Prefabricated device, gate slot component, hoisting device and gate slot construction method

By combining prefabrication and hoisting devices, the problems of long on-site construction time, high labor intensity, and high positioning difficulty in gate slot construction were solved, achieving efficient and precise gate slot track installation and quality control, and reducing costs.

CN109295933BActive Publication Date: 2024-11-26CHENGDU ALANGTECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201811216565.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-10-18
Publication Date
2024-11-26
Estimated Expiration
2038-10-18

AI Technical Summary

Technical Problem

Existing technologies for gate slot construction suffer from problems such as long on-site construction time, high labor intensity, low hoisting efficiency, high difficulty in positioning and installing gate slot tracks, complex structure, and high cost.

Method used

Using prefabrication and hoisting devices, door slot components are fabricated using template assemblies and clamping mechanisms. The shape of the door slot track is adjusted using a correction and inspection unit. The door slot components are then hoisted and cast using the hoisting device, avoiding on-site welding and achieving precise positioning and fixation of the door slot track.

Benefits of technology

Shorten the construction period, improve construction efficiency, reduce labor intensity, avoid deformation of the door track, ensure the quality of the joint surface, optimize structural design, and reduce project investment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN109295933B_ABST
    Figure CN109295933B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of gate construction, and specifically to a prefabricated device, a gate slot component, a hoisting device, and a gate slot construction method. The prefabricated device includes a template assembly and a clamping mechanism; the template assembly includes a side plate and a bottom plate, and the template assembly forms a casting space for forming a gate slot; the clamping mechanism includes an end plate, which is connected to the bottom plate, and a clamping space is formed between the end plate and the side plate. Through the prefabricated device provided by the present invention, the gate slot components can be directly cast, and then the gate slot components can be hoisted and fixed in pairs through the hoisting device, without the need for a large amount of welding work on site. Through mechanization and standardization, manual work can be reduced, and production efficiency can be significantly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of gate construction, in particular to a prefabricated device, a gate slot component, a hoisting device and a gate slot construction method. Background Art

[0002] The gate is a control facility used to close and open the water discharge channel. It is an important part of hydraulic structures and can be used to intercept water flow, control water level, regulate flow, discharge sediment and floating objects, etc. Two gate slot tracks are set on both sides of the gate slot. When in use, the gate body slides along the gate slot track to achieve the opening and closing of the gate. In the prior art, the two-phase concrete installation method is usually adopted. For example, for the parts with large gate slot height, firstly, the second-phase concrete pouring space is reserved, and the first-phase concrete pouring is carried out. After the concrete structure is basically formed, the concrete surface is cleaned, the gate slot working bracket is set up, the gate slot track is hoisted to the site, and the gate slot track is installed in place on site, and then the formwork is erected and poured, and finally the formwork and bracket are removed. Therefore, the construction period of the gate slot part is delayed by 3-6 months. The second phase installation also has the following disadvantages: the working space is small, and workers are often required to work at height, which poses a great safety hazard; the quality of the joint surface between the first phase concrete and the second phase concrete is difficult to guarantee, and water leakage is likely to occur at the joint surface; during the on-site installation of the door slot track, a large amount of welding work is required, which can easily cause the door slot track to deform; in addition, during the installation process in the prior art, the relative positions of each door slot track need to be adjusted first, which is time-consuming and the adjustment position accuracy is not high. Summary of the invention

[0003] The purpose of the invention is to provide a prefabricated device, a gate slot component, a hoisting device and a gate slot construction method to address the problems of the prior art, such as long on-site construction time, high labor intensity, low lifting efficiency, high difficulty in positioning and installing the gate slot track during on-site construction, and complex design structure and high cost of the gate slot track.

[0004] In order to achieve the above object, the technical solution adopted by the present invention is:

[0005] A prefabricated device for making a gate slot component comprises a template assembly and a clamping mechanism; the template assembly comprises a side plate and a bottom plate, the template assembly forms a casting space for forming a gate slot; the clamping mechanism comprises an end plate, the end plate is connected to the bottom plate, and a clamping space is formed between the end plate and the side plate.

[0006] The prefabricated device provided by the present invention is used to make a gate slot component of a gate. When in use, the gate slot track is first placed in the casting space so that the working surface of the gate slot track contacts the bottom plate. After the position of the gate slot track is determined, the end face structure of the gate slot track is placed in the clamping space, and the structural steel bars are installed in the casting space for casting. After solidification, the gate slot component can be made. Through the prefabricated device provided by the present invention, the gate slot component can be directly obtained, thereby fixing the gate slot track, without the need for a large amount of welding work on site, and deformation of the gate slot track due to welding can be avoided.

[0007] As a preferred solution of the present invention, the prefabricated device further includes a correction part, and the gate slot track has a gate slot track working surface. The correction part is used to adjust the shape of the gate slot track working surface. The gate slot track may be deformed during transportation, which may affect the opening and closing of the gate during use. Therefore, the correction part is provided in the gate slot to facilitate the correction of the shape of the gate slot track.

[0008] As a preferred embodiment of the present invention, the correction part includes a through hole, a magnetic part and an adjusting part; the through hole is arranged on the base plate, the magnetic part is arranged in the through hole, the magnetic part is used to fit with the working surface of the door groove track, and the adjusting part is connected to the magnetic part for adjusting the position of the magnetic part in the depth direction of the through hole.

[0009] During the transportation of the door slot track, deformation of the door slot track may occur, which may affect the use of the door slot track. Through the prefabricated device provided by the present invention, the bottom plate of the prefabricated device is set to match the working surface of the door slot track, and the bottom plate has a higher precision. Then the shape of the working surface of the door slot track is corrected by the correction device. Specifically, before the precast concrete is poured, the working surface of the door slot track is fitted with the magnetic part, and then the magnetic part is located in the through hole, and the position of each magnetic part is adjusted by the adjustment part so that the working surface of the door slot track can fit with the bottom plate, thereby correcting the deformation of the working surface of the door slot track during transportation, so that the working surface of the door slot track can maintain a higher shape accuracy.

