Fabricated component optimization method and system applied to concrete structure engineering
By optimizing the matching relationship and construction process of prefabricated components, the problems of mismatch and conflict in prefabricated buildings are solved, and construction efficiency and quality are improved.
Patent Information
- Application Number
- CN202411796206.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-09
- Publication Date
- 2025-02-14
AI Technical Summary
During prefabricated building construction, the mismatch or conflict between prefabricated components affects the construction quality and slows down the construction progress.
By obtaining structural data of prefabricated buildings, establishing component models, optimizing the matching relationship of prefabricated components, determining the optimized component information, and setting the production layout scheduling plan and construction process based on this information to ensure the matching between components and The construction progressed smoothly.
It improves the efficiency and quality of prefabricated building construction, reduces matching problems between components and conflicts in construction, and promotes the acceleration of construction progress.
Smart Images

Figure CN119442429A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of prefabricated building construction, and more particularly to a prefabricated component optimization method and system applied to concrete structure engineering. Background Art
[0002] Prefabricated buildings refer to buildings that transfer a large amount of on-site work in traditional construction methods to factories, where building components and accessories are processed and manufactured in factories, transported to construction sites, and assembled and installed on site through reliable connection methods. Prefabricated buildings mainly include prefabricated concrete structures, steel structures, modern wooden structures, etc., and are representatives of modern industrialized production methods because they adopt standardized design, factory production, assembly construction, information management, and intelligent applications. Prefabricated components have high requirements for construction accuracy. Since prefabricated buildings require the prefabrication of a variety of different prefabricated components, their production speed is slow, and during the construction process, there may be problems of mismatch or conflict between different prefabricated components, which affects the construction quality and slows down the progress of construction. Therefore, how to provide a prefabricated component optimization method and system for concrete structure engineering is a problem that technicians in this field urgently need to solve. Summary of the invention
[0003] In view of this, the present invention provides a method and system for optimizing prefabricated components applied to concrete structure engineering, which optimizes the production and construction process of prefabricated components and solves the problems existing in the prior art.
[0004] In order to achieve the above object, the present invention provides the following technical solutions:
[0005] A method for optimizing prefabricated components applied to concrete structural engineering comprises the following steps:
[0006] S1. Obtaining structural data of the prefabricated building, establishing a component model according to the structural data of the prefabricated building, and determining the layout of each prefabricated component in the prefabricated building;
[0007] S2. Optimize all prefabricated components based on the matching relationship of each prefabricated component, and determine the optimized prefabricated component information;
[0008] S3, determining a production layout scheduling plan for the prefabricated components based on the optimized prefabricated component information;
[0009] S4. Determine the construction process of the prefabricated building and the construction status of each prefabricated component, and carry out the construction of the prefabricated building after completing the production of the prefabricated components.
[0010] Optionally, S1 specifically comprises: determining the structure of the prefabricated building based on the design plan of the prefabricated building, establishing a component model according to the structural data of the prefabricated building, determining the parts in the component model that need to be constructed with prefabricated components, determining the materials and types of prefabricated components required for each part, and the quantity and reinforcement of each prefabricated component. The types of prefabricated components include prefabricated exterior wall panels, prefabricated interior wall panels, prefabricated composite panel covers, prefabricated stairs, prefabricated balcony panels, and prefabricated air-conditioning panels.
[0011] Optionally, S2 specifically includes: determining the form of the joints between the prefabricated components based on the connection relationship between each prefabricated component, determining the position information of the embedded parts points and reserved pipeline points inside the prefabricated components, and optimizing the conflicts between the embedded parts points, reserved pipeline points and the steel bar accessories and supporting components.
[0012] Optional, S3 is:
[0013] S31, setting the layout mode and constraint conditions of the mold platform based on the optimized prefabricated component information, constructing a mathematical model of the layout optimization problem, solving the mathematical model of the layout optimization problem so that the mold platform length is minimized, obtaining the arrangement sequence of the prefabricated components, and converting the arrangement sequence of the prefabricated components into a production layout plan of the prefabricated components through the lowest horizontal line algorithm;
[0014] S32. Set production scheduling constraints based on the production layout plan of the prefabricated components, construct a mathematical model of the scheduling optimization problem, solve the mathematical model of the scheduling optimization problem to minimize the production time, and obtain the production scheduling plan of the prefabricated components.
