Performance test system for phase change heat storage type heat exchanger
By designing a performance test system for phase change heat storage heat exchangers, using components such as flow path switching devices and working fluid pumps, high-frequency dynamic heat storage/exotherm testing is realized, and it solves the difficulty in testing phase change in the existing technology. The performance problems of the heat storage heat exchanger in high-frequency periodic working mode improve the accuracy and stability of the test.
Patent Information
- Application Number
- CN202323567477.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-27
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2033-12-27
AI Technical Summary
There is a lack of systems in the prior art that can provide high-frequency, dynamic heat storage and discharge performance testing for phase-change heat storage and heat exchangers, making it difficult to obtain real performance data in high-frequency periodic working modes.
A phase change heat storage heat exchanger performance test system is designed, including test docking pipes, heating pipes, cooling pipes, flow path switching devices, working fluid pumps and flow rate adjustment devices, and switching them through flow paths. The device realizes switching between heat storage and heat release test modes to ensure the stability of the inlet temperature and flow rate.
The control logic is simplified, the accuracy of heat storage/exothermic performance testing is improved, and the performance data authenticity of phase-change heat storage heat exchanger under high-frequency operating conditions is ensured.
Smart Images

Figure CN222013535U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of phase-change heat storage type heat exchangers, in particular to a phase-change heat storage type heat exchanger performance test system. Background Art
[0002] Phase change heat storage heat exchangers can play a role in regulating system thermal load, reducing system weight and improving system stability in thermal management systems under high heat flux, high power and periodic heat load modes (such as laser weapon thermal management systems).
[0003] The heat storage and release characteristics of the phase change heat storage heat exchanger directly affect the stability and reliability of the periodic thermal management system. Especially when the heat source in the thermal management system is in a high-frequency periodic working mode (such as laser weapons), the phase change heat storage heat exchanger should also be in a high-frequency dynamic response state to ensure the cooling of the heat source. In order to test the dynamic response characteristics of the phase change heat storage heat exchanger when working at high frequency, a test system needs to be built to test its performance. Due to the high operating frequency of the phase change heat storage heat exchanger, the dynamic rapid switching performance of the test system is particularly critical.
[0004] There is no existing test system that can provide high-frequency, dynamic heat storage and release performance testing for phase change heat storage heat exchangers, making it difficult to obtain the true performance of the phase change heat storage heat exchanger when the heat source in the thermal management system is in a high-frequency periodic working mode. Utility Model Content
[0005] The purpose of the utility model is to provide a phase change heat storage heat exchanger performance test system, which can provide a high-frequency, dynamic heat storage and release test for the phase change heat storage heat exchanger, so as to obtain the performance data of the phase change heat storage heat exchanger in the corresponding scenario, and then truly reflect the specific performance indicators of the phase change heat storage heat exchanger in the actual application scenario.
[0006] To achieve this purpose, the utility model adopts the following technical solutions:
[0007] A phase change heat storage heat exchanger performance test system, comprising:
[0008] A test butt-joint pipe circuit, wherein the phase-change heat storage heat exchanger to be tested can be connected in series in the middle section of the test butt-joint pipe circuit;
[0009] A heating pipeline and a heat source, wherein the heat source is configured to exchange heat with the heating pipeline to heat the test medium flowing through the heating pipeline;
[0010] A cooling pipeline and a cold source, wherein the cold source is configured to exchange heat with the cooling pipeline to cool the test medium flowing through the cooling pipeline;
[0011] a flow path switching device, connected to the test docking pipe, the heating pipe and the cooling pipe respectively, and configured to selectively connect the test docking pipe with the heating pipe or the cooling pipe, so that the test docking pipe and the heating pipe form a heat storage test loop through which the test working medium can circulate, or the test docking pipe and the cooling pipe form a heat release test loop through which the test working medium can circulate;
[0012] A working fluid pump is arranged in the heat storage test loop and the heat release test loop.
[0013] Preferably, the flow path switching device is also configured to enable, when one of the heating pipeline and the cooling pipeline is connected to the test docking pipeline, the other of the heating pipeline and the cooling pipeline to independently constitute a self-circulating loop through which the test working fluid can circulate.
