A fast high-purity filling device for warhead cooling gas cylinders

By designing fast and high-purity charging equipment, the problems of leakage risks and uncertainty in high-pressure gas cylinders during transportation and storage are solved, and efficient and safe gas cylinder filling is achieved to ensure the flight stability and control accuracy of the missile.

CN110207004BActive Publication Date: 2024-12-03SHANGHAI WUDAO ELECTROMECHANICAL EQUIP CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN201910590242.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-07-02
Publication Date
2024-12-03
Estimated Expiration
2039-07-02

AI Technical Summary

Technical Problem

Existing high-pressure gas cylinders have a risk of leakage during long-distance transportation and storage, and the filling process is uncertain, which affects the flight stability and control accuracy of the missile.

Method used

A fast and high-purity charging equipment including high-pressure gas supply module, inflation execution module, inflation product module and gas replacement module is designed to achieve efficient and safe use of components such as booster pumps, filters, cooling gas delivery pipelines and vacuum pumps. Gas filling and replacement are supplemented by infrared thermometer and cooling nozzle for temperature detection and cooling.

Benefits of technology

It realizes fast and efficient filling of gas cylinders, reduces energy consumption, improves charging efficiency and gas purity, is suitable for on-board operations, and ensures the flight stability and control accuracy of missiles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110207004B_ABST
    Figure CN110207004B_ABST
Patent Text Reader

Abstract

The present application discloses a rapid high-purity filling device for warhead cooling gas cylinders, including: a high-pressure gas supply module, which is used to store high-pressure gas and deliver high-pressure gas to a charging execution module; a charging execution module, wherein the high-pressure gas supply port I in the charging execution module is connected to the high-pressure gas supply port II in the high-pressure gas supply module; and at least one charging product module, which is connected to the charging execution module, and the charging execution module delivers high-pressure gas to achieve gas filling of the charging product module. The present application provides cooling gas filling efficiency while ensuring safety and reliability by establishing a closed-loop control filling method for gas cylinder temperature and charging rate; and the present application has the advantages of high gas cylinder filling efficiency, vehicle-mounted mobility, high terrain adaptability, high charging purity, etc., and can achieve one-to-many operations, and achieve advantages such as point-to-surface and multi-level layout.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of high-pressure gas filling of gas cylinders, and in particular relates to a rapid high-purity filling device for warhead cooling gas cylinders. Background Art

[0002] During the flight of a missile, due to the friction between the missile and the air at high speed, the warhead will generate a lot of heat. This part of the heat will be transferred to the inside of the missile body through heat conduction. When the temperature reaches a high level, the guidance, communication, control and other systems inside the missile will have an adverse effect on its performance during operation, making its flight stability worse and the control accuracy reduced. Therefore, high-pressure gas is used to cool the electrical components of the missile during flight.

[0003] Due to the dangers of high-pressure gas cylinders during long-distance transportation and storage, as well as the risk of leakage during long-term storage, the pre-launch filling mode is often adopted. The existing operation method is to transport the missile body to the high-pressure filling station and return it to the launch point after filling. There are many uncertainties in this process. Therefore, it is necessary to develop relevant equipment and formulate effective solutions. Summary of the invention

[0004] In view of the above-mentioned shortcomings or deficiencies of the prior art, the technical problem to be solved by the present application is to provide a fast high-purity filling device for warhead cooling gas cylinders.

[0005] To solve the above technical problems, this application is implemented through the following technical solutions:

[0006] A rapid high-purity filling device for a warhead cooling gas cylinder comprises: a high-pressure gas supply module, which is used to store high-pressure gas and deliver the high-pressure gas to a charging execution module;

[0007] A charging execution module, wherein the high-pressure air supply port I in the charging execution module is connected to the high-pressure air supply port II in the high-pressure air supply module;

[0008] And at least one inflatable product module is connected to the inflatable execution module, and the inflatable product module is filled with gas by delivering high-pressure gas through the inflatable execution module.

[0009] Furthermore, the above-mentioned device further comprises: a gas replacement module for replacing gas in the inflatable product module, and the gas replacement module is arranged on the pipeline between the inflation execution module and the inflatable product module.

[0010] Furthermore, in the above-mentioned device, the high-pressure gas supply module includes: a booster pump, a booster pump outlet valve, a high-pressure gas storage bottle and a high-pressure gas supply port II, wherein the booster pump is equipped with a low-pressure gas source port, the booster pump outlet valve is arranged on the pipeline between the booster pump and the high-pressure gas storage bottle, and the high-pressure gas supply port II is arranged on the first gas supply pipeline of the high-pressure gas storage bottle.