[0010] As a preferred solution of the present invention, the prefabricated device further comprises a detection unit for detecting the shape accuracy of the door slot track. During correction, the shape accuracy of the door slot track working surface is detected by the detection unit to ensure that the corrected door slot track working surface can meet the use requirements.

[0011] As a preferred solution of the present invention, the detection unit is arranged on the bottom plate, and the detection unit includes a plurality of sensors, and the sensors are used to detect the distance between a point on the door slot track and the bottom plate.

[0012] Specifically, the detection unit includes multiple sensors, and the distance between the point on the door slot track and the bottom plate detected by each sensor can be used to determine the degree of fit between the working surface of the door slot track and the bottom plate. Furthermore, multiple sensors are collinearly arranged, and the straight line determined by each sensor is parallel to the length direction of the door slot track. Through this design, if the difference in distance data obtained by each sensor is within the error range, it can be determined that the shape of the working surface of the door slot track meets the requirements.

[0013] As a preferred solution of the present invention, a support part is provided on the bottom plate, and the support part and the pouring space are located on both sides of the bottom plate. The support part is provided on the bottom plate, and when in use, the bottom plate can be propped up by the support part, and an adjustment piece is placed in the space below the bottom plate to facilitate operation during the correction process.

[0014] As a preferred solution of the present invention, the side plate is detachably connected to the bottom plate, which is convenient for installation and demoulding.

[0015] As a preferred embodiment of the present invention, the pouring space is a U-shaped structure, and the pouring space includes a first gate slot track space, a second gate slot track space and a connecting space; the first gate slot track space is used to install a gate slot track, and the second gate slot track space is used to install another gate slot track, and the first gate slot track space is connected to the second gate slot track space through the connecting space. Four gate slot tracks are often required on a gate. By pouring with the above structure, two gate slot tracks with fixed relative positions can be obtained after one pouring is completed, which can further simplify the steps of on-site construction and improve the installation efficiency of the gate slot tracks.

[0016] A door slot component comprises a door slot track, a concrete filler, a structural steel bar and an end face structure; the door slot track is arranged on the surface of the concrete filler, and the structural steel bar is arranged in the concrete filler; in the length direction of the door slot component, one end of the concrete filler is connected to an end face structure. The end face structure is used to be connected to a sill, or to be connected to another end face structure.

[0017] The gate slot component provided by the present invention is obtained by processing through a prefabricated device. When in use, there is no need to weld the gate slot track on site, but it can be directly installed on site, thereby avoiding deformation of the gate slot track caused by welding. One end of the concrete filler is connected to an end surface structure, which can realize the mutual connection of two adjacent gate slot components. As for the end of the concrete filler located above the lintel of the gate, since it does not need to be connected to another gate slot component, the end surface structure may not be provided.

[0018] As a preferred solution of the present invention, a connecting hole is provided on the end surface structure.

[0019] A connecting hole is provided on the end surface structure. During installation, the door slot component can be hoisted through the connecting hole, which is convenient for installation. During use, several door slot components can also be connected through the connecting hole to obtain a door slot track length that meets actual production needs.

[0020] As a preferred solution of the present invention, the door slot component includes two door slot tracks arranged opposite to each other;

[0021] The concrete filling is a U-shaped structure, and two door groove tracks are arranged opposite to each other on the concrete filling.

[0022] As a preferred solution of the present invention, both ends of the concrete filler are connected to the end surface structure.

[0023] For the gate slot component located below the gate lintel during use, one end of the gate slot component needs to be connected to the gate slot component located above it, and the other end needs to be connected to the gate slot component or the sill located below it. Therefore, in use, both ends of the gate slot component located below the gate lintel are connected to the end surface structure. For the gate slot component partially located above the gate lintel during use, only one end needs to be provided with the end surface structure.

[0024] A hoisting device includes a hanging beam, a positioning connection mechanism and a lifting point; the number of the positioning connection mechanisms is at least two, and each connection mechanism is connected through a hanging beam; the lifting point is arranged on the hanging beam. When using the gate slot hoisting device provided by the present invention, the gate slot track is connected through the connection mechanism during hoisting, and the gate slot tracks on the left and right sides are hoisted at the same time. By determining the size of the hanging beam, the relative position of the gate slot track during the hoisting process can be determined. Such a design can simplify the adjustment steps performed on site, which is conducive to improving production efficiency. When in use, the hoisting device is used to hoist the gate slot component on site. Specifically, the positioning connection mechanism is connected to the gate slot component. At least two gate slot components can be hoisted on one hoisting device.

[0025] As a preferred solution of the present invention, a connection hole is provided on the positioning connection mechanism. With the above structure, during hoisting, the gate slot track is connected through the connection hole, which facilitates the disassembly and assembly of the gate slot hoisting device.

[0026] As a preferred solution of the present invention, there are multiple connection holes. With the above structure, multiple connection holes are designed on the connection mechanism, and before hoisting, the door slot rails can be connected to different connection holes, thereby adjusting the relative positions between the door slot rails.

[0027] As a preferred solution of the present invention, a positioning member is provided on the positioning connection mechanism. Specifically, the positioning member can be a positioning pin or other parts.

[0028] A gate slot construction method comprises the following steps: an installation step: moving a gate slot track component to a preset installation position by a hoisting device; a pouring step: pouring on-site concrete of a door frame around the gate slot track component; the pouring step is performed after the installation step.

[0029] By using the gate slot construction method provided by the present invention, the gate slot components are prepared before on-site installation. During on-site installation, the installation position of the gate slot components is determined, and then concrete is poured around the gate slot components without welding, which is conducive to simplifying the installation steps and can also avoid deformation of the gate slot track due to welding.