[0014] Preferably, the flow path switching device is a two-position six-way reversing valve.
[0015] Preferably, the two working fluid pumps are respectively arranged in the heating pipeline and the cooling pipeline.
[0016] Preferably, it further comprises a flow regulating device, which is arranged in the heat storage test circuit and the heat release test circuit to adjust the flow of the measuring working fluid flowing through the heat storage test circuit and the heat release test circuit.
[0017] Preferably, the flow regulating devices are respectively arranged in the heating pipeline and the cooling pipeline.
[0018] Preferably, the flow regulating device comprises:
[0019] Two flow regulating valves are respectively arranged in the heating pipeline and the cooling pipeline;
[0020] Two flow meters are respectively arranged downstream of the two flow regulating valves in the heating pipeline and the cooling pipeline to test the flow direction of the working medium.
[0021] Preferably, a first pressure sensor and a first temperature sensor are provided on the test connecting pipe line upstream of the phase change heat storage heat exchanger being tested; a second pressure sensor and a second temperature sensor are provided on the test connecting pipe line downstream of the phase change heat storage heat exchanger being tested; a third pressure sensor and a third temperature sensor are provided on the heating pipeline; and a fourth pressure sensor and a fourth temperature sensor are provided on the cooling pipeline.
[0022] Preferably, the length of the test butt joint pipe is much shorter than the length of the heating pipe and the cooling pipe.
[0023] Preferably, the cold source comprises a constant temperature cold water bath container, which is used to contain the test cold water medium and is arranged in the middle section of the cooling pipeline; the heat source comprises a constant temperature hot water bath container, which is used to contain the test hot water medium and is arranged in the middle section of the heating pipeline.
[0024] Beneficial effects of the utility model:
[0025] Based on the phase change heat storage heat exchanger performance test system provided by the utility model, during the phase change heat storage heat exchanger performance test process, the tester can use the flow path switching device to timely switch the connection between the test docking pipe and the heating pipe and the cooling pipe according to the frequency and cycle of the heat source working in the thermal management system of the specific application of the tested phase change heat storage heat exchanger, that is, to switch the heat storage test and heat release test modes of the test system, which greatly simplifies the control logic. Compared with the situation where the switching actions are not synchronized when multiple valves are switched in sequence, the stability of the inlet temperature and flow of the phase change heat storage heat exchanger can be ensured, and the accuracy of the heat storage / heat release performance test of the phase change heat storage heat exchanger can be improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a system principle diagram of a phase change heat storage heat exchanger performance test system in an embodiment of the utility model;
[0027] Figure 2 It is a system principle diagram of the phase change heat storage heat exchanger performance test system in the embodiment of the utility model when it is in the heat storage test mode;
[0028] Figure 3 It is a system principle diagram of the phase change heat storage heat exchanger performance test system in the embodiment of the utility model when it is in the heat release test mode.
[0029] In the figure:
[0030] 100. Phase change heat storage heat exchanger; 101. Working fluid inflow end; 102. Working fluid inflow end;
[0031] 1. Test the butt pipe; 2. Heating pipe; 3. Heat source; 4. Cooling pipe; 5. Cold source; 6. Flow switching device; 7. Working fluid pump; 8. First pressure sensor; 9. First temperature sensor; 10. Second pressure sensor; 11. Second temperature sensor; 12. Third pressure sensor; 13. Third temperature sensor; 14. Fourth pressure sensor; 15. Fourth temperature sensor; 16. Flow control valve; 17. Flow meter. DETAILED DESCRIPTION
[0032] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only the parts related to the present invention, rather than all structures, are shown in the accompanying drawings.
[0033] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0034] In the present utility model, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0035] In the description of this embodiment, the terms "upper", "lower", "right", etc., are based on the directions or positions shown in the drawings, and are only for the convenience of description and simplified operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation of the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.
