A temperature sensor temperature shock test equipment and control method thereof
By designing the temperature sensor temperature shock test equipment of muffle furnace, rotating motion mechanism and PLC technology, the problem of lack of standard test equipment in the existing technology is solved, automated temperature changes and efficient test processes are realized, and the exhaust temperature is verified Sensor life and performance.
Patent Information
- Application Number
- CN201910892600.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-09-20
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2039-09-20
AI Technical Summary
The existing technology lacks standard temperature shock test equipment, resulting in the need for experimenters to manually switch between high and low temperature environments, making it impossible to effectively verify the life and performance of the exhaust temperature sensor.
A temperature sensor temperature shock test equipment including a muffle furnace, a rotating motion mechanism and a cooling water tank is designed. It is combined with PLC technology to achieve automated operation. It can achieve rapid temperature changes in the range of 50-1000 degrees Celsius, and through the rotating table and piston The cylinder realizes high and low temperature switching of the sample.
It provides a reliable and automated test environment, improves efficiency, reduces labor costs, ensures the accuracy and reliability of the test, and can effectively verify the life and performance of the temperature sensor.
Smart Images

Figure CN110470415B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of automobile parts detection, in particular to a temperature sensor temperature shock test device and a control method thereof. Background Art
[0002] As the country attaches great importance to environmental protection, the motor vehicle emission standards have entered the National VI era. The upgrade of automobile exhaust emission standards has forced manufacturers to install temperature sensors in the exhaust pipes to transmit the exhaust temperature data to the control system so that the engine can adjust its working state to meet the new emission standards.
[0003] The exhaust temperature sensor is designed for life, that is, it will not be replaced during the entire life cycle of the car, which means that the service life of the product is the basic requirement of each vehicle manufacturer for parts suppliers. According to the operating load and structural process of the exhaust temperature sensor, a very easy failure mode can be predicted, that is, the sensor source is separated from the internal filling material, resulting in the inability to transmit the temperature from the outside to the vicinity of the sensor source, causing the response time or accuracy to fail to meet the requirements. This failure form is mainly caused by the different volume change rates of various materials under temperature. The temperature shock test is very easy to expose this problem. Therefore, during the development stage, the vehicle manufacturer requires the exhaust temperature sensor provided by the parts manufacturer to pass the temperature shock test. The temperature shock test requires the product to switch alternately between two extreme environments, the conversion process is rapid, and each switch can produce a strong temperature change. The maximum operating temperature that needs to be reached at high temperature is about 1000 degrees Celsius, and it needs to be inserted into normal temperature water at low temperature to achieve the purpose of rapid cooling.
[0004] The invented equipment is custom-developed to meet this demand, and the equipment is mainly composed of three parts: a high-temperature muffle furnace, a rotary motion mechanism, and a cooling water tank-level circulation system. There is no standard test equipment on the market for this test. Testers usually switch manually according to requirements, or use normal high temperature instead of impact, which cannot fully meet the requirements of the test. This device combines knowledge of industrial automation, material heat treatment, hydraulic basics, etc. to build a reliable test environment, so that the test conditions are accurate and can effectively verify the life of the product. Because common equipment with high maturity in industrial sites is used, the reliability of the device is guaranteed, and unattended testing can be carried out, which greatly improves efficiency and reduces labor costs. Summary of the invention
[0005] In view of the shortcomings of the prior art, the present invention provides a temperature sensor temperature shock test equipment, which has the advantages of a wide muffle furnace temperature measurement range and the application of PLC technology to achieve automated operation. It solves the problem that there is no standard experimental equipment on the market for this experiment, and experimenters usually perform manual switching according to requirements, which cannot meet the experimental requirements.
[0006] The present invention provides the following technical solution: a temperature sensor temperature shock test device, comprising a cooling water trough, a water tank, a circulating pump, a rotating table and a muffle furnace, wherein the cooling water trough, the water tank and the circulating pump are connected in pairs, the cooling water trough and the muffle furnace are both located on the side of the rotating table, a piston cylinder is provided on the rotating table, a clamp for clamping a sample is provided at the end of the piston cylinder, an opening upper cover of the muffle furnace is provided with a heat insulation layer, and a plurality of through holes for accommodating the sample are opened on the heat insulation layer.
