A production device for concrete slatted floor
Through the concrete manure leakage plate production device integrating fabric, shovel, and polishing functions, the problems of large area and low production efficiency in the existing technology are solved, space saving and efficiency improvement are achieved, and it is suitable for small and medium-sized enterprises. .
Patent Information
- Application Number
- CN201910323230.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-04-22
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2039-04-22
AI Technical Summary
The existing concrete manure leakage slab production equipment covers a large area and is independent in the process, which leads to low production efficiency and excessive space occupation, especially in small and medium-sized enterprises with tight sites.
A concrete manure leakage plate production device integrating fabric, shovel average stall and polishing functions was designed, including a vibration table, rack, fabric mechanism, shovel average stall mechanism and polishing mechanism, and the frame is controlled by walking ground beams. Move horizontally to achieve compact layout and integration of functions of the device.
It significantly saves the area of land, improves work efficiency, is suitable for small and medium-sized enterprises with tight site, and reduces production costs.
Smart Images

Figure CN109849168B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of slatted floor processing, and in particular to a production device for a concrete slatted floor. Background Art
[0002] In order to keep the pig house clean and facilitate the automatic cleaning of pig manure, many modern large-scale pig farms generally use concrete slatted floors to build pig houses. The slatted floors are produced using molds. When processing the slatted floors, the slatted floor mold must first be placed on a vibration table, and then a steel mesh is placed in the mold body, filled with concrete, and the vibration table is turned on for vibration. After the vibration is dense, the upper part is polished, the mold is lifted as a whole, and after the mold is turned over, the processed slatted floor is demolded and placed on the pallet.
[0003] The existing concrete slatted floor manufacturing device is generally a production line. The equipment used in each process on the production line is independent. For example, the material distribution equipment and the polishing equipment are integrated into one, which requires several equipment racks. The distance between each equipment is also large. This arrangement occupies a large area. When the manufacturer makes the concrete slatted floor, it needs to provide a large space for smooth production, which brings a lot of trouble to the production party with insufficient space. Summary of the invention
[0004] In order to solve the deficiencies in the prior art, the present invention provides a production device for a concrete slatted floor, which integrates the functions of spreading, shoveling and polishing. The production of the concrete slatted floor can be completed on one device, which greatly saves floor space and space. At the same time, due to the compactness of each process, work efficiency can be improved.
[0005] The technical solution adopted by the present invention to solve the above-mentioned problem is to provide a production device for a concrete slatted floor, including a vibrating table, on which a slatted floor mold is placed, and a frame that can move horizontally relative to the vibrating table is arranged on the outside of the vibrating table, on which a placing mechanism, a shoveling and spreading mechanism for shoveling away excess concrete on the concrete mold, and a polishing mechanism for polishing the surface are installed.
[0006] The material distribution mechanism includes a storage hopper, a conveyor belt and a material distribution hopper. The storage hopper and the conveyor belt are respectively installed on the top of the frame. The upper and lower parts of the storage hopper are open. The conveyor belt is horizontally arranged directly below the storage hopper. The material distribution hopper is vertically installed on the frame. The upper opening of the material distribution hopper is located at one end of the conveyor belt. A discharge port is provided at one end of the storage hopper close to the material distribution hopper. The lower opening of the material distribution hopper is located above the slatted floor mold.
[0007] The shovel averaging mechanism is hinged on one side of the frame close to the material distributing hopper, the polishing mechanism is arranged above the vibration table and hinged on the frame, a first lifting mechanism is arranged between the shovel averaging mechanism and the frame, and a second lifting mechanism is arranged between the polishing mechanism and the frame.
[0008] Preferably, the shovel averaging mechanism includes a crossbeam, a first reduction motor, a bearing seat, an eccentric shaft, a bearing sleeve and a shovel blade mounting seat. The bearing seat, the eccentric shaft, the bearing sleeve and the shovel blade mounting seat are recorded as a set of shovel leveling components, and two sets of the shovel leveling components are provided. The first reduction motor is installed on the crossbeam, and the output shaft of the first reduction motor extends downward and is transmission-connected to the driving sprocket. The two bearing seats are symmetrically arranged on both sides of the first reduction motor and fixedly connected to the crossbeam. The bearing seat is rotatably connected to the eccentric shaft, and the eccentric shaft is transmission-connected to the driven sprocket. The driven sprocket is transmission-connected to the driving sprocket through a chain. The eccentric part of the eccentric shaft is rotatably connected to the bearing sleeve, and the shovel blade mounting seat is detachably connected to the bearing sleeve. The shovel blade mounting seat is also detachably connected. The shovel blade also includes a shovel blade, which is tilted, and the two ends of the shovel blade are detachably connected to the two shovel blade mounting seats by bolts.