[0036] The present embodiment provides a phase change heat storage heat exchanger performance test system (hereinafter referred to as the test system) that can be used to test the performance of a phase change heat storage heat exchanger. The test system can be specifically applied to the performance parameters of a single-channel phase change heat storage heat exchanger under high-frequency, dynamic heat storage and heat release switching conditions, so as to characterize the true performance of the phase change heat storage heat exchanger when the tested phase change heat storage heat exchanger is used in a thermal management system such as a laser weapon and the heat source is in a high-frequency periodic working mode.
[0037] See also Figure 1The test system provided in this embodiment includes a test docking pipe 1, a heating pipe 2, a heat source 3, a cooling pipe 4 and a cold source 5. Among them, the tested phase-change heat storage heat exchanger 100 can be connected in series in the middle section of the test docking pipe 1, that is, the test docking pipe 1 docks the working fluid inlet end 102 and the working fluid inlet end 102 of the tested phase-change heat storage heat exchanger 100. The heating pipe 2 and the cooling pipe 4 are both used for the test working fluid to flow through, the heat source 3 is configured to exchange heat with the heating pipe 2 to heat the test working fluid flowing through the heating pipe 2, and the cold source 5 is configured to exchange heat with the cooling pipe 4 to cool the test working fluid flowing through the cooling pipe 4. Therefore, when the heating pipeline 2 is connected to the test docking pipeline 1, a high-temperature test working fluid can be provided to the tested phase change heat storage heat exchanger 100, thereby testing the heat storage performance of the phase change heat storage heat exchanger 100; and when the cooling pipeline 4 is connected to the test docking pipeline 1, a low-temperature test working fluid can be provided to the tested phase change heat storage heat exchanger 100, thereby testing the heat release performance of the phase change heat storage heat exchanger 100.
[0038] The aforementioned high-frequency and dynamic test refers to the test of the heat storage and heat release performance of the phase-change heat storage heat exchanger 100 under the conditions of high-frequency switching of the cold storage and heat storage, indeterminate switching cycles, etc. Therefore, the test system is required to provide high-temperature and low-temperature test working fluids to the phase-change heat storage heat exchanger 100 in a high-frequency and dynamic form during the test. To this end, the test system provided in this embodiment further includes a flow path switching device 6, which is connected to the test docking pipe 1, the heating pipeline 2 and the cooling pipeline 4 respectively, and is configured to selectively connect the test docking pipe 1 with the heating pipeline 2 or the cooling pipeline 4, so that the test docking pipe 1 and the heating pipeline 2 constitute a heat storage test loop through which the test working fluid can circulate, or the test docking pipe 1 and the cooling pipeline 4 constitute a heat release test loop through which the test working fluid can circulate.
[0039] Based on the above settings, during the test process, the tester can use the flow path switching device 6 to timely switch the connection between the test connecting pipe 1 and the heating pipe 2 and the cooling pipe 4 according to the working frequency and cycle of the heat source 3 in the thermal management system specifically used by the tested phase change heat storage heat exchanger 100, that is, to switch the heat storage test and heat release test modes of the test system, which greatly simplifies the control logic. Compared with the situation where the switching actions are not synchronized when multiple valves are switched in sequence, the stability of the inlet temperature and flow rate of the phase change heat storage heat exchanger 100 can be ensured, and the accuracy of the heat storage / heat release performance test of the phase change heat storage heat exchanger 100 can be improved.
[0040] It is understandable that in order to circulate the test working fluid to the phase change heat storage heat exchanger 100, a working fluid pump 7 should be provided in both the above-mentioned heat storage test loop and the heat release test loop to continuously pump the test working fluid as needed. Optionally, the working fluid pump 7 can be provided only on the test docking pipe 1, such as being provided upstream or downstream of the phase change heat storage heat exchanger 100. Preferably, the working fluid pump 7 can be provided on the heating pipeline 2 and the cooling pipeline 4, respectively, so as to shorten the length of the test docking pipe 1 as much as possible, which can effectively reduce the influence of the test working fluid remaining in the test docking pipe 1 in the previous test mode on the next test mode when the heat storage / heat release mode is switched. Furthermore, the length of the test docking pipe 1 can be set to be much smaller than the length of the heating pipeline 2 and the cooling pipeline 4, so as to further reduce the accuracy deviation of the test results caused by the above-mentioned influence.
