Trestle structure and construction method
The trestle structure constructed by supporting beams, piers and micro-ground piles solves the problems of low construction efficiency and small scope of application in the existing technology, and achieves fast and simple construction under the conditions of short construction period and limited construction site. , high-quality construction, and improved the load-bearing performance and overall stability of the structure.
Patent Information
- Application Number
- CN201811323961.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2018-11-08
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2038-11-08
AI Technical Summary
The existing trestle construction efficiency is low and the scope of application is small. It is difficult to build quickly, easily and with high quality under the conditions of short construction period and limited construction site. Moreover, the foundation reinforcement method has high requirements on the bearing capacity of the foundation and is not suitable for steep slopes. The problem of location construction and grouting effect is difficult to verify.
The trestle structure is constructed using support beams, piers and micro-ground piles. Multiple micro-ground piles are embedded in the underground rock formation to build the trestle pile foundation, and a supporting base and pier columns are built on it to adjust the structure. The height and support width can meet different stress and deformation requirements, and combined with on-site pouring and assembly technology, it can achieve rapid construction and efficient support.
It improves the efficiency and scope of application of trestle construction, reduces material use and labor requirements, reduces environmental impact, enhances the load-bearing performance and overall stability of the structure, and is suitable for projects with complex geological conditions and high construction period requirements.
Smart Images

Figure CN109322241B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of traffic engineering construction, in particular to a trestle structure. In addition, the present invention also relates to a trestle construction method. Background Art
[0002] During the construction of transportation projects, especially those immediately following the construction of existing road projects, it is necessary to ensure the normal operation and safety of existing roads. Building temporary trestles is one of the most commonly used methods. Existing trestles have the following problems: the trestles have complex structures, high costs, low construction efficiency, and small scope of application. Under the conditions of short construction period and limited construction sites, how to solve the problem of fast, simple and high-quality construction of temporary trestles is a very important issue in the construction of transportation projects. In addition, in the existing construction, the foundation reinforcement treatment methods of the trestles include expanding the foundation reinforcement and grouting reinforcement of the foundation. When expanding the foundation reinforcement, the expansion of the foundation has high requirements on the bearing capacity of the foundation, and the expansion of the foundation requires large-scale excavation, which is not suitable for construction in steep areas, and may cause subsequent adverse effects such as landslides and soil erosion; when grouting the foundation, the grouting effect is difficult to view and verify, and the grouting effect cannot be effectively guaranteed. Summary of the invention
[0003] The invention provides a trestle structure and a construction method to solve the technical problems that the existing trestle construction efficiency is low, the application scope is small, and the construction method of the trestle is not suitable for the conditions of short construction period and limited construction site.
[0004] The technical solution adopted by the present invention is as follows:
[0005] A trestle structure comprises: a supporting beam frame erected along the extension direction of the trestle, a supporting panel extending along the length direction of the supporting beam frame is laid on the supporting beam frame, a plurality of groups of pier column frames for supporting the supporting beam frame are supported below the supporting beam frame, and the plurality of groups of pier column frames are sequentially arranged at intervals along the length direction of the supporting beam frame; a trestle foundation serving as the basis for supporting the trestle is supported below each pier column frame, and the trestle foundation comprises a trestle pile foundation constructed by a plurality of micro-ground piles constructed on-site and embedded in underground rock formations, and a supporting base supported on the trestle pile foundation, and the pier column frames are supported on the corresponding supporting bases.
[0006] Furthermore, pile foundation holes for installing each micro-ground pile are drilled in the supporting stratum for supporting the pier foundation; the micro-ground piles include a hollow tube vertically arranged in the pile foundation hole and open at the top, a steel cage vertically arranged in the hollow tube, and cement mortar filled between the hollow tube and the pile foundation hole and in the hollow tube.
[0007] Furthermore, a plurality of grouting holes are provided on the side wall of the hollow tube; the micro-ground pile also includes a concrete connecting rod which is filled in the grouting holes and connects the concrete layers on both sides of the inner and outer sides of the hollow tube.
[0008] Furthermore, the supporting base includes a steel mesh and reinforced concrete cast on the steel mesh; the steel mesh includes longitudinal steel bars arranged along the length direction of the pier, transverse steel bars arranged along the width direction of the pier, connecting steel bars connecting the longitudinal steel bars, transverse steel bars, and connecting steel bars of the longitudinal steel bars and the transverse steel bars.
[0009] Furthermore, the pier column frame includes a plurality of vertically arranged piers, and a plurality of groups of scissor struts connected between adjacent piers for enhancing the supporting stability of the pier column frame; the plurality of groups of scissor struts are arranged in sequence and spaced apart along the height direction of the piers.
