T-shaped flange for mounting ocean platform crane tower drum on sea

By using lifting auxiliary frame tooling, auxiliary semicircular flanges and T-shaped flanges in the installation of marine platform crane towers, combined with insertion plates and fitting grooves, the problems of long and low efficiency of tower installation onshore are solved, and the problem of long-term and low efficiency of tower installation onshore is realized. Quick fixation and efficient welding.

CN221955712UActive Publication Date: 2024-11-05TIANJIN HELI OIL & GAS TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420795816.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-17
Publication Date
2024-11-05
Estimated Expiration
2034-04-17

AI Technical Summary

Technical Problem

The construction time of the marine platform crane tower installation at sea is long and has low efficiency. It is affected by tide water, wind speed and lifting ship resources, and the welding of temporary lifting lugs affects the steel structure strength of the tower.

Method used

A system including a crane tower, lifting auxiliary frame tooling, auxiliary lifting semicircular flange and T-shaped flange are designed, and the tower is fixedly connected by high-strength bolts, and the butt accuracy and welding area are improved by using insert plates and fitting grooves.

Benefits of technology

By quickly fixing the connecting tower, shorten installation time, improve efficiency, and enhance the fixing effect and welding stability between towers, reducing installation risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221955712U_ABST
    Figure CN221955712U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of crane tower drum installation, and discloses a T-shaped flange for installation of an ocean platform crane tower drum installed on the sea, which comprises a crane tower drum, a hoisting auxiliary frame tool, an auxiliary hoisting semicircular flange, an L-shaped inner flange and a T-shaped flange, the T-shaped flange is welded at the lower end of the crane tower drum, and the L-shaped flange is welded at the upper end of the crane tower drum. According to the hoisting device, the auxiliary hoisting semicircular flange, the hoisting auxiliary frame tool, the T-shaped flange and the like are arranged, when the hoisting device is used, the tower drum on a transport ship is hoisted to a platform with a pre-installed crane stand column base through a floating crane, installation personnel enter the crane tower drum through a crawling ladder, and the hoisting auxiliary frame tool is arranged on the periphery of the crane tower drum. And through a hydraulic wrench, high-strength bolts quickly penetrate through the L-shaped flanges and the T-shaped flanges through the connecting holes, then the two crane tower barrels are fixedly connected through the high-strength bolts, and the problems that the current ocean platform crane tower barrel installation construction operation is long in time and low in efficiency are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of crane tower installation, and in particular relates to a T-shaped flange for installing a crane tower of an offshore platform installed at sea. Background Art

[0002] The platform crane is an important material handling tool for the offshore platform. When a new platform is built on land, the crane tower is welded and installed in sections. If it is installed at sea, it will be affected by the tide, wind speed and hoisting ship resources at sea, which makes it inconvenient to align the crane tower. A flaw detection inspection is required 24 hours after welding. In addition, the tower needs to be temporarily installed with lifting ears, which need to be removed and repainted after the crane is installed. The welding of the temporary lifting ears affects the strength of the steel structure material of the tower body, and the construction time is long, which seriously affects the production operation of the platform. Therefore, a T-flange for the installation of an offshore offshore platform crane tower is designed to solve the problem of long construction time and low efficiency of the current offshore platform crane tower installation. Utility Model Content

[0003] The utility model aims to provide a T-shaped flange for installing an offshore platform crane tower, so as to solve the problem of long installation time and low efficiency of the current offshore platform crane tower installation construction work proposed in the above background technology.

[0004] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a T-flange installed on an offshore platform crane tower comprises a crane tower, a lifting auxiliary frame tooling, an auxiliary lifting semicircular flange, an L-shaped inner flange and a T-flange, a T-flange welded at the lower end of the crane tower and an L-shaped inner flange welded at the upper end, and a lifting auxiliary frame tooling is arranged on the periphery of the crane tower, the lifting auxiliary frame tooling is fixedly connected to the crane tower via an auxiliary lifting semicircular flange, and the T-flange is used to control the fixed connection between the crane towers.

[0005] Preferably, the inner and outer side surfaces of the T-shaped flange and the surface of the L-shaped inner flange are symmetrically provided with connecting holes at equal intervals, and the auxiliary lifting semicircular flange is symmetrically fixed on the outer wall of the lifting auxiliary frame tooling at equal intervals, and the surface of the auxiliary lifting semicircular flange is provided with fixing holes, the diameter of the fixing holes is consistent with the diameter of the connecting holes, and the fixing holes and the connecting holes are connected through high-strength bolts.

[0006] Preferably, a maintenance manhole is provided at the top of the inner wall of the crane tower, and ladders are installed at equal intervals on one side of the inner wall of the crane tower, and the ladders are located below the maintenance manhole.

[0007] Preferably, the inner walls of the T-shaped flange and the L-shaped inner flange are fixedly mounted with support plates, a through hole is provided on the surface of the support plate on the side away from the ladder, a plurality of small holes are symmetrically provided at equal intervals on both sides of the through hole, and the small holes correspond one-to-one to the connecting holes.