[0011] Furthermore, in the above-mentioned device, the high-pressure air supply module also includes: an air supply port, a boost pump control valve and a drive exhaust port, the air supply port is arranged on the second air supply pipeline of the boost pump, the boost pump control valve is arranged on the second air supply pipeline between the air supply port and the boost pump, and the drive exhaust port is arranged on the boost pump; wherein, a power source is provided to the boost pump through the second air supply pipeline.

[0012] Furthermore, in the above-mentioned device, a cooling gas delivery pipeline is also provided between the air supply port and the booster pump, and the cooling gas delivery pipeline is sequentially provided with a cooling gas regulating valve and a cooling air supply port.

[0013] Furthermore, in the above-mentioned device, the high-pressure gas storage cylinder is provided with a gas source pressure sensor and a gas source safety valve.

[0014] Furthermore, in the above-mentioned device, the first air supply pipeline is also provided with a high-pressure filter, a high-pressure stop valve and a pipeline pressure sensor in sequence.

[0015] Furthermore, in the above-mentioned device, the inflation execution module includes: a high-pressure air supply port I, a manual stop valve, an air supply solenoid valve, a pressure reducer, a low-pressure pressure sensor, a low-pressure air supply valve I, a low-pressure air supply valve II and a low-pressure air supply port,

[0016] The high-pressure air supply port I is arranged on the first air supply pipeline and connected to the high-pressure air port II;

[0017] The manual stop valve, the pressure reducing valve, the low-pressure pressure sensor, and the low-pressure air supply valve I are sequentially arranged on the third air supply pipeline.

[0018] The air supply solenoid valve is arranged on the fourth air supply pipeline, wherein the fourth air supply pipeline is arranged in parallel with the third air supply pipeline and both are connected to the first air supply pipeline;

[0019] The fourth air supply pipeline is connected in parallel with the third air supply pipeline and then connected to at least one fifth air supply pipeline, and the fifth air supply pipeline is connected to the inflatable product module corresponding to it.

[0020] Furthermore, in the above-mentioned device, the inflation execution module also includes: a low-pressure air supply valve II and a low-pressure air supply port, the low-pressure air supply valve II and the low-pressure air supply port are sequentially arranged on a sixth air supply pipeline, and the sixth air supply pipeline is connected to the third air supply pipeline.

[0021] Furthermore, in the above-mentioned device, one of the fifth air supply pipelines is provided with an exhaust solenoid valve.

[0022] Furthermore, in the above-mentioned device, the fifth air supply pipeline is also provided with an air charging solenoid valve, an air charging pressure sensor and an air charging regulating valve.

[0023] Furthermore, in the above-mentioned device, the inflatable product module includes a product inflation valve and a cooling gas cylinder, the product inflation valve is connected to the inflation solenoid valve through an inflation pipeline, and the product inflation valve is installed at the inlet of the cooling gas cylinder.

[0024] Furthermore, in the above-mentioned device, the gas replacement module includes: a vacuum pump, a vacuum pump motor, a vacuum gauge, a vacuum gauge, a vacuum diaphragm valve and at least one vacuum solenoid valve,

[0025] The vacuum pump is connected to the vacuum gauge via a vacuum gauge tube, and the vacuum pump is also connected to the vacuum pump motor;

[0026] The vacuum diaphragm valve is installed on a first vacuum extraction pipeline, and the first vacuum extraction pipeline is connected to a pipeline arranged between the vacuum pump and the vacuum gauge;

[0027] The first vacuum extraction pipeline is connected to the fifth air supply pipeline through at least one second vacuum extraction pipeline, wherein the vacuum solenoid valve is arranged on the second vacuum extraction pipeline, and the number of the vacuum solenoid valve and the second vacuum extraction pipeline is the same.

[0028] Furthermore, in the above-mentioned device, it further comprises at least one auxiliary module, and the number of the auxiliary modules is the same as the number of the inflatable product modules;

[0029] The auxiliary module comprises: an infrared thermometer and at least one cooling nozzle, wherein the infrared thermometer is installed near the cooling gas cylinder in the inflatable product module, and the cooling nozzle is also arranged near the cooling gas cylinder;

[0030] The cooling nozzle is connected to the cooling air supply port, or the cooling nozzle is connected to the driving exhaust port.

[0031] Compared with the prior art, this application has the following technical effects:

[0032] This application can realize the rapid filling and efficient replacement of the product warhead cooling cylinder; and its small size and light weight determine that it can realize vehicle-mounted operation and low energy consumption, which expands its application scenarios;

[0033] The present application improves the filling efficiency of the cooling gas cylinder through the organic coordination of the high-pressure gas supply module, the charging execution module, the charging product module, the gas replacement module and the auxiliary module, and effectively utilizes the exhaust gas of the booster pump for cooling the gas cylinder, thereby achieving the purpose of energy saving and environmental protection;

[0034] In the process of filling the cooling gas cylinder of the present application, the gas replacement module is used to evacuate the cylinder, and the charging execution module can supply high-purity gas with the required flow rate and pressure to clean and sweep the cylinder; the auxiliary module can detect the temperature of the cooling gas cylinder during the filling process and adopt gas cooling to reduce the temperature, thereby improving the filling efficiency while ensuring the safety of the gas cylinder;

[0035] The present application provides cooling gas filling efficiency while ensuring safety and reliability by establishing a closed-loop control filling method for gas cylinder temperature and filling rate.