[0010] Furthermore, the supporting beam frame includes a supporting truss arranged along the length direction of the pier, a plurality of transverse beams laid on the supporting truss at intervals in sequence along the length direction of the supporting truss, a plurality of longitudinal beams laid on the plurality of transverse beams at intervals in sequence along the width direction of the supporting truss, and a plurality of cushion beams laid on the top of the pier column frame at intervals in sequence along the width direction of the supporting truss; the supporting panel is laid on the plurality of longitudinal beams; and the supporting truss is supported on the plurality of cushion beams.
[0011] According to another aspect of the present invention, a pier construction method is also provided, which is used to construct a pier structure as described above, and the pier construction method comprises the following steps: constructing a plurality of groups of pier pile foundations which are arranged in sequence and at intervals along the extension direction of the pier and embedded in underground rock formations; casting a supporting base on each group of pier pile foundations; constructing a pier column frame on each supporting base; constructing a supporting beam frame at the top of the pier column frame which is simultaneously supported on a plurality of pier column frames arranged along the extension direction of the pier; and laying a supporting panel on the supporting beam frame.
[0012] Furthermore, each pier pile foundation includes a plurality of micro-ground piles embedded in the underground rock formation, and a pile foundation hole for installing each micro-ground pile is drilled in the supporting formation for supporting the pier foundation; each micro-ground pile includes a hollow tube vertically arranged in the pile foundation hole and open at the top, a steel cage vertically arranged in the hollow tube, and a concrete layer filled between the hollow tube and the pile foundation hole and in the hollow tube.
[0013] Furthermore, the construction of the trestle pile foundation includes the following steps: drilling pile foundation holes for installing micro piles in the supporting stratum; preparing hollow tubes and steel cages; hoisting the hollow tubes into the pile foundation holes and the steel cages into the hollow tubes in sequence; and pouring cement mortar into the pile foundation holes.
[0014] Furthermore, the supporting beam frame includes a supporting truss arranged along the length direction of the pier, a plurality of transverse beams laid on the supporting truss at intervals in sequence along the length direction of the supporting truss, a plurality of longitudinal beams laid on the plurality of transverse beams at intervals in sequence along the width direction of the supporting truss, and a plurality of cushion beams laid on the top of the pier column frame at intervals in sequence along the width direction of the supporting truss; the supporting panel is laid on the plurality of longitudinal beams; and the supporting truss is supported on the plurality of cushion beams.
[0015] The present invention has the following beneficial effects:
[0016] In the trestle structure of the present invention, a plurality of groups of pier column frames are supported below the supporting beam frame, and a trestle foundation is supported below each pier column frame, and the trestle foundation includes a trestle pile foundation constructed by a plurality of micro-ground piles and a supporting base supported on the trestle pile foundation, so that the height of the pier column frames can be adjusted according to actual construction requirements, and the height of the trestle can also be adjusted by adjusting the supporting width of the pier column frames and / or adjusting the arrangement of a plurality of micro-ground piles, and the length of the trestle pile foundation can be adjusted to meet different stress and deformation requirements, and the application range is wide; compared with the prior art of strengthening the foundation by expanding the foundation or reinforcing the foundation by grouting The method of consolidating the foundation, in the trestle structure of the present invention, firstly, a plurality of groups of pier columns and frames are used to jointly support the supporting beam frame, and then a group of trestle foundations are supported under each pier column and frame, and each group of trestle foundations includes a plurality of micro-pile ground piles cast on site and embedded in the underground rock formation. The micro-pile ground piles can be constructed by small machinery, so the construction is convenient and the construction speed is fast. In addition to transmitting the force of the upper supporting base to the solid rock formation below, the micro-pile ground piles cast on site can also consolidate the soil or broken rock around the piles, thereby increasing the bearing capacity of the trestle foundation, and no additional excavation is required except for the supporting base, so the impact on the environment is small;
[0017] When the trestle construction method of the present invention is used to construct the trestle structure, the trestle pile foundation is constructed on-site, the supporting base is cast on-site, the pier column frame is constructed on-site, the supporting beam frame is constructed on-site, and the supporting panel is laid on-site, so that the trestle structure is a prefabricated and assembled structure, which not only saves materials and is convenient for construction, but also all construction operations can be assembled and cast on-site, thereby greatly reducing labor, and has obvious advantages in application in projects with complex geological conditions and high construction period requirements, and also expands the scope of engineering application, with significant economic benefits, construction efficiency and application value. In addition, the trestle structure is a prefabricated and assembled structure, and the structural bearing The pier structure constructed by the pier construction method of the present invention has strong load-bearing performance and good overall stability. Since a plurality of pier column frames are supported below the supporting beam frame, a pier foundation is supported below each pier column frame, and the pier foundation includes a pier pile foundation constructed by a plurality of micro-pile foundations and a supporting base supported on the pier pile foundation. Therefore, the height of the pier column frames can be adjusted according to actual construction needs, thereby adjusting the height of the pier. The supporting width of the pier column frames and / or the arrangement of a plurality of micro-pile foundations can also be adjusted to adjust the supporting width of the pier pile foundation, and the length of the pier pile foundation can be adjusted to meet different stress and deformation requirements, and the scope of application is wide.