[0030] First, compared with the two-phase installation method commonly used in the prior art, the gate slot construction method provided by the present invention belongs to a one-phase installation method. With this installation method, only one concrete pouring is required on site, thereby greatly shortening the construction period. Secondly, the surface quality of the prefabricated gate slot components can be better controlled, which can ensure the quality of the bonding surface between the gate slot components and the concrete poured on site and avoid water leakage. Thirdly, it can effectively reduce the amount of high-altitude work of workers, thereby reducing safety risks.

[0031] Compared with the prior art, the present invention provides a more efficient first-stage door slot construction method. The hoisting device has the function of fixed support and versatility, and can hoist multiple door slot components at one time. On the one hand, by prefabricating a door slot component with high rigidity, the workload of on-site installation or templates is reduced. On the other hand, it can hoist, position and install multiple components on both sides of the door slot at the same time, which not only reduces on-site operation time, further reduces labor intensity, improves the level of standardization, but also optimizes the door slot structure design and reduces project investment. The existing large-scale hoisting equipment can already meet

[0032] As a preferred solution of the present invention, the door slot component further includes a concrete filler, and the door slot track is arranged on the surface of the concrete filler and connected to the concrete filler.

[0033] In the prior art, the door slot track is connected to the door slot by welding. A large amount of welding work easily causes the door slot track to deform, which is not conducive to improving the effect. According to the above scheme, the door slot component includes the door slot track and the concrete filler. During the on-site construction, concrete can be directly poured on the outside of the door slot component without welding the door slot track, which can avoid the deformation of the door slot track and is also conducive to improving the on-site construction efficiency.

[0034] As a preferred embodiment of the present invention, the door slot assembly includes two groups of door slot components, each group of door slot components includes at least one door slot component, and the installation steps include: connecting the two groups of door slot components to a lifting device to form a door slot assembly; and transporting the door slot assembly to a preset installation position.

[0035] Further, each group of gate slot components includes at least one lateral gate slot component, or includes two gate slot components, one upstream and one downstream, or includes three gate slot components, one upstream, one downstream and one lateral. In the present invention, the upstream gate slot component, the downstream gate slot component and the lateral gate slot component are relative to the water flow direction of the gate when in use, that is, the water flow direction of the gate when in use is from the upstream direction to the downstream direction, and the lateral direction refers to both sides along the water flow direction.

[0036] As a preferred solution of the present invention, after the door slot assembly is transported to a preset installation position, the installation step further includes: fixing the door slot assembly.

[0037] As a preferred solution of the present invention, the following steps are also included: a dismantling step: dismantling the hoisting device from the cast door slot assembly; the dismantling step is performed after the casting step. The dismantling step is performed after the casting step, so that during the casting process, the hoisting device can support the door slot component, which is convenient for construction.

[0038] As a preferred solution of the present invention, after the removal step is completed, the installation step, the hoisting step and the removal step are repeated to splice a plurality of gate slot components to form a gate slot. After one gate slot component is installed, the installation step, the hoisting step and the removal step are repeated, and the number of steps repeated is determined according to the designed gate slot height and the length of the gate slot component, so as to obtain the required gate slot.

[0039] As a preferred solution of the present invention, both ends of the door slot component are provided with end surface structures, and two adjacent end surface structures are connected by bolts or welding. Two adjacent end surface structures are connected by bolts or welding, so as to realize the connection of the door slot component in the height direction.

[0040] As a preferred embodiment of the present invention, two relatively arranged upstream and downstream gate slot tracks are provided on the gate slot component, and the installation steps include: connecting the two gate slot components on the left and right sides to the hoisting device to form a gate slot assembly; transporting the gate slot assembly to a preset installation position. Through the above-mentioned installation steps, four gate slot tracks with determined relative positions can be hoisted in one hoisting process. Furthermore, the size of the hoisting device is determined according to the size of the gate body, so that in one hoisting process, the four hoisted gate slot tracks can meet the installation accuracy requirements. In this way, the on-site gate slot track positioning process can be greatly simplified, and the position accuracy of the installed gate slot track can be high. In the present invention, the left side and the right side are relative to the gate body, that is, in this solution, one of the gate slot components is located on the left side of the gate body, and the other gate slot component is located on the right side of the gate body.

[0041] As a preferred solution of the present invention, after the door slot assembly is transported to the preset installation position, the installation step further includes: fixing the door slot assembly. After the door slot assembly is transported to the preset installation position, the door slot assembly is fixed. Specifically, the door slot assembly can be fixed to the bottom sill; or it can be fixed to the top surface of the door slot assembly installed last time.

[0042] As a preferred solution of the present invention, the dismantling step is to dismantle the hoisting device from the cast door slot assembly; the dismantling step is performed after the casting step. The dismantling step is performed after the casting step, so that during the casting process, the hoisting device can support the door slot assembly, which is convenient for construction.

[0043] As a preferred solution of the present invention, after the removal step is completed, the installation step, the hoisting step and the removal step are repeated to splice a plurality of gate slot components to form a gate slot. After one gate slot component is installed, the installation step, the hoisting step and the removal step are repeated, and the number of steps repeated is determined according to the designed gate slot height and the length of the gate slot component, so as to obtain the required gate slot.

[0044] As a preferred solution of the present invention, both ends of the door slot component are end surface structures, and the adjacent end surface structures on two adjacent door slot components are connected by bolts or welding. The two adjacent end surface structures are connected by bolts and welding, so as to realize the connection of the door slot components in the height direction.

[0045] As a preferred solution of the present invention, before the installation step, it also includes: a prefabrication step: making a gate slot component. The prefabrication step can be used as a part of the gate slot construction method to achieve gate customization for a specific site. If the construction site has no special requirements for the gate slot, the gate slot components can also be mass-produced, and during on-site construction, the gate slot components can be directly purchased for installation.

[0046] As a preferred solution of the present invention, the prefabrication step includes: placing the door slot track in a prefabricated device; and pouring concrete in the prefabricated device.

[0047] As a preferred solution of the present invention, the prefabricated device includes a template assembly; the template assembly includes a side plate and a bottom plate, and the template assembly forms a pouring space for pouring concrete.