[0009] Preferably, the first lifting mechanism includes a hinge plate and a first hydraulic cylinder, two hinge plates are provided at each end of the cross beam, the two hinge plates on the same side are arranged in parallel, one end of the hinge plate is hinged to the frame, and the other end of the hinge plate is hinged to the cross beam, and two first hydraulic cylinders are symmetrically provided, the cylinder barrel of the first hydraulic cylinder is hinged to the frame, and the piston rod of the first hydraulic cylinder is hinged to the cross beam.
[0010] Preferably, an eccentric block is installed at one end of the eccentric shaft.
[0011] Preferably, the polishing mechanism includes a swing limit sleeve, a swing limit rod, a second reduction motor, a grinding disc, an adjusting rod and an adjusting sleeve. The grinding disc is horizontally arranged, and a boss is provided on the upper surface of the grinding disc. An inner hole with a keyway is processed in the boss, and the inner hole is vertically arranged. A keyway is provided on the output shaft of the second reduction motor, and the grinding disc is installed on the output shaft of the second reduction motor through the inner hole with the keyway. The second reduction motor is fixedly arranged on the second reduction motor seat, and a first ear plate and a second ear plate are respectively provided on both sides of the second reduction motor seat. The limited swing rod is hinged on the first ear plate, and the end of the swing limit rod is sleeved in the swing limit sleeve. The swing limit sleeve is hinged on the frame, and multiple second ear plates are provided. There are two adjusting rods, namely the first adjusting rod and the second adjusting rod. One end of the first adjusting rod is rotatably connected to the frame, and the other end is rotatably arranged in the adjusting sleeve. One end of the second adjusting rod is rotatably connected to the second reduction motor seat through the second ear plate, and the other end is rotatably arranged in the adjusting sleeve.
[0012] Preferably, the second lifting mechanism includes a second hydraulic cylinder and a connecting plate, the cylinder barrel of the second hydraulic cylinder is hinged on the frame, the piston rod of the second hydraulic cylinder is rotatably connected to the second reduction motor seat through the second ear plate, and two connecting plates are provided. The positions of the connecting plates correspond to the upper and lower adjustment sleeves, and the two ends of the connecting plates are rotatably connected to the frame and the side walls of the second reduction motor seat respectively.
[0013] Preferably, an internal thread is provided on the inner wall of the adjusting sleeve, one end of the adjusting sleeve is a left-handed internal thread, and the other end is a right-handed internal thread, and both adjusting rods are correspondingly provided with external threads, and the first adjusting rod and the second adjusting rod are rotatably arranged at both ends of the adjusting sleeve.
[0014] Preferably, there are two groups of the adjusting sleeve and the adjusting rod, which are respectively arranged on both sides of the second hydraulic cylinder.
[0015] Preferably, walking beams are respectively installed on both sides of the bottom of the frame, the walking beams on both sides are arranged in parallel, and walking wheels are installed at both ends of the walking beams.
[0016] Preferably, the material distribution bucket is a sleeve structure, which includes a lifting bucket and a lifting bucket sleeve, the lifting bucket sleeve is fixedly connected to the frame, the lifting bucket is slidably connected in the lifting bucket sleeve, and fastening bolts are installed on the lifting bucket sleeve.
[0017] By adopting the above technical solution, the present invention has the following advantages:
[0018] The present invention controls the horizontal movement of the frame relative to the vibration table through the walking ground beam, and the operation is flexible and convenient; the distribution mechanism of the present invention can distribute the concrete in the storage hopper to the slatted floor mold through the distribution hopper, without the need for manual distribution; the shoveling and evenly spreading mechanism of the present invention can make the shovel blade swing on the surface of the concrete slatted floor to shovel away excess concrete on the concrete slatted floor; the polishing mechanism of the present invention can polish the concrete slatted floor.