[0018] In addition to the above-described purposes, features and advantages, the present invention has other purposes, features and advantages. The present invention will be further described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The drawings constituting a part of this application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0020] Figure 1 2 is a cross-sectional schematic diagram of a trestle structure of a preferred embodiment of the present invention;
[0021] Figure 2 yes Figure 1 A magnified structural diagram of the middle trestle foundation;
[0022] Figure 3 yes Figure 1 Schematic diagram of the plan layout of the pile foundation of the middle trestle;
[0023] Figure 4 yes Figure 1 Schematic diagram of the cross section of the medium and micro pile;
[0024] Figure 5 yes Figure 1 Schematic diagram of the structure of a hollow core tube.
[0025] Legend
[0026] 10. Support beam frame; 11. Support truss; 12. Transverse support beam; 13. Longitudinal support beam; 14. Pad beam; 20. Support panel; 30. Pier frame; 31. Pier; 32. Scissors brace; 40. Trestle foundation; 41. Micro pile; 411. Hollow pipe; 4110. Leakage hole; 412. Steel cage; 413. Cement mortar; 414. Concrete connecting rod; 42. Support base; 421. Steel mesh; 422. Reinforced concrete; 50. Pile foundation hole. DETAILED DESCRIPTION
[0027] The embodiments of the present invention are described in detail below with reference to the accompanying drawings, but the present invention can be implemented in many different ways as defined and covered by the claims.
[0028] Reference Figure 1The preferred embodiment of the present invention provides a trestle structure, comprising: a support beam frame 10 erected along the extension direction of the trestle, a support panel 20 extending along the length direction thereof and used to support people or vehicles is laid on the support beam frame 10, and a plurality of groups of pier column frames 30 for supporting the support beam frame 10 are supported below the support beam frame 10, and the plurality of groups of pier column frames 30 are sequentially arranged at intervals along the length direction of the support beam frame 10. A trestle foundation 40 serving as the foundation for supporting the trestle is supported below each pier column frame 30, and the trestle foundation 40 includes a trestle pile foundation constructed by a plurality of micro-ground piles 41 constructed on site and embedded in the underground rock formation, and a support base 42 supported on the trestle pile foundation, and the pier column frames 30 are supported on the correspondingly arranged support base 42.
[0029] In the trestle structure of the present invention, a plurality of pier column frames 30 are supported below the supporting beam frame 10, and a trestle foundation 40 is supported below each pier column frame 30, and the trestle foundation 40 includes a trestle pile foundation constructed by a plurality of micro-pile 41 and a supporting base 42 supported on the trestle pile foundation, so that the height of the pier column frame can be adjusted according to actual construction requirements, and the height of the trestle can also be adjusted by adjusting the supporting width of the pier column frame and / or adjusting the arrangement of a plurality of micro-pile, thereby adjusting the supporting width of the trestle pile foundation, and adjusting the length of the trestle pile foundation to meet different stress and deformation requirements, and the scope of application is wide; compared with the prior art method of strengthening the foundation by expanding the foundation or strengthening the foundation by grouting In the pier structure of the present invention, firstly, a plurality of groups of pier columns and columns 30 are used to jointly support the supporting beam frame 10, and then a group of pier foundations 40 are supported under each pier column and column frame 30, and each group of pier foundations 40 includes a plurality of micro-ground piles 41 cast on site and embedded in the underground rock formation. The micro-ground piles 41 can be constructed by small machinery, so that the construction is convenient and the construction speed is fast. In addition to transmitting the force of the upper supporting base 42 to the solid rock formation below, the micro-ground piles 41 cast on site can also consolidate the soil or broken rock around the piles, thereby increasing the bearing capacity of the pier foundation 40, and no additional excavation part is required except for the supporting base 42, thereby having little impact on the environment.
[0030] Optionally, the micro-pile 41 is cast on site, and after the trestle pile foundation is cast, the supporting base 42 is cast directly on the trestle pile foundation, and the trestle pile foundation and the supporting base 42 are spliced by casting; the pier column frame 30 is spliced with the supporting base 42 through the embedded parts embedded in the supporting base 42; the supporting beam frame 10 is welded and connected to the pier column frame 30 through the connecting plate; the supporting panel 20 is laid on the supporting beam frame 10 and connected to the supporting beam frame 10 by welding. Therefore, the trestle structure of the present invention is a prefabricated and assembled structure, which not only saves materials and is convenient for construction, but all construction operations can be assembled and cast on site, thereby greatly reducing labor, and has obvious advantages in application in projects with complex geological conditions and high construction period requirements, and also expands the scope of engineering application, with significant economic benefits, construction efficiency and application value. In addition, the trestle structure is a prefabricated and assembled structure with strong structural bearing capacity and good overall stability.