[0048] The door slot component is manufactured by the above method. During the prefabrication process, the shape of the door slot track is limited by the prefabrication device, thereby avoiding obvious deformation of the door slot track.

[0049] As a preferred embodiment of the present invention, before pouring concrete in the prefabrication device, the prefabrication step further includes: correcting the shape of the door slot track. Before the door slot component is made, the door slot track may be deformed due to transportation and other reasons. In order to correct this deformation, the shape of the door slot track is corrected in the prefabrication step, so as to facilitate later use.

[0050] As a preferred embodiment of the present invention, the hoisting device includes a hanging beam, a positioning connection mechanism and a lifting point; the number of the positioning connection mechanisms is at least two, and the respective connection mechanisms are connected through the hanging beam; the lifting point is arranged on the hanging beam.

[0051] As a preferred solution of the present invention, a connection hole is provided on the positioning connection mechanism.

[0052] As a preferred solution of the present invention, the positioning connection mechanism has a positioning member. Further, the positioning member can be a positioning pin.

[0053] As a preferred solution of the present invention, the gate slot is one of a plane gate slot, a curved gate slot or a trash rack slot.

[0054] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:

[0055] 1. The door slot components can be directly obtained to fix the door slot track without a large amount of welding work on site, which can avoid deformation of the door slot track due to welding;

[0056] 2. A correction device is set up. Before the precast concrete is poured, the correction device can be used to correct the deformation of the working surface of the door slot track, so that the working surface of the door slot track maintains a high accuracy, which is convenient for subsequent use;

[0057] 3. The bottom plate is supported by the support part, and the adjustment parts are allowed to be placed in the space under the bottom plate, so as to facilitate the correction of the working surface of the door groove track;

[0058] 4. The pouring space is a U-shaped structure, which can fix two door slot tracks through a single pouring, further simplifying the on-site installation steps; saving the installation and disassembly work of the door slot template.

[0059] 5. The door slot components are hoisted and fixed in pairs through the hoisting device, which eliminates the need for a large amount of welding work on site. Through mechanized and standardized construction, manual work can be reduced and production efficiency can be significantly improved. At the same time, a set of hoisting devices can be used for turnover and construction of multiple door slots of the same size.

[0060] 6. Optimize the design of the structure of department door slots. BRIEF DESCRIPTION OF THE DRAWINGS

[0061] Figure 1 It is a schematic diagram of the structure of the prefabrication device provided in Example 1 of the present invention.

[0062] Figure 2 It is a schematic diagram of the structure of the prefabrication device provided in Example 1 of the present invention.

[0063] Figure 3 This is a schematic diagram before correction when using a prefabricated device to correct the door groove track.

[0064] Figure 4 This is a schematic diagram after correction when using a prefabricated device to correct the door groove track.

[0065] Figure 5 It is a schematic diagram of the door slot component provided in Example 1 of the present invention during the hoisting process.

[0066] Figure 6 It is a schematic diagram of the structure of the prefabrication device provided in Example 2 of the present invention.

[0067] Figure 7 It is a schematic diagram of the structure of the casting space of the prefabricated device provided in Example 2 of the present invention.

[0068] Figure 8 It is a schematic diagram of the door slot component provided by the present invention during the hoisting process.

[0069] Fig. 9 The present invention is a flow chart of the gate slot construction method provided by the present invention.

[0070] Icons: 1-prefabricated device; 2-formwork assembly; 5-end plate; 3-door slot track; 4-end face structure; 6-correction part; 7-detection part; 8-structural reinforcement; 9-concrete filling; 12-support part; 22-bottom plate; 21-side plate; 25-pouring space; 101-lifting device; 252-first door slot track space; 254-second door slot track space; 256-connecting space; 102-lifting point; 103-lifting beam; 104-positioning connection mechanism; 11-door slot component; 61-magnetic part; 62-adjusting part; 63-through hole. DETAILED DESCRIPTION

[0071] The present invention will be described in detail below in conjunction with the accompanying drawings.

[0072] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0073] Example 1

[0074] See also Figure 1-5The present invention provides a prefabricated device 1 for making a gate slot component 11, comprising a template assembly 2 and a clamping mechanism; the template assembly 2 comprises a side plate 21 and a bottom plate 22, and the template assembly 2 forms a casting space 25 for forming a gate slot; the clamping mechanism comprises an end plate 5, the end plate 5 is connected to the bottom plate 22, and a clamping space is formed between the end plate 5 and the side plate 21.

[0075] The prefabricated device 1 provided by the present invention is used to make a gate slot component 11 of a gate. When in use, the gate slot track 3 is first placed in the pouring space 25 so that the working surface of the gate slot track 3 contacts the bottom plate 22. After the position of the gate slot track 3 is determined, the end face structure 4 of the gate slot track 3 is placed in the clamping space, and the structural steel bar 8 is installed in the pouring space 25 for pouring. After solidification, the gate slot component 11 can be made. The prefabricated device 1 provided by the present invention can directly obtain the gate slot component 11. When assembling on site, it is only necessary to connect the various gate slot components 11 through the end face structure 4, without the need for a large amount of welding work on site, and deformation of the gate slot track 3 due to welding can be avoided.

[0076] Preferably, the prefabricated device 1 further includes a correction part 6, and the door slot track 3 has a door slot track 3 working surface, and the correction part 6 is used to adjust the shape of the door slot track 3 working surface. The door slot track 3 may be deformed during transportation, and the deformation of the door slot track 3 working surface will affect the opening and closing of the gate during use. Therefore, the correction part 6 is provided in the prefabricated device 1 to facilitate the correction of the shape of the door slot track 3.

[0077] Preferably, the correction part 6 includes a through hole 63, a magnetic part 61 and an adjusting part 62; the through hole 63 is arranged on the base plate 22, the magnetic part 61 is arranged in the through hole 63, the magnetic part 61 is used to fit with the door groove track 3, and the adjusting part 62 is connected to the magnetic part 61, and is used to adjust the position of the magnetic part 61 in the depth direction of the through hole 63.