[0019] The height of the lifting bucket in the present invention can be adjusted, and the gap between the lower end of the lifting bucket and the upper surface of the slatted floor mold is used to control the height of the concrete on the slatted floor mold. When the lifting bucket is lifted to a certain height position of the lifting bucket sleeve, the lifting bucket and the lifting bucket sleeve can be fixed by tightening bolts.
[0020] When the shoveling and leveling mechanism and the polishing mechanism are not working, the first lifting mechanism and the second lifting mechanism of the present invention can control the working parts of the shoveling and leveling mechanism and the polishing mechanism to stay away from the upper surface of the concrete slatted floor. Only when shoveling and polishing are required, the shovel blade and the polishing disc are lowered to the working position, which facilitates the coordination between different processes and prevents the smooth progress of each process from being affected.
[0021] The polishing mechanism of the present invention can ensure stable up and down movement through the swing limiting sleeve and the adjusting sleeve.
[0022] In summary, the present invention integrates the functions of spreading, shoveling and polishing, and can complete the production of concrete slatted floor on one device. Compared with the previous large-scale equipment that requires a gantry for spreading and polishing, it greatly saves floor space and is suitable for application in small and medium-sized enterprises with limited space. Moreover, when using the present invention, the various processes are closely coordinated, which can improve work efficiency and reduce costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the structure of the present invention;
[0024] Figure 2 yes Figure 1 Schematic diagram of the structure of the middle rack;
[0025] Figure 3 yes Figure 1 Structural diagram of the middle shovel averaging mechanism;
[0026] Figure 4 yes Figure 3 Right view of;
[0027] Figure 5 yes Figure 3 A top view of
[0028] Figure 6 yes Figure 4 AA section view;
[0029] Figure 7 yes Figure 1 Structural schematic diagram of the middle polishing mechanism;
[0030] Figure 8 yes Figure 7 Top view of the . DETAILED DESCRIPTION
[0031] like Figures 1 to 8 As shown, Figure 1 The left direction is the left direction of the present invention. A production device for a concrete slatted floor of the present invention includes a vibrating table 1, a slatted floor mold 2 is placed on the vibrating table 1, a frame 3 capable of horizontally moving left and right relative to the vibrating table 1 is arranged on the outside of the vibrating table 1, and a spreading mechanism, a shoveling and spreading mechanism for shoveling away excess concrete on the concrete mold, and a polishing mechanism for polishing the surface are installed on the frame 3.
[0032] As one of the embodiments of the present invention, walking beams 31 are respectively installed on the front and rear sides of the bottom of the frame 3, and the walking beams 31 on both sides are arranged in parallel. Walking wheels 32 are installed at both ends of the walking beams 31. Tracks can be installed on the ground, and the walking wheels 32 can move along the tracks.
[0033] The material distribution mechanism includes a storage hopper 41, a conveyor belt 42 and a material distribution hopper. The storage hopper 41 and the conveyor belt 42 are respectively installed on the top of the frame 3. The upper and lower parts of the storage hopper 41 are open. The conveyor belt 42 is horizontally arranged directly below the storage hopper 41. The material distribution hopper is vertically installed on the frame 3. The upper opening of the material distribution hopper is located at one end of the conveyor belt 42. A discharge port 43 is provided at one end of the storage hopper 41 close to the material distribution hopper, and the lower opening of the material distribution hopper is located above the slatted floor mold 2.
[0034] The material distributing bucket is a sleeve structure, and includes a lifting bucket 44 and a lifting bucket sleeve 45. The lifting bucket sleeve 45 is fixedly connected to the frame 3, and the lifting bucket 44 is slidably connected in the lifting bucket sleeve 45. A fastening bolt is installed on the lifting bucket sleeve 45. The height of the lifting bucket 44 can be adjusted, and the gap between the lower end of the lifting bucket 44 and the upper surface of the slatted floor mold 2 is used to control the height of the concrete on the slatted floor mold 2. When the lifting bucket 44 is lifted to a certain height position of the lifting bucket sleeve 45, the lifting bucket 44 and the lifting bucket sleeve 45 can be fixed by fastening bolts.