[0031] Specifically, Figure 1 As shown, the support beam frame 10 is a hollow cylindrical structure assembled by steel sections along the extension direction of the trestle; the pier column frame 30 is a hollow cylindrical structure assembled by vertically arranged steel pipes and steel sections connecting the steel pipes; the supporting base 42 is a table-like structure formed by a steel mesh constructed by steel bars and concrete poured on the steel mesh; the micro-ground pile 41 is a pile-shaped structure formed by vertically arranged steel pipes, steel cages arranged in the steel pipes, and concrete poured on the steel pipes and the steel cages, so that the trestle structure is a prefabricated and assembled structure, which not only saves materials and is convenient for construction, but all construction operations can be assembled and cast on site, thereby greatly reducing labor, and has obvious advantages in application in projects with complex geological conditions and high construction period requirements, and also expands the scope of engineering application, with significant economic benefits, construction efficiency and application value. In addition, the trestle structure is a prefabricated and assembled structure with strong structural bearing capacity and good overall stability.
[0032] Optionally, the plurality of micro piles 41 constituting the pile foundation of the pier are vertically arranged and regularly arranged. Figure 3 As shown, a plurality of micro-ground piles 41 are arranged in a grid. The plurality of micro-ground piles 41 are arranged regularly, which is convenient for evenly supporting the supporting base 42, thereby enhancing the overall support stability of the pier foundation, and also makes each micro-ground pile 41 evenly stressed and in the same stress state, thereby enhancing the stability of the pier pile foundation support; in addition, the plurality of micro-ground piles 41 are arranged regularly, and the support width of the pier pile foundation can also be conveniently adjusted according to actual construction needs to meet construction requirements.
[0033] Alternatively, if Figure 4As shown, a pile foundation hole 50 for installing each micro pile 41 is drilled in the supporting stratum for supporting the trestle foundation 40. The micro pile 41 includes a hollow tube 411 vertically arranged in the pile foundation hole 50 and opened at the top, a steel cage 412 vertically arranged in the hollow tube 411, and cement mortar 413 filled between the hollow tube 411 and the pile foundation hole 50 and in the hollow tube 411. Since the micro pile 41 includes the hollow tube 411 and the steel cage 412, the micro pile 41 has high support strength and strong shear resistance; and the cement mortar 413 is filled between the hollow tube 411 and the pile foundation hole 50 and in the hollow tube 411, thereby further enhancing the support strength and shear resistance of the micro pile 41, and also enhancing the connection strength and connection stability between the micro pile 41 and the surrounding strata, thereby further improving the stability of the overall support of the trestle pile foundation.
[0034] Preferably, if Figure 4 As shown, a plurality of grout holes 4110 are provided on the side wall of the hollow tube 411. The micro pile 41 further includes a concrete connecting rod 414 filled in the grout holes 4110 and connecting the cement mortar 413 on both sides of the hollow tube 411. By providing the grout holes 4110 on the hollow tube 411, it is convenient for the concrete connecting rod 414 filled in the grout holes 4110 to connect the cement mortar 413 on both sides of the hollow tube 411, thereby further improving the supporting strength and shear resistance of the micro pile 41.
[0035] Preferably, if Figure 4 As shown, the outer diameter of the hollow tube 411 is smaller than the inner diameter of the pile foundation hole 50. The outer diameter of the steel cage 412 is smaller than the inner diameter of the hollow tube 411. This facilitates the formation of a concrete layer between the pile foundation hole 50 and the hollow tube 411, and between the hollow tube 411 and the steel cage 412, thereby further enhancing the supporting strength and shear resistance of the micro pile 41.
[0036] In actual construction, the micro piles 41 are selected from hollow steel pipes with a diameter of 10 cm to 20 cm (preferably 14.6 cm), a wall thickness of 5 mm to 10 mm, a spacing of 80 cm between micro piles 41, and a length of 6 m to 20 m. The micro piles 41 can be arranged in an equilateral triangle or square shape, and the plane layout is as follows: Figure 3 As shown. During construction, the pile foundation hole 50 is drilled by drilling method. The diameter of the pile foundation hole 50 should be larger than the diameter of the hollow tube 411. The leakage holes 4110 are drilled on the hollow tube 411. The diameter of the leakage holes 4110 is 0.8cm to 1.5cm, and the hole spacing is about 15cm. The entire length of the hollow tube 411 can be divided into a non-drilling grouting section, a drilling and grouting section, and a cone head section. Figure 5As shown. The overlapping parts of hollow pipe 411 adopt sleeve lap welding. The sleeve height is not less than 2 times the diameter of the hollow pipe, and the sleeve wall thickness is not less than the steel pipe wall thickness. Welding is done around the sleeve, and the welding should be full. When connecting hollow pipe 411, pay attention to check the verticality to prevent the joint from bending or folding.