[0036] The present application has the advantages of high gas cylinder filling efficiency, vehicle-mounted mobility, high terrain adaptability, high inflation purity, etc. It can realize one-to-many operations, achieve point-to-surface, multi-level layout, etc. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Other features, objects and advantages of the present application will become more apparent by reading the detailed description of non-limiting embodiments made with reference to the following drawings:

[0038] Figure 1 : Assembly schematic diagram of the rapid high-purity filling equipment for warhead cooling gas cylinders of the present application;

[0039] Figure 2 : Partial assembly principle of the rapid high-purity filling equipment of the warhead cooling gas cylinder of this application Figure 1 ;

[0040] Figure 3 : Partial assembly principle of the rapid high-purity filling equipment of the warhead cooling gas cylinder of this application Figure 2 .

[0041] Reference numerals:

[0042] In the figure: 1-high pressure air supply port Ⅰ; 2-manual stop valve; 3-air supply solenoid valve; 4-pressure reducer; 5-exhaust solenoid valve; 6-low pressure pressure sensor; 7-low pressure air supply valve Ⅰ; 8-low pressure air supply valve Ⅱ; 9-charging solenoid valve Ⅰ; 10-low pressure air supply port; 11-charging pressure sensor Ⅰ; 12-charging regulating valve Ⅰ; 13-product charging valve Ⅰ; 14-infrared thermometer Ⅰ; 15-cooling gas cylinder Ⅰ; 16-cooling nozzle Ⅰ; 17-cooling nozzle Ⅱ; 18-cooling nozzle Ⅲ; 19-vacuum gauge; 20-cooling nozzle Ⅳ; 21-infrared thermometer Ⅱ; 22-cooling gas cylinder Ⅱ; 23-vacuum pump motor; 24-product charging valve Ⅱ; 25 - vacuum pump; 26 - vacuum gauge; 27 - charging regulating valve II; 28 - charging pressure sensor II; 29 - vacuum diaphragm valve; 30 - vacuum solenoid valve I; 31 - charging solenoid valve II; 32 - vacuum solenoid valve II; 33 - air source pressure sensor; 34 - air source pressure sensor; 35 - air source safety valve; 36 - air supply port; 37 - high pressure filter; 38 - high pressure stop valve; 39 - pipeline pressure sensor; 40 - high pressure air supply port II; 41 - cooling air supply port; 42 - low pressure air source; 43 - booster pump; 44 - drive exhaust port; 45 - cooling air regulating valve; 46 - booster pump control valve; 47 - booster pump outlet valve; 48 - high pressure gas storage cylinder. DETAILED DESCRIPTION

[0043] The concept, specific structure and technical effects of the present application will be further described below in conjunction with the accompanying drawings to fully understand the purpose, characteristics and effects of the present application.

[0044] like Figures 1 to 3 As shown, in this embodiment, a rapid high-purity filling device for a warhead cooling gas cylinder includes: a high-pressure gas supply module, which is used to store high-pressure gas and deliver high-pressure gas to a charging execution module; a charging execution module, wherein a high-pressure gas supply port Ⅰ 1 in the charging execution module is connected to a high-pressure gas supply port Ⅱ 40 in the high-pressure gas supply module; and at least one charging product module, which is connected to the charging execution module, and the charging execution module delivers high-pressure gas to achieve gas filling of the charging product module. In this embodiment, the number of the charging product modules is preferably two, but the number of the charging product modules does not limit the scope of protection of this application.

[0045] This embodiment further includes: a gas replacement module for performing gas replacement on the inflatable product module, and the gas replacement module is arranged on a pipeline between the inflation execution module and the inflatable product module.

[0046] The present application forms an organic whole between the above-mentioned modules to achieve the replacement, purging, filling and process control of the gas inside the cooling cylinder before product filling; it has the advantages of high cylinder filling efficiency, vehicle-mounted mobility, high terrain adaptability, high inflation purity, etc., and can realize one-to-many operations, achieve point-to-surface, multi-level layout, etc.

[0047] The gas replacement module includes: a vacuum pump 25, a vacuum pump motor 23, a vacuum gauge 19, a vacuum gauge 26, a vacuum diaphragm valve 29 and at least one vacuum solenoid valve, wherein the number of the vacuum solenoid valves corresponds to the inflatable product module, that is, in this embodiment, it is preferably set to two.