[0035] The shoveling and averaging mechanism is hinged on the side of the frame 3 close to the material hopper, the polishing mechanism is arranged above the vibration table 1 and hinged on the frame 3, a first lifting mechanism is arranged between the shoveling and averaging mechanism and the frame 3, and a second lifting mechanism is arranged between the polishing mechanism and the frame 3.
[0036] The shovel averaging mechanism includes a crossbeam 51, a first reduction motor 52, a bearing seat 53, an eccentric shaft 54, a bearing sleeve 55 and a shovel blade mounting seat 56. The bearing seat 53, the eccentric shaft 54, the bearing sleeve 55 and the shovel blade mounting seat 56 are recorded as a set of shovel leveling components. The shovel leveling components are provided with two sets. The first reduction motor 52 is installed on the crossbeam 51. The output shaft of the first reduction motor 52 extends downward and is transmission-connected with a driving sprocket 57. The driving sprocket 57 can adopt a double-row sprocket and can be transmission-connected with two chains at the same time. The two bearing seats 53 are symmetrically arranged on the first reduction motor 52. The motor 52 is fixedly connected to the crossbeam 51 on both sides, and the bearing seat 53 is rotatably connected to the eccentric shaft 54 through a bearing. The eccentric shaft 54 is transmission-connected with a driven sprocket 58, and the driven sprocket 58 is transmission-connected to the driving sprocket 57 through a chain. The eccentric part of the eccentric shaft 54 is rotationally connected to the bearing sleeve 55 through a bearing, and the bearing sleeve 55 is detachably connected to the shovel blade mounting seat 56 through bolts. The shovel averaging mechanism also includes a shovel blade 59, which is tilted, and the two ends of the shovel blade 59 are detachably connected to the two shovel blade mounting seats 56 through bolts.
[0037] An eccentric block 60 is installed at one end of the eccentric shaft 54. The eccentric block 60 is installed at the upper end of the eccentric shaft 54, and the eccentric block 60 can act as an energy storage device. Both ends of the eccentric shaft 54 are respectively processed with threads, and the two ends of the eccentric shaft 54 are respectively locked by nuts.
[0038] The first lifting mechanism includes a hinge plate 61 and a first hydraulic cylinder 62. Two hinge plates 61 are provided at each end of the cross beam 51. The two hinge plates 61 on the same side are arranged in parallel. One end of the hinge plate 61 is hinged to the frame 3, and the other end of the hinge plate 61 is hinged to the cross beam 51. Two first hydraulic cylinders 62 are symmetrically provided. The cylinder barrel of the first hydraulic cylinder 62 is hinged to the frame 3, and the piston rod of the first hydraulic cylinder 62 is hinged to the cross beam 51. The hinged part of the cylinder barrel of the first hydraulic cylinder 62 is higher than the hinged part of the piston rod of the first hydraulic cylinder 62.
[0039] The polishing mechanism includes a swing limiting sleeve 79, a swing limiting rod 78, a second reduction motor 77, a grinding disc 70, an adjusting rod and an adjusting sleeve 74. The grinding disc 70 is arranged horizontally. A boss 701 is arranged on the upper surface of the grinding disc 70. An inner hole with a keyway is processed in the boss 701. The inner hole is arranged vertically. A keyway is arranged on the output shaft of the second reduction motor 77. The grinding disc 70 is installed on the output shaft of the second reduction motor 77 through the inner hole with the keyway. The second reduction motor 77 is fixedly arranged on the second reduction motor seat 76. First ear plates 75 are respectively arranged on both sides of the second reduction motor seat 76. 1 and the second ear plate 752, the first ear plate 751 is hinged with a limited swing rod 78, the end of the limited swing rod 78 is sleeved in a limited swing sleeve 79, and the limited swing sleeve 79 is hinged on the frame 3, the second ear plate 752 is provided with multiple, and there are two adjusting rods, namely a first adjusting rod 731 and a second adjusting rod 732, one end of the first adjusting rod 731 is rotatably connected to the frame 3, and the other end is rotatably set in the adjusting sleeve 74, one end of the second adjusting rod 732 is rotatably connected to the second reduction motor seat 76 through the second ear plate 752, and the other end is rotatably set in the adjusting sleeve 74.