[0037] Alternatively, if Figure 2 As shown, the support base 42 includes a steel mesh 421 and concrete 422 poured on the steel mesh 421. The steel mesh 421 includes longitudinal steel bars arranged along the length direction of the trestle, transverse steel bars arranged along the width direction of the trestle, connecting longitudinal steel bars, transverse steel bars, and connecting steel bars connecting the longitudinal steel bars and the transverse steel bars. The steel mesh 421 is arranged in the support base 42, so as to enhance the overall support strength and rigidity of the support base 42.
[0038] Alternatively, if Figure 1 As shown, the pier column frame 30 includes a plurality of vertically arranged pier columns 31, and a plurality of groups of scissor struts 32 connected between adjacent pier columns 31 for enhancing the supporting stability of the pier column frame 30. The plurality of groups of scissor struts 32 are arranged in sequence along the height direction of the pier columns 31. Specifically, each group of scissor struts 32 includes two horizontal beams arranged opposite to each other up and down, and two inclined beams connected to the diagonals of the two horizontal beams, respectively. The two ends of the horizontal beams are respectively welded and fixed to the two adjacent pier columns 31, and each end of the inclined beams is respectively welded and fixed to the correspondingly arranged horizontal beams and pier columns 31. During actual construction, the pier columns 31 adopt a steel pipe of model φ630mm×8mm, and the pier columns 31 are connected to each other by welding 16# channel steel scissor struts 32 to ensure their stability. The pier columns 31 are firmly connected to the supporting base 42 through embedded parts.
[0039] Alternatively, if Figure 1 As shown, the support beam frame 10 includes a support truss 11 arranged along the length direction of the trestle, a plurality of transverse beams 12 sequentially laid on the support truss 11 at intervals along the length direction of the support truss 11, a plurality of longitudinal beams 13 sequentially laid on the plurality of transverse beams 12 at intervals along the width direction of the support truss 11, and a plurality of cushion beams 14 sequentially laid on the top of the pier column frame 30 at intervals along the width direction of the support truss 11. The support panel 20 is laid on the plurality of longitudinal beams 13. The support truss 11 is supported on the plurality of cushion beams 14.
[0040] During actual construction, the cushion beam 14 is an I40b double-joined I-beam cushion beam. The pre-welded double-joined I-beam is hoisted onto the top of the pier column frame 30 by a crane, and 8# channel steel is used on both sides of the I-beam to be welded and connected to the top of the pier column frame 30. The support truss 11 is a Bailey truss, which is a prefabricated component and assembled on site. The Bailey pieces are hoisted piece by piece by a crane, and are connected and extended with truss pins. All bolts and nuts connecting the trusses must be tightened, and the safety pins must be inserted after the truss pins are in place. After the Bailey truss is assembled, it is hoisted by a crane and placed on the cushion beam 14. The Bailey truss and the double-joined I-beam cushion beam are connected by a U-shaped buckle made of 8# channel steel, and the U-shaped buckle is respectively welded and fixed to the two connected ones. The Bailey truss group is connected with the Bailey truss group by a scissors brace made of 8# channel steel to enhance the stability of the overall structure of the support beam frame 10.
[0041] During actual construction, the transverse beam 12 is made of I25a steel, the spacing between adjacent transverse beams 12 is 0.75m, each transverse beam 12 is arranged horizontally along the trestle, and the transverse beam 12 is connected to the Bailey truss by an inverted gate clamp, which is welded to the transverse beam 12 and fixed to the Bailey truss after being connected to the Bailey truss. Each contact point between the transverse beam 12 and the Bailey truss beam is connected and welded by a gate clamp, and the gate clamp is welded to the web of the transverse beam 12 to ensure the weld length and welding quality. The longitudinal beam 13 is made of I14 steel, the spacing between adjacent longitudinal beams 13 is 0.30m, and spot welding is used at the connection with I25a.
[0042] Optionally, the support panel 20 includes a plurality of steel panels arranged in sequence along the length direction of the support beam frame 10. A connection panel connected to each of the two adjacent steel panels is connected between the two adjacent steel panels. The two adjacent steel panels are arranged at intervals, and space can be reserved for the steel panels to expand and contract due to heat and cold, so as to prevent the support panel 20 from deforming. In actual construction, the steel panel is made of 12mm thick patterned steel plate with a plate width of 6m, which is welded to the longitudinal support beam 13. After the steel panel is tightly attached to the longitudinal support beam 13, intermittent welding is adopted, and a 2cm gap is left between each steel panel.