[0015] Optionally, S31 is specifically:
[0016] Set the layout and constraints of the mold platform:
[0017] The size of the prefabricated components cannot exceed the size range of the formwork platform, the number of prefabricated components cannot exceed the number of corresponding molds, and the prefabricated components cannot overlap each other. The length of the overhanging steel bars of the prefabricated components and the reserved length of the formwork platform should be considered;
[0018] Construct a mathematical model for the layout optimization problem:
[0019]
[0020] Where, L z is the total length of the mold platform, m is the number of layouts, N i is the number of mold pallets used in the i-th layout, L is the length of a single mold pallet, and L0 is the length of the mold pallet occupied by the last layout;
[0021] The mathematical model for solving the layout optimization problem makes the total length of the mold platform L zThe minimum is obtained, and the arrangement sequence of the prefabricated components is converted into the production layout plan of the prefabricated components through the lowest horizontal line algorithm.
[0022] Optionally, S32 is specifically:
[0023] Set the constraints for production scheduling:
[0024] The processing time of prefabricated components is the sum of the processing time of all processes and the interval time. Prefabricated components are processed according to fixed processes. All prefabricated components on the same die table can only undergo one process at the same time. The number of die tables processed simultaneously in each process does not exceed the preset value.
[0025] Construct a mathematical model for the scheduling optimization problem:
[0026]
[0027] Where, T z is the total production time, n is the number of molds, c is the number of processes, T ij is the processing time of the jth process on the i-th die table, and T0 is the total interval time;
[0028] The mathematical model for solving the scheduling optimization problem makes the total production time T z Minimum, get the production scheduling plan of prefabricated components.
[0029] Optionally, S4 specifically includes: determining the construction process of each prefabricated component based on the layout of each prefabricated component in the prefabricated building, during the construction process of each prefabricated component, using the optimized prefabricated component information to determine its construction plan, and constructing the prefabricated building based on the construction process and the construction plan.
[0030] A prefabricated component optimization system applied to concrete structure engineering executes the above-mentioned prefabricated component optimization method applied to concrete structure engineering, including: a component layout module, a component optimization module, a production optimization module and a construction module; the component layout module is used to determine the layout of each prefabricated component in the prefabricated building; the component optimization module is used to determine the optimized prefabricated component information; the production optimization module is used to determine the production layout scheduling plan of the prefabricated component; the construction module is used to determine the construction process of the prefabricated building and the construction status of each prefabricated component and carry out the prefabricated building construction.
[0031] It can be seen from the above technical solution that, compared with the prior art, the present invention provides a method and system for optimizing prefabricated components applied to concrete structure engineering. By optimizing the matching degree between prefabricated components, the production process of prefabricated components and the construction process, the construction progress of prefabricated buildings can be accelerated while ensuring the construction quality of the project. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.
[0033] Figure 1 The invention provides an optimization method flow for the assembled component. DETAILED DESCRIPTION
[0034] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0035] The embodiment of the present invention discloses a method for optimizing assembled components applied to concrete structural engineering, such as Figure 1 As shown, the following steps are included:
[0036] S1. Obtaining structural data of the prefabricated building, establishing a component model according to the structural data of the prefabricated building, and determining the layout of each prefabricated component in the prefabricated building;
[0037] S2. Optimize all prefabricated components based on the matching relationship of each prefabricated component, and determine the optimized prefabricated component information;
[0038] S3, determining a production layout scheduling plan for the prefabricated components based on the optimized prefabricated component information;
[0039] S4. Determine the construction process of the prefabricated building and the construction status of each prefabricated component, and carry out the construction of the prefabricated building after completing the production of the prefabricated components.
[0040] Furthermore, S1 is specifically as follows: determining the structure of the prefabricated building based on the design plan of the prefabricated building, establishing a component model according to the structural data of the prefabricated building, determining the parts in the component model that need to be constructed with prefabricated components, determining the materials and types of prefabricated components required for each part, as well as the quantity and reinforcement of each prefabricated component. The types of prefabricated components include prefabricated exterior wall panels, prefabricated interior wall panels, prefabricated composite panel covers, prefabricated stairs, prefabricated balcony panels, and prefabricated air-conditioning panels.
[0041] Furthermore, S2 is specifically as follows: based on the connection relationship between each prefabricated component, the form of the joint point between the prefabricated components is determined, the position information of the embedded parts points and the reserved pipeline points inside the prefabricated components is determined, and the conflict between the embedded parts points, the reserved pipeline points and the steel bar accessories and the supporting components is optimized.
[0042] In the embodiment of the present invention, the forms of the joints include: prestressed anchor joints, wet joint connection nodes, dry joint connection nodes, friction connection nodes, adhesive connection nodes and flexible connection nodes. In this embodiment, the most suitable form of the joints is determined by considering the relationship between the assembled components.
[0043] In the embodiment of the present invention, optimization is achieved by re-examining the positions of embedded parts, reserved pipeline positions, steel bar accessories, and supporting components.