[0040] The second lifting mechanism includes a second hydraulic cylinder 72 and a connecting plate 71. The cylinder barrel of the second hydraulic cylinder 72 is hinged on the frame 3. The piston rod of the second hydraulic cylinder 72 is rotatably connected to the second reduction motor seat 76 through the second ear plate 752. Two connecting plates 71 are provided. The positions of the connecting plates 71 correspond to the upper and lower adjustment sleeves 74. The two ends of the connecting plates 71 are rotatably connected to the frame 3 and the side walls of the second reduction motor seat 76. The cylinder barrel of the second hydraulic cylinder 72 is higher than the piston rod of the second hydraulic cylinder 72.
[0041] The inner wall of the adjusting sleeve 74 is provided with an internal thread, one end of the adjusting sleeve 74 is a left-handed internal thread, and the other end is a right-handed internal thread. Both adjusting rods are provided with corresponding external threads. The first adjusting rod 731 and the second adjusting rod 732 are rotatably arranged at both ends of the adjusting sleeve 74.
[0042] The adjusting sleeve 74 and the adjusting rod are provided in two groups, which are respectively arranged at the front and rear sides of the second hydraulic cylinder 72 .
[0043] During operation, a slatted floor mold 2 is placed above the vibrating table 1, and the frame 3 is located outside the vibrating table 1 and can move horizontally left and right relative to the vibrating table 1. As one of the embodiments of the present invention, walking beams 31 are respectively installed on the front and rear sides of the bottom of the frame 3, and walking wheels 32 are installed at both ends of the walking beam 31. The horizontal movement of the frame 3 can be controlled by driving the walking wheels 32 installed on the walking beam 31, and the walking beam 31 can be driven to move by installing a reduction motor on the wheel axle of one of the walking wheels 32.
[0044] A conveyor belt 42 is installed above the frame 3, and a storage hopper 41 is installed above the conveyor belt 42. A distribution hopper is set on the right side of the conveyor belt 42. The distribution hopper is fixed on the frame 3. The height of the distribution hopper can be adjusted to adjust the gap between the lower end of the distribution hopper and the upper plane of the slatted floor mold 2, so as to control the height of the concrete on the slatted floor mold 2.
[0045] A shovel averaging mechanism is hingedly installed on the right side of the frame 3, and two first hydraulic cylinders 62 are installed between the shovel averaging mechanism and the frame 3. The extension and retraction of the piston rod of the first hydraulic cylinder 62 can control the rise and fall of the shovel averaging mechanism so that the shovel blade 59 installed on the shovel averaging mechanism contacts or leaves the upper surface of the slatted floor mold 2.
[0046] When the shovel averaging mechanism is not working, the piston rods of the two first hydraulic cylinders 62 are retracted, and at the same time, under the action of the hinge plates 61 on both sides, the crossbeam 51 is lifted upward, and the shovel blade 59 is away from the upper surface of the concrete slatted floor; when the shovel averaging mechanism is working, the piston rod of the first hydraulic cylinder 62 is extended, the crossbeam 51 is lowered, and the shovel blade 59 falls above the concrete slatted floor and contacts the concrete to be shoveled. The first reduction motor 52 works, driving the active sprocket 57 and the driven sprocket 58 to rotate, and the two eccentric shafts 54 rotate in the same direction at the same time, driving the two bearing sleeves 55 and the shovel blade mounting seat 56 to swing in the horizontal plane, thereby driving the shovel blade 59 to swing on the surface of the concrete slatted floor, and the excess concrete on the concrete slatted floor can be shoveled away.
[0047] The polishing mechanism is hinged on the frame 3 through a connecting plate 71, a swing limiting sleeve 79 and an adjusting sleeve 74. A second hydraulic cylinder 72 is provided between the frame 3 and the polishing mechanism. The extension and retraction of the piston rod of the second hydraulic cylinder 72 can control the rise and fall of the polishing mechanism.
