Prestressed anchor cable cleaning device and method

By installing a shaft structure and a jack jacking device in the construction of urban shield tunnels, the potential safety hazards caused by the intrusion of anchor cables are solved, and safe, controllable and low-cost anchor cable cleaning is achieved, which is suitable for subway tunnel construction.

CN109630173BActive Publication Date: 2024-10-22CHINA RAILWAY 21ST BUREAU GRP TRACK TRAFFIC ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201811366659.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-11-16
Publication Date
2024-10-22
Estimated Expiration
2038-11-16

AI Technical Summary

Technical Problem

In the construction of urban shield tunnels, the intrusion-limited anchor cable structure has major safety hazards. Existing methods such as shaft excavation or shaft + concealed tunnel design have problems such as long operation cycles, high safety risks, and high costs, especially in sensitive areas. The anchor cable cannot be removed directly under the building by shaft excavation.

Method used

Design a prestressed anchor cable cleaning device. By setting up a shaft structure at the position of the anchor cable, using a jack to push into the concrete round pipe to remove the anchor cable, and manually clearing the anchor cable in the pipe, combined with dewatering wells and drainage ditches to achieve waterless operations. Finally backfill the shaft with concrete or mortar to seal it.

Benefits of technology

It achieves safe, controllable, low-cost, and simple-to-operate anchor cable cleaning, which can accurately and effectively remove the intrusion-limited anchor cables without affecting subsequent shield machine excavation. It is suitable for the treatment of underground intrusion-limited structures in subway tunnel construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN109630173B_ABST
    Figure CN109630173B_ABST
Patent Text Reader

Abstract

A prestressed anchor cable cleaning device is provided with a shaft structure on one side of the anchor cable position, the shaft structure is a concrete retaining wall beyond the horizontal plane of the shaft, a concrete structural wall arranged inside the shaft, a concrete back wall and a concrete foundation are arranged at the bottom of the shaft structure, the concrete foundation is a step-type structure, a jack is fixedly arranged on the side wall of the concrete back wall, the piston rod of the jack is connected to the longitudinal top iron, the longitudinal top iron is connected to the transverse top iron, the transverse top iron is connected to the wedge-shaped top shoe, and the wedge-shaped top shoe is connected to the concrete circular tube arranged on the concrete foundation; the device and method can accurately, effectively and visually remove the intrusive anchor cable without affecting the subsequent tunneling of the shield machine, the operation is simple and the cost is low, and the device can be widely applied to the technical field of underground intrusive structure treatment construction involving subway tunnel construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of pipe jacking construction, and specifically relates to a construction device and a method for jacking a concrete pipe section with a jack and removing anchor cables in the pipe section. Background Art

[0002] In the construction of urban shield tunnels, due to the limitations of line conditions, a large amount of construction under buildings is often required. The underground foundation treatment of urban buildings is complicated, especially when crossing high-rise buildings. Since the retaining piles, anchor cables and other structures used in the early foundation pit reinforcement project intrude into the design limit, it will cause great safety hazards to the shield tunnel construction. The commonly used method at present is to change the design, generally using the shaft excavation method to excavate, or using the "shaft + dark tunnel" engineering mode for treatment and construction. However, when the intruding anchor cable structure is located under a sensitive building and the building does not meet the conditions for demolition, it cannot be directly removed by shaft excavation. If the "shaft channel + dark tunnel" design and construction is adopted, there are problems such as long operation cycle, high safety risk, and high cost, and the construction plan has limitations. Summary of the invention

[0003] The technical problem to be solved by the present invention is to overcome the deficiencies of the above-mentioned prior art and to provide a prestressed anchor cleaning device and method which has a reasonable design, is convenient to construct, has a relatively low cost, is safe and controllable, and can effectively solve the construction safety hazards caused by the intrusion of the anchor cable.

[0004] The technical solution adopted to solve the above technical problems is: a shaft structure is arranged on one side of the anchor cable position, the shaft structure is a concrete retaining wall exceeding the horizontal plane of the shaft, a concrete structural wall arranged inside the shaft, a concrete back wall and a concrete foundation are arranged at the bottom of the shaft structure, the concrete foundation is a step-type structure, a jack is fixedly arranged on the side wall of the concrete back wall, the piston rod of the jack is connected to the longitudinal top iron, the longitudinal top iron is connected to the transverse top iron, the transverse top iron is connected to the wedge-shaped top shoe, and the wedge-shaped top shoe is connected to the concrete circular pipe arranged on the concrete foundation.