[0044] Furthermore, S3 is specifically:
[0045] S31, setting the layout mode and constraint conditions of the mold platform based on the optimized prefabricated component information, constructing a mathematical model of the layout optimization problem, solving the mathematical model of the layout optimization problem so that the mold platform length is minimized, obtaining the arrangement sequence of the prefabricated components, and converting the arrangement sequence of the prefabricated components into a production layout plan of the prefabricated components through the lowest horizontal line algorithm;
[0046] S32. Set production scheduling constraints based on the production layout plan of the prefabricated components, construct a mathematical model of the scheduling optimization problem, solve the mathematical model of the scheduling optimization problem to minimize the production time, and obtain the production scheduling plan of the prefabricated components.
[0047] Furthermore, S31 is specifically:
[0048] Set the layout and constraints of the mold platform:
[0049] The size of the prefabricated components cannot exceed the size range of the formwork platform, the number of prefabricated components cannot exceed the number of corresponding molds, and the prefabricated components cannot overlap each other. The length of the overhanging steel bars of the prefabricated components and the reserved length of the formwork platform should be considered;
[0050]
[0051] In the formula, x i For component g i The length occupied, y i For component g i The width occupied, L is the length of the mold platform, W is the width of the mold platform, (x il ,y il )、(x ir ,y ir ) are components gi The lower left corner coordinates and upper right corner coordinates, S m is the number of molds, S g is the number of components, l is the length of the component, w is the width of the component, l0 is the length of the component itself, l1 is the length of the protruding steel bar, l2 is the reserved length, w0 is the width of the component itself, w1 is the width of the protruding steel bar, and w2 is the reserved width;
[0052] Construct a mathematical model for the layout optimization problem:
[0053]
[0054] Where, L z is the total length of the mold platform, m is the number of layouts, N i is the number of mold pallets used in the i-th layout, L is the length of a single mold pallet, and L0 is the length of the mold pallet occupied by the last layout;
[0055] The mathematical model for solving the layout optimization problem makes the total length of the mold platform L z The minimum is obtained, and the arrangement sequence of the prefabricated components is converted into the production layout plan of the prefabricated components through the lowest horizontal line algorithm.
[0056] In an embodiment of the present invention, a mathematical model for solving the layout optimization problem based on the Grey Wolf Algorithm is used. An initial set of prefabricated component arrangement sequences are randomly generated under the set mold platform layout mode and constraint conditions. The fitness of the initial prefabricated component arrangement sequence is calculated. The prefabricated component arrangement sequence is adjusted based on the fitness calculation result. The process of calculating the fitness and adjusting the arrangement sequence is repeated until the maximum number of iterations is reached. The final prefabricated component arrangement sequence is used as the production layout plan for the prefabricated components.
[0057] Furthermore, S32 is specifically:
[0058] Set the constraints for production scheduling:
[0059] The processing time of prefabricated components is the sum of the processing time of all processes and the interval time. Prefabricated components are processed according to fixed processes. All prefabricated components on the same die table can only undergo one process at the same time. The number of die tables processed simultaneously in each process does not exceed the preset value.
[0060] Construct a mathematical model for the scheduling optimization problem:
[0061]
[0062] Where, T z is the total production time, n is the number of molds, c is the number of processes, T ij is the processing time of the jth process on the i-th die table, and T0 is the total interval time;
[0063] The mathematical model for solving the scheduling optimization problem makes the total production time T z Minimum, get the production scheduling plan of prefabricated components.
[0064] In an embodiment of the present invention, a mathematical model for solving the scheduling optimization problem is based on a genetic algorithm.
[0065] Furthermore, S4 is specifically as follows: determining the construction process of each prefabricated component based on the layout of each prefabricated component in the prefabricated building, during the construction process of each prefabricated component, using the optimized prefabricated component information to determine its construction plan, and constructing the prefabricated building based on the construction process and the construction plan.
[0066] In an embodiment of the present invention, measures are taken during the construction process to ensure construction quality. Anti-sway devices are provided to reduce the shaking of components during hoisting to ensure installation accuracy and avoid misalignment. The construction process is determined based on the degree of influence of the construction process on the project.
[0067] and Figure 1 Corresponding to the method described above, an embodiment of the present invention further discloses a prefabricated component optimization system applied to concrete structure engineering, which executes the above-mentioned prefabricated component optimization method applied to concrete structure engineering, including: a component layout module, a component optimization module, a production optimization module and a construction module; the component layout module is used to determine the layout of each prefabricated component in the prefabricated building; the component optimization module is used to determine the optimized prefabricated component information; the production optimization module is used to determine the production layout scheduling plan of the prefabricated component; the construction module is used to determine the construction process of the prefabricated building and the construction status of each prefabricated component and perform prefabricated building construction.
[0068] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the system disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.