[0078] Through the prefabricated device 1 provided by the present invention, the bottom plate 22 of the prefabricated device 1 is set to match the working surface of the door slot track 3, and the bottom plate 22 has a higher precision. Then, the shape of the working surface of the door slot track 3 is corrected by the correction part 6.

[0079] For details, please refer to Figure 3 and Figure 4Before pouring precast concrete, make the working surface of the door slot track 3 fit with the magnetic piece 61, and then make the magnetic piece 61 located in the through hole 63, and adjust the position of each magnetic piece 61 by the adjusting piece 62, and each magnetic piece 61 drives the working surface of the door slot track 3 to move together. If the working surface of the door slot track 3 is deformed during the early transportation process, the deformed part will gradually fit with the bottom plate 22 under the magnetic force of the magnetic piece 61, and finally make the working surface of the door slot track 3 fit with the bottom plate 22 as a whole, so as to correct the deformation of the working surface of the door slot track 3 during transportation, so that the working surface of the door slot track 3 can maintain a high shape accuracy.

[0080] Preferably, the prefabrication device 1 further comprises a detection unit 7 , and the detection unit 7 is used to detect the shape accuracy of the door groove track 3 .

[0081] While calibrating, the shape accuracy of the working surface of the door slot track 3 is detected by a detection member to ensure that the working surface of the door slot track 3 after calibration can meet the use requirements.

[0082] Preferably, the detection unit 7 is disposed on the bottom plate 22 , and the detection unit 7 includes a plurality of sensors, and the sensors are used to detect the distance between a point on the door slot track 3 and the bottom plate 22 .

[0083] Specifically, the detection unit 7 includes a plurality of distance sensors, and the distance between the point on the door slot track 3 and the bottom plate 22 detected by each distance sensor can be used to determine the degree of fit between the working surface of the door slot track 3 and the bottom plate 22. Furthermore, the plurality of distance sensors are collinearly arranged, and the straight line determined by each distance sensor is parallel to the length direction of the door slot track 3. With this design, if the difference between the distance data measured by each distance sensor is within a preset error range, it can be determined that the shape difference between the working surface of the door slot track 3 and the bottom plate 22 meets the requirements, thereby determining that the shape of the working surface of the door slot track 3 meets the requirements. The specific structure and connection method of the distance sensor are prior art and will not be described in detail here.

[0084] Preferably, a support portion 12 is provided on the bottom plate 22, and the support portion 12 and the pouring space 25 are located on both sides of the bottom plate 22. The support portion 12 is provided on the bottom plate 22, and when in use, the bottom plate 22 can be supported by the support portion 12, and the adjustment member 62 is placed in the space below the bottom plate 22, which is convenient for operation during the calibration process.

[0085] Preferably, the side plate 21 is detachably connected to the bottom plate 22. The side plate 21 is detachably connected to the bottom plate 22, which is convenient for installation and demoulding.

[0086] The door slot component 11 obtained by processing the prefabricated device 1 provided in the embodiment of the present invention is shown in the figure. The door slot component 11 includes a door slot track 3, a concrete filler 9, a structural steel bar 8 and an end surface structure 4; the door slot track 3 is arranged on the surface of the concrete filler 9, and the structural steel bar 8 is placed in the concrete filler 9; in the length direction of the door slot component 11, one end of the concrete filler 9 is connected to the end surface structure 4 of one door slot component 11. The other end of the concrete filler 9 can be connected to another end surface structure 4, or it can be connected to no end surface structure 4.

[0087] Preferably, a connecting hole is provided on the end surface structure 4 .

[0088] The purpose of setting the end surface structure 4 is that when the gate slot components 11 are used, multiple gate slot components 11 may need to be connected to each other in the height direction of the gate to make a gate slot that meets the height requirements. Multiple connection holes are set on the end surface structure 4. When in use, the connection holes on the end surface structure 4 can be used to connect two adjacent end surface structures 4, and the connection holes on the end surface structure 4 can also be used to connect the end surface structure 4 with the bottom sill.

[0089] Specifically, for the door slot component 11 located below the gate lintel during use, one end of the door slot component 11 needs to be connected to the door slot component 11 located above it, and the other end needs to be connected to the door slot component 11 located below it or the sill. Therefore, during use, one end of the door slot component 11 located below the gate lintel is connected to one end surface structure 4, and the other end is connected to another end surface structure 4.

[0090] As for the gate slot member 11 that is partially located above the gate lintel during use, since the lower end of the gate slot member 11 needs to be connected to the gate slot member 11 or the sill located below it, the upper end does not need to be connected to another gate slot member 11, but can be connected to the platform at the concrete pouring. Therefore, in use, one end of the gate slot member 11 that is partially located above the gate lintel is connected to an end surface structure 4, and the other end is not connected to the end surface structure 4.

[0091] The four gate slot components 11 are connected to the same hoisting device 101, so that the four gate slot components 11 can be hoisted as a whole. After hoisting to the site, the next step of processing can be carried out. This design makes it easy to control the relative position of the gate slot track 3.

[0092] The beneficial effects of the prefabricated device 1 and the door slot component 11 provided by the embodiment of the present invention are:

[0093] 1. The door slot component 11 can be directly obtained to fix the door slot track 3 without a large amount of welding work on site, which can prevent the door slot track 3 from being deformed due to welding;

[0094] 2. A correction part 6 is provided, and before the precast concrete is poured, the correction part 6 can correct the deformation of the working surface of the door slot track 3, so that the working surface of the door slot track 3 maintains a high precision, which is convenient for subsequent use;

[0095] 3. The bottom plate 22 is supported by the support portion 12, and the adjustment member 62 is allowed to be placed in the space below the bottom plate 22, so as to facilitate the correction of the working surface of the door groove track 3;

[0096] 4. The traditional door slot installation and adjustment process is transformed into the connection of 4 screw holes on the end surface structure, which improves the installation efficiency.

