slurry poured into each grouting port is easy to form a mountain-like structure, which makes the grouting height on both sides inconsistent. When the next layer of grouting is continued, bubbles are easy to be generated, which affects the lining quality. At this time, the height of the liquid level on both sides is known through the liquid level sensing component, and then the vibrating rod is inserted into the inside for vibration treatment, so that the two sides can be on the same level as much as possible. The conventional vibrating device is placed manually, and the operation process is relatively cumbersome. In this scheme, when the slurry is poured, the slurry will give the booster groove an extra downward force. At this time, the motor component does not work, and the reel will continue to pay out the wire, so that the vibrating rod enters the deep part with the slurry, which is convenient for vibrating the deep part and reducing bubbles in the corresponding area. When the vibration is completed, the reel is driven to rotate by the motor component, and then the wire is driven to reel in to retract the vibrating rod. In this scheme, the reel automatically pays out the wire, which can make vibration more convenient and improve the quality of the dark excavation lining. 2. Before grouting, the formwork assembly needs to be expanded to a frustum. The grouting assembly can contact the grouting pipe reserved in the tied steel bars to prevent it from being blocked by the slurry, making it easier to perform grouting operations through the grouting pipe in the future. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the overall structure of the embodiment; Figure 2 It is a structural schematic diagram highlighting the template assembly; Figure 3 yes Figure 2 Enlarged view of part A in the middle; Figure 4 is a cross-sectional schematic diagram highlighting the structure of the crushing assembly in the embodiment; Figure 5 is a structural schematic diagram highlighting the vibrating device in the embodiment; Figure 6 yes Figure 5 Enlarged view of middle part B; Figure 7 is a schematic structural diagram of a debris collection device in an embodiment; Figure 8 1 is a schematic diagram showing the structure of the water tank in the embodiment.

[0028] Explanation of reference numerals: 1. beam frame assembly; 2. needle beam assembly; 21. support; 22. lifting cylinder; 23. debris collection device; 231. collection box; 232. inclined loading plate; 2321. gear; 2322. rack; 2323. collection trough; 233. cleaning assembly; 234. cross plate; 235. connecting rod; 236. control cylinder; 237. fixing rod; 238. claw; 24. water tank; 241. hose; 3. walking mechanism; 31. winch; 4. template assembly; 41. left mold; 42. right mold ; 43. Top mold; 431. Bottom mold; 44. Grouting port; 45. Vibrating device; 451. Vibrating rod; 452. Wire reel; 453. Power assist slot; 454. Motor assembly; 455. Storage slot; 47. Baffle; 471. First drive cylinder; 472. Turntable; 48. Resistance block; 5. Hydraulic jack system; 51. Driving hydraulic cylinder; 52. Supporting hydraulic cylinder; 6. Crushing assembly; 61. Rotating slot; 62. Crushing base; 63. Crushing gear; 64. Driving rack; 65. Crushing knife; 66. Crushing motor. DETAILED DESCRIPTION

[0029] The following is combined with Figure 1-8 This application is described in further detail.

[0030] The present application embodiment discloses a large-section tunnel lining trolley. Figure 1 and Figure 2 , including a beam-frame assembly 1 and a needle beam assembly 2 arranged in the beam-frame assembly 1, both ends of the needle beam assembly 2 protrude from the beam-frame assembly 1 and can move laterally relative to the beam-frame assembly 1, a walking mechanism 3 for controlling relative movement is arranged between the two, the walking mechanism 3 includes a winch 31, the winch 31 is arranged on the two protruding ends of the needle beam assembly 2, the fixed end of the winch 31 is fixedly connected to the needle beam assembly 2, and the movable end is fixedly connected to the beam-frame assembly 1; an anti-floating device is detachably connected to the beam-frame assembly 1, and a counterweight block is arranged on the anti-floating device, and the counterweight block can be used to press the beam-frame assembly 1 to prevent it from floating.