[0043] Reference Figure 1 The preferred embodiment of the present invention further provides a trestle construction method for constructing a trestle structure as described above, the trestle construction method comprising the following steps:
[0044] The construction involves multiple groups of trestle pile foundations which are arranged in sequence and spaced apart along the extension direction of the trestle and embedded in the underground rock formations.
[0045] A supporting base 42 is cast on each set of trestle pile foundations.
[0046] The pier stand 30 is constructed on each supporting base 42 .
[0047] A support beam frame 10 is constructed at the top of the pier column frame 30 and is simultaneously supported on a plurality of pier column frames 30 arranged along the extending direction of the pier.
[0048] The supporting panel 20 is laid on the supporting beam frame 10 .
[0049] When the trestle construction method of the present invention is used to construct a trestle structure, the trestle pile foundation is prepared on-site, the supporting base 42 is cast on-site, the pier column frame 30 is constructed on-site, the supporting beam frame 10 is constructed on-site, and the supporting panel 20 is laid on-site, so that the trestle structure is a prefabricated and assembled structure, which not only saves materials and is convenient to construct, but also all construction operations can be assembled and cast on-site, thereby greatly reducing labor, and has obvious advantages in applications in projects with complex geological conditions and high construction period requirements, and also expands the scope of engineering application, with significant economic benefits, construction efficiency and application value. In addition, the trestle structure is a prefabricated and assembled structure with strong structural bearing performance and good overall stability; the trestle structure constructed by the trestle construction method of the present invention has a plurality of pier column frames 30 supported below the supporting beam frame 10, and a trestle foundation 40 is supported below each pier column frame 30, and the trestle foundation 40 includes a trestle pile foundation constructed by a plurality of micro piles 41 and a supporting base 42 supported on the trestle pile foundation, so that it can be constructed according to actual construction needs. The height of the pier column frame can be adjusted to meet different requirements, and the height of the trestle can be adjusted by adjusting the height of the pier column frame. The supporting width of the pier column frame and / or the arrangement of multiple micro piles can also be adjusted to adjust the supporting width of the trestle pile foundation. The length of the trestle pile foundation can be adjusted to meet different force and deformation requirements, and the application range is wide. Compared with the prior art method of strengthening the foundation by expanding the foundation or strengthening the foundation by grouting, in the trestle structure of the present invention, firstly, a plurality of pier column frames 30 are used to jointly support the support beam frame 10, and then a group of stack beams are supported under each pier column frame 30. The bridge foundation 40, and each group of trestle foundation 40 includes a plurality of micro ground piles 41 cast on site and embedded in the underground rock formation. The micro ground piles 41 can be constructed with small machinery, so the construction is convenient and fast. The micro ground piles 41 transfer the force of the upper supporting base 42 to the solid rock formation below. The micro ground piles 41 cast on site can also consolidate the soil or broken rock around the piles, thereby increasing the bearing capacity of the trestle foundation 40. In addition to the supporting base 42, no additional excavation is required, thereby having little impact on the environment.
[0050] Alternatively, if Figure 1 and Figure 4As shown, each trestle pile foundation includes a plurality of micro-ground piles 41 embedded in the underground rock formation, and a pile foundation hole 50 for installing each micro-ground pile 41 is drilled in the supporting stratum for supporting the trestle foundation 40. Each micro-ground pile 41 includes a hollow tube 411 vertically arranged in the pile foundation hole 50 and opened at the top, a steel cage 412 vertically arranged in the hollow tube 411, and cement mortar 413 filled between the hollow tube 411 and the pile foundation hole 50 and in the hollow tube 411. Further, a plurality of grouting holes 4110 are opened on the side wall of the hollow tube 411. The micro-ground pile 41 also includes a concrete connecting rod 414 of cement mortar 413 filled in the grouting holes 4110 and connecting the inner and outer sides of the hollow tube 411.
[0051] Optionally, constructing the trestle pile foundation includes the following steps:
[0052] A pile foundation hole 50 for installing the micro pile 41 is drilled in the supporting stratum.
[0053] A hollow tube 411 and a steel cage 412 are prepared.
[0054] The hollow tube 411 is hoisted into the pile foundation hole 50 and the steel cage 412 is hoisted into the hollow tube 411 in sequence.
[0055] Cement mortar is poured into the pile foundation hole 50 .