[0005] The wedge-shaped top shoe of the present invention comprises: a rear end pad steel ring and a front end pad steel ring are connected through a side wall steel plate, and a guide steel ring is arranged on the side wall steel plate.

[0006] The guide steel ring of the present invention is a semicircular ring structure, and one end of the guide steel ring extends out of the end surface of the side wall steel plate.

[0007] The side wall steel plate of the present invention is a circular ring structure, one end surface of the side wall steel plate is a plane, and the other end surface is an inclined surface.

[0008] The inclined surface of the side wall steel plate of the present invention is radially processed with a reserved groove, and the transverse top iron is arranged in the reserved groove.

[0009] One side of the concrete foundation of the present invention is a plane and the other side is an inclined surface, and the concrete circular pipe is arranged on the inclined surface.

[0010] A precipitation well is arranged on one side of the vertical shaft structure of the present invention, and drainage ditches are arranged on both sides of the vertical shaft structure.

[0011] A cleaning method of a prestressed anchor cable cleaning device of the present invention comprises the following steps:

[0012] S1. Construction dewatering well: Carry out construction dewatering to achieve water-free operation in the shaft and water-free construction in the top pipe;

[0013] S2, construction shaft: excavate below the tensioning end of the anchor cable, the depth should be sufficient for the construction space of the jacking pipe;

[0014] S3, construct concrete foundation and concrete back wall;

[0015] S4, chisel off and clean the structural concrete at the end of the anchor cable, and excavate the soil within the first section of the concrete circular pipe;

[0016] S5. Install the first section of concrete circular pipe;

[0017] S6. Install wedge-shaped jacking shoes, horizontal jacking irons, and longitudinal jacking irons, debug, and push the jack cylinder to conduct trial jacking;

[0018] S7, excavating the soil in the second section of the concrete circular pipe and installing the second section of the concrete circular pipe are carried out in sequence until the cleaning of the entire anchor cable is completed;

[0019] S8. Remove jacks, wedge-shaped jacking shoes and other jacking equipment;

[0020] S9. Use mortar to backfill the hollow part of the concrete circular tube, use miscellaneous soil to backfill the vertical shaft and compact it layer by layer, and reserve the pavement layer thickness at the top of the vertical shaft and use pavement concrete to seal and backfill;

[0021] S10. Backfill the drainage well with concrete or mortar and finally restore the construction site.

[0022] Compared with the prior art, the present invention has the following advantages:

[0023] Since the present invention adopts the method of pushing the concrete circular pipe by a jack pushing device in the shaft structure, the front end of the concrete circular pipe is sleeved on the end of the anchor cable, and the soil is manually chiseled out and the anchor cable is cut off in the pipe until the anchor cable is finally removed, when the groundwater level is high, the pipe well outside the shaft is assisted to lower the water level, and finally lean concrete or mortar is used to backfill the concrete pipe, the shaft is backfilled with slag, and the shaft mouth is sealed with a concrete layer. The present invention can accurately, effectively and visually remove the intrusive anchor cable without affecting the subsequent tunneling of the shield machine, is simple to operate, and has low cost, and can be widely applied to the technical field of underground intrusive structure treatment construction involving subway tunnel construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic structural diagram of an embodiment of the present invention.

[0025] Figure 2 It is a structural schematic diagram of the present invention when cleaning is completed.

[0026] Figure 3 It is a structural schematic diagram of the present invention when backfilling is completed.

[0027] Figure 4 yes Figure 1 A schematic structural diagram of the middle wedge-shaped top shoe 10.

[0028] Figure 5 yes Figure 4 sectional view of .

[0029] Figure 6 yes Figure 4 Front view of .

[0030] In the figure: 1. Concrete foundation; 2. Concrete back wall; 3. Concrete structural wall; 4. Dewatering well; 5. Jack; 6. Longitudinal top iron; 7. Horizontal top iron; 8. Concrete retaining wall; 9. Drainage ditch; 10. Wedge-shaped top boot; 11. Concrete circular pipe; 10-1. Rear end pad steel ring; 10-2. Side wall steel plate; 10-3. Guide steel ring; 10-4. Front end pad steel ring; a. Reserved groove. DETAILED DESCRIPTION

[0031] The present invention is further described in detail below with reference to the accompanying drawings and embodiments, but the present invention is not limited to these embodiments.