[0048] The vacuum pump 25 is connected to the vacuum gauge 19 through the vacuum gauge 26, and the vacuum pump 25 is also connected to the vacuum pump motor 23; the vacuum diaphragm valve 29 is installed on the first vacuum extraction pipeline, and the first vacuum extraction pipeline is connected to the pipeline arranged between the vacuum pump 25 and the vacuum gauge 26; the first vacuum extraction pipeline is connected to the fifth gas supply pipeline through one of the second vacuum extraction pipelines, wherein the vacuum solenoid valve II 32 is arranged on the second vacuum extraction pipeline. Similarly, the first vacuum extraction pipeline is connected to another fifth gas supply pipeline through another second vacuum extraction pipeline, wherein the vacuum solenoid valve I 30 is arranged on the second vacuum extraction pipeline. The gas replacement module can realize the extraction of residual atmospheric pressure gas with low purity in the cooling gas cylinder, and realize the rapid replacement and purification of the gas in the cooling gas cylinder.

[0049] The high-pressure gas supply module includes: a booster pump 43, a booster pump outlet valve 47, a high-pressure gas cylinder 48 and a high-pressure gas supply port II 40, wherein the booster pump 43 is provided with a low-pressure gas source port 42, the booster pump outlet valve is provided on the pipeline between the booster pump 43 and the high-pressure gas cylinder 48, and the high-pressure gas supply port II 40 is provided on the first gas supply pipeline of the high-pressure gas cylinder. The high-pressure gas supply module boosts the low-pressure gas through the booster pump 43 to reach the pressure required for filling the gas cylinder, and is equipped with a high-pressure gas cylinder 48 to ensure a stable and sufficient supply of gas.

[0050] The high-pressure air supply module also includes: an air supply port, a boost pump control valve 46 and a driven exhaust port 44, wherein the air supply port is arranged on the second air supply pipeline of the boost pump 43, the boost pump control valve 46 is arranged on the second air supply pipeline between the air supply port and the boost pump 43, and the driven exhaust port 44 is arranged on the boost pump 43; wherein, a power source is provided to the boost pump 43 through the second air supply pipeline, and the air supply amount can be adjusted through the boost pump control valve 46, wherein the driven exhaust port 44 is used to discharge excess gas, wherein the driven exhaust port 44 can be connected to the cooling nozzle described below, and the low-temperature gas is transported through the cooling nozzle to cool the cooling gas cylinder described below, thereby achieving the purpose of energy saving and environmental protection.

[0051] Furthermore, a cooling gas delivery pipeline is provided between the gas supply port and the booster pump 43, and the cooling gas delivery pipeline is sequentially provided with a cooling gas regulating valve 45 and a cooling gas supply port 41. By closing the booster pump control valve 46 described above, the cooling gas regulating valve 45 is opened, and low-temperature gas is delivered to the cooling nozzle described below through the cooling gas delivery pipeline to cool the cooling gas cylinder described below. The cooling gas regulating valve 45 can adjust the cooling gas flow rate according to the temperature of the cooling gas cylinder Ⅰ 15 and the cooling gas cylinder Ⅱ 22 detected by the infrared thermometer Ⅰ 14 and the infrared thermometer Ⅱ 21 described below, so as to improve the filling efficiency.

[0052] Among them, the high-pressure gas storage cylinder 48 is equipped with a gas source pressure sensor and a gas source safety valve 35. Of course, in this embodiment, two gas source pressure sensors can be set to prevent the normal operation of the high-pressure inflation module from being affected when one of them fails. It can be set with a gas source pressure sensor I 33 and a gas source pressure sensor II 34.

[0053] Furthermore, the first gas supply pipeline is also provided with a high-pressure filter 37, a high-pressure shut-off valve 38 and a pipeline pressure sensor 39 in sequence, wherein the high-pressure filter 37 can filter impurities in the high-pressure gas delivered by the high-pressure gas storage pump to ensure the purity of the high-pressure gas.

[0054] In this embodiment, the inflation execution module includes: a high-pressure air supply port Ⅰ 1, a manual stop valve 2, an air supply solenoid valve 3, a pressure reducer, a low-pressure pressure sensor 6, a low-pressure air supply valve Ⅰ 7, a low-pressure air supply valve Ⅱ 8 and a low-pressure air supply port 10, wherein the high-pressure air supply port Ⅰ 1 is arranged on the first air supply pipeline and is connected to the high-pressure air port Ⅱ; the manual stop valve 2, the pressure reducing valve 4, the low-pressure pressure sensor 6, and the low-pressure air supply valve Ⅰ 7 are arranged on the third air supply pipeline in sequence, and the air supply solenoid valve 3 is arranged on the fourth air supply pipeline, wherein the fourth air supply pipeline is arranged in parallel with the third air supply pipeline, and both are connected to the first air supply pipeline; the fourth air supply pipeline is connected in parallel with the third air supply pipeline and is connected to at least one fifth air supply pipeline, and the fifth air supply pipeline is connected to the corresponding inflation product module.