[0048] When the concrete slatted floor needs to be polished, the piston rod of the second hydraulic cylinder 72 extends out, and the second adjusting rod 732 moves downward with the grinding disc 70, driving the adjusting sleeve 74 to rotate outside the first adjusting rod 731 and the second adjusting rod 732. At the same time, the swing limiter 8 moves in the swing limiter sleeve 79, thereby driving the second reduction motor 77 and the grinding disc 70 to descend. When the grinding disc 70 falls on the concrete slatted floor, the second hydraulic cylinder 72 stops moving and turns on the second reduction motor 77. The second reduction motor 77 drives the grinding disc 70 to rotate to polish the concrete slatted floor. After polishing is completed, the second reduction motor 77 stops rotating, and the piston rod of the second hydraulic cylinder 72 contracts, driving the polishing mechanism to rise, and the grinding disc 70 leaves the concrete slatted floor.
[0049] During operation, the material is distributed from the right end of the slatted floor mold 2, and the conveyor belt 42 is operated (the operation and driving of the conveyor belt 42 are prior art and will not be described in detail), and the concrete in the storage hopper 41 is sent to the distribution hopper; the concrete is distributed to the slatted floor mold 2 through the distribution hopper, and the distribution hopper moves from the right end to the left end of the slatted floor mold 2 (that is, the frame 3 moves from right to left relative to the vibration table 1), and the conveyor belt 42 stops operating to complete the distribution.
[0050] After the material is laid, the vibration motor of the vibration table 1 is started, and the vibration table 1 starts to vibrate (the vibration table is a prior art, and the specific structure is not repeated here), and the concrete in the slatted floor mold 2 is vibrated and compacted and the slurry is vibrated out, and then the vibration is stopped. While vibrating, the frame 3 is moved to the left side of the concrete slatted floor. After the vibration is completed, the piston rod of the first hydraulic cylinder 62 of the shoveling average spreading mechanism extends, the shoveling average spreading mechanism descends, and the shovel blade 59 falls to the working position and contacts the concrete to be shoveled. The first reduction motor 52 of the shoveling average spreading mechanism runs, driving the shovel blade 59 to swing in the horizontal plane, and the reduction motor installed on the walking ground beam works, and the frame 3 starts to move from left to right. When the grinding disc 70 of the polishing mechanism walks to the top of the concrete slatted floor, the piston rod of the second hydraulic cylinder 72 of the polishing mechanism extends, so that the grinding disc 70 falls on the concrete slatted floor. When the polishing mechanism falls, the second reduction motor 77 of the polishing mechanism runs, and the grinding disc 70 rotates to polish the concrete slatted floor. When the grinding disc 70 moves to the right end of the concrete slatted floor with the random frame 3, the polishing is completed.
[0051] After polishing is completed, the frame 3 is withdrawn and separated from the vibration table 1, and the concrete slatted floor is demoulded to complete the production of a concrete slatted floor.
[0052] The above embodiments do not impose any formal limitations on the shape, material, structure, etc. of the present invention. Any simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention are within the protection scope of the technical solution of the present invention.
Claims
1. A production device for a concrete slatted floor, comprising a vibrating table, on which a slatted floor mold is placed, characterized in that: The vibrating table is provided with a frame capable of horizontally moving relative to the vibrating table on the outside, on which a material distribution mechanism, a shoveling and spreading mechanism for shoveling away excess concrete on the concrete mold, and a polishing mechanism for polishing the surface are installed; The material distribution mechanism includes a storage hopper, a conveyor belt and a material distribution hopper. The storage hopper and the conveyor belt are respectively installed on the top of the frame. The upper and lower parts of the storage hopper are open. The conveyor belt is horizontally arranged just below the storage hopper. The material distribution hopper is vertically installed on the frame. The upper opening of the material distribution hopper is located at one end of the conveyor belt. A discharge port is opened at one end of the storage hopper close to the material distribution hopper. The lower opening of the material distribution hopper is located above the slatted floor mold. The shovel averaging mechanism is hinged on the side of the frame close to the material distributing hopper, the polishing mechanism is arranged above the vibration table and hinged on the frame, a first lifting mechanism is arranged between the shovel averaging mechanism and the frame, and a second lifting mechanism is arranged between the polishing mechanism and the frame; The shovel averaging mechanism includes a crossbeam, a first reduction motor, a bearing seat, an eccentric shaft, a