[0031] A template assembly 4 is arranged on the outer ring surface of the beam frame assembly 1, and a hydraulic jack system 5 is arranged between the beam frame assembly 1 and the template assembly 4, through which the template assembly 4 can be controlled to perform mold expansion and mold closing actions; the template assembly 4 includes a bottom mold 431, a left mold 41, a right mold 42 and a top mold 43, and the hydraulic jack system 5 includes a driving hydraulic cylinder 51 and a supporting hydraulic cylinder 52, and the driving hydraulic cylinder 51 includes three groups, and each group corresponds to the left mold 41, the right mold 42 and the top mold 43. The mold 42 and the top mold 43, each driving hydraulic cylinder 51 has one end hinged to the beam frame assembly 1, and the other end hinged to the corresponding left mold 41, right mold 42 and top mold 43; the supporting hydraulic cylinder 52 also includes three groups and each group corresponds to the left mold 41, right mold 42 and top mold 43, one end of the supporting hydraulic cylinder 52 is fixedly connected to the beam frame assembly 1, the outer side of the template assembly 4 is provided with an opening corresponding to the position of the grouting pipe, and a resistance block 48 protruding from the opening is provided at the opening (see Figure 5 ), the abutment block 48 fits tightly against the inner wall of the opening, an elastic member 481 is provided between the abutment block 48 and the template assembly 4, when the elastic member 481 is in a natural state, the abutment block 48 protrudes from the outer ring surface of the template assembly 4; supports 21 are provided at both the front and rear ends of the needle beam assembly 2, and three lifting cylinders 22 distributed in a triangular shape are fixedly connected to the upper side of the supports 21, the fixed parts of the lifting cylinders 22 are fixedly connected to the supports 21, and the movable ends of the lifting cylinders 22 are fixedly connected to the needle beam assembly 2, and the propulsion speeds of the three lifting cylinders 22 are different.

[0032] Reference Figure 3 and Figure 4, multiple baffles 47 that flip outward to seal the two ends of the annular structure are arranged on both sides of the template assembly 4, and a driving component that drives the corresponding baffle 47 to rotate is arranged between each baffle 47 and the template assembly 4, and the driving component includes a first driving cylinder 471, the base of the first driving cylinder 471 is hinged to the template assembly 4, the piston rod of the first cylinder is hinged with a V-shaped rotating plate, the other end of the rotating plate is hinged to the template assembly 4, and the baffle 47 is fixedly connected to the V-shaped top position of the rotating plate; an integrated control module is arranged on the first driving cylinder 471, and the integrated control module controls the staggered start or stop of the first driving cylinder 471; an annular crushing Component 6, a rotating groove 61 is opened on the outer ring surface of the template assembly 4, a driving rack 64 is arranged on one side of the rotating groove 61, the crushing component 6 is clamped in the rotating groove 61, the crushing component 6 includes a crushing base 62, a crushing gear 63 is rotatably connected to the crushing base 62, the crushing gear 63 is meshed with the driving rack 64, and a crushing knife 65 is fixedly connected to the upper end of the crushing base 62; a crushing motor 66 for driving the crushing gear 63 to rotate is arranged inside the crushing base 62; when the crushing process is performed by the crushing component 6, the baffle 47 can be controlled to rotate to a horizontal angle of about 45 degrees. At this time, the broken pieces broken by the crushing component 6 can be thrown farther under the action of the baffle 47 to prevent damage to the equipment.