[0055] In this embodiment, the number of the fifth gas supply pipelines is preferably two, that is, the charging execution module has two filling stations, which can simultaneously perform filling operations of two cooling gas cylinders in different steps, thereby improving the filling efficiency of the cooling gas cylinders.

[0056] Furthermore, the inflation execution module further includes: a low-pressure air supply valve II 8 and a low-pressure air supply port 10, wherein the low-pressure air supply valve II 8 and the low-pressure air supply port 10 are sequentially arranged on a sixth air supply pipeline, and the sixth air supply pipeline is connected to the third air supply pipeline. The low-pressure air supply port 10 and the low-pressure air supply valve II 8 can supply gas of a specific pressure to the device.

[0057] One of the fifth gas supply pipelines is also provided with a gas charging solenoid valve I 9, a gas charging pressure sensor I 11 and a gas charging regulating valve I 12, and another of the fifth gas supply pipelines is also provided with a gas charging solenoid valve II 31, a gas charging pressure sensor II 28 and a gas charging regulating valve II 27. Each of the fifth gas supply pipelines is connected to a corresponding gas charging product module. The gas charging regulating valve I 12 and the gas charging regulating valve II 27 can realize the regulation and control of the gas cylinder filling speed.

[0058] An exhaust solenoid valve 5 is disposed on one of the fifth gas supply pipelines, and the exhaust solenoid valve 5 is used to discharge the gas in the cooling gas cylinder to prepare for rapid and high-purity filling of the cooling gas cylinder.

[0059] In this embodiment, the inflatable product module includes a product inflating valve I 13, a cooling gas bottle I 15, a product inflating valve II 24 and a cooling gas bottle II 22. The product inflating valve I 13 is connected to the inflating solenoid valve I 9 through a first inflating pipeline, and the product inflating valve I 13 is installed at the inlet of the cooling gas bottle I 15. Similarly, the product inflating valve II 24 is connected to the inflating solenoid valve II 31 through a second inflating pipeline, and the product inflating valve II 24 is installed at the inlet of the cooling gas bottle II 22. Among them, the cooling gas bottle I 15 and the cooling gas bottle II 22 can alternately and independently perform vacuuming and gas filling operations.

[0060] This embodiment further comprises at least one auxiliary module, and the number of the auxiliary modules is the same as the number of the inflatable product modules. In this embodiment, the number of the auxiliary modules is preferably two.

[0061] One of the auxiliary modules includes: an infrared thermometer I 14 and at least one cooling nozzle. In this embodiment, the number of cooling nozzles is two, namely, cooling nozzle I 16 and cooling nozzle II 17. The infrared thermometer I 14 is installed near the cooling gas cylinder I 15 in the inflatable product module, and the cooling nozzle I 16 and cooling nozzle II 17 are also arranged near the cooling gas cylinder I 15; the cooling nozzle I 16 and cooling nozzle II 17 are both connected to the cooling air supply port 41, or the cooling nozzle I 16 and cooling nozzle II 17 are both connected to the driving exhaust port 44.

[0062] As above, another auxiliary module includes: an infrared thermometer II 21 and at least one cooling nozzle. In this embodiment, the number of cooling nozzles is two, namely, cooling nozzle III 18 and cooling nozzle IV 20. The infrared thermometer II 21 is installed near the cooling gas bottle II 22 in the inflatable product module, and the cooling nozzle III 18 and cooling nozzle IV 20 are also arranged near the cooling gas bottle II 22; the cooling nozzle III 18 and cooling nozzle IV 20 are both connected to the cooling air supply port 41, or the cooling nozzle III 18 and cooling nozzle IV 20 are both connected to the driving exhaust port 44.

[0063] The infrared thermometer I 14 and the infrared thermometer II 21 can detect the temperature of the cooling gas cylinder during the filling process in a non-contact manner to avoid overheating and damage to the bottle body. The cooling nozzle I 16, the cooling nozzle II 17, the cooling nozzle III 18 and the cooling nozzle IV 20 can cool the gas cylinder during the filling process to achieve rapid filling of the gas cylinder.

[0064] In this embodiment, the cooling gas cylinder is evacuated by the gas replacement module during the filling process, and the gas filling execution module can supply high-purity gas with the required flow rate and pressure to clean and sweep the gas cylinder. The auxiliary module can detect the temperature of the cooling gas cylinder during the filling process and adopt gas cooling to reduce the temperature, thereby improving the filling efficiency while ensuring the safety of the gas cylinder.