[0056] In actual construction, the micro piles 41 are selected from hollow steel pipes with a diameter of 10 cm to 20 cm (preferably 14.6 cm), a wall thickness of 5 mm to 10 mm, a spacing of 80 cm between adjacent micro piles 41, and a length of 6 m to 20 m. The micro piles 41 can be arranged in an equilateral triangle or square shape, and the plane layout is as follows: Figure 3 As shown. During construction, the pile foundation hole 50 is constructed by drilling method, and the diameter of the pile foundation hole 50 should be larger than the diameter of the hollow tube 411. The leakage holes 4110 are drilled on the hollow tube 411, and the diameter of the leakage holes 4110 is 0.8cm~1.5cm, and the hole spacing is about 15cm. After the hollow tube 411 is hoisted into the pile foundation hole 50 and the steel cage 412 is hoisted into the hollow tube 411, M30 grouting mortar is used for filling, and the grouting pressure can be 0.3MPa~0.5MPa; after the top of the hollow tube 411 overflows, the pile foundation hole 50 is closed and pressurized for a period of time, and the grouting is stopped after the mortar overflows again. The entire length of the hollow tube 411 can be divided into a non-drilling grouting section, a drilling grouting section and a cone head section. Figure 5 As shown. The overlapping parts of hollow pipe 411 adopt sleeve lap welding. The sleeve height is not less than 2 times the diameter of the hollow pipe, and the sleeve wall thickness is not less than the steel pipe wall thickness. Welding is done around the sleeve, and the welding should be full. When connecting hollow pipe 411, pay attention to check the verticality to prevent the joint from bending or folding.
[0057] Alternatively, if Figure 1As shown, the support beam frame 10 includes a support truss 11 arranged along the length direction of the trestle, a plurality of transverse beams 12 sequentially laid on the support truss 11 at intervals along the length direction of the support truss 11, a plurality of longitudinal beams 13 sequentially laid on the plurality of transverse beams 12 at intervals along the width direction of the support truss 11, and a plurality of cushion beams 14 sequentially laid on the top of the pier column frame 30 at intervals along the width direction of the support truss 11. The support panel 20 is laid on the plurality of longitudinal beams 13. The support truss 11 is supported on the plurality of cushion beams 14.
[0058] Optionally, constructing the support beam frame 10 includes the following steps:
[0059] The cushion beam 14, the supporting truss 11, the transverse support beam 12 and the longitudinal support beam 13 are prepared on site.
[0060] The cushion beam 14 is mounted to the top end of the pier stand 30 .
[0061] The support truss 11 is mounted on the cushion beam 14 .
[0062] The transverse beam 12 is mounted on the supporting truss 11 .
[0063] The longitudinal support beam 13 is mounted on the transverse support beam 12 .
[0064] During actual construction, the cushion beam 14 is an I40b double-joined I-beam cushion beam. The pre-welded double-joined I-beam is hoisted onto the top of the pier column frame 30 by a crane, and 8# channel steel is used on both sides of the I-beam to be welded and connected to the top of the pier column frame 30. The support truss 11 is a Bailey truss, which is a prefabricated component and assembled on site. The Bailey pieces are hoisted piece by piece by a crane, and are connected and extended with truss pins. All bolts and nuts connecting the trusses must be tightened, and the safety pins must be inserted after the truss pins are in place. After the Bailey truss is assembled, it is hoisted by a crane and placed on the cushion beam 14. The Bailey truss and the double-joined I-beam cushion beam are connected by a U-shaped buckle made of 8# channel steel, and the U-shaped buckle is respectively welded and fixed to the two connected ones. The Bailey truss group is connected with the Bailey truss group by a scissors brace made of 8# channel steel to enhance the stability of the overall structure of the support beam frame 10.
[0065] During actual construction, the transverse beam 12 is made of I25a steel, the spacing between adjacent transverse beams 12 is 0.75m, each transverse beam 12 is arranged horizontally along the trestle, and the transverse beam 12 is connected to the Bailey truss by an inverted gate clamp, which is welded to the transverse beam 12 and fixed to the Bailey truss after being connected to the Bailey truss. Each contact point between the transverse beam 12 and the Bailey truss beam is connected and welded by a gate clamp, and the gate clamp is welded to the web of the transverse beam 12 to ensure the weld length and welding quality. The longitudinal beam 13 is made of I14 steel, the spacing between adjacent longitudinal beams 13 is 0.30m, and spot welding is used at the connection with I25a.