[0033] Reference Figure 5 and Figure 6 A plurality of rows of transverse grouting ports 44 are provided on the left mold 41 and the right mold 42, and a stirring port is provided at the middle position of each row of grouting ports 44, and a vibrating device 45 is provided at the grouting ports 44 at both ends of each row of grouting ports 44, the vibrating device 45 comprises a vibrating rod 451, a winding drum 452 is provided on the inner wall of the upper side of the grouting port 44, a winding wire is wound on the winding drum 452, the vibrating rod 451 is fixedly connected to one end of the winding wire, the end of the vibrating rod 451 close to the winding wire is hemispherical and a plurality of power-assisting grooves 453 are provided at the end, a motor assembly 454 for winding up the winding wire is provided on the winding wire assembly, a sealing plate for closing the grouting port 44 is provided, and receiving grooves 455 extending along the ring surfaces are provided on both sides of the outer ring surfaces of the left mold 41 and the right mold 42, and a liquid level sensing assembly is provided in the receiving groove 455; the liquid level sensing assembly comprises a liquid level sensor.

[0034] A vibrating device 45 is provided at the grouting port 44, and the vibrating device 45 includes a vibrating rod 451. A winding drum 452 is provided on the inner wall of the upper side of the grouting port 44, and a winding wire is wound on the winding drum 452. The vibrating rod 451 is fixedly connected to one end of the winding wire. A plurality of upwardly inclined power-assisting grooves 453 are provided on the side of the vibrating rod 451. A motor assembly 454 for retracting the winding wire is provided on the winding assembly. A sealing plate for closing the grouting port 44 is provided, and the lower edge of the grouting port 44 is inclined toward the corresponding inner surface of the left mold 41 or the right mold 42; an opening is provided on the outer side of the template assembly 4 at a position corresponding to the grouting pipe, and a resistance block 48 protruding from the opening is provided at the opening and at the opening, the resistance block 48 is tightly fitted with the inner wall of the opening, and an elastic member 481 is provided between the resistance block 48 and the template assembly 4. When the elastic member 481 is in a natural state, the resistance block 48 protrudes from the outer annular surface of the template assembly 4.

[0035] Reference Figure 7 and Figure 8 The front end of the needle beam assembly 2 is provided with a debris collection device 23, which includes a collection box 231, an inclined loading plate 232 disposed at the front side of the collection box 231, and a cleaning assembly 233 located on the upper side of the inclined loading plate 232 and can be extended. The front end of the collection box 231 is provided with an opening, and a rotating shaft is rotatably connected to the opening, and a coaxially arranged gear 2321 is fixedly connected to the rotating shaft. The inclined loading plate 232 is mounted on the gear 2321, and a rack 2322 meshing with the gear 2321 is fixedly connected to the position of the inclined loading plate 232 corresponding to the gear 2321; a cross plate 234 is provided at the front opening of the collection box 231, and a connecting rod 235 that can extend out of the collection box 231 is provided on the cross plate 234, and a connecting rod 235 that can be extended out of the collection box 231 is connected to the cross plate 234. The rear end of the rod 235 is connected to a control cylinder 236 for controlling its extension, the front end of the connecting rod 235 is hinged with a fixing rod 237, and the front end of the fixing rod 237 is provided with a claw 238; an inclined water tank 24 is provided on the inner side of the collecting box 231, a water pump is provided in the water tank 24, a plurality of collecting grooves 2323 are provided in the inclined feeding plate 232, a hose 241 is fixedly connected to the collecting groove 2323, and the other end of the hose 241 is located in the water tank 24 and is connected to the water pump in the water tank 24.

[0036] A lining construction method comprises the following steps: Step 1: prefabricate the full ring lining steel bars and fix them to the tunnel prefabricated anchor rods, and tie the steel bars to form a section to be poured; Step 2: inserting a plurality of grouting guide pipes on the inner wall of the tunnel for backfilling grouting; Step 3, controlling the template assembly 4 to move to the section to be poured through the walking mechanism 3; Step 4, controlling the template assembly 4 to open by the hydraulic jack system 5, and making its outer surface close to the end surface of the grouting guide pipe; Step five, grouting is performed through the grouting ports 44 of the left mold 41 and the right mold 42. When the grouting is almost completed, the liquid level height of the slurry on both sides is known through the liquid level sensing sensor in the receiving groove 455. When the height on one side is significantly higher than the other side, the vibrating device 45 is controlled to enter the slurry for vibration.