[0065] The specific implementation process is as follows:

[0066] Initial state: Before filling, observe the pressure in the high-pressure gas cylinder 48 to ensure that it is greater than the pressure required for filling. Check that all manual valves, solenoid valves and regulating valves are in the closed state, and the pressure reducer is in the unloading state. Turn on the vacuum pump motor 23 to perform vacuum operation, open the vacuum diaphragm valve 29, vacuum solenoid valve II 32, charging regulating valve I 12 and product charging valve I 13, and start to extract the residual gas in the cooling gas cylinder I 15. When the pressure in the gas cylinder is lower than 100 Pa, close the vacuum diaphragm valve 29 and vacuum solenoid valve II 32. Open the high-pressure stop valve 38 and the manual stop valve 2, adjust the pressure of the pressure reducer 4 to 1 MPa, open the low-pressure gas supply valve Ⅰ 7 and the charging solenoid valve Ⅰ 9, and the pressure in the cooling gas cylinder Ⅰ 15 will be pressed to 1 MPa. After the pressure stabilizes, close the manual stop valve 2 and the low-pressure gas supply valve Ⅰ 7, open the exhaust solenoid valve 5, and the pressure in the cooling gas cylinder Ⅰ 15 is discharged to the normal pressure level, and close the exhaust solenoid valve 5. Open the vacuum diaphragm valve 29 and the vacuum solenoid valve Ⅱ 32 to evacuate the cooling gas cylinder Ⅰ 15 to 100 Pa again, and then close the vacuum diaphragm valve 29 and the vacuum solenoid valve Ⅱ 32. Open the manual stop valve 2 and the low-pressure gas supply valve Ⅰ 7, and start to fill the cooling gas cylinder Ⅰ 15 with gas. Assuming that the gas filling pressure of the cooling gas cylinder Ⅰ 15 is 35 MPa, adjust the pressure of the pressure reducer 4 to 10 MPa, and enter the gas filling process. The booster pump 43 is turned on, and the booster pump outlet valve 47 is opened to continuously supply gas to the high-pressure gas storage cylinder 48. According to the feedback pressure signal of the gas source pressure sensor Ⅰ33 or the gas source pressure sensor Ⅱ34, the booster pump 43 stops working after reaching the rated value. The infrared thermometer Ⅰ 14 can detect the surface temperature of the cooling gas cylinder Ⅰ 15. When the temperature exceeds the specified value, the cooling nozzle Ⅰ 16 and the cooling nozzle Ⅱ 17 start to spray cooling gas. The source of cooling gas has two parts, the cooling gas supply port 41 and the driving exhaust port 44. First, the driving exhaust port 44 is used for cooling. When the temperature continues to rise, the cooling gas regulating valve 45 is opened to increase the cooling gas supply. When the opening of the cooling gas regulating valve 45 reaches the maximum and the temperature continues to rise, the charging regulating valve Ⅰ 12 is closed to reduce the filling rate. The above process is completed by program closed-loop control to realize the automation of the charging process. When the pressure of the cooling gas cylinder Ⅰ 15 reaches 9 MPa, the gas supply pressure is adjusted to 20 MPa. When the pressure of the cooling gas cylinder Ⅰ 15 reaches 19 MPa, close the manual stop valve 2 and the low-pressure gas supply valve Ⅰ 7, and unload the pressure reducer 4. Open the gas supply solenoid valve 3 and start the direct charging mode. During the charging process, the pressure difference between the gas source and the pressure in the cooling gas cylinder Ⅰ 15 is always sufficient to ensure that the charging rate is large enough. After the pressure in the cooling gas cylinder Ⅰ 15 reaches the target value, close the charging solenoid valve Ⅰ 9, the charging regulating valve Ⅰ 12 and the product charging valve Ⅰ 13.

[0067] The vacuum replacement and gas filling process of cooling gas cylinder II 22 is the same as that of cooling gas cylinder I 15, specifically:

