An ultra-high pressure hydrogen pressure test system

Through the dual-stage boosting method of diaphragm compressor and high-pressure hydraulic oil-free piston machine, combined with a flowmeter and an electric flow regulating valve, the pressure and flow problems of the high-pressure hydrogen pressure test system are solved, and efficient hydrogen circulation experiments are achieved , and the temperature during hydrogen filling is reduced by the pre-cooling unit.

CN110702528BActive Publication Date: 2024-11-29北京海德利森科技有限公司
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN201911056275.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-10-31
Publication Date
2024-11-29
Estimated Expiration
2039-10-31

AI Technical Summary

Technical Problem

The existing high-pressure hydrogen pressure test system cannot meet the needs of the 90MPa hydrogen cylinder pressure cycle experiment. The system has low pressure, small flow rate, and lacks temperature regulation and flow control functions, resulting in low experimental efficiency and unsuitable temperature.

Method used

The diaphragm compressor and high-pressure hydraulic oil-free piston machine are adopted to achieve precise control and temperature regulation of high-pressure hydrogen.

Benefits of technology

A high-pressure hydrogen output of 120MPa was achieved, and the flow rate reached 200NM3/H was improved, and the experimental efficiency was improved, and the temperature during high-pressure gas was reduced through the pre-cooling unit.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110702528B_ABST
    Figure CN110702528B_ABST
Patent Text Reader

Abstract

The present invention discloses an ultra-high pressure hydrogen pressure test system, comprising a hydrogen input port, the hydrogen input port is connected to the air inlet of a first gas cylinder group through a first pipeline provided with a first stop valve, the air outlet of the first gas cylinder group is connected to the air inlet of a second gas cylinder group through a second pipeline provided with a pressure reducing valve, the air outlet of the second gas cylinder group is connected to the air inlet of a 120MPa hydrogen compressor through a third pipeline, the air outlet of the 120MPa hydrogen compressor is connected to the air inlet of a high pressure gas cylinder group through a fourth pipeline, the air outlet of the high pressure gas cylinder group is connected to the hydrogen inlet and outlet of the test gas cylinder through a fifth pipeline, and the fifth pipeline is also connected to the first pipeline through a sixth pipeline provided with a fifth pneumatic ball valve and a second one-way valve. The test pressure is high, and it adopts a combined supercharging method of a diaphragm compressor and a high pressure liquid-driven oil-free piston machine, and the supercharging pressure can reach 120MPa.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of skid-mounted hydrogenation equipment, and in particular to an ultra-high pressure hydrogen pressure testing system. Background Art

[0002] With the continuous development of new energy, hydