Movable ground anchor for installing cone section of steel structure cooling tower and construction method thereof
Through the temporary tie support of the mobile ground anchor and the cone section triangular unit, the problems of long construction period and large area during the installation of the cone section of the steel structure cooling tower are solved, and a short-period, low-cost installation method is realized. Ground anchor design Optimized floor space.
Patent Information
- Application Number
- CN201910985182.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-10-16
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2039-10-16
AI Technical Summary
The installation of the cone section of the steel structure cooling tower is difficult and requires a large amount of scaffolding to assist in fixing, resulting in a long construction period, large floor space, and high costs.
A movable ground anchor is used, including a movable ground anchor body and a lifting ring. A temporary tie is formed through the cable wind rope and the guide chain to support the fixed installation of the cone section triangular unit. After welding, the temporary tie is removed and the ground anchor can be moved to the bottom. One location to avoid large-scale scaffolding installation and disassembly.
The construction period is shortened and the construction cost is reduced. The ground anchor occupies a small area and can be used multiple times. Its design is optimized through mechanical analysis.
Smart Images

Figure CN110670590B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of steel structure intercooler tower installation, in particular to a movable ground anchor for installing a cone section of a steel structure cooling tower and a construction method thereof. Background Art
[0002] Steel structure cooling towers are energy-saving, green and environmentally friendly, but the installation of the cone section is difficult and requires higher technical content. The triangular unit of the cone section weighs about 8t and has an inclination angle of 65° to the horizontal. The existing construction method of the cone section is to set up a temporary bracket or scaffolding as a temporary support, and then weld and fix the cone section. However, the bottom radius of the cooling tower is 77m, and each layer of the cone section is 12 meters high, with a total of 6 layers and a height of 65m. The construction range of the cone section is large. Therefore, the early scaffolding installation and the later dismantling tasks are large, requiring a longer construction period and higher construction costs. Summary of the invention
[0003] In view of the above situation, in order to overcome the defects of the prior art, the present invention provides a movable ground anchor for installing the cone section of a steel structure cooling tower and a construction method thereof, which solves the problem of using a large number of scaffoldings to assist the cone section for fixed installation, long construction period and large floor space.
[0004] The technical solution is that a movable ground anchor is used for installing the cone section of a steel structure cooling tower, comprising a movable ground anchor body for temporary pulling and fixing and a lifting ring for rope connection. The ground anchor body is used in rotation, and the lifting ring comprises a ground anchor lifting ring fixed on the ground anchor body, a pulling anchor lifting ring and a steel triangular lifting ring fixed to the cone section triangular unit. The steel triangular lifting ring is connected to a cable wind rope, the pulling anchor lifting ring is connected to a guide chain, and the cable wind rope is connected through the guide chain to realize force support between the ground anchor body and the cone section triangular unit.
[0005] Furthermore, the steel triangular lifting ring is fixedly connected to the cone section triangular unit, and the fixed connection method can be welding. The cable wind rope is fastened to the steel triangular lifting ring before the cone section triangular unit is in place. The ground anchor lifting ring and the pull anchor lifting ring are respectively fixed to the ground anchor body. The ground anchor lifting ring and the pull anchor lifting ring are pre-buried before the ground anchor body is lifted and fixed by pouring concrete. The guide chain and the cable wind rope are detachable and fixed to form a temporary tie between the ground anchor body and the cone section triangular unit, which plays a role of traction and fixing, and plays a role of temporary fixation in the process of installing and fixing the cone section triangular unit.