[0066] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A trestle structure, characterized in that: include: A support beam (10) is erected along the extension direction of the trestle, and a support panel (20) extending along the length direction thereof and used to support people or vehicles is laid on the support beam (10), and a plurality of groups of pier column frames (30) used to support the support beam (10) are supported below the support beam (10), and the plurality of groups of pier column frames (30) are arranged in sequence and at intervals along the length direction of the support beam (10); A pier foundation (40) serving as a support for the pier is supported below each of the pier column frames (30), the pier foundation (40) comprising a pier pile foundation constructed by a plurality of micro piles (41) constructed on site and embedded in underground rock formations, and a supporting base (42) supported on the pier pile foundation, and the pier column frames (30) are supported on the corresponding supporting bases (42); The micro-ground pile (41) is cast on site, and after the trestle pile foundation is cast, the supporting base (42) is cast directly on the trestle pile foundation, and the trestle pile foundation and the supporting base (42) are spliced by casting; the pier column frame (30) is spliced with the supporting base (42) through the embedded parts embedded in the supporting base (42); A pile foundation hole (50) for installing each micro-ground pile (41) is drilled in a supporting stratum for supporting a trestle foundation (40); the micro-ground pile (41) comprises a hollow tube (411) vertically arranged in the pile foundation hole (50) and having an opening at the top, a steel cage (412) vertically arranged in the hollow tube (411), and cement mortar (413) filled between the hollow tube (411) and the pile foundation hole (50) and in the hollow tube (411); a plurality of mortar leakage holes (4110) are opened on the side wall of the hollow tube (411); the micro-ground pile (41) further comprises a concrete connecting rod (414) of cement mortar (413) filled in the mortar leakage holes (4110) and connecting the inner and outer sides of the hollow tube (411); The pier column frame (30) comprises a plurality of vertically arranged pier columns (31), and a plurality of groups of scissor struts (32) connected between adjacent pier columns (31) for enhancing the supporting stability of the pier column frame (30); the plurality of groups of scissor struts (32) are arranged in sequence and spaced apart along the height direction of the pier columns (31).
2. The trestle structure according to claim 1, characterized in that: The supporting base (42) comprises a steel mesh (421) and concrete (422) poured on the steel mesh (421); The steel mesh (421) comprises longitudinal steel bars arranged along the length direction of the pier, transverse steel bars arranged along the width direction of the pier, and connecting steel bars connecting the longitudinal steel bars, the transverse steel bars, and the longitudinal steel bars and the transverse steel bars.
3. The trestle structure according to claim 1, characterized in that: The support beam frame (10) comprises a support truss (11) arranged along the length direction of the trestle, a plurality of transverse beams (12) sequentially and spaced apart on the support truss (11) along the length direction of the support truss (11), a plurality of longitudinal beams (13) sequentially and spaced apart on the plurality of transverse beams (12) along the width direction of the support truss (11), and a plurality of cushion beams (14) sequentially and spaced apart on the top of the pier column frame (30) along the width direction of the support truss (11); The supporting panel (20) is laid on a plurality of longitudinal beams (13); The supporting truss (11) is supported on a plurality of cushion beams (14).
4. A trestle construction method, characterized in that: Used to construct a trestle structure according to any one of claims 1 to 3, the trestle construction method comprises the following steps: Construct multiple groups of trestle pile foundations which are arranged in sequence and spaced apart along the extension direction of the trestle and embedded in the underground rock formation; Casting a supporting base (42) on each group of the trestle pile foundations; Constructing a pier column stand (30) on each of the supporting bases (42); A support beam frame (10) is constructed at the top of the pier column frame (30) and is supported on a plurality of pier column frames (30) arranged along the extension direction of the pier; Laying a support panel (20) on the support beam frame (10); Each trestle pile foundation comprises a plurality of micro-ground piles (41) embedded in an underground rock formation, and a pile foundation hole (50) for installing each micro-ground pile (41) is drilled in a supporting stratum for supporting the trestle foundation (40); each micro-ground pile (41) comprises a hollow tube (411) vertically arranged in the pile foundation hole (50) and having an opening at the top, a steel cage (412) vertically arranged in the hollow tube (411), and cement mortar (413) filled between the hollow tube (411) and the pile foundation hole (50) and in the hollow tube (411); further, a plurality of mortar leakage holes (4110) are opened on the side wall of the hollow tube (411); the micro-ground pile (41) also comprises a concrete connecting rod (414) of cement mortar (413) filled in the mortar leakage holes (4110) and connecting the inner and outer sides of the hollow tube (411).
5. The trestle construction method according to claim 4, characterized in that: The construction of the trestle pile foundation comprises the following steps: Drilling a pile foundation hole (50) in the supporting stratum for installing the micro-ground pile (41); Preparing the hollow tube (411) and the steel cage (412); Sequentially hoisting the hollow tube (411) into the pile foundation hole (50), and hoisting the steel cage (412) into the hollow tube (411); Cement mortar is poured into the pile foundation hole (50).
6. The trestle construction method according to claim 4, characterized in that: The support beam frame (10) comprises a support truss (11) arranged along the length direction of the trestle, a plurality of transverse beams (12) sequentially and spaced apart on the support truss (11) along the length direction of the support truss (11), a plurality of longitudinal beams (13) sequentially and spaced apart on the plurality of transverse beams (12) along the width direction of the support truss (11), and a plurality of cushion beams (14) sequentially and spaced apart on the top of the pier column frame (30) along the width direction of the support truss (11); The supporting panel (20) is laid on a plurality of longitudinal beams (13); The supporting truss (11) is supported on a plurality of cushion beams (14).
Citation Information
Patent Citations
Foundation ditch assembled steel trestle
CN206768570U
Trestle structure