[0032] Example 1

[0033] exist Figures 1 to 6In the present invention, a prestressed anchor cable cleaning device is provided. A shaft structure is excavated on one side of the anchor cable position. The shaft structure is excavated below the tensioning end of the anchor cable. The depth and width need to meet the requirements of pipe jacking construction. The shaft structure includes a concrete retaining wall 8 that exceeds the horizontal plane of the shaft. The concrete retaining wall 8 is mainly used to prevent surface water from entering the shaft structure. A concrete structural wall 3 is arranged inside the shaft structure. The concrete structural wall 3 adopts a prefabricated reinforced concrete pipe segment structure, a caisson method, or a steel frame and anchor net spraying structure, and an inverted well wall method to provide an operation space for anchor cable extraction. A concrete back wall 2 and a concrete foundation 1 are arranged at the bottom of the shaft structure. The concrete foundation 1 is a step-type structure. One side of the concrete foundation 1 of this embodiment is a plane and the other side is an inclined surface. A concrete circular pipe 11 is arranged on the inclined surface. The inclination of the inclined surface is determined according to the direction and position of the actual anchor cable installation. A jack 5 is fixedly installed on the top, and the reaction force required for construction is provided for the jack 5 through the concrete back wall 2. The jack 5 is the power source of the entire propulsion device. The piston rod of the jack 5 is connected to the longitudinal top iron 6, and the longitudinal top iron 6 is connected to the transverse top iron 7. The longitudinal top iron 6 and the transverse top iron 7 are both made of 2cm steel plates processed into a quadrangular prism shape, and the end face size of the longitudinal top iron 6 is adapted to the diameter size of the jack cylinder; the transverse top iron 7 is connected to the wedge-shaped top shoe 10. The wedge-shaped top shoe of this embodiment is composed of a rear end pad steel ring 10-1, a side wall steel plate 10-2, a guide steel ring 10-3, and a front end pad steel ring 10-4. The rear end pad steel ring 10-1 and the front end pad steel ring 10-4 are welded and connected by the side wall steel plate 10-2. The rear end pad steel ring 10-1 improves the force of the wedge-shaped top shoe 10, and the front end pad steel ring 10-4 mainly increases the contact area with the end wall of the concrete circular pipe 11. The side wall steel plate 10-2 is a circular ring structure, one end face of the side wall steel plate 10-2 is a plane, and the other end face is an inclined surface. A reserved groove a is radially processed on the inclined surface of the side wall steel plate 10-2, and the transverse top iron 7 is installed in the reserved groove a. The size of the reserved groove a is adapted to the size of the transverse top iron 7 to prevent sliding during operation. A guide steel ring 10-3 is welded to the outer wall of the side wall steel plate 10-2. The guide steel ring 10-3 is a semicircular ring structure. One end of the guide steel ring 10-3 extends out of the end face of the side wall steel plate 10-2. When in use, it is stuck on the outside of the concrete circular pipe 11 to stabilize the wedge-shaped top boot 10. The wedge-shaped top boot 10 is connected to the concrete circular pipe 11 set on the inclined surface of the concrete foundation 1. The jack 5 pushes the wedge-shaped top boot 10 along the inclined surface of the concrete foundation 1 through the longitudinal top iron 6 and the transverse top iron 7, so that the concrete circular pipe 11 moves in the same direction. The number of sections of the concrete circular pipe 11 is selected according to the depth of the anchor cable installation until the anchor cable is cleaned. The concrete circular pipe 11 of this embodiment is a concrete pipe commonly used in drainage pipes. The inner diameter of the concrete circular pipe 11 is larger than the original installation hole diameter of the anchor cable and is not less than 800mm to meet the needs of manual excavation working space.

[0034] A dewatering well 4 is excavated on one side of the shaft structure of the present invention, and pipe well dewatering is adopted. According to the groundwater level, engineering geological conditions, and anchor cable depth data, the relevant construction parameters of the pipe well are determined by calculation, and ultimately, waterless anchor cable construction operations need to be achieved. Drainage ditches are set on both sides of the shaft structure to discharge surface water and prevent it from entering the shaft.

