Combined formwork for pouring concrete top slab of comprehensive pipe gallery and construction method thereof

By connecting the embedded sleeve bolts and bidirectional bolts to combine angle steel, the fixed steel formwork is solved on the wall panel of the integrated pipe corridor, and the difficulty of building and dismantling scaffolding is achieved, and efficient and low-cost construction of concrete roof panel casting is achieved.

CN108824480BActive Publication Date: 2024-11-29SHANGHAI MUNICIPAL ENG DESIGN INST (GRP) CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN201810439416.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-05-09
Publication Date
2024-11-29
Estimated Expiration
2038-05-09

AI Technical Summary

Technical Problem

In the comprehensive pipeline corridor, scaffolding needs to be built and removed before and after pouring the concrete roof slab, resulting in large labor investment, long construction cycle and poor economicality.

Method used

The angle steel is combined with embedded sleeve bolts and bidirectional bolts. The steel formwork is fixed on the wall panel of the integrated pipe corridor through the formwork fixing bolts to form a concrete roof cast formwork to avoid the construction of scaffolding.

Benefits of technology

It reduces labor investment, saves construction costs, simplifies the construction process, and shortens the construction cycle.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN108824480B_ABST
    Figure CN108824480B_ABST
Patent Text Reader

Abstract

The purpose of the present invention is to provide a combined formwork for pouring concrete top slabs of a comprehensive pipe gallery, characterized in that: a connector is embedded in the wall panel of the comprehensive pipe gallery, the embedded connector is a sleeve bolt, a bolt hole is provided on the combined angle steel, a two-way bolt is provided in the bolt hole, threads are provided at both ends of the two-way bolt, one end of the two-way bolt is threadedly connected to the sleeve bolt, and the other end of the two-way bolt is used to connect the combined angle steel, and the steel formwork is fixed on the combined angle steel to form a concrete top slab pouring formwork. The present invention can replace scaffolding, thereby reducing labor input and saving construction costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of comprehensive pipe gallery concrete casting templates, in particular to a construction method for casting a comprehensive pipe gallery concrete top plate. Background Art

[0002] In the integrated pipe gallery, scaffolding is generally used as the formwork support for pouring the concrete top slab. The construction of the scaffolding before pouring the concrete top slab and the removal of the scaffolding after the strength of the concrete top slab is formed require a lot of manpower and a long construction period; the scaffolding generally needs to be rented, which is not very economical. Summary of the invention

[0003] The invention aims to provide a combined formwork for pouring a concrete top slab of a comprehensive pipe gallery without the need to build a scaffold.

[0004] In order to achieve the above-mentioned purpose, the technical solution of the present invention is: a combined formwork for pouring concrete top slab of an integrated pipe gallery, characterized in that: a connecting piece is embedded in the wall panel of the integrated pipe gallery, the embedded connecting piece is a sleeve bolt, a bolt hole is arranged on the combined angle steel, a two-way bolt is arranged in the bolt hole, both ends of the two-way bolt are provided with threads, one end of the two-way bolt is threadedly connected to the sleeve bolt, and the other end of the two-way bolt is used to connect the combined angle steel, and the steel formwork is fixed on the combined angle steel to form a concrete top slab pouring formwork.

[0005] Furthermore, a recessed portion is provided on the inner wall of the integrated pipe gallery wall panel, so that the end of the embedded sleeve bolt is located in the recessed portion, one end of the two-way bolt is provided with an internal thread, the internal threaded end of the two-way bolt is inserted into the recessed portion, the other end of the two-way bolt is provided with an external thread, and a bolt hole is provided on the side of the combined angle steel. After the external threaded end of the two-way bolt passes through the bolt hole, a fixed double nut is used to tighten it to fix the combined angle steel on the integrated pipe gallery wall panel.

[0006] Furthermore, the concrete top slab casting template is formed by splicing a number of steel templates, and the four corners of each steel template are respectively connected to the combined angle steel through template fixing bolts.

[0007] Furthermore, the gaps between the steel formwork joints and the gaps between the steel formwork and the wall panels of the integrated pipe gallery can be sealed with sealants.

[0008] The invention aims to provide a construction method for pouring a concrete top slab of a comprehensive pipe gallery, which does not require the construction of a scaffold.