[0069] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A method for optimizing prefabricated components applied to concrete structural engineering, characterized in that: The following steps are involved: S1. Obtaining structural data of the prefabricated building, establishing a component model according to the structural data of the prefabricated building, and determining the layout of each prefabricated component in the prefabricated building; S2. Optimize all prefabricated components based on the matching relationship of each prefabricated component, and determine the optimized prefabricated component information; S3, determining a production layout scheduling plan for the prefabricated components based on the optimized prefabricated component information; S4. Determine the construction process of the prefabricated building and the construction status of each prefabricated component, and carry out the construction of the prefabricated building after completing the production of the prefabricated components.
2. The method for optimizing prefabricated components applied to concrete structure engineering according to claim 1, characterized in that: S1 is specifically as follows: determine the structure of the prefabricated building based on the design plan of the prefabricated building, establish a component model according to the structural data of the prefabricated building, determine the parts in the component model that need to be constructed with prefabricated components, determine the materials and types of prefabricated components required for each part, as well as the quantity and reinforcement of each prefabricated component. The types of prefabricated components include prefabricated exterior wall panels, prefabricated interior wall panels, prefabricated composite panel covers, prefabricated stairs, prefabricated balcony panels and prefabricated air-conditioning panels.
3. The method for optimizing prefabricated components applied to concrete structure engineering according to claim 1, characterized in that: S2 is specifically: based on the connection relationship between each prefabricated component, determine the form of the joint point between the prefabricated components, determine the position information of the embedded parts and reserved pipeline points inside the prefabricated components, and optimize the conflict between the embedded parts and reserved pipeline points and the steel accessories and supporting components.
4. The method for optimizing prefabricated components applied to concrete structure engineering according to claim 1, characterized in that: S3 is specifically: S31, setting the layout mode and constraint conditions of the mold platform based on the optimized prefabricated component information, constructing a mathematical model of the layout optimization problem, solving the mathematical model of the layout optimization problem so that the mold platform length is minimized, obtaining the arrangement sequence of the prefabricated components, and converting the arrangement sequence of the prefabricated components into a production layout plan of the prefabricated components through the lowest horizontal line algorithm; S32. Set production scheduling constraints based on the production layout plan of the prefabricated components, construct a mathematical model of the scheduling optimization problem, solve the mathematical model of the scheduling optimization problem to minimize the production time, and obtain the production scheduling plan of the prefabricated components.
5. The method for optimizing prefabricated components used in concrete structural engineering according to claim 4, characterized in that: S31 is specifically: Set the layout and constraints of the mold platform: The size of the prefabricated components cannot exceed the size range of the formwork platform, the number of prefabricated components cannot exceed the number of corresponding molds, and the prefabricated components cannot overlap each other. The length of the overhanging steel bars of the prefabricated components and the reserved length of the formwork platform should be considered; Construct a mathematical model for the layout optimization problem: Where, L z is the total length of the mold platform, m is the number of layouts, N i is the number of mold pallets used in the i-th layout, L is the length of a single mold pallet, and L0 is the length of the mold pallet occupied by the last layout; The mathematical model for solving the layout optimization problem makes the total length of the mold platform L z The minimum is obtained, and the arrangement sequence of the prefabricated components is converted into the production layout plan of the prefabricated components through the lowest horizontal line algorithm.
6. The method for optimizing prefabricated components applied to concrete structure engineering according to claim 4, characterized in that: S32 is specifically: Set the constraints for production scheduling: The processing time of prefabricated components is the sum of the processing time of all processes and the interval time. Prefabricated components are processed according to fixed processes. All prefabricated components on the same die table can only undergo one process at the same time. The number of die tables processed simultaneously in each process does not exceed the preset value. Construct a mathematical model for the scheduling optimization problem: Where, T z is the total production time, n is the number of molds, c is the number of processes, T ij is the processing time of the jth process on the i-th die table, and T0 is the total interval time; The mathematical model for solving the scheduling optimization problem makes the total production time T z Minimum, get the production scheduling plan of prefabricated components.
7. The method for optimizing prefabricated components applied to concrete structure engineering according to claim 1, characterized in that: S4 is specifically as follows: determining the construction process of each prefabricated component based on the layout of each prefabricated component in the prefabricated building, during the construction process of each prefabricated component, using the optimized prefabricated component information to determine its construction plan, and constructing the prefabricated building based on the construction process and the construction plan.
8. A prefabricated component optimization system applied to concrete structure engineering, characterized in that: A method for optimizing prefabricated components applied to concrete structure engineering according to any one of claims 1 to 7, comprising: a component layout module, a component optimization module, a production optimization module and a construction module; the component layout module is used to determine the layout of each prefabricated component in the prefabricated building; the component optimization module is used to determine the optimized prefabricated component information; the production optimization module is used to determine the production layout scheduling plan of the prefabricated components; the construction module is used to determine the construction process of the prefabricated building and the construction status of each prefabricated component and to carry out the construction of the prefabricated building.