[0041] Specifically, in this embodiment, both the cold source 5 and the heat source 3 can use a water bath to exchange heat with the cooling pipeline 4 and the heating pipeline 2 respectively. Figure 1 As shown, the cold source 5 includes a constant temperature cold water bath container disposed in the middle section of the cooling pipeline 4, and the constant temperature cold water bath container is used to accommodate the test cold water working medium (i.e., the low temperature test working medium). The heat source 3 includes a constant temperature hot water bath container disposed in the middle section of the heating pipeline 2, and the constant temperature hot water bath container is used to accommodate the test hot water working medium (i.e., the high temperature test working medium). In this way, when the constant temperature hot water bath container and the constant temperature cold water bath container provide a constant temperature environment of reference such as 26°C and reference such as 8°C, respectively, they can exchange heat with the test hot water working medium and the test cold water working medium respectively.
[0042] The above test content can be achieved by arranging temperature sensors and pressure sensors at the working fluid inlet end 102 and the working fluid inlet end 102 of the phase change heat storage heat exchanger 100, respectively, to obtain the temperature parameters and pressure parameters of the test working fluid at the working fluid inlet end 102 and the working fluid inlet end 102. The heat storage and heat release characteristics of the phase change heat storage heat exchanger 100 are evaluated by the temperature difference between the working fluid inlet end 102 and the working fluid inlet end 102, and it is determined whether the phase change material has reached the standard of cold storage solidification, and whether the phase change heat storage heat exchanger 100 can meet the design requirements. At the same time, the pressure drop when the test working fluid flows through the phase change heat storage heat exchanger 100 is evaluated by the pressure difference between the working fluid inlet end 102 and the working fluid inlet end 102.
[0043] Specifically, Figure 1 As shown, a first pressure sensor 8 and a first temperature sensor 9 are arranged on the test butt joint pipe 1 upstream of the phase change heat storage heat exchanger 100 being tested; a second pressure sensor 10 and a second temperature sensor 11 are arranged on the test butt joint pipe 1 downstream of the phase change heat storage heat exchanger 100 being tested.
[0044] Furthermore, a third pressure sensor 12 and a third temperature sensor 13 may be arranged downstream of the working fluid pump 7 arranged on the heating pipeline 2, and a fourth pressure sensor 14 and a fourth temperature sensor 15 may be arranged downstream of the working fluid pump 7 arranged on the cooling pipeline 4. Combined with the inlet temperature measured by the first temperature sensor 9 located at the working fluid inlet end 102 of the phase change heat storage heat exchanger 100, the influence of the test working fluid remaining in the test connecting pipeline 1 in the previous test mode on the design temperature can be evaluated; the third pressure sensor 12 and the fourth pressure sensor 14 downstream of the working fluid pump 7 can be used to monitor the working characteristics of the working fluid pump 7 in combination with the inlet pressure parameters of the first pressure sensor 8 at the working fluid inlet end 102 of the phase change heat storage heat exchanger 100.
[0045] In order to be suitable for testing the performance parameters of the phase change heat storage heat exchanger 100 under working conditions of different flow rates, and to evaluate whether the flow rate in the corresponding pipeline is stable, the above test may further include testing the adjustment of the flow rate of the test working fluid in the corresponding pipeline 1. Exemplarily, the flow rate of the measuring working fluid flowing through the heat storage test loop and the heat release test loop can be adjusted by controlling the working fluid pump 7 by a frequency converter. Preferably, the above flow adjustment can be achieved by using a flow regulating device arranged in the heat storage test loop and the heat release test loop. Specifically, the flow regulating device can be respectively arranged in the heating pipeline 2 and the cooling pipeline 4, which includes two flow regulating valves 16 respectively arranged in the heating pipeline 2 and the cooling pipeline 4, and two flow meters 17 respectively arranged in the downstream of the flow direction of the test working fluid in the heating pipeline 2 and the cooling pipeline 4 corresponding to the two flow regulating valves 16.