[0068] Initial state: Before filling, observe the pressure in the high-pressure gas cylinder 48 to ensure that it is greater than the pressure required for filling. Check that all manual valves, solenoid valves and regulating valves are in the closed state, and the pressure reducer is in the unloading state. Turn on the vacuum pump motor 23 to perform vacuum operation, open the vacuum diaphragm valve 29, vacuum solenoid valve I 30, charging regulating valve II 27 and product charging valve II 24, and start to extract the residual gas in the cooling gas cylinder II 22. When the pressure in the gas cylinder is lower than 100Pa, close the vacuum diaphragm valve 29 and vacuum solenoid valve I 30. Open the high-pressure stop valve 38 and the manual stop valve 2, adjust the pressure of the pressure reducer 4 to 1MPa, open the low-pressure gas supply valve Ⅰ 7 and the charging solenoid valve Ⅱ 33, and the pressure in the cooling gas cylinder Ⅱ 22 will be pressed to 1MPa. After the pressure stabilizes, close the manual stop valve 2 and the low-pressure gas supply valve Ⅰ 7, open the exhaust solenoid valve 5, and the pressure in the cooling gas cylinder Ⅱ 22 is discharged to the normal pressure level, and close the exhaust solenoid valve 5. Open the vacuum diaphragm valve 29 and the vacuum solenoid valve Ⅰ 30 to evacuate the cooling gas cylinder Ⅱ 22 to 100Pa again, and then close the vacuum diaphragm valve 29 and the vacuum solenoid valve Ⅰ 30. Open the manual stop valve 2 and the low-pressure gas supply valve Ⅰ 7, and start to fill the cooling gas cylinder Ⅱ 22 with gas. Assuming that the gas filling pressure of the cooling gas cylinder Ⅱ 22 is 35MPa, adjust the pressure of the pressure reducer 4 to 10MPa, and enter the gas filling process. The booster pump 43 is turned on, and the booster pump outlet valve 47 is opened to continuously supply gas to the high-pressure gas storage cylinder 48. According to the feedback pressure signal of the gas source pressure sensor I33 or the gas source pressure sensor II34, the booster pump 43 stops working after reaching the rated value. The infrared thermometer II 21 can detect the surface temperature of the cooling gas cylinder II 22. When the temperature exceeds the specified value, the cooling nozzle III 18 and the cooling nozzle IV 20 start to spray cooling gas. The source of cooling gas has two parts, the cooling gas supply port 41 and the driving exhaust port 44. First, the driving exhaust port 44 is used for cooling. When the temperature continues to rise, the cooling gas regulating valve 45 is opened to increase the cooling gas supply. When the opening of the cooling gas regulating valve 45 reaches the maximum and the temperature continues to rise, the charging regulating valve II 27 is closed to reduce the filling rate. The above process is completed by program closed-loop control to realize the automation of the charging process. When the pressure of the cooling gas cylinder II 22 reaches 9 MPa, the gas supply pressure is adjusted to 20 MPa. When the pressure of cooling gas cylinder II 22 reaches 19 MPa, close the manual stop valve 2 and the low-pressure gas supply valve I 7, and unload the pressure reducer 4. Open the gas supply solenoid valve 3 and start the direct charging mode. During the charging process, the pressure difference between the gas source and the pressure in the cooling gas cylinder II 22 is always sufficient to ensure that the charging rate is large enough. After the pressure in the cooling gas cylinder II 22 reaches the target value, close the charging solenoid valve II 31, the charging regulating valve II 27 and the product charging valve II 24.

[0069] When the cooling gas cylinder Ⅰ15 is filled with gas, the present application can perform a vacuum replacement operation on the cooling gas cylinder Ⅱ22, thereby maximizing the gas filling efficiency and ensuring the purity of the gas entering the cooling gas cylinders Ⅰ, Ⅱ15, and 22.

[0070] The above embodiments are only used to illustrate the technical solution of the present application but not to limit it. The present application is described in detail with reference to the preferred embodiments. It should be understood by those skilled in the art that the technical solution of the present application can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present application, and should be included in the scope of the claims of the present application.

Claims

1. A fast high-purity filling device for warhead cooling gas cylinders, It is characterized in that include: A high-pressure gas supply module, which is used to store high-pressure gas and deliver high-pressure gas to the inflation execution module; A charging execution module, wherein the high-pressure air supply port I in the charging execution module is connected to the high-pressure air supply port II in the high-pressure air supply module; And at least one inflatable product module, which is connected to the inflatable execution module, through the inflatable execution module to deliver high-pressure gas, to achieve gas filling of the inflatable product module; Also included: a gas replacement module for replacing the gas in the inflatable product module, the gas replacement module is disposed on the pipeline between the inflatable execution module and the inflatable product module; The inflatable product module includes a product inflation valve and a cooling gas cylinder; At least one auxiliary module, used to detect the temperature of the cooling gas cylinder during the filling process and reduce the temperature by gas cooling; The auxiliary module comprises: an infrared thermometer and at least one cooling nozzle, wherein the infrared thermometer is installed near the cooling gas cylinder in the inflatable product module, and the cooling nozzle is also arranged near the cooling gas cylinder; The charging execution module has two filling stations, which can simultaneously perform the filling operations of two cooling gas cylinders at different steps; The inflation execution module includes: a high-pressure air supply port I, a manual stop valve, an air supply solenoid valve, a pressure reducer, a low-pressure pressure sensor, a low-pressure air supply valve I, a low-pressure air supply valve II and a low-pressure air supply port. The high-pressure gas supply port I is arranged on the first gas supply pipeline and connected to the high-pressure gas supply port II; The manual stop valve, the pressure reducer, the low-pressure pressure sensor, and the low-pressure air supply valve I are sequentially arranged on the third air supply pipeline. The air supply solenoid valve is arranged on the fourth air supply pipeline, wherein the fourth air supply pipeline is arranged in parallel with the third air supply pipeline and both are connected to the first air supply pipeline; The fourth air supply pipeline is connected in parallel with the third air supply pipeline and then connected to at least one fifth air supply pipeline, and the fifth air supply pipeline is connected to the inflatable product module corresponding to it; The inflation execution module also includes: a low-pressure air supply valve II and a low-pressure air supply port, the low-pressure air supply valve II and the low-pressure air supply port are sequentially arranged on a sixth air supply pipeline, and the sixth air supply pipeline is connected to the third air supply pipeline.