[0006] Construction method of mobile ground anchor for installation of cone section of steel structure cooling tower:
[0007] S1. Weld the cone section triangle unit and the steel triangle lifting ring into a whole, and fasten the cable wind rope to the steel triangle lifting ring, and at the same time embed the anchor lifting ring and the pull anchor lifting ring into the anchor body to form a whole;
[0008] S2. The anchor body with the anchor eye and the anchor eye is lifted to the pointing position by a crane, and the cone section triangle unit is lifted into place by a lifting machinery;
[0009] S3. Use a guide chain, one end of which is used to pull the anchor body through the anchor ring, and the other end is used to pull the cone section triangular unit through the connecting cable wind rope, and finally the cone section triangular unit and the anchor body are tied and fixed;
[0010] S4. Welding the cone segment triangular unit to the steel structure;
[0011] S5. After the cone section triangle unit is welded to the steel structure, it forms a stable system with the steel structure within a certain range without the need for traction. At this time, the temporary tie between the guide chain and the cable wind rope is loosened, and the cone section triangle unit and the anchor body are not pulled by each other;
[0012] S6. Use a crane to lift the anchor ring and move the anchor body to the next temporary designated position. The temporary designated position is calculated by mechanical analysis before moving, and return to step S3 to repeat the operation steps until the installation of the entire cone section is completed.
[0013] The technical effect of the present invention is that a temporary tie is formed between a movable ground anchor and the cone section triangular unit to be welded, thereby supporting the cone section triangular unit to be welded and facilitating its fixed installation. After welding is completed, the temporary tie is removed and the ground anchor is moved to a designated position calculated near the pre-installation position of the next cone section, thereby avoiding the work of installing scaffolding over a large area in the early stage of construction and dismantling the scaffolding in the later stage of construction. The construction period is short and the ground anchor can be used multiple times, thereby reducing construction costs. The ground anchor has its geometric dimensions designed by force analysis and calculation, and compared with the installation of the scaffolding, it occupies a small area. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the construction structure of the anchor body of the present invention.
[0015] Figure 2 It is a schematic diagram of the cone section installation plane structure of the present invention.
[0016] 1. Ground anchor body, 2. Ground anchor lifting ring, 3. Pull anchor lifting ring, 4. Guide chain, 5. Cable wind rope, 6. Steel triangle lifting ring, 7. Cone section triangle unit. DETAILED DESCRIPTION
[0017] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0018] It should be noted that in the description of the present invention, the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" and the like indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings, which are only for the convenience of description, and do not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third" and "fourth" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0019] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0020] Embodiment 1: Figure 1 to Figure 2 A movable ground anchor for installing a cone section of a steel structure cooling tower is provided, comprising a movable ground anchor body 1 for temporary pulling and fixing and a lifting ring for rope connection, the ground anchor body 1 is used in rotation, the lifting ring comprises a ground anchor lifting ring 2 fixed on the ground anchor body 1, a pulling anchor lifting ring 3 and a steel triangular lifting ring 6 fixed to the cone section triangular unit 7, the steel triangular lifting ring 6 is connected to a cable wind rope 5, the pulling anchor lifting ring 3 is connected to a guide chain 4, and the cable wind rope 5 is connected through the guide chain to realize a force support between the ground anchor body 1 and the cone section triangular unit 7.
[0021] On the basis of Example 1, the steel triangle lifting ring 6 is fixedly connected to the cone section triangle unit 7, and the fixed connection method can be welding. The cable wind rope 5 is fastened to the steel triangle lifting ring 6 before the cone section triangle unit 7 is in place. The ground anchor lifting ring 2 and the pull anchor lifting ring 3 are respectively fixed to the ground anchor body 1. The ground anchor lifting ring 2 and the pull anchor lifting ring 3 are pre-buried and fixed by pouring concrete before the ground anchor body 1 is lifted. The guide chain 4 and the cable wind rope 5 are detachable and fixed to form a temporary tie between the ground anchor body 1 and the cone section triangle unit 7, which plays a traction and fixing role, and plays a temporary fixation role in the process of installing and fixing the cone section triangle unit 7.