[0046] Preferably, in this embodiment, the flow path switching device 6 is further configured to make the other of the heating pipeline 2 and the cooling pipeline 4 independently form a self-circulating loop through which the test working medium can circulate when one of the heating pipeline 2 and the cooling pipeline 4 is connected to the test docking pipeline 1. That is, when the test docking pipeline 1 is in the heat storage test mode in which the test docking pipeline 1 is connected to the heating pipeline 2, the head and tail ends of the cooling pipeline 4 are connected by the flow path switching device 6, so that the cooling pipeline 4 forms a closed self-circulating loop, so that the working medium in the cooling pipeline 4 is circulated and pumped under the pumping of the working medium pump 7 provided on the cooling pipeline 4, so as to be ready to send the low-temperature working medium in the cooling pipeline 4 into the test docking pipeline 1 at any time when the cooling pipeline 4 is switched to the heat release test mode in which it is connected to the test docking pipeline 1 by the flow path switching device 6.
[0047] Similarly, when the test docking pipe 1 is in the heat release test mode connected to the cooling pipe 4, the two ends of the heating pipe 2 are connected by the flow switching device 6, so that the heating pipe 2 forms another closed self-circulating loop. In this way, under the pumping of the working fluid pump 7 arranged on the heating pipe 2, the working fluid in the heating pipe 2 is circulated and pumped, so that the high-temperature working fluid in the heating pipe 2 can be sent into the test docking pipe 1 at any time when the heating pipe 2 is switched to the heat storage test mode connected to the test docking pipe 1 by the flow switching device 6.
[0048] The purpose of using the above-mentioned cold / hot self-circulation loop is that when the phase-change heat storage heat exchanger 100 is subjected to high-frequency and dynamic heat storage / release mode switching to realize the heat storage / release characteristic test of the phase-change heat storage heat exchanger 100, the above-mentioned cold / hot self-circulation loop can eliminate the time required for the start and stop of the working fluid pump 7, and prevent the temperature and flow rate of the working fluid inlet end 102 of the phase-change heat storage heat exchanger 100 from being unstable when the working fluid pump 7 is started and stopped. At the same time, the above-mentioned cold / hot self-circulation loop can ensure that the test working fluid is in a standby state at any time. Otherwise, when any one of the heat storage test loop and the heat release test loop is circulated, the test working fluid in the other loop does not flow. When the heat storage / release mode is switched, the test working fluid remaining in the pipeline will be mixed with the test working fluid at the rated working temperature, thereby causing the temperature of the working fluid inlet end 102 of the phase-change heat storage heat exchanger 100 to be unstable.
[0049] In addition, as a preferred embodiment, the flow path switching device 6 in this embodiment can be a two-position six-way reversing valve, which includes a P1 connector and a P2 connector respectively connected to the head and tail ends of the test docking pipe 1, an A connector and a B connector respectively connected to the head and tail ends of the heating pipe 2, and a C connector and a D connector respectively connected to the head and tail ends of the cooling pipe 4. The connector form and structure of the above-mentioned two-position six-way reversing valve can be referred to the prior art, and will not be repeated here.
[0050] See also Figure 2 When the two-position six-way reversing valve is in the first position, the test system is in the heat storage test mode. The test fluid is pumped downstream by the fluid pump 7 on the heating pipeline 2, flows through the A joint into the two-position six-way reversing valve, flows out of the two-position six-way reversing valve from the P1 joint and flows into the phase-change heat storage heat exchanger 100 through the test docking pipeline 1, flows out of the phase-change heat storage heat exchanger 100 through the test docking pipeline 1 and the P2 joint, and finally flows out of the two-position six-way reversing valve from the B joint, exchanges heat with the heat source 3 through the heating pipeline 2, and completes a single cycle. In this process, the cooling pipeline 4 is in a closed self-circulating loop.
[0051] See also Figure 3When the two-position six-way reversing valve is in the second position, the test system is in the heat release test mode. The test medium is pumped downstream by the medium pump 7 on the cooling pipeline 4, flows through the C joint into the two-position six-way reversing valve, flows out of the two-position six-way reversing valve from the P1 joint and flows into the phase-change heat storage heat exchanger 100 through the test docking pipeline 1, flows out of the phase-change heat storage heat exchanger 100 through the test docking pipeline 1 and the P2 joint, and finally flows out of the two-position six-way reversing valve from the D joint, exchanges heat with the heat source 3 through the heating pipeline 2, and completes a single cycle. In this process, the heating pipeline 2 is in a closed self-circulating loop.