2. The rapid high-purity filling equipment for warhead cooling gas cylinders according to claim 1, It is characterized in that The high-pressure gas supply module includes: a booster pump, a booster pump outlet valve, a high-pressure gas storage bottle and a high-pressure gas supply port II, wherein the booster pump is equipped with a low-pressure gas source port, the booster pump outlet valve is arranged on the pipeline between the booster pump and the high-pressure gas storage bottle, and the high-pressure gas supply port II is arranged on the first gas supply pipeline of the high-pressure gas storage bottle.

3. The rapid high-purity filling equipment for warhead cooling gas cylinders according to claim 1, It is characterized in that The high-pressure air supply module also includes: an air supply port, a boost pump control valve and a drive exhaust port, the air supply port is arranged on the second air supply pipeline of the boost pump, the boost pump control valve is arranged on the second air supply pipeline between the air supply port and the boost pump, and the drive exhaust port is arranged on the boost pump; wherein, a power source is provided to the boost pump through the second air supply pipeline.

4. The rapid high-purity filling equipment for warhead cooling gas cylinders according to claim 3, It is characterized in that A cooling air delivery pipeline is also provided between the air supply port and the booster pump, and the cooling air delivery pipeline is sequentially provided with a cooling air regulating valve and a cooling air supply port.

5. The rapid high-purity filling equipment for warhead cooling gas cylinders according to claim 3, It is characterized in that The high-pressure gas storage cylinder is provided with a gas source pressure sensor and a gas source safety valve.

6. The rapid high-purity filling equipment for warhead cooling gas cylinders according to claim 3, It is characterized in that The first air supply pipeline is also provided with a high-pressure filter, a high-pressure stop valve and a pipeline pressure sensor in sequence.

7. The rapid high-purity filling equipment for warhead cooling gas cylinders according to claim 1, It is characterized in that One of the fifth air supply pipelines is provided with an exhaust solenoid valve.

8. The rapid high-purity filling equipment for warhead cooling gas cylinders according to claim 1, It is characterized in that The fifth air supply pipeline is also provided with an air charging solenoid valve, an air charging pressure sensor and an air charging regulating valve.

9. The rapid high-purity filling equipment for warhead cooling gas cylinders according to claim 8, It is characterized in that The product inflation valve is connected to the inflation solenoid valve through an inflation pipeline, and the product inflation valve is installed at the inlet of the cooling gas cylinder.

10. The rapid high-purity filling equipment for warhead cooling gas cylinders according to claim 2, It is characterized in that The gas replacement module includes: a vacuum pump, a vacuum pump motor, a vacuum gauge, a vacuum gauge, a vacuum diaphragm valve and at least one vacuum solenoid valve. The vacuum pump is connected to the vacuum gauge via a vacuum gauge tube, and the vacuum pump is also connected to the vacuum pump motor; The vacuum diaphragm valve is installed on a first vacuum extraction pipeline, and the first vacuum extraction pipeline is connected to a pipeline arranged between the vacuum pump and the vacuum gauge; The first vacuum extraction pipeline is connected to the fifth air supply pipeline through at least one second vacuum extraction pipeline, wherein the vacuum solenoid valve is arranged on the second vacuum extraction pipeline, and the number of the vacuum solenoid valve and the second vacuum extraction pipeline is the same.

11. The rapid high-purity filling equipment for warhead cooling gas cylinders according to claim 1, 2 or 10, It is characterized in that The number of the auxiliary modules is the same as the number of the inflatable product modules; The cooling nozzle is connected to the cooling air supply port, or the cooling nozzle is connected to the driving exhaust port.

Citation Information

Patent Citations

  • Gas filling system and gas filling method of gas storage bottle

    CN103982773A

  • Gas filling system

    CN105351743A

  • Gas filling device of small-size sealing product and gas filling method of device

    CN108087719A

  • Rapid high-purity filling equipment for bullet cooling gas cylinder

    CN210398371U