[0007] Preferably, a circulating water pipeline is provided between the cooling water tank and the circulating pump, and the circulating water pipeline is externally connected to industrial cooling water. The cooling water tank is provided with an overflow port, and the overflow port is connected to the water tank through a pipeline.
[0008] Preferably, a solenoid valve is provided on the cooling water drain outlet of the circulating water pipeline.
[0009] Preferably, the piston cylinder is fixedly mounted to the gas source via a pipeline.
[0010] Preferably, a rotating cylinder is fixedly mounted on the bottom of the rotating table.
[0011] In order to solve the same technical problem, the present invention also provides a control method for a temperature sensor temperature shock test device, comprising the following steps:
[0012] Step S1, starting the muffle furnace, when the temperature of the muffle furnace is raised to a preset test temperature, the test temperature is 900-1100° C., the muffle furnace is kept warm for 4-6 minutes;
[0013] Step S2, starting the circulation pump to continuously collect temperature data output by the sample;
[0014] Step S3, the rotating table drives the piston cylinder to rotate so that the sample is aligned with the through hole on the thermal insulation layer, and the piston cylinder drives the sample to pass through the through hole and maintain it for 10 to 30 seconds;
[0015] Step S4, the piston cylinder drives the sample to exit the through hole, the rotating table drives the piston cylinder to rotate, so that the sample is arranged opposite to the cooling water tank, and the piston cylinder drives the sample to extend into the cooling water tank for cooling;
[0016] Step S5, repeat steps S3 to S4 several times.
[0017] Preferably, step S1 also includes the step of testing the clamping state of the sample before starting the muffle furnace: loading the sample into the fixture, driving the piston cylinder with a rotating table to rotate so that the sample and the thermal insulation layer are arranged relative to each other, and checking the position correspondence between the sample and the through hole.
[0018] Compared with the prior art, the present invention has the following beneficial effects:
[0019] 1. The temperature sensor temperature shock test equipment is provided with a muffle furnace. The setting of the muffle furnace can make the test temperature range arbitrarily change within 50-1000 degrees Celsius, thereby providing a temperature test range that can be changed at will for the temperature test. In addition, the furnace door of the muffle furnace is replaced by a non-standard furnace door by disassembling the standard furnace door. The non-standard furnace door has an insulation board with a test hole, which can facilitate the penetration test of the sample on the one hand, and can be insulated on the other hand, making the operating environment more comfortable.
[0020] 2. The temperature sensor temperature shock test equipment fixes the piston cylinder on the rotating table. On the one hand, the sample can be sent into the muffle furnace for high temperature testing through the telescopic movement of the piston cylinder. On the other hand, the sample can be switched back and forth between the muffle furnace and the cooling water tank through the circular rotation of the rotating table, making the test process more convenient and quick.
[0021] 3. The temperature sensor temperature shock test equipment applies PLC technology, so that the rotating table and piston cylinder and other structures are controlled by PLC technology, making the operation simpler, and the overall device can be operated automatically, reducing manual intervention and improving work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a schematic diagram of the working principle of the present invention.