[0052] Obviously, the above embodiments of the present invention are merely examples for the purpose of clearly illustrating the present invention, and are not intended to limit the implementation methods of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the scope of protection of the present invention. It is not necessary and impossible to list all implementation methods here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention shall be included in the scope of protection of the claims of the present invention.
Claims
1. A phase change heat storage heat exchanger performance test system, characterized in that: include: A test butt-joint pipe circuit, wherein the phase-change heat storage heat exchanger to be tested can be connected in series in the middle section of the test butt-joint pipe circuit; A heating pipeline and a heat source, wherein the heat source is configured to exchange heat with the heating pipeline to heat the test medium flowing through the heating pipeline; A cooling pipeline and a cold source, wherein the cold source is configured to exchange heat with the cooling pipeline to cool the test medium flowing through the cooling pipeline; a flow path switching device, connected to the test docking pipe, the heating pipe and the cooling pipe respectively, the flow path switching device being configured to selectively connect the test docking pipe with the heating pipe or the cooling pipe so that the test docking pipe and the heating pipe form a heat storage test loop through which the test working fluid can circulate, or so that the test docking pipe and the cooling pipe form a heat release test loop through which the test working fluid can circulate; and A working fluid pump is arranged in the heat storage test loop and the heat release test loop.
2. The phase change heat storage heat exchanger performance test system according to claim 1 is characterized in that: The flow path switching device is also configured to enable the other of the heating pipeline and the cooling pipeline to independently form a self-circulating loop through which the test working medium can circulate when one of the heating pipeline and the cooling pipeline is connected to the test docking pipeline.
3. The phase change heat storage heat exchanger performance test system according to claim 2 is characterized in that: The flow path switching device is a two-position six-way reversing valve.
4. The phase change heat storage heat exchanger performance test system according to claim 2 is characterized in that: The two working fluid pumps are respectively arranged in the heating pipeline and the cooling pipeline.
5. The phase change heat storage heat exchanger performance test system according to claim 1 is characterized in that: It also includes a flow regulating device, which is arranged in the heat storage test circuit and the heat release test circuit to adjust the flow of the measuring working fluid flowing through the heat storage test circuit and the heat release test circuit.
6. The phase change heat storage heat exchanger performance test system according to claim 5 is characterized in that: The flow regulating devices are respectively arranged on the heating pipeline and the cooling pipeline.
7. The phase change heat storage heat exchanger performance test system according to claim 6 is characterized in that: The flow regulating device comprises: Two flow regulating valves are respectively arranged in the heating pipeline and the cooling pipeline; and Two flow meters are respectively arranged downstream of the two flow regulating valves in the heating pipeline and the cooling pipeline to test the flow direction of the working medium.
8. The phase change heat storage heat exchanger performance test system according to claim 1 is characterized in that: A first pressure sensor and a first temperature sensor are arranged on the test connecting pipe line upstream of the phase change heat storage heat exchanger being tested; a second pressure sensor and a second temperature sensor are arranged on the test connecting pipe line downstream of the phase change heat storage heat exchanger being tested; a third pressure sensor and a third temperature sensor are arranged on the heating pipeline; and a fourth pressure sensor and a fourth temperature sensor are arranged on the cooling pipeline.
9. The phase change heat storage heat exchanger performance test system according to any one of claims 1 to 8, characterized in that: The length of the test butt joint pipe is much shorter than the length of the heating pipe and the cooling pipe.
10. The phase change heat storage heat exchanger performance test system according to claim 1, characterized in that: The cold source comprises a constant temperature cold water bath container, which is used to contain the test cold water medium and is arranged in the middle section of the cooling pipeline; and The heat source comprises a constant temperature hot water bath container, which is used to contain the test hot water working medium and is arranged in the middle section of the heating pipeline.
Citation Information
Cited By
Comprehensive performance test system for heat exchange device of gas energy storage system
CN120577040A
Testing system of phase change energy storage heat exchanger
CN120628658A