[0008] Preferably, the upper inner walls of the T-shaped flange and the L-shaped inner flange are symmetrically provided with mating grooves at equal intervals, and plug plates are symmetrically installed at both ends of the crane tower at equal intervals. The plug plates are embedded in the mating grooves, and the mating grooves and the T-shaped flange and the L-shaped inner flange are fixed by welding.

[0009] Preferably, the tops on both sides of the inner wall of the fitting groove are inclined outwards, the end surfaces on both sides of the bottom of the plug plate are inclined outwards, and the angle of the inclined surface on the fitting groove is the same as that of the inclined surface on the plug plate.

[0010] Compared with the prior art, the beneficial effects of the utility model are:

[0011] (1) The utility model is provided with an auxiliary lifting semicircular flange, a lifting auxiliary frame tooling and a T-shaped flange, etc. When in use, the floating crane lifts the tower on the transport ship to a platform on which the crane column base has been pre-installed. The installation personnel enter the crane tower through a ladder and use a hydraulic wrench to quickly insert high-strength bolts through the connecting holes through the L-shaped flange and the T-shaped flange, and then fix the two crane towers together through the high-strength bolts, thereby solving the problem of long time and low efficiency in the current offshore platform crane tower installation construction work.

[0012] (2) The utility model is provided with an insert plate and an interlocking groove, etc. Before welding the T-shaped flange to the crane tower, the T-shaped flange and the end of the crane tower can be butted against each other by using the interlocking connection of the insert plate and the interlocking groove. Subsequently, the T-shaped flange is fixed to the end of the crane tower by welding, thereby improving the butt connection accuracy and increasing the welding area, thereby improving the fixing effect between the T-shaped flange and the crane tower. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a schematic diagram of the structure of the utility model;

[0014] Figure 2 It is a top view of the T-shaped flange of the utility model;

[0015] Figure 3 This is a schematic diagram of the installation of the utility model;

[0016] Figure 4 for Figure 1 A in the enlarged view;

[0017] In the figure: 1. Auxiliary lifting frame tooling; 2. Auxiliary lifting semicircular flange; 3. Support plate; 4. Ladder; 5. Connection hole; 6. High-strength bolts; 7. T-shaped flange; 8. Maintenance manhole; 9. Crane tower; 10. Insert plate; 11. Fitting groove; 12. Fixing hole; 13. Through hole; 14. L-shaped flange. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0019] See also Figure 1-Figure 4 As shown, the utility model provides the following technical solutions: a T-flange for installing an offshore platform crane tower comprises a crane tower 9, a lifting auxiliary frame tool 1, an auxiliary lifting semicircular flange 2, an L-shaped inner flange 14 and a T-flange 7, the lower end of the crane tower 9 is welded with a T-flange 7, the upper end is welded with an L-shaped inner flange 14, and the outer periphery of the crane tower 9 is provided with a lifting auxiliary frame tool 1, the lifting auxiliary frame tool 1 and the crane tower 9 are fixedly connected by the auxiliary lifting semicircular flange 2, and the T-flange 7 is used to control the fixed connection between the crane tower 9 , connection holes 5 are symmetrically provided on the inner and outer surfaces of the T-shaped flange 7 and the surface of the L-shaped inner flange 14 at equal intervals, the auxiliary lifting semicircular flange 2 is symmetrically fixedly installed on the outer wall of the lifting auxiliary frame tooling 1 at equal intervals, and the surface of the auxiliary lifting semicircular flange 2 is provided with fixing holes 12, the diameter of the fixing holes 12 is consistent with the diameter of the connecting holes 5, and the fixing holes 12 and the connecting holes 5 are connected through high-strength bolts 6, an inspection manhole 8 is provided on the top of the inner wall of the crane tower 9, and a ladder 4 is installed at equal intervals on one side of the inner wall of the crane tower 9, and the ladder 4 is located below the inspection manhole 8.

[0020] Through the above technical solution: when in use, the floating crane hoists the crane tower 9 on the transport ship to the platform on which the crane column base has been pre-installed, and the installer enters the crane tower 9 through the ladder 4, and uses the hydraulic wrench to quickly pass the high-strength bolts 6 through the connecting hole 5 through the L-shaped flange 14 and the T-shaped flange 7, and then fixes the two crane towers 9 through the high-strength bolts 6. Then, the installer moves to the cage on the auxiliary hook of the floating crane through the ladder 4, and transfers the installer to the lifting auxiliary frame tooling 1 next to the tower through the cage. Then, the installer removes the high-strength bolts 6 on the auxiliary lifting semicircular flange 2 in turn, and evacuates together with the lifting auxiliary frame tooling 1, thereby solving the problem of long installation time and low efficiency of the current offshore platform crane tower 9 construction operation.