[0023] In the figure: 1. Cooling water tank; 2. Water tank; 3. Circulation pump; 4. Solenoid valve; 5. Rotary table; 6. Piston cylinder; 7. Sample; 8. Perforated insulation layer; 9. Muffle furnace. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0025] See also Figure 1A temperature sensor temperature shock test device and a control method thereof, comprising a cooling water tank 1, a circulating water pipeline is connected at the bottom of the cooling water tank 1, and industrial cooling water is connected to the left side of the circulating water pipeline, an overflow port is provided on the right side of the cooling water tank 1, and water overflowing from the overflow port directly flows into the water tank 2 through the pipeline, and the bottom of the cooling water tank 1 is connected to the circulating water pipeline, and under the drive of the circulating pump 3, water can flow from one end of the water tank 2 into the cooling water tank 1 to form a cycle, and the industrial cooling water is connected to the left side of the circulating water pipeline, so that the industrial cooling water can be connected to the circulating water pipeline to cool the water, and an overflow port is provided on the right side of the cooling water tank 1. The setting of the opening can keep the water level inside the cooling water tank 1 at the standard test water level. A water tank 2 is fixedly installed on the right side below the cooling water tank 1, and a circulating pump 3 is fixedly installed on the left side of the water tank 2. The circulating pump 3 is located between the water tank 2 and the bottom of the cooling water tank 1, and the circulating pump 3 is electrically connected to the power supply through a line. Through the setting of the circulating pump 3, the water inside the water tank 1 can enter the cooling water tank 1 through the circulating water pipe at the bottom of the cooling water tank 1 through the driving action of the circulating pump 3 to form a circulation. Moreover, the setting of the circulating pump 3 being electrically connected to the power supply through the line can enable the power supply to provide a continuous supply of electricity to the circulating pump 3, so that the circulating pump 3 can continue to operate. Work, a solenoid valve 4 is provided on the cooling water drain outlet of the circulating water pipeline, a rotating table 5 is fixedly installed on the back of the cooling water tank 1, and a rotating cylinder is fixedly installed on the bottom of the rotating table 5. Through the setting of the rotating cylinder, the rotating table 5 can be guaranteed to rotate, and a piston cylinder 6 is fixedly installed on the top of the rotating table 5, wherein the piston cylinder 6 is preferably an air cylinder, and the piston cylinder 6 is fixedly installed with an air source through a pipeline. The setting that the piston cylinder 6 is fixedly installed with an air source through a pipeline can enable the air source to bring a continuous air supply to the piston cylinder 6, so that the piston cylinder 6 can work normally, and a fixture and a sample 7 are fixedly installed at the end of the piston cylinder 6, and the right side of the fixture and the sample 7 is fixedly installed A muffle furnace 9 is installed. The furnace door on the left side of the muffle furnace 9 is disassembled and replaced with a perforated thermal insulation layer 8. The setting of the perforated thermal insulation layer 8 can enable the piston cylinder 6 to push the fixture and the sample 7 through the perforated thermal insulation layer 8 to enter the high-temperature test area inside the muffle furnace 9, and the temperature of the high-temperature test area is 50-1100°C. The furnace door on the left side of the muffle furnace 9 is disassembled and replaced with the perforated thermal insulation layer 8, so that the perforated thermal insulation layer 8 can extend the fixture and the sample 7 into the interior of the muffle furnace 9 through the pores in the middle. In addition, the setting of the temperature of the high-temperature test area to 50-1100°C can make the temperature test range wider and the test effect better. A perforated thermal insulation layer 8 is fixedly installed on the left side of the muffle furnace 9.
[0026] Working principle: first install the product to be tested (i.e. sample 7) on the fixture, usually 12-20 products are installed, and multiple products are tested together. Then, test the muffle furnace 9 without opening it, check the position correspondence between the perforated insulation layer 8 and the sample 7, ensure that the piston cylinder 6 can extend the sample 7 into the furnace when extending it, then start the muffle furnace 9, wait for the temperature to reach the specified test temperature, the set value is based on the process requirements, usually selected between 900 and 1100 degrees Celsius, it usually takes 40 to 60 minutes for the inner cavity temperature of the muffle furnace 9 to reach the specified working temperature, and it needs to stay for more than 5 minutes after reaching it to be truly stable. After stabilization, it means that the test conditions are ready. At this time, the cooling water tank 1 is started to circulate, and the temperature of the cooling water tank 1 is controlled to be room temperature. The sample 7 is inserted into the muffle furnace 9 through the piston cylinder 6. The residence time is selected between 10 seconds and 30 seconds according to different processes. Because the sample 7 is slender, the temperature can rise rapidly after being inserted into the muffle furnace 9. The sample 7 itself is also a temperature sensor. Through external testing, the temperature of the muffle furnace 9 can be tested. When the temperature is close to the target value, it means that the sample 7 has been completely heated. Then drive the piston cylinder 6 to take the sample 7 out of the furnace, and after reversing, quickly put it into the cooling water tank 1. The time interval from taking it out of the furnace to putting it into the water tank needs to be less than 10 seconds. During the whole process, it is necessary to continuously detect the temperature output by the sample 7 and generate a curve. At high and low temperatures, it needs to be compared with the furnace temperature or water temperature to ensure that the temperature of the sensing end of the sample 7 is completely converted every time the environment is converted. If an abnormality occurs, the system will generate an alarm signal to prompt the experimenter that the test is invalid and the effectiveness of the test needs to be re-evaluated. The entire impact test needs to repeat the above process continuously until the specified number of cycles is met (usually more than 1,000 times). After the test is completed, the muffle furnace is closed and waited for it to return to room temperature naturally, and the test sample is removed for subsequent tests.