[0097] Example 2

[0098] See also Figure 6-8 . An embodiment of the present invention provides a prefabricated device 1. Compared with the prefabricated device 1 in Example 1, the difference is that: in this embodiment, the pouring space 25 is a U-shaped structure, and the pouring space 25 includes a first door slot track space 252, a second door slot track space 254 and a connecting space 256; the first door slot track space 252 is used to install a door slot track 3, and the second door slot track space 254 is used to install another door slot track 3, and the first door slot track space 252 is connected to the second door slot track space 254 through the connecting space 256.

[0099] The door slot component 11 obtained by processing the prefabricated device 1 provided in this embodiment is as follows Figure 8 The door slot component 11 has two door slot tracks 3, and the two door slot tracks 3 are arranged opposite to each other.

[0100] The concrete filler 9 is a U-shaped structure. One of the door slot tracks 3 is connected to one side of the concrete filler 9, and the other door slot track 3 is connected to the other side of the concrete filler 9.

[0101] On the basis of the prefabricated device 1 and the door slot component 11 provided in Example 1, the prefabricated device 1 and the door slot component 11 provided in this embodiment also have the following beneficial effects:

[0102] 1. Through the prefabricated device 1 provided in this embodiment, two door slot tracks 3 can be fixed by a single pouring, thereby further simplifying the construction steps during processing and reducing the amount of template installation and disassembly engineering;

[0103] 2. The relative positions of the two door slot tracks 3 on the door slot component 11 provided in this embodiment are constant, which can improve the installation accuracy of the gate.

[0104] Example 3

[0105] See also Figure 5 and Figure 8The present invention further provides a hoisting device 101 , which includes a hanging beam 103 , a positioning connection mechanism 104 and a lifting point 102 ; there are at least two positioning connection mechanisms 104 , and each positioning connection mechanism 104 is connected through the hanging beam 103 ; and the lifting point 102 is arranged on the hanging beam 103 .

[0106] By using the gate slot hoisting device 101 provided by the present invention, at least two gate slot components 11 can be hoisted at the same time by connecting the gate slot components 11 through the positioning connection mechanism 104 during hoisting. By determining the size of the hoisting beam 103, the relative positions of the gate slot tracks 3 on the two gate slot components 11 during the hoisting process can be determined. Such a design can simplify the adjustment steps performed on site, which is conducive to improving production efficiency.

[0107] On the basis of the above structure, a connection hole is provided on the positioning connection mechanism 104 .

[0108] With the above structure, during hoisting, the gate slot component 11 is connected through the connecting hole, which facilitates the disassembly and assembly of the gate slot hoisting device 101.

[0109] Based on the above structure, there are multiple connection holes.

[0110] With the above structure, a plurality of connection holes are designed on the positioning connection mechanism 104 , and before hoisting, the door slot components 11 can be connected to different connection holes, thereby adjusting the relative positions of the door slot components 11 .

[0111] The hoisting device 101 is designed as the above structure. When in use, the distance between each door slot component 11 can be determined by the distance between the two positioning connection mechanisms 104 and the size of the positioning connection mechanism 104 itself, so that the relative positions of the door slot tracks 3 on each door slot component 11 can be kept fixed.

[0112] Example 4

[0113] See also Fig. 9 This embodiment provides a gate slot construction method, comprising the following steps: an installation step: moving the gate slot assembly to a preset installation position by means of a hoisting device 101; a pouring step: pouring on-site concrete of the door frame around the gate slot assembly; the pouring step is performed after the installation step.

[0114] By the gate slot construction method provided by the present invention, the gate slot component 11 is prepared before on-site installation. During on-site installation, the installation position of the gate slot component 11 is determined, and then concrete is poured around the gate slot component 11, which is conducive to simplifying the installation steps.

[0115] Preferably, the door slot component 11 further includes a concrete filler 9 , and the door slot track 3 is disposed on the surface of the concrete filler 9 and connected to the concrete filler 9 .

[0116] In the prior art, the door slot track 3 is connected to the door slot by welding, and a large amount of welding work easily causes deformation of the door slot track 3, which is not conducive to improving construction efficiency. According to the above scheme, the door slot component 11 includes the door slot track 3 and the concrete filler 9. During on-site construction, concrete can be directly poured on the outside of the door slot component 11 without welding the door slot track 3, which can avoid deformation of the door slot track 3 and is also conducive to improving on-site construction efficiency.

[0117] Preferably, the door slot assembly includes two groups of door slot components 11, and each group of door slot components 11 includes two door slot components 11. The installation steps include: pairing the upstream and downstream door slot components 11 into one group, connecting the two groups of door slot components 11 to the hoisting device 101 to form a door slot assembly; and transporting the door slot assembly to a preset installation position.

[0118] Preferably, after transporting the door slot assembly to a preset installation position, the installation step further includes: fixing the door slot assembly.

[0119] Preferably, the following steps are also included: a dismantling step: dismantling the hoisting device 101 from the cast door slot assembly; the dismantling step is performed after the casting step. The dismantling step is performed after the casting step, so that during the casting process, the hoisting device 101 can support the door slot assembly, which is convenient for construction.

[0120] Preferably, after the removal step is completed, the installation step, the hoisting step and the removal step are repeated to splice a plurality of gate slot components 11 to form a gate slot. After one gate slot component 11 is installed, the installation step, the hoisting step and the removal step are repeated, and the number of steps repeated is determined according to the designed gate slot height and the length of the gate slot component 11, so as to obtain the required gate slot.

[0121] Preferably, both ends of the door slot member 11 are provided with end surface structures 4, and the adjacent end surface structures 4 on two adjacent door slot members 11 are connected by bolts or welding. The two adjacent end surface structures 4 are connected by bolts or welding, thereby realizing the connection of the door slot members 11 in the height direction.

[0122] Preferably, before the installation step, the method further includes: a prefabrication step of making the door slot component 11 .