[0009] In order to achieve the above object, the technical solution of the present invention is: a construction method for pouring concrete top slab of comprehensive pipe gallery, characterized in that the method comprises the following steps:

[0010] A. When pouring the wall panels of the integrated pipe gallery, pre-embed sleeve bolts;

[0011] B. One end of the two-way bolt is fixed in the sleeve bolt, and the other end is connected to the combined angle steel;

[0012] C. Adjust the combined angle steel to the ground elevation of the formwork, install the steel formwork on the combined angle steel, and fix it with the formwork fixing bolts;

[0013] D. Use sealant to smooth the gap between the steel formwork and the wall panels of the integrated pipe gallery;

[0014] E. After the steel bars are tied, apply release agent to the formwork and pour concrete;

[0015] F. After the concrete strength is formed, remove the combined angle steel, two-way bolts and steel formwork.

[0016] Furthermore, the combined angle steel, bidirectional bolts and steel formwork can be used for the next construction work surface.

[0017] Furthermore, the combined angle steel is provided with an oblong bolt adjustment hole, and the end of the bidirectional bolt passes through the oblong bolt adjustment hole and is threadedly connected with the fixed double nut. The oblong bolt adjustment hole can be used to adjust the height of the combined angle steel.

[0018] The present invention embeds sleeve bolts in the wall panels of the integrated pipe gallery, fixes the steel template on the wall panels of the integrated pipe gallery by the embedded sleeve bolts, forms a concrete top plate casting template, and directly fixes the concrete top plate casting template on the wall panels of the integrated pipe gallery, so there is no need to build a scaffold. The advantage of the present invention is that it can replace the scaffold, thereby reducing labor input and saving construction costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a floor plan of an example of the present invention.

[0020] Figure 2 for Figure 1 AA section view in.

[0021] Figure 3 for Figure 1 BB cross-section diagram in.

[0022] Figure 4 for Figure 2 Detailed node diagram in . DETAILED DESCRIPTION

[0023] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0024] The figure includes a pipe gallery wall panel 1, a steel formwork 2, a combined angle steel 3, formwork fixing bolts 4, a cast-in-place concrete top plate 5, sleeve bolts 6, two-way bolts 7, and fixing double nuts 8.

[0025] The present invention is a combined formwork for pouring concrete top slabs of a comprehensive pipe gallery. As shown in the figure, the combined formwork mainly consists of a steel formwork 2, a combined angle steel 3, a formwork fixing bolt 4, a sleeve bolt 6, a bidirectional bolt 7, and a fixed double nut 8. The sleeve bolt 6 is pre-embedded on the wall plate of the comprehensive pipe gallery, and the combined angle steel 3 is connected and fixed with the bidirectional bolt 7 and the pre-embedded sleeve bolt 6 through the fixed double nut 8, wherein both ends of the bidirectional bolt 7 are provided with threads, one end is connected with the sleeve bolt 6, and the other end is connected with the fixed double nut 8; the steel formwork 2 is fixed with the combined angle steel 3 through the formwork fixing bolt 4 to form a concrete top slab pouring formwork.

[0026] As shown in the figure, a sleeve bolt 6 is embedded in the wall panel of the integrated pipe gallery, and a recess is set on the inner wall of the wall panel of the integrated pipe gallery, so that the end of the embedded sleeve bolt 6 is located in the recess, one end of the two-way bolt 7 is provided with an internal thread, the internal thread end of the two-way bolt is inserted into the recess, and is threadedly locked with the end of the embedded sleeve bolt 6, the other end of the two-way bolt 7 is provided with an external thread, and a bolt hole is set on the side of the combined angle steel 3, and the two-way bolt is tightened with a fixed double nut 8 after passing through the bolt hole, so as to fix the combined angle steel 3 on the wall panel of the integrated pipe gallery. Of course, the two-way bolt 7 can also adopt other thread setting methods, and it only needs to realize that one end is threadedly connected with the embedded sleeve bolt 6, and the other end is threadedly connected with the fixed double nut 8.