[0027] In order to solve the same technical problem, the present invention also provides a control method for a temperature sensor temperature shock test device, comprising the following steps:
[0028] Step S1, start the muffle furnace, when the temperature of the muffle furnace 9 is raised to a preset test temperature, the test temperature is 900-1100° C., the muffle furnace 9 is kept warm for 4-6 minutes;
[0029] Step S2, starting the circulation pump 3, and continuously collecting the temperature data output by the sample 7;
[0030] Step S3, the rotating table 5 drives the piston cylinder 6 to rotate so that the sample 7 is aligned with the through hole on the thermal insulation layer 8, and the piston cylinder 6 drives the sample 7 to pass through the through hole and maintains it for 10 to 30 seconds;
[0031] Step S4, the piston cylinder 6 drives the sample 7 to exit the through hole, and the rotating table 5 drives the piston cylinder 6 to rotate, so that the sample 7 is arranged opposite to the cooling water tank 1, and the piston cylinder 6 drives the sample 7 to extend into the cooling water tank 1 for cooling;
[0032] Step S5, repeat steps S3 to S4 several times.
[0033] Among them, step S1 also includes the step of testing the clamping state of the sample 7 before starting the muffle furnace 6: the sample is loaded on the fixture, the rotating table 5 drives the piston cylinder 6 to rotate, so that the sample 7 and the insulation layer 8 are arranged relative to each other, and the position correspondence between the sample 7 and the through hole is checked.
[0034] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A control method for a temperature sensor temperature shock test device, characterized in that: The method comprises the following steps: step S1, starting the muffle furnace, when the temperature of the muffle furnace is raised to a preset test temperature, the test temperature is 900-1100°C, and the muffle furnace is kept warm for 4-6 minutes; step S2, starting the circulation pump, and continuously collecting the temperature data output by the sample; step S3, the rotating table drives the piston cylinder to rotate, so that the sample is aligned with the through hole on the thermal insulation layer, and the piston cylinder drives the sample to pass through the through hole and maintain it for 10-30 seconds; step S4, the piston cylinder drives the sample to exit the through hole, the rotating table drives the piston cylinder to rotate, so that the sample is arranged relative to the cooling water tank, and the piston cylinder drives the sample to extend into the cooling water tank for cooling; step S5, repeating steps S3 to S4 several times; wherein step S1 also comprises the step of testing the clamping state of the sample before starting the muffle furnace: loading the sample on the fixture, the rotating table drives the piston cylinder to rotate, so that the sample is arranged relative to the thermal insulation layer, and checking the position correspondence between the sample and the through hole;Among them, the temperature sensor temperature shock test equipment includes a cooling water tank, the bottom of the cooling water tank is connected to a circulating water pipeline, and the left side of the circulating water pipeline is externally connected to industrial cooling water, and an overflow port is opened on the right side of the cooling water tank, and the water overflowing from the overflow port directly flows into the water tank through the pipeline. By connecting the bottom of the cooling water tank to a circulating water pipeline, under the drive of a circulating pump, water can flow from one end of the water tank into the interior of the cooling water tank to form a cycle, and the left side of the circulating water pipeline is externally connected to industrial cooling water, which can enable the industrial cooling water to be connected to the inside of the circulating water pipeline to cool the water. In addition, an overflow port is opened on the right side of the cooling water tank. The setting of the port can keep the water level inside the cooling water tank at the standard test water level. A water tank is fixedly installed on the right side below the cooling water tank, and a circulating pump is fixedly installed on the left side of the water tank. The circulating pump is located between the water tank and the bottom of the cooling water tank, and the circulating pump is electrically connected to the power supply through the line. Through the setting of the circulating pump, the water inside the water tank can enter the interior of the cooling water tank through the circulating water pipe at the bottom of the cooling water tank through the driving action of the circulating pump to form a