[0123] The prefabrication step can be used as part of the gate slot construction method to achieve gate customization for a specific site. If the construction site has no special requirements for the gate slot, the gate slot components 11 can also be mass-produced, and during on-site construction, the gate slot components 11 can be directly purchased and installed.

[0124] Preferably, the prefabrication step comprises: placing the door slot track 3 in the prefabrication device 1 ; and pouring concrete in the prefabrication device 1 .

[0125] Preferably, the prefabricated device 1 comprises a formwork assembly 2; the formwork assembly 2 comprises a side plate 21 and a bottom plate 22, and the formwork assembly 2 forms a pouring space 25 for pouring concrete.

[0126] The door slot member 11 is manufactured by the above method. During the prefabrication process, the shape of the door slot track 3 is restricted by the prefabrication device 1, thereby preventing the door slot track 3 from being significantly deformed.

[0127] Preferably, before pouring concrete in the prefabrication device 1 , the prefabrication step further includes: correcting the shape of the door slot track 3 .

[0128] Before the door slot member 11 is manufactured, the door slot track 3 may be deformed due to transportation, etc. In order to correct this deformation, the shape of the door slot track 3 is corrected in the prefabrication step, so as to facilitate later use.

[0129] Furthermore, in the prefabrication step, the door slot track 3 is calibrated by the calibration part 6. The calibration part 6 includes a through hole 63, a magnetic member 61 and an adjusting member 62; the through hole 63 is provided on the bottom plate 22, the magnetic member 61 is provided in the through hole 63, the magnetic member 61 is used to fit with the door slot track 3, and the adjusting member 62 is connected to the magnetic member 61 and is used to adjust the position of the magnetic member 61 in the depth direction of the through hole 63.

[0130] During the production of the prefabricated device 1, the bottom plate 22 of the prefabricated device 1 is set to match the working surface of the door slot track 3, and the bottom plate 22 has a high precision. Then the shape of the working surface of the door slot track 3 is corrected by the correction part 6. Specifically, before the prefabricated concrete is poured, the working surface of the door slot track 3 is fitted with the magnetic member 61, and then the magnetic member 61 is located in the through hole 63, and the position of each magnetic member 61 is adjusted by the adjustment member 62. Since there is magnetic force between the magnetic member 61 and the door slot track 3, each point on the door slot track 3 will move with the magnetic member 61. When each magnetic member 61 is flush with the bottom plate 22 of the prefabricated device 1, the working surface of the door slot track 3 can be fitted with the bottom plate 22, thereby correcting the deformation of the working surface of the door slot track 3 during transportation, so that the working surface of the door slot track 3 can maintain a high shape accuracy. As a preferred embodiment of the present invention, the prefabricated device 1 also includes a detection part 7, which is used to detect the shape accuracy of the door slot and door slot track 3.

[0131] Specifically, the adjusting member 62 is a screw rod, and the magnetic member 61 is a permanent magnet.

[0132] Preferably, when the shape of the door groove track 3 is corrected, the shape accuracy of the door groove track 3 is detected by the detection unit 7 .

[0133] Specifically, the detection unit 7 includes a plurality of sensors, and the distance between a point on the door slot track 3 and the bottom plate 22 detected by each sensor can be used to determine the degree of fit between the working surface of the door slot track 3 and the bottom plate 22. Further, the plurality of sensors are collinearly arranged, and the straight line determined by each sensor is parallel to the length direction of the door slot track 3. With this design, if the difference in distance data obtained by each sensor is within the error range, it can be determined that the shape of the working surface of the door slot track 3 meets the requirements.

[0134] Preferably, the lifting device 101 includes a hanging beam 103 , a positioning connection mechanism 104 and a lifting point 102 ; the number of the positioning connection mechanism 104 is at least two, and each connection mechanism is connected through the hanging beam 103 ; the lifting point 102 is arranged on the hanging beam 103 .

[0135] Preferably, a connection hole is provided on the positioning connection mechanism 104 .

[0136] Preferably, the positioning connection mechanism 104 has a positioning member. Further, the positioning member can be a positioning pin.

[0137] The beneficial effects of the present invention are:

[0138] 1. The gate slot construction method provided by the present invention determines the relative position between the two gate slot tracks 3 before construction, thereby eliminating the need for complex positioning work on site and improving construction efficiency;

[0139] 2. The gate slot construction method provided by the present invention adopts the gate slot component 11. During on-site construction, only the gate slot component 11 needs to be poured, and the gate slot track 3 does not need to be welded, thereby preventing the gate slot track 3 from being deformed due to welding;

[0140] 3. In the gate slot construction method provided by the present invention, two gate slot components 11 adjacent to each other in the gate height direction are connected by bolts and welding, which can ensure sufficient connection strength and make the gate slot components 11 have high water tightness;

[0141] 4. In the gate slot construction method provided by the present invention, when manufacturing the gate slot component 11, the shape correction of the gate slot track 3 is achieved through the correction part 6, so that the deformation of the gate slot track 3 generated during the early transportation process can be corrected;

[0142] 5. The gate slot hoisting device 101 provided by the present invention is used for hoisting, positioning and supporting, and is disassembled after the gate slot is cast.

[0143] Example 5

[0144] See also Fig. 9 This embodiment provides a gate slot construction method, and the steps are basically the same as those of the gate slot construction method in Embodiment 4. The difference is that in this embodiment, the structure of the gate slot component 11 is different from that in Embodiment 4.

[0145] In this embodiment, one door slot component 11 is provided with two door slot tracks 3 oppositely disposed upstream and downstream.

[0146] In this embodiment, the installation steps include: connecting two door slot components 11 to the hoisting device 101 to form a door slot assembly; and transporting the door slot assembly to a preset installation position.

[0147] Through the above installation steps, four relatively positioned door slot tracks 3 can be hoisted in one hoisting process. Further, the size of the hoisting device 101 is determined according to the size of the gate body, so that in one hoisting process, the four hoisted door slot tracks 3 can meet the installation accuracy requirements. In this way, the on-site positioning process of the door slot track 3 can be greatly simplified, and the position accuracy of the installed door slot track 3 is high.