[0022] Construction method of mobile ground anchor for installation of cone section of steel structure cooling tower:
[0023] S1. The cone section triangle unit 7 and the steel triangle ring 6 are welded as a whole, and the cable wind rope 5 is fastened to the steel triangle ring, and the anchor ring 2 and the anchor ring 3 are pre-buried into the anchor body 1 to form a whole;
[0024] S2. The anchor body 1 with the anchor ring 2 and the anchor ring 3 is lifted to the pointing position by a crane, and the cone section triangular unit 7 is lifted into place using a lifting machinery;
[0025] S3. Use the guide chain 4, one end of which is pulled through the anchor ring 3 to pull the anchor body, and one end is pulled through the connecting cable wind rope to pull the cone section triangular unit, and finally the cone section triangular unit 7 and the anchor body 1 are tied and fixed;
[0026] S4. The cone segment triangular unit 7 is welded to the steel structure;
[0027] S5. After the cone section triangular unit 7 is welded to the steel structure, a stable system is formed with the steel structure within a certain range without the need for traction. At this time, the temporary tie between the guide chain 4 and the cable wind rope 5 is loosened, and the cone section triangular unit 7 and the anchor body 1 are not pulled by each other;
[0028] S6. Use a crane to lift the anchor ring 2 to move the anchor body 1 to the next temporary designated position. The temporary designated position is calculated by mechanical analysis before moving, and return to step S3 to repeat the operation steps until the installation of the entire cone section is completed.
[0029] The technical effect of the present invention is that a temporary tie is formed between a movable ground anchor and the cone section triangular unit to be welded, thereby supporting the cone section triangular unit to be welded and facilitating its fixed installation. After welding is completed, the temporary tie is removed and the ground anchor is moved to a designated position calculated near the pre-installation position of the next cone section, thereby avoiding the work of installing scaffolding over a large area in the early stage of construction and dismantling the scaffolding in the later stage of construction. The construction period is short and the ground anchor can be used multiple times, thereby reducing construction costs. The ground anchor has its geometric dimensions designed by force analysis and calculation, and compared with the installation of the scaffolding, it occupies a small area.
[0030] The present invention has been described in detail above through specific implementation modes and embodiments, but these do not constitute limitations of the present invention. Without departing from the principles of the present invention, those skilled in the art may also make many variations and improvements, which should also be regarded as the protection scope of the present invention.
Claims
1. The construction method of a movable ground anchor for installing a cone section of a steel structure cooling tower is characterized by: The invention comprises a ground anchor body (1) and a lifting ring, wherein the lifting ring comprises a ground anchor lifting ring (2) fixed to the ground anchor body (1), a pulling anchor lifting ring (3) and a steel triangular lifting ring (6) fixed to the cone section triangular unit (7), wherein the steel triangular lifting ring (6) is connected to a cable wind rope (5), and the pulling anchor lifting ring (3) is connected to a guide chain (4) and connected to the cable wind rope (5) via the guide chain, thereby forming a force support between the ground anchor body (1) and the cone section triangular unit (7); The steel triangle lifting ring (6) is fixedly connected to the cone section triangle unit (7), the ground anchor lifting ring (2) and the anchor lifting ring (3) are respectively fixed to the ground anchor body (1), and the guide chain (4) and the cable wind rope (5) are detachably fixed; S1. The cone section triangle unit (7) and the steel triangle lifting ring (6) are welded into a whole, and the guy rope (5) is fastened to the steel triangle lifting ring, and the anchor lifting ring (2) and the anchor lifting ring (3) are pre-buried into the anchor body (1) to form a whole; S2. The anchor body (1) with the anchor ring (2) and the anchor ring (3) is lifted to the pointing position by a crane, and the cone section triangular unit (7) is lifted into place by a lifting machine; S3. Use the guide chain (4) to tie and secure the cone segment triangular unit (7) to the anchor body (1); S4. The cone segment triangular unit (7) is welded to the steel structure; S5. After the cone-section triangular unit (7) forms a stable system within a certain range, the guide chain (4) is released to form a tie between the cone-section triangular unit (7) and the anchor body (1); S6. Use a crane to lift the anchor ring (2) to move the anchor body (1) to the next temporary designated position, and return to step S3 to repeat the operation steps.
Citation Information
Patent Citations
Assembly structure and method for concrete towers used in wind turbines
CN101126284A
Pulling cable wind rope for through type jack
CN101537977A
Angle-adjustable-type guy cable system of ultra-high steel pipe support
CN108589542A
120 meter common steel pipe fastener vertical well frame used in large cooling tower construction
CN1229162A
Can dismantle guy rope earth anchor subassembly
CN205776203U