bearing sleeve and a shovel blade mounting seat. The bearing seat, the eccentric shaft, the bearing sleeve and the shovel blade mounting seat are recorded as a set of shovel averaging components, and the shovel averaging components are provided with two sets. The first reduction motor is installed on the crossbeam, and the output shaft of the first reduction motor extends downward and is transmission-connected with a driving sprocket. Two bearing seats are symmetrically arranged on both sides of the first reduction motor and fixedly connected to the crossbeam. The bearing seat is rotatably connected to the eccentric shaft, and the eccentric shaft is transmission-connected with a driven sprocket. The driven sprocket is transmission-connected to the driving sprocket through a chain. The eccentric part of the eccentric shaft is rotationally connected to the bearing sleeve, and the shovel blade mounting seat is detachably connected to the bearing sleeve. The shovel blade mounting seat is also provided. The shovel blade is tilted, and the two ends of the shovel blade are detachably connected to the two shovel blade mounting seats by bolts. The polishing mechanism includes a swing limiting sleeve, a swing limiting rod, a second reduction motor, a grinding disc, an adjusting rod and an adjusting sleeve. The grinding disc is horizontally arranged, a boss is arranged on the upper surface of the grinding disc, an inner hole with a keyway is processed in the boss, the inner hole is vertically arranged, a keyway is arranged on the output shaft of the second reduction motor, the grinding disc is installed on the output shaft of the second reduction motor through the inner hole with the keyway, the second reduction motor is fixedly arranged on the second reduction motor seat, a first ear plate and a second ear plate are respectively arranged on both sides of the second reduction motor seat, a limited swing rod is hinged on the first ear plate, an end of the limited swing rod is sleeved in the swing limiting sleeve, the swing limiting sleeve is hinged on the frame, a plurality of second ear plates are arranged, and there are two adjusting rods, namely the first adjusting rod and the second adjusting rod, one end of the first adjusting rod is rotatably connected to the frame, and the other end is rotatably arranged in the adjusting sleeve, one end of the second adjusting rod is rotatably connected to the second reduction motor seat through the second ear plate, and the other end is rotatably arranged in the adjusting sleeve; The second lifting mechanism includes a second hydraulic cylinder and a connecting plate, the cylinder barrel of the second hydraulic cylinder is hinged on the frame, the piston rod of the second hydraulic cylinder is rotatably connected to the second reduction motor seat through the second ear plate, two connecting plates are provided, the positions of the connecting plates correspond to the upper and lower positions of the adjusting sleeve, and the two ends of the connecting plates are rotatably connected to the frame and the side wall of the second reduction motor seat respectively; The inner wall of the adjusting sleeve is provided with an internal thread, one end of the adjusting sleeve is a left-handed internal thread, and the other end is a right-handed internal thread. Both adjusting rods are correspondingly provided with external threads, and the first adjusting rod and the second adjusting rod are rotatably arranged at both ends of the adjusting sleeve.
2. The manufacturing device of a concrete slatted floor according to claim 1 is characterized in that: The first lifting mechanism includes a hinge plate and a first hydraulic cylinder. Two hinge plates are respectively provided at both ends of the cross beam. The two hinge plates on the same side are arranged in parallel. One end of the hinge plate is hinged to the frame, and the other end of the hinge plate is hinged to the cross beam. Two first hydraulic cylinders are symmetrically provided. The cylinder barrel of the first hydraulic cylinder is hinged to the frame, and the piston rod of the first hydraulic cylinder is hinged to the cross beam.
3. The manufacturing device of a concrete slatted floor according to claim 2 is characterized in that: An eccentric block is installed at one end of the eccentric shaft.
4. The manufacturing device of a concrete slatted floor according to claim 1 is characterized in that: There are two groups of adjusting sleeves and adjusting rods, which are respectively arranged on both sides of the second hydraulic cylinder.
5. A production device for a concrete slatted floor according to any one of claims 1 to 4, characterized in that: Walking beams are respectively installed on both sides of the bottom of the frame, the walking beams on both sides are arranged in parallel, and walking wheels are installed at both ends of the walking beams.
6. A production device for a concrete slatted floor according to any one of claims 1 to 4, characterized in that: The material distribution bucket is a sleeve structure, which includes a lifting bucket and a lifting bucket sleeve. The lifting bucket sleeve is fixedly connected to the frame, and the lifting bucket is slidably connected in the lifting bucket sleeve. Fastening bolts are installed on the lifting bucket sleeve.