Auxiliary device for directly burying cable

By using auxiliary devices of wire laying frames, wire rollers, material storage boxes and push mechanisms during the direct burial of cables, the problem of easy dislocation of cables during the direct burial of cables is solved, and higher quality cable direct burial and convenient maintenance work is achieved.

CN222620531UActive Publication Date: 2025-03-14TIANMA YUANDONG CABLE CO LTD
View PDF 0 Cites 4 Cited by

Patent Information

Application Number
CN202420867528.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-24
Publication Date
2025-03-14
Estimated Expiration
2034-04-24

AI Technical Summary

Technical Problem

During the direct burial of cables, the cable cannot limit the cables in the trench because the cables cannot be protected by limiting the cables, which leads to arching and dislocation, which reduces the quality of the direct burial of cables and has adverse effects on subsequent maintenance work.

Method used

Provided is an auxiliary device for direct burial of cables, including a wire rack, a wire roller, a material storage box and a push mechanism. A plurality of rollers and wire rollers are provided on the wire rack, and the wire rollers are connected to the rollers through a transmission mechanism to achieve synchronous rotation. A fixed card is installed on the material storage box, and a push mechanism and a push mechanism are equipped to push the fixed card into the ground to abut the cable to prevent the cable from being offset.

Benefits of technology

Through this auxiliary device, it is possible to effectively prevent the cable from being misaligned during the direct burial process, improve the quality of the direct burial of the cable, and simplify subsequent maintenance work.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222620531U_ABST
    Figure CN222620531U_ABST
Patent Text Reader

Abstract

The utility model provides an auxiliary device for directly burying a cable. The auxiliary device comprises a pay-off rack, a cable roller, a plurality of storage boxes and a plurality of pushing mechanisms, a plurality of rollers are arranged on the pay-off rack, and each roller is rotationally connected with the pay-off rack in the left-right direction; the wire roller is arranged on the pay-off rack, and the two ends of the wire roller are rotationally connected with the pay-off rack; the wire roller is connected with one of the rollers through a transmission mechanism, and when the rollers rotate, the rollers drive the wire roller to rotate synchronously through the transmission mechanism; a plurality of fixing clamps which are arranged side by side are arranged in each storage box, a pushing mechanism used for providing acting force for the fixing clamps is further arranged in each storage box, and a discharging opening allowing one of the fixing clamps to pass through is formed in the lower side of each storage box; the multiple pushing mechanisms correspond to the multiple storage boxes one to one and are used for pushing the fixing cards in the corresponding storage boxes to pass through the discharging openings. According to the auxiliary device for direct burying of the cable, the cable can be fixed in the direct burying process of the cable, and convenience is provided for subsequent cable maintenance work.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of cable laying, and more specifically, relates to an auxiliary device for direct burial of cables. Background Art

[0002] Cable laying refers to the process of laying and installing cables along the surveyed route to form a cable line. According to the application, it can be divided into several laying methods, such as overhead, underground (pipeline and direct burial), underwater, wall and tunnel. Direct burial cable is a laying method in which the cable is laid at the bottom of the cable trench after the direct burial cable trench is dug in accordance with the requirements of the specification.

[0003] At present, when the cable is directly buried, it is necessary to wind the cable in a pay-off frame, and then use manual or mechanical arms to pull the cable to the laying position. Finally, the pay-off frame is moved and the wire roller on the pay-off frame is rotated to make the cable fall into the groove and be aligned at the preset position.

[0004] The inventors found that during the direct burial of cables, since the pay-off frame cannot limit the position of the cables in the trench, the cables in the trench are prone to arching and dislocation, resulting in technical problems such as reduced quality of direct burial of cables and adverse effects on subsequent cable maintenance work. Utility Model Content

[0005] The purpose of the present application is to provide an auxiliary device for direct burial of cables, so as to solve the technical problem in the prior art that the cables are prone to misalignment during the direct burial process.