[0148] Preferably, after the door slot assembly is transported to the preset installation position, the installation step further includes: fixing the door slot assembly. Specifically, the door slot assembly can be fixed to the bottom sill; or it can be fixed to the top surface of the door slot assembly installed last time.

[0149] Preferably, the dismantling step: dismantling the hoisting device 101 from the cast door slot assembly; the dismantling step is performed after the casting step.

[0150] The dismantling step is performed after the pouring step. Such a design enables the hoisting device 101 to support the door slot assembly during the pouring process, thereby facilitating construction.

[0151] Preferably, after the dismantling step is completed, the installation step, the hoisting step and the dismantling step are repeated to splice a plurality of gate slot components 11 to form a gate slot.

[0152] After installing a gate slot assembly, the installation steps, the hoisting steps and the removal steps are repeated. The number of steps to be repeated is determined according to the designed gate slot height and the length of the gate slot component 11, so as to obtain the required gate slot.

[0153] Preferably, both ends of the door slot component 11 are provided with end surface structures 4, and two adjacent end surface structures 4 are connected by bolts or welding.

[0154] Two adjacent end surface structures 4 are connected by bolts and welding, thereby achieving the connection of the door slot components 11 in the height direction.

[0155] On the basis of the beneficial effects of Example 4, the gate slot construction method provided in this embodiment also has the following beneficial effects:

[0156] In this embodiment, only two gate slot components 11 need to be connected during a single hoisting process, which can save time during the hoisting process and is particularly suitable for the construction process of gate slots with smaller gate openings.

[0157] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A gate slot construction method, characterized in that: The following steps are involved: The door slot component comprises a concrete filler, a structural steel bar, an end face structure and a door slot track, wherein the door slot track is arranged on the surface of the concrete filler, and the door slot track has a door slot track working surface; the structural steel bar is placed in the concrete filler; in the length direction of the door slot component, one end of the concrete filler is connected to one of the end face structures; the end face structure is used to be connected to the sill, or to be connected to another end face structure, and a connecting hole is provided on the end face structure, and the connecting hole is used to be connected to a hoisting device; Prefabrication step: manufacturing the door slot component by a prefabrication device, the prefabrication device comprising a template assembly and a clamping mechanism; the template assembly comprises a side plate and a bottom plate, the template assembly forms a casting space for molding the door slot component; the clamping mechanism comprises an end plate, the end plate is connected to the bottom plate, and a clamping space is formed between the end plate and the side plate; The prefabricated device also includes a correction part, which is used to adjust the shape of the working surface on the door slot track; the correction part includes a through hole, a magnetic part and an adjusting part; the through hole is arranged on the bottom plate, the magnetic part is arranged in the through hole, and the magnetic part is used to fit with the working surface of the door slot track; the adjusting part is connected to the magnetic part and is used to adjust the position of the magnetic part in the depth direction of the through hole; the working surface of the door slot track fits with the magnetic part, and then the magnetic part is located in the through hole, and the position of each magnetic part is adjusted by the adjusting part, and each magnetic part drives the working surface of the door slot track to move together. If the working surface of the door slot track is deformed during the early transportation process, then under the magnetic force of the magnetic part, the deformed part will gradually fit with the bottom plate, and finally the working surface of the door slot track can fit with the bottom plate as a whole, thereby correcting the deformation of the working surface of the door slot track during transportation, so that the working surface of the door slot track can maintain a high shape accuracy; Installation steps: Move the door slot assembly to the preset installation position using a lifting device; Pouring step: pouring on-site concrete of the door frame around the door slot assembly; the pouring step is performed after the installation step, and the door slot assembly includes a door slot component.

2. A gate slot construction method according to claim 1, characterized in that: It also includes a detection unit, which is used to detect the shape accuracy of the working surface of the door groove track.

3. A gate slot construction method according to claim 2, characterized in that: The detection part is arranged on the bottom plate, and the detection part comprises a plurality of sensors, and the sensors are used to detect the distance between a point on the door slot track and the bottom plate.

4. A gate slot construction method according to claim 1, characterized in that: The side plate is detachably connected to the bottom plate.

5. The construction method of a gate slot according to claim 1, characterized in that: The door slot assembly includes two groups of door slot components, each group of door slot components includes at least one door slot component, and the installation steps include: connecting the two groups of door slot components to a hoisting device to form a door slot assembly; and transporting the door slot assembly to a preset installation position.

6. A gate slot construction method according to claim 5, characterized in that: After the door slot assembly is transported to a preset installation position, the installation step further includes: fixing the door slot assembly.

7. A gate slot construction method according to claim 5, characterized in that: The following steps are also included: Dismantling step: removing the lifting device from the cast door slot assembly; the dismantling step is performed after the casting step.

8. A gate slot construction method according to claim 1, characterized in that: Both ends of the door slot component are provided with end surface structures, and the end surface structures of two adjacent door slot components are connected by bolts or welding.

9. A gate slot construction method according to claim 1, characterized in that: The hoisting device comprises a hanging beam, a positioning connection mechanism and a lifting point; the number of the positioning connection mechanisms is at least two, and the connection mechanisms are connected through the hanging beam; the lifting point is arranged on the hanging beam.

10. A gate slot construction method according to claim 9, characterized in that: The positioning connection mechanism is provided with a connection hole.

11. A gate slot construction method according to claim 10, characterized in that: The positioning connection mechanism has a positioning piece.

12. A gate slot construction method according to claim 1, characterized in that: The gate slot is one of a plane gate slot, a curved gate slot or a trash rack slot.

13. A gate slot construction method according to claim 1, characterized in that: The pouring space is a U-shaped structure, and the pouring space includes a first door slot track space, a second door slot track space and a connecting space; the first door slot track space is used to install a door slot track, and the second door slot track space is used to install another door slot track, and the first door slot track space is connected with the second door slot track space through the connecting space.