[0037] Step six, control the cable reel 452 to reverse and retract the corresponding vibrating device 45.

[0038] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A large-section tunnel lining trolley, characterized in that: The invention comprises a beam frame assembly (1) and a needle beam assembly (2) arranged in the beam frame assembly (1); a walking mechanism (3) for controlling the relative movement of the beam frame assembly (1) and the needle beam assembly (2) is arranged between the beam frame assembly (1) and the needle beam assembly (2); a template assembly (4) is arranged on the beam frame assembly (1) and a hydraulic jack system (5) is arranged between the two; supports (21) are arranged at both the front and rear ends of the needle beam assembly (2); the template assembly (4) comprises a bottom template (431), A left mold (41), a right mold (42) and a top mold (43), wherein the left mold (41) and the right mold (42) are respectively hinged to the two sides of the bottom mold (431), and the top mold (43) is hinged to the right mold (42); the left mold (41), the right mold (42) and the top mold (43) can all be demoulded under the drive of the hydraulic jack system (5), and the left mold (41) and the right mold (42) are provided with multiple rows of transverse grouting ports (44), and each row of grouting ports (44) is provided with a plurality of grouting ports (44) on the left mold (41) and the right mold (42). A vibrating device (45) is provided at the grouting opening (44) at both ends of the grouting opening (44), the vibrating device (45) comprising a vibrating rod (451), a winding drum (452) is provided on the upper inner wall of the grouting opening (44), a winding wire is wound on the winding drum (452), the vibrating rod (451) is fixedly connected to one end of the winding wire, the end of the vibrating rod (451) close to the winding wire is hemispherical and a plurality of power-assisting grooves ( 453), the winding assembly is provided with a motor assembly (454) capable of winding up the winding wire, the grouting port (44) is provided with a sealing plate capable of closing it, and the lower edge of the grouting port (44) is inclined toward the inner surface of the corresponding left mold (41) or right mold (42); both sides of the outer annular surface of the left mold (41) and the right mold (42) are provided with receiving grooves (455) arranged along the annular surface, and a liquid level sensing assembly is arranged in the receiving groove (455).

2. A large-section tunnel lining trolley according to claim 1, characterized in that: A plurality of baffles (47) are provided on both sides of the template assembly (4) and are turned outward to seal the two ends of the annular structure. A driving assembly for driving the corresponding baffle (47) to rotate is provided between each baffle (47) and the template assembly (4). The driving assembly comprises a first driving cylinder (471). The base of the first driving cylinder (471) is hinged to the template assembly (4). The piston rod of the first driving cylinder (471) is hinged to a V-shaped rotating plate. The other end of the rotating plate is hinged to the template assembly (4). The baffle (47) is fixedly connected to the V-shaped top position of the rotating plate. The first driving cylinder (471) is provided with an integrated control module, and the integrated control module controls the staggered start or stop of the first driving cylinder (471).

3. The large-section tunnel lining trolley according to claim 1, characterized in that: The walking mechanism (3) comprises two groups of winches (31), the two groups of winches (31) are respectively located at the front side and the rear side of the needle beam assembly (2), the fixed end and the movable end of the winches (31) are respectively connected to the needle beam assembly (2) and the beam frame assembly (1), and the needle beam assembly (2) can be controlled to move relative to the beam frame assembly (1) through the two groups of winches (31); three lifting cylinders (22) distributed in a triangular shape are fixedly connected to the upper side of the support (21), the fixed parts of the lifting cylinders (22) are all fixedly connected to the support (21), and the movable ends of the lifting cylinders (22) are all fixedly connected to the needle beam assembly (2), and the propulsion speeds of the three lifting cylinders (22) are different.