circulation, and the setting of the circulating pump being electrically connected to the power supply through the line can enable the power supply to provide a continuous power supply for the circulating pump, so that the circulating pump can work continuously. The cooling water outlet of the circulating water pipeline is provided with a solenoid valve, a rotating table is fixedly installed on the back of the cooling water tank, a rotating cylinder is fixedly installed on the bottom of the rotating table, and the rotating table can ensure the rotating work by setting the rotating cylinder, and a piston cylinder is fixedly installed on the top of the rotating table, wherein the piston cylinder is an air cylinder, and the piston cylinder is fixedly installed with an air source through a pipeline, and the setting that the piston cylinder is fixedly installed with an air source through a pipeline can enable the air source to bring a steady supply of air to the piston cylinder, so that the piston cylinder can work normally, and a fixture and a sample are fixedly installed at the end of the piston cylinder, and a Muffle furnace, the furnace door on the left side of the muffle furnace is disassembled and replaced with a perforated thermal insulation layer, and the setting of the perforated thermal insulation layer enables the piston cylinder to push the fixture and the sample through the perforated thermal insulation layer to enter the high-temperature test area inside the muffle furnace, and the temperature of the high-temperature test area is 50-1100°C, and the furnace door on the left side of the muffle furnace is disassembled and replaced with a perforated thermal insulation layer, so that the perforated thermal insulation layer can extend the fixture and the sample into the interior of the muffle furnace through the pores in the middle, and the setting of the temperature of the high-temperature test area to 50-1100°C can make the temperature test range wider and the test effect better, and a perforated thermal insulation layer is fixedly installed on the left side of the muffle furnace;Working principle: first install the product to be tested on the fixture, the number of installations is 12-20, and multiple products are tested together. Then, test it without opening the muffle furnace, check the position correspondence between the perforated insulation layer and the sample, ensure that the sample can be inserted into the furnace when the piston cylinder extends the sample, then start the muffle furnace, wait for the temperature to reach the specified test temperature, the set value is selected between 900 and 1100 degrees Celsius according to the process requirements, it takes 40 to 60 minutes for the temperature of the muffle furnace cavity to reach the specified working temperature, and it needs to stay for more than 5 minutes after reaching it to wait for it to be truly stable; after stabilization, it means that the test conditions are ready, then start the cooling water tank circulation, control the temperature of the cooling water tank to room temperature, and extend the sample into the muffle furnace through the piston cylinder. The residence time is selected between 10 seconds and 30 seconds according to different processes. Because the sample is slender, after being inserted into the muffle furnace, the temperature rises , the temperature in the muffle furnace can be tested through external testing. When the temperature is close to the target value, it means that the sample has been completely heated. Then the piston cylinder is driven to take the sample out of the furnace, and after reversing, it is quickly placed in the cooling water tank. The time interval from taking it out of the furnace to putting it into the water tank needs to be less than 10 seconds. During the whole process, the temperature output by the sample needs to be continuously detected and a curve needs to be generated. At high and low temperatures, it needs to be compared with the furnace temperature or water temperature to ensure that the temperature of the sensing end of the sample is completely converted every time the environment is changed. If an abnormality occurs, the system will generate an alarm signal to prompt the tester that the test has failed and the effectiveness of the test needs to be re-evaluated. The entire impact test needs to repeat the above process until the specified number of cycles is met. After the test is completed, the muffle furnace is closed and waits for it to return to room temperature naturally, and the test sample is removed for subsequent tests. ;
Citation Information
Patent Citations
Temperature sensor thermal response automatic test driving device
CN203414202U
Temperature sensor temperature impact test equipment
CN210774437U