[0027] A construction method for pouring a concrete top slab of a comprehensive pipe gallery using the combined formwork of the present invention is characterized in that the method comprises the following steps:

[0028] A. When pouring the wall panels of the integrated pipe gallery, pre-embed sleeve bolts;

[0029] B. One end of the two-way bolt is fixed in the sleeve bolt, and the other end is connected to the combined angle steel;

[0030] C. Adjust the combined angle steel to the ground elevation of the formwork, install the steel formwork on the combined angle steel, and fix it with the formwork fixing bolts;

[0031] D. Use sealant to smooth the gap between the steel formwork and the wall panels of the integrated pipe gallery;

[0032] E. After the steel bars are tied, apply release agent to the formwork and pour concrete;

[0033] F. After the concrete strength is formed, remove the combined angle steel, two-way bolts and steel formwork.

[0034] Furthermore, the combined angle steel, bidirectional bolts and steel formwork can be used for the next construction work surface.

[0035] The above description is only a description of the preferred embodiments of the present invention, and is not intended to limit the scope of the present invention. Any changes or modifications made by a person skilled in the art based on the above disclosure shall fall within the scope of protection of the claims.

Claims

1. A combined formwork for pouring concrete top slab of a comprehensive pipe gallery, characterized in that: A pre-embedded connector is provided in the wall panel of the integrated pipe gallery, and the pre-embedded connector is a sleeve bolt. A bolt hole is provided on the combined angle steel, and a two-way bolt is provided in the bolt hole. Both ends of the two-way bolt are provided with threads, and one end of the two-way bolt is threadedly connected to the sleeve bolt, and the other end of the two-way bolt is used to connect the combined angle steel. The steel formwork is fixed on the combined angle steel to form a concrete top plate casting formwork, and a recessed portion is provided on the inner wall of the wall panel of the integrated pipe gallery so that the end of the pre-embedded sleeve bolt is located in the recessed portion. One end of the two-way bolt is provided with an internal thread, and the internal threaded end of the two-way bolt is inserted into the recessed portion, and the other end of the two-way bolt is provided with an external thread. A bolt hole is provided on the side of the combined angle steel, and the external threaded end of the two-way bolt passes through the bolt hole and is tightened with a fixed double nut to fix the combined angle steel on the wall panel of the integrated pipe gallery.

2. A combined formwork for pouring concrete top slab of a comprehensive pipe gallery as claimed in claim 1, characterized in that: The concrete top slab casting template is formed by splicing a plurality of steel templates, and the four corners of each steel template are respectively connected to the combined angle steel through template fixing bolts.

3. A combined formwork for pouring concrete top slab of a comprehensive pipe gallery as claimed in claim 2, characterized in that: The gaps between the steel formwork joints and the gaps between the steel formwork and the wall panels of the integrated pipe gallery are sealed with sealant.

4. A construction method for pouring concrete top slab of a comprehensive pipe gallery, characterized in that: The method comprises the following steps: A. pre-embedding sleeve bolts when pouring the wall panels of the integrated pipe gallery; B. One end of the two-way bolt is fixed in the sleeve bolt, and the other end is connected to the combined angle steel; C. Adjust the combined angle steel to the ground elevation of the formwork, install the steel formwork on the combined angle steel, and fix it with the formwork fixing bolts; D. Use sealant to smooth the gap between the steel formwork and the wall panels of the integrated pipe gallery; E. After the steel bars are tied, apply release agent to the formwork and pour concrete; F. After the concrete strength is formed, remove the combined angle steel, two-way bolts and steel formwork.

5. A construction method for pouring concrete top slab of a comprehensive pipe gallery as claimed in claim 4, characterized in that: The removed combined angle steel, two-way bolts and steel formwork are used for the next construction work surface.

6. A construction method for pouring concrete top slab of a comprehensive pipe gallery as claimed in claim 4, characterized in that: The combined angle steel is provided with an oblong bolt adjustment hole, and the end of the bidirectional bolt passes through the oblong bolt adjustment hole and is threadedly connected with the fixed double nut. The oblong bolt adjustment hole can be used to adjust the height of the combined angle steel.

Citation Information

Patent Citations

  • Template system beam partially supported, plate free of supporting and size adjustable

    CN103410312A

  • Adjustable tripod supporting system and method of fabricated concrete shear wall structure

    CN105649325A