[0035] A cleaning method for a prestressed anchor cable cleaning device of the present invention comprises the following steps:

[0036] S1, construction dewatering well 4: construction dewatering is carried out to achieve water-free operation in the shaft and water-free construction in the top pipe;

[0037] S2, construction shaft: excavate below the tensioning end of the anchor cable, the depth should be sufficient for the construction space of the jacking pipe;

[0038] S3, constructing concrete foundation 1 and concrete back wall 2;

[0039] S4, chiseling and cleaning the structural concrete of the anchor cable end portion, and excavating the soil within the first section of the concrete circular pipe 11;

[0040] S5, installing the first section of concrete circular pipe 11;

[0041] S6, install the wedge-shaped top shoe 10, the horizontal top iron 7, the longitudinal top iron 6, debug, and push the jack 5 cylinder to conduct a trial jacking;

[0042] S7, excavating the soil in the range of the second section of the concrete circular pipe 11 and installing the second section of the concrete circular pipe 11 are performed in sequence until the cleaning of the entire anchor cable is completed;

[0043] S8, remove the jack 5, wedge-shaped jacking shoe 10 and other jacking equipment;

[0044] S9, backfill the hollow part of the concrete circular tube 11 with mortar, backfill the vertical shaft with miscellaneous soil and compact it layer by layer, and seal and backfill with pavement concrete at the top of the vertical shaft with a reserved pavement layer thickness;

[0045] S10. Backfill the drainage well with concrete or mortar and finally restore the construction site.

Claims

1. A prestressed anchor cleaning device, wherein a shaft structure is arranged on one side of the anchor position, wherein the shaft structure is a concrete retaining wall beyond the horizontal plane of the shaft, a concrete structural wall arranged inside the shaft, a concrete back wall and a concrete foundation are arranged at the bottom of the shaft structure, the concrete foundation is a step-type structure, a jack is fixedly arranged on the side wall of the concrete back wall, a piston rod of the jack is connected to a longitudinal top iron, the longitudinal top iron is connected to a transverse top iron, the transverse top iron is connected to a wedge-shaped top shoe, and the wedge-shaped top shoe is connected to a concrete circular pipe arranged on the concrete foundation; Features: The cleaning method of the above-mentioned prestressed anchor cable cleaning device comprises the following steps: S1. Construction dewatering well: Carry out construction dewatering to achieve water-free operation in the shaft and water-free construction in the top pipe; S2, construction shaft: excavate below the tensioning end of the anchor cable, the depth should be sufficient for the construction space of the jacking pipe; S3, construct concrete foundation and concrete back wall; S4, chisel off and clean the structural concrete at the end of the anchor cable, and excavate the soil within the first section of the concrete circular pipe; S5. Install the first section of concrete circular pipe; S6. Install wedge-shaped jacking shoes, horizontal jacking irons, and longitudinal jacking irons, debug, and push the jack cylinder to conduct trial jacking; S7, excavating the soil in the second section of the concrete circular pipe and installing the second section of the concrete circular pipe are carried out in sequence until the cleaning of the entire anchor cable is completed; S8. Remove the jack and wedge-shaped jacking shoe jacking equipment; S9. Use mortar to backfill the hollow part of the concrete circular tube, use miscellaneous soil to backfill the vertical shaft and compact it layer by layer, and reserve the pavement layer thickness at the top of the vertical shaft and use pavement concrete to seal and backfill; S10. Backfill the drainage well with concrete or mortar and finally restore the construction site.

2. A prestressed anchor cable cleaning device according to claim 1, characterized in that The wedge-shaped top shoe comprises: a rear end pad steel ring and a front end pad steel ring are connected through a side wall steel plate, and a guide steel ring is arranged on the side wall steel plate.

3. A prestressed anchor cable cleaning device according to claim 2, characterized in that: The guide steel ring is a semicircular ring structure, and one end of the guide steel ring extends out of the end surface of the side wall steel plate.

4. A prestressed anchor cable cleaning device according to claim 2, characterized in that: The side wall steel plate is a circular ring structure, one end surface of the side wall steel plate is a plane, and the other end surface is an inclined surface.

5. A prestressed anchor cable cleaning device according to claim 2, characterized in that: A reserved groove is radially processed on the inclined surface of the side wall steel plate, and the transverse top iron is arranged in the reserved groove.

6. A prestressed anchor cable cleaning device according to claim 1, characterized in that: One side of the concrete foundation is a plane and the other side is an inclined surface, and the concrete circular pipe is arranged on the inclined surface.

7. A prestressed anchor cable cleaning device according to claim 1, characterized in that: A precipitation well is arranged on one side of the vertical shaft structure, and drainage ditches are arranged on both sides of the vertical shaft structure.