[0021] See also Figure 1-Figure 2 and Figure 4 As shown, the upper inner wall of the T-shaped flange 7 and the L-shaped inner flange 14 is symmetrically provided with engaging grooves 11 at equal intervals, and plug plates 10 are symmetrically installed at both ends of the crane tower 9 at equal intervals. The plug plates 10 are embedded in the engaging grooves 11, and the engaging grooves 11 and the T-shaped flange 7 and the L-shaped inner flange 14 are fixed by welding. The tops on both sides of the inner wall of the engaging groove 11 are inclined outward, and the end surfaces on both sides of the bottom of the plug plates 10 are inclined outward. The inclined surface on the engaging groove 11 has the same angle as the inclined surface on the plug plates 10. The inner walls of the T-shaped flange 7 and the L-shaped inner flange 14 are fixedly provided with support plates 3, and a through hole 13 is provided on the surface of the support plate 3 on the side away from the ladder 4, and a plurality of small holes are symmetrically provided on both sides of the through hole 13 at equal intervals, and the small holes correspond to the connecting holes 5 one by one.

[0022] Through the above technical scheme: before use, the T-flange 7 needs to be welded and fixed to the crane tower 9 on land, and then in the process of aligning the two, the T-flange 7 can be guided by the interlocking connection between the plug plate 10 and the interlocking groove 11 to move it to a suitable position, simplifying the docking steps and improving the prefabrication efficiency, and then the T-flange 7 is fixed to the end of the crane tower 9 by welding. At the same time, since the plug plate 10 is embedded in the interlocking groove 11, the welding area is increased while the docking accuracy is improved, and the welding stability between the T-flange 7 and the crane tower 9 is improved. In addition, the installed support plate 3 can partition the internal space of the crane tower 9 multiple times, eliminating the safety hazard caused by the installer stepping on the air and falling, and allowing the operator to move freely near the connecting hole 5, thereby achieving the purpose of improving the installation efficiency.

[0023] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A T-shaped flange for installing an offshore platform crane tower, characterized in that: The invention comprises a crane tower (9), a lifting auxiliary frame tool (1), an auxiliary lifting semicircular flange (2), an L-shaped inner flange (14) and a T-shaped flange (7); the lower end of the crane tower (9) is welded with a T-shaped flange (7) and the upper end is welded with an L-shaped inner flange (14); the outer periphery of the crane tower (9) is provided with a lifting auxiliary frame tool (1); the lifting auxiliary frame tool (1) and the crane tower (9) are fixedly connected via the auxiliary lifting semicircular flange (2); and the T-shaped flange (7) is used to control the fixed connection between the crane towers (9).

2. The T-shaped flange for installing a crane tower of an offshore platform installed at sea according to claim 1, characterized in that: The inner and outer surfaces of the T-shaped flange (7) and the surface of the L-shaped inner flange (14) are evenly and symmetrically provided with connection holes (5); the auxiliary lifting semicircular flange (2) is evenly and symmetrically fixedly installed on the outer wall of the lifting auxiliary frame tooling (1); and the surface of the auxiliary lifting semicircular flange (2) is provided with a fixing hole (12); the diameter of the fixing hole (12) is consistent with the diameter of the connection hole (5), and the fixing hole (12) and the connection hole (5) are connected through a high-strength bolt (6).

3. The T-shaped flange for installing a crane tower of an offshore platform installed at sea according to claim 2, characterized in that: A maintenance manhole (8) is provided at the top of the inner wall of the crane tower (9), and ladders (4) are installed at equal intervals on one side of the inner wall of the crane tower (9), wherein the ladders (4) are located below the maintenance manhole (8).

4. The T-shaped flange for installing a crane tower of an offshore platform installed at sea according to claim 3, characterized in that: A support plate (3) is fixedly mounted on the inner walls of the T-shaped flange (7) and the L-shaped inner flange (14); a through hole (13) is provided on a surface of the support plate (3) on a side away from the ladder (4); a plurality of small holes are symmetrically provided at equal intervals on both sides of the through hole (13); the small holes correspond to the connection holes (5) one by one.

5. The T-shaped flange for installing a crane tower of an offshore platform installed at sea according to claim 1, characterized in that: The upper inner walls of the T-shaped flange (7) and the L-shaped inner flange (14) are symmetrically provided with engaging grooves (11) at equal intervals, and plug plates (10) are symmetrically installed at both ends of the crane tower (9) at equal intervals. The plug plates (10) are embedded in the engaging grooves (11), and the engaging grooves (11) and the T-shaped flange (7) and the L-shaped inner flange (14) are fixed by welding.

6. The T-shaped flange for installing a crane tower of an offshore platform installed at sea according to claim 5, characterized in that: The tops of both sides of the inner wall of the engaging groove (11) are inclined outwards, and the end surfaces of both sides of the bottom of the plug plate (10) are inclined outwards. The inclined surface on the engaging groove (11) has the same angle as the inclined surface on the plug plate (10).