4. The large-section tunnel lining trolley according to claim 1, characterized in that: The hydraulic jack system (5) comprises a driving hydraulic cylinder (51) and a supporting hydraulic cylinder (52); the driving hydraulic cylinder (51) comprises three groups, each group corresponding to a left mold (41), a right mold (42) and a top mold (43); one end of each driving hydraulic cylinder (51) is hinged to the beam frame assembly (1), and the other end is hinged to the corresponding left mold (41), right mold (42) and top mold (43); the supporting hydraulic cylinder (52) also comprises three groups, each group corresponding to the left mold (41), right mold (42) and top mold (43); one end of each supporting hydraulic cylinder (52) is fixedly connected to the beam frame assembly (1).

5. The large-section tunnel lining trolley according to claim 1, characterized in that: An opening is provided on the outer side of the template assembly (4) at a position corresponding to the grouting pipe, and a resistance block (48) is provided at the opening to protrude from the opening. The resistance block (48) is tightly fitted with the inner wall of the opening. An elastic member (481) is provided between the resistance block (48) and the template assembly (4). When the elastic member (481) is in a natural state, the resistance block (48) protrudes from the outer annular surface of the template assembly (4).

6. The large-section tunnel lining trolley according to claim 1, characterized in that: A debris collection device (23) is provided at the front end of the needle beam assembly (2), and the debris collection device (23) comprises a collection box (231), an inclined loading plate (232) arranged on the front side of the collection box (231), and a cleaning component (233) located on the upper side of the inclined loading plate (232) and extendable.

7. A large-section tunnel lining trolley according to claim 6, characterized in that: The front end of the collecting box (231) is provided with an opening, and a rotating shaft is rotatably connected to the opening, a coaxially arranged gear (2321) is fixedly connected to the rotating shaft, the inclined loading plate (232) is mounted on the gear (2321), and a rack (2322) meshing with the gear (2321) is fixedly connected to the position of the inclined loading plate (232) corresponding to the gear (2321).

8. A large-section tunnel lining trolley according to claim 7, characterized in that: A transverse plate (234) is provided at the front opening of the collection box (231), and a connecting rod (235) that can extend out of the collection box (231) is provided on the transverse plate (234). The rear end of the connecting rod (235) is connected to a control cylinder (236) for controlling the extension of the connecting rod (235). The front end of the connecting rod (235) is hinged with a fixing rod (237), and the front end of the fixing rod (237) is provided with a claw (238).

9. A large-section tunnel lining trolley according to claim 8, characterized in that: An inclined water tank (24) is arranged inside the collecting box (231), a water pump is arranged inside the water tank (24), a plurality of collecting grooves (2323) are provided inside the inclined loading plate (232), a hose (241) is fixedly connected to the collecting groove (2323), and the other end of the hose (241) is located inside the water tank (24) and connected to the water pump inside the water tank (24).

10. A lining construction method, characterized in that: The following steps are included: Step 1: prefabricate the full ring lining steel bars and fix them to the tunnel prefabricated anchor rods, and tie the steel bars to form a section to be poured; Step 2: inserting a plurality of grouting guide pipes on the inner wall of the tunnel for backfilling grouting; Step 3, controlling the template assembly (4) to move to the section to be poured by the walking mechanism (3); Step 4, controlling the template assembly (4) to open by means of a hydraulic jack system (5), and making its outer surface close to the end surface of the grouting guide pipe; Step 5: Grouting is performed through the grouting ports (44) of the left mold (41) and the right mold (42). When the grouting is nearly completed, the liquid level height of the slurry on both sides is known through the liquid level sensor in the receiving groove (455). When the height on one side is significantly higher than that on the other side, the vibrating device (45) is controlled to enter the slurry for vibration. Step six, control the cable reel (452) to reverse and retract the corresponding vibrating device (45).

Citation Information

Cited By

  • Lining trolley and formwork supporting device thereof

    CN120120031A

  • A lining trolley and its formwork support device

    CN120120031B

  • Self-peristaltic inclined shaft full-process integrated construction equipment and construction method

    CN120465963A

  • Compressed air energy storage-based full-circle needle beam trolley and method

    CN121854100A