[0006] In order to achieve the above-mentioned purpose, the technical solution adopted in this application is: to provide an auxiliary device for direct burial of cables, comprising:

[0007] A pay-off frame is used to move horizontally in the cable laying area, and the moving direction of the pay-off frame is defined as forward; a plurality of rollers are arranged on the pay-off frame, and each of the rollers is connected to the pay-off frame for rotation in the left-right direction;

[0008] A wire roller is arranged on the wire pay-off frame, with its axial direction parallel to the left-right direction, and both ends of which are rotatably connected to the wire pay-off frame; the wire roller is connected to one of the rollers through a transmission mechanism; when the roller rotates, the roller drives the wire roller to rotate synchronously through the transmission mechanism;

[0009] A plurality of material storage boxes are arranged at intervals along the left-right direction on the upper side of the pay-off frame and are located at the rear side of the wire roller; a plurality of fixing cards arranged in parallel along the front-to-back direction are arranged inside each of the material storage boxes, and the interior of the material storage box also has a pushing mechanism for providing a force along the front-to-back direction to the plurality of fixing cards; the lower side of each of the material storage boxes has a material outlet for one of the fixing cards to pass through; and

[0010] A plurality of pushing mechanisms are arranged at equal intervals along the left-right direction on the upper side of the pay-off frame, corresponding to the plurality of material storage boxes one by one, and used to push the fixing cards in the corresponding material storage boxes through the discharge port;

[0011] Among them, the wire roller is used for winding multiple cables, and the multiple cables wound on the wire roller are spaced apart in the left and right directions; when the multiple cables pass through the lower side of the multiple storage boxes respectively, each of the pushing mechanisms can push the fixing card to be inserted into the ground and abut against the corresponding cables therein.

[0012] Preferably, the material storage box has a structure with a hollow interior and an upper opening, and the pushing mechanism includes:

[0013] A linear cylinder is fixedly arranged on the upper side of the material storage box, and its power output axis is parallel to the up-down direction; and

[0014] A push plate connected to the power output shaft of the linear cylinder and located directly above the discharge port;

[0015] Wherein, when the linear cylinder drives the push plate to move downward, the push plate is suitable for being inserted into the interior of the storage box and pushing one of the fixing cards through the discharge port.

[0016] Preferably, the pushing mechanism comprises:

[0017] A first guide rod is arranged inside the material storage box, and its axial direction is parallel to the front-rear direction; one end of the first guide rod is fixedly connected to the material storage box, and the other end of the first guide rod is arranged away from the material discharge port;

[0018] A top plate is slidably disposed on the first guide rod along a front-rear direction; and

[0019] A first spring is sleeved on the first guide rod, and two ends of the first spring are respectively in contact with the inner side surface of the material storage box and the top plate;

[0020] When a plurality of the fixing cards are loaded into the material storage box, the first spring is in a compressed state so as to be suitable for pushing the top plate to abut against the fixing cards and making one of the fixing cards be located directly above the discharge port.

[0021] Preferably, a positioning plate is provided between the wire roller and the pushing mechanism; the positioning plate is fixedly connected to the pay-off frame and has a plurality of through holes arranged at intervals along the left-right direction for allowing a plurality of cables to pass through one by one.

[0022] Preferably, a guide tube for passing the cable is fixedly inserted in each of the through holes, and the guide tube is arranged to be tilted downward in the direction from the wire roller toward the pushing mechanism.

[0023] Preferably, the auxiliary device further comprises:

[0024] A wire pressing assembly is slidably arranged on the upper side of the wire pay-off frame in the up-down direction and is located between the positioning plate and the pushing mechanism; and

[0025] An elastic reset component is arranged between the wire pay-off frame and the wire pressing assembly;

[0026] Wherein, when the cable passes through the lower side of the wire pressing assembly, the elastic reset component is suitable for driving the wire pressing assembly to move downward until it abuts against the cable.

[0027] Preferably, the wire pressing assembly comprises:

[0028] A movable plate is slidably disposed on the upper side of the pay-off frame in the up-down direction and is suitable for connecting with the elastic reset member; and

[0029] A pressure roller is arranged at the lower side of the movable plate, its axial direction is parallel to the left-right direction, and it is connected to the movable plate for rotation along the left-right direction;

[0030] Wherein, when the cable passes through the lower side of the pressing roller, the elastic reset member is suitable for driving the pressing roller to move downward until it abuts against the cable.

[0031] Preferably, the elastic reset member comprises:

[0032] A second guide rod is fixedly arranged on the upper side of the pay-off frame, and its axial direction is parallel to the up-down direction; and the wire pressing assembly is slidably connected to the second guide rod along the up-down direction; and

[0033] A second spring is sleeved on the second guide rod, is located on the upper side of the wire pressing assembly, and has upper and lower ends connected to the second guide rod and the wire pressing assembly respectively;

[0034] Wherein, when the cable passes through the lower side of the wire pressing assembly, the second spring is suitable for driving the wire pressing assembly to move downward to abut against the cable.

[0035] Preferably, the front end of each guide tube has an expanded diameter portion, and the diameter of the expanded diameter portion gradually increases in a direction away from the pushing mechanism.

[0036] Preferably, the transmission mechanism comprises:

[0037] a driving gear, disposed on one of the rollers; and

[0038] The driven gear is fixedly arranged on the line roller and is concentrically arranged with the line roller, and the driven gear is meshingly connected with the driving gear.

[0039] In the embodiment of the present application, a wire roller is provided on the wire pay-off frame, and the wire roller is used for winding multiple cables; the wire pay-off frame is also provided with multiple rollers, and when one of the rollers rotates, the roller drives the wire roller to rotate synchronously through a transmission mechanism to realize the wire pay-off function; the wire pay-off frame is also provided with multiple material storage boxes, which are filled with multiple fixed cards arranged in parallel, and the interior of the material storage box is also provided with a pushing mechanism for providing a force in the front-to-back direction to the multiple fixed cards, and the lower side of the material storage box is provided with a discharge port for one of the fixed cards to pass through; when paying out the wire, when multiple cables on the wire roller pass through the lower side of the multiple material storage boxes, the pushing mechanisms corresponding to the material storage boxes one by one can push the fixed cards to be inserted into the ground and abut against the corresponding cables, and the fixed cards can prevent the cable laying position from shifting.

[0040] Compared with the prior art, the auxiliary device for direct burial of cables provided in the embodiment of the present application can fix the cables during the direct burial of cables, thus providing convenience for subsequent cable maintenance work. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0042] Figure 1 A schematic diagram of the three-dimensional structure of an auxiliary device for direct burial of cables provided in an embodiment of the present application;

[0043] Figure 2 A schematic diagram of the main structure of the auxiliary device for direct burial of cables provided in an embodiment of the present application;

[0044] Figure 3 For along Figure 2 Schematic diagram of the cross-sectional structure along the AA line;

[0045] Figure 4 for Figure 3 A schematic diagram of the local enlarged structure of the middle B area;

[0046] Among them, the reference numerals in the figure are:

[0047] 1. Pay-off rack; 11. Roller; 2. Wire roller; 3. Material storage box; 31. Material outlet; 32. Push mechanism; 321. First guide rod; 322. Top plate; 323. First spring; 4. Push mechanism; 41. Linear cylinder; 42. Push plate; 5. Transmission mechanism; 51. Driving gear; 52. Driven gear; 61. Positioning plate; 62. Guide tube; 621. Expanding part; 7. Wire pressing assembly; 71. Moving plate; 72. Pressing roller; 8. Elastic reset member; 81. Second guide rod; 82. Second spring; 9. Fixing card; 1000. Cable. DETAILED DESCRIPTION

[0048] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0049] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it can be directly on the other element or indirectly on the other element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.

[0050] It should be understood that the orientation or position relationship indicated by terms such as "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0051] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0052] Please also read Figures 1 to 4 The auxiliary device for direct burying of cables provided in the present application is now described. The auxiliary device for direct burying of cables comprises a pay-off frame 1, a wire roller 2, a plurality of material storage boxes 3 and a plurality of pushing mechanisms 4.

[0053] The pay-off frame 1 is used to move horizontally in the laying area of ​​the cable 1000. The laying area of ​​the cable 1000 is generally a cable 1000 ditch dug by engineering machinery; the moving direction of the pay-off frame 1 is defined as forward, and a towing hook can be installed in front of the pay-off frame 1 to facilitate the connection between the towing vehicle and the pay-off frame 1, or towing by manpower; a plurality of rollers 11 are arranged on the pay-off frame 1, and each roller 11 is connected to the pay-off frame 1 in a left-right direction for rotation; each roller 11 is made of rubber material, and when rolling in the cable 1000 laying area, the rubber material has good buffering performance, which can effectively prevent the vibration from affecting the pay-off frame 1.

[0054] The wire roller 2 is arranged on the wire pay-off frame 1, the axial direction of the wire roller 2 is parallel to the left-right direction, and both ends thereof are rotatably connected to the wire pay-off frame 1; the wire roller 2 is connected to one of the rollers 11 through a transmission mechanism 5; when the roller 11 rotates, the roller 11 drives the wire roller 2 to rotate synchronously through the transmission mechanism 5; wherein, the rotation direction of the wire roller 2 is opposite to the rotation direction of the roller 11.

[0055] A plurality of material storage boxes 3 are arranged at intervals along the left-right direction on the upper side of the wire pay-off frame 1, and each material storage box 3 is located on the rear side of the wire roller 2; a plurality of fixed cards 9 arranged in parallel along the front-to-back direction are arranged inside each material storage box 3, and the interior of the material storage box 3 also has a pushing mechanism 32 for providing a force along the front-to-back direction to the plurality of fixed cards 9; the lower side of the material storage box 3 has a discharge port 31 for one of the fixed cards 9 to pass through.

[0056] A plurality of pushing mechanisms 4 are arranged at equal intervals along the left-right direction on the upper side of the pay-off frame 1, which correspond to the plurality of material storage boxes 3 one by one, and are used to push the fixed cards 9 in the corresponding material storage boxes 3 through the discharge port 31;

[0057] Among them, the wire roller 2 is used for winding multiple cables 1000, and the multiple cables 1000 wound on the wire roller 2 are spaced apart along the left and right directions; when the multiple cables 1000 pass through the lower side of multiple storage boxes 3 respectively, each pushing mechanism 4 can push the fixing card 9 to be inserted into the ground and abut against the corresponding cable 1000 therein.

[0058] It should be additionally explained that the fixing card 9 adopts a U-shaped structure, and the U-shaped opening of the fixing card 9 faces downward. When the cable 1000 is fixed, the two legs of the fixing card 9 are respectively located on both sides of the cable 1000.

[0059] In the embodiment of the present application, a wire roller 2 is provided on the wire pay-off frame 1, and the wire roller 2 is used for winding multiple cables 1000; the wire pay-off frame 1 is also provided with multiple rollers 11, and when one of the rollers 11 rotates, the roller 11 drives the wire roller 2 to rotate synchronously through the transmission mechanism 5 to realize the wire pay-off function; the wire pay-off frame 1 is also provided with multiple material storage boxes 3, which are filled with multiple fixed cards 9 arranged in parallel, and the interior of the material storage box 3 is also provided with a pushing mechanism 32 for providing a force in the front-to-back direction to the multiple fixed cards 9, and the lower side of the material storage box 3 is provided with a discharge port 31 for one of the fixed cards 9 to pass through; when paying out the wire, when the multiple cables 1000 on the wire roller 2 pass through the lower side of the multiple material storage boxes 3, the pushing mechanisms 4 corresponding to the material storage boxes 3 one by one can push the fixed cards 9 to be inserted into the ground and abut against the corresponding cables 1000, and the fixed cards 9 can prevent the laying position of the cables 1000 from shifting.

[0060] Compared with the prior art, the auxiliary device for direct burial of cables provided in the embodiment of the present application can fix the cable 1000 during the direct burial process of the cable 1000, thereby facilitating the subsequent maintenance work of the cable 1000.

[0061] In some embodiments, please refer to Figures 1 to 4 As a specific embodiment of the auxiliary device for direct burial of cables provided in the present application, the storage box 3 adopts a structure with a hollow interior and an upper opening, and the pushing mechanism 4 includes a linear cylinder 41 and a pushing plate 42.

[0062] The linear cylinder 41 is fixedly arranged on the upper side of the material storage box 3, and its power output axis is parallel to the up-down direction.

[0063] The push plate 42 is connected to the power output shaft of the linear cylinder 41 , and the two are connected by welding or threading, and the push plate 42 is located directly above the discharge port 31 .

[0064] When the linear cylinder 41 drives the push plate 42 to move downward, the push plate 42 is adapted to be inserted into the interior of the material storage box 3 and push one of the fixing cards 9 through the material outlet 31 .

[0065] By adopting the above technical scheme, the linear reciprocating motion of the push plate 42 can be realized, and during the operation of the linear cylinder 41, the piston reciprocates along a straight line, the motion is smooth, and it is not easy to generate vibration; and because the piston and the inner wall of the cylinder have good sealing and low friction, the movement noise is also small; the linear cylinder 41 has a fast response speed and can complete the action in a very short time, thereby improving the pushing efficiency of the pushing mechanism 4, and the linear cylinder 41 can also be controlled by adjusting the control valve as needed, so that the push plate 42 can be pushed at intervals, thereby achieving the fixing card 9 to fix the cable 1000 at the same distance.

[0066] In some embodiments, please refer to Figure 2 and Figure 4 As a specific implementation of the auxiliary device for direct burial of cables provided in the present application, the pushing mechanism 32 includes a first guide rod 321 , a top plate 322 and a first spring 323 .

[0067] The first guide rod 321 is arranged inside the storage box 3, and its axial direction is parallel to the front-to-back direction; one end of the first guide rod 321 is fixedly connected to the storage box 3, and the other end thereof is arranged away from the discharge port 31; the surface of the first guide rod 321 is polished to reduce the friction between the fixing card 9 and the top plate 322.

[0068] The top plate 322 is slidably arranged on the first guide rod 321 along the front-rear direction; a reserved hole is provided in the middle of the top plate 322, and the top plate 322 is slidably connected to the first guide rod 321 through the reserved hole; when the top plate 322 is installed on the first guide rod 321, the top plate 322 is not connected to the inner wall of the storage box 3 on all sides.

[0069] The first spring 323 is sleeved on the first guide rod 321 , and two ends thereof are respectively in contact with the inner side surface of the material storage box 3 and the top plate 322 .

[0070] When a plurality of fixing cards 9 are loaded into the storage box 3 , the first spring 323 is in a compressed state, so as to push the top plate 322 to abut against the fixing cards 9 and make one of the fixing cards 9 be directly above the discharge port 31 .

[0071] By adopting the above technical solution, the fixed card 9 inside the storage box 3 can be automatically moved toward the discharge port 31, thereby improving the feeding efficiency of the fixed card 9 and preventing the fixed card 9 from tilting and getting stuck at the discharge port 31 inside the storage box 3.

[0072] In some embodiments, please refer to Figures 1 to 3 As a specific embodiment of the auxiliary device for direct burial of cables provided in the present application, there is a positioning plate 61 between the wire roller 2 and the pushing mechanism 4; the positioning plate 61 is fixedly connected to the wire pay-off frame 1, and has a plurality of through holes arranged at intervals along the left-right direction for allowing a plurality of cables 1000 to pass through one by one.

[0073] By adopting the above technical solution, the positioning plate 61 has two functions. One is to improve the structural strength of the pay-off frame 1. The other is that the multiple through holes on the positioning plate 61 provide a guide for the multiple cables 1000, so that the multiple cables can maintain the same spacing when paying out the cables. The spacing between two adjacent through holes can also be adjusted according to the needs of paying out the cables.

[0074] In some embodiments, please refer to Figures 1 to 3As a specific embodiment of the auxiliary device for direct burial of cables provided in the present application, a guide tube 62 for allowing the cable 1000 to pass through is fixedly inserted in each through hole, and the guide tube 62 is arranged to be tilted downward in the direction of the line roller 2 toward the pushing mechanism 4.

[0075] By adopting the above technical solution, the downwardly inclined guide tube 62 can make the cable 1000 passing through the inside of the guide tube 62 quickly close to the ground, which provides convenience for the subsequent cable 1000 fixing process and avoids the cable 1000 from arching and affecting the laying.

[0076] In some embodiments, please refer to Figures 1 to 4 As a specific implementation of the auxiliary device for direct burial of cables provided in the present application, the auxiliary device also includes a wire pressing assembly 7 and an elastic reset member 8.

[0077] The wire pressing assembly 7 is slidably disposed on the upper side of the wire paying-off frame 1 along the up-down direction, and is located between the positioning plate 61 and the pushing mechanism 4 .

[0078] The elastic reset member 8 is arranged between the pay-off frame 1 and the wire pressing assembly 7 .

[0079] When the cable 1000 passes through the lower side of the wire crimping assembly 7 , the elastic reset member 8 is suitable for driving the wire crimping assembly 7 to move downward until it abuts against the cable 1000 .

[0080] By adopting the above technical solution, the elastic reset member 8 can provide a downward force to the wire pressing assembly 7, and the wire pressing assembly 7 can press the cable 1000 to fit the ground, which is convenient for the subsequent fixing process.

[0081] In some embodiments, please refer to Figures 1 to 4 As a specific implementation of the auxiliary device for direct burial of cables provided in the present application, the wire pressing assembly 7 includes a movable plate 71 and a pressing roller 72 .

[0082] The movable plate 71 is slidably disposed on the upper side of the pay-off frame 1 along the up-down direction, and is suitable for contacting with the elastic reset member 8 .

[0083] The pressure roller 72 is disposed at the lower side of the moving plate 71 , with its axial direction parallel to the left-right direction, and is connected to the moving plate 71 to rotate along the left-right direction.

[0084] When the cable 1000 passes through the lower side of the pressure roller 72 , the elastic reset member 8 is suitable for driving the pressure roller 72 to move downward until it abuts against the cable 1000 .

[0085] By adopting the above technical solution, the pressure roller 72 always has a downward force driven by the elastic reset component 8, so the pressure roller 72 can press the cable 1000 tightly to fit the ground, which is convenient for the subsequent fixing process; in addition, the cross-section of the pressure roller 72 is circular, which also avoids scratching the outer protective layer of the cable 1000 when contacting the cable 1000.

[0086] In some embodiments, please refer to Figures 1 to 3 As a specific implementation of the auxiliary device for direct burial of cables provided in the present application, the elastic reset member 8 includes a second guide rod 81 and a second spring 82 .

[0087] The second guide rod 81 is fixedly arranged on the upper side of the pay-off frame 1 , and its axial direction is parallel to the up-down direction; and the wire pressing assembly 7 is slidably connected to the second guide rod 81 along the up-down direction.

[0088] The second spring 82 is sleeved on the second guide rod 81 and is located on the upper side of the wire pressing assembly 7 , and its upper and lower ends are connected to the second guide rod 81 and the wire pressing assembly 7 respectively.

[0089] When the cable 1000 passes through the lower side of the wire crimping assembly 7 , the second spring 82 is adapted to drive the wire crimping assembly 7 to move downward until it abuts against the cable 1000 .

[0090] By adopting the above technical solution, the operator can change the elastic modulus of the second spring 82 according to the model of the cable 1000 to provide the pressure roller 72 with a suitable downward pressure.

[0091] In some embodiments, please refer to Figures 1 to 3 As a specific embodiment of the auxiliary device for direct burial of cables provided in the present application, the front end of each guide tube 62 has an expanded diameter portion 621, and the diameter of the expanded diameter portion 621 gradually increases in a direction away from the pushing mechanism 4.

[0092] By adopting the above technical solution, the cable 1000 will shake when it is released, and the expanded diameter portion 621 can protect the cable 1000 from being scratched by the tube opening of the guide tube 62 when it enters the guide tube 62 from the wire roller 2, thereby improving the quality of the cable 1000 when it is laid.

[0093] In some embodiments, please refer to Figures 1 to 4 As a specific implementation of the auxiliary device for direct burial of cables provided in the present application, the transmission mechanism 5 includes a driving gear 51 and a driven gear 52 .

[0094] The driving gear 51 is fixedly connected to one of the rollers 11 by welding.

[0095] The driven gear 52 is fixedly disposed on the line roller 2 , and is disposed concentrically with the line roller 2 . The driven gear 52 is meshedly connected with the driving gear 51 .

[0096] Gear meshing transmission is a highly efficient transmission method, and its transmission efficiency can usually reach more than 96%, which is incomparable to traditional belt transmission and chain transmission; therefore, by adopting the above scheme, the power of roller 11 can be efficiently transmitted to wire roller 2, and the transmission method of gear meshing drive is direct meshing without energy loss, and the gears are generally made of carbide or high-strength steel, which can withstand large torque and high-speed rotation, thereby making wire roller 2 more stable when rotating.

[0097] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present application should be included in the protection scope of the present application.

Claims

1. Auxiliary device for direct burial of cables, characterized in that: include: A pay-off frame (1) is used to move in a horizontal direction in a cable (1000) laying area, and the moving direction of the pay-off frame (1) is defined as forward; a plurality of rollers (11) are provided on the pay-off frame (1), and each of the rollers (11) is connected to the pay-off frame (1) for rotation in a left-right direction; A wire roller (2) is arranged on the wire pay-off frame (1), with its axial direction parallel to the left-right direction, and both ends of which are rotatably connected to the wire pay-off frame (1); the wire roller (2) is connected to one of the rollers (11) via a transmission mechanism (5); when the roller (11) rotates, the roller (11) drives the wire roller (2) to rotate synchronously via the transmission mechanism (5); A plurality of material storage boxes (3) are arranged at intervals along the left-right direction on the upper side of the pay-off frame (1) and are located at the rear side of the wire roller (2); each of the material storage boxes (3) is provided with a plurality of fixing cards (9) arranged in parallel along the front-back direction, and the material storage box (3) also has a pushing mechanism (32) for providing a force along the front-back direction to the plurality of fixing cards (9); the lower side of each of the material storage boxes (3) has a material outlet (31) for allowing one of the fixing cards (9) to pass through; and A plurality of pushing mechanisms (4) are arranged at equal intervals along the left-right direction on the upper side of the pay-off frame (1), corresponding one to one to the plurality of material storage boxes (3), and are used to push the fixing cards (9) in the corresponding material storage boxes (3) through the material outlet (31); The wire roller (2) is used for winding a plurality of cables (1000), and the plurality of cables (1000) wound on the wire roller (2) are spaced apart in the left-right direction; when the plurality of cables (1000) pass through the lower side of the plurality of storage boxes (3) respectively, each of the pushing mechanisms (4) can push the fixing card (9) to be inserted into the ground and abut against the corresponding cable (1000) therein.

2. The auxiliary device for direct burial of a cable according to claim 1, characterized in that: The material storage box (3) has a structure with a hollow interior and an upper opening, and the pushing mechanism (4) comprises: A linear cylinder (41) is fixedly arranged on the upper side of the material storage box (3), and its power output axis is parallel to the up-down direction; and A push plate (42) connected to the power output shaft of the linear cylinder (41) and located directly above the discharge port (31); When the linear cylinder (41) drives the push plate (42) to move downward, the push plate (42) is adapted to be inserted into the interior of the material storage box (3) and to push one of the fixing cards (9) through the material outlet (31).

3. The auxiliary device for direct burial of a cable according to claim 1, characterized in that: The pushing mechanism (32) comprises: A first guide rod (321) is arranged inside the material storage box (3), and its axial direction is parallel to the front-rear direction; one end of the first guide rod (321) is fixedly connected to the material storage box (3), and the other end of the first guide rod (321) is arranged away from the material discharge port (31); A top plate (322) is slidably disposed on the first guide rod (321) along a front-rear direction; and A first spring (323) is sleeved on the first guide rod (321), and two ends of the first spring are respectively in contact with the inner side surface of the material storage box (3) and the top plate (322); When a plurality of the fixing cards (9) are loaded into the storage box (3), the first spring (323) is in a compressed state so as to be suitable for pushing the top plate (322) to abut against the fixing cards (9) and making one of the fixing cards (9) be directly above the discharge port (31).

4. The auxiliary device for direct burial of a cable according to claim 1, characterized in that: A positioning plate (61) is provided between the wire roller (2) and the pushing mechanism (4); the positioning plate (61) is fixedly connected to the pay-off frame (1), and has a plurality of through holes arranged at intervals in the left-right direction for allowing a plurality of cables (1000) to pass through in a one-to-one correspondence.

5. The auxiliary device for direct burial of cables according to claim 4, characterized in that: A guide tube (62) for allowing the cable (1000) to pass through is fixedly inserted in each through hole, and the guide tube (62) is arranged to be tilted downward in the direction of the wire roller (2) toward the pushing mechanism (4).

6. The auxiliary device for direct burial of a cable according to claim 4, characterized in that: The auxiliary device also includes: A wire pressing assembly (7) is slidably arranged on the upper side of the wire pay-off frame (1) in an up-down direction and is located between the positioning plate (61) and the pushing mechanism (4); and An elastic reset component (8) is arranged between the wire pay-off frame (1) and the wire pressing assembly (7); When the cable (1000) passes through the lower side of the wire pressing assembly (7), the elastic reset member (8) is suitable for driving the wire pressing assembly (7) to move downward until it abuts against the cable (1000).

7. The auxiliary device for direct burial of a cable according to claim 6, characterized in that: The wire pressing assembly (7) comprises: A movable plate (71) is slidably disposed on the upper side of the pay-off frame in an up-down direction and is suitable for connecting with the elastic reset member (8); and A pressure roller (72) is arranged on the lower side of the movable plate (71), its axial direction is parallel to the left-right direction, and it is connected to the movable plate (71) for rotation along the left-right direction; Wherein, when the cable (1000) passes through the lower side of the pressure roller (72), the elastic reset member (8) is suitable for driving the pressure roller (72) to move downward until it abuts against the cable (1000).

8. The auxiliary device for direct burial of cables according to claim 6, characterized in that: The elastic reset member (8) comprises: A second guide rod (81) is fixedly arranged on the upper side of the pay-off frame (1), and its axial direction is parallel to the up-down direction; and the wire pressing assembly (7) is slidably connected to the second guide rod (81) along the up-down direction; and A second spring (82) is sleeved on the second guide rod (81), is located on the upper side of the wire pressing assembly (7), and has upper and lower ends connected to the second guide rod (81) and the wire pressing assembly (7) respectively; When the cable (1000) passes through the lower side of the wire pressing assembly (7), the second spring (82) is suitable for driving the wire pressing assembly (7) to move downward until it abuts against the cable (1000).

9. The auxiliary device for direct burial of a cable according to claim 5, characterized in that: The front end of each guide tube (62) has an expanded diameter portion (621), and the inner diameter of the expanded diameter portion (621) gradually increases from the back to the front.

10. The auxiliary device for direct burial of cables according to claim 1, characterized in that: The transmission mechanism (5) comprises: a driving gear (51) disposed on one of the rollers (11); and The driven gear (52) is fixedly arranged on the line roller (2) and is arranged concentrically with the line roller (2), and the driven gear (52) is meshingly connected with the driving gear (51).

Citation Information

Cited By

  • Wiring device

    CN120674967A

  • Wiring device

    CN120674967B

  • Pay-off device for laying photovoltaic direct-current cable and pay-off method of pay-off device

    CN120879412A

  • A wire laying device for photovoltaic direct current cable laying and a wire laying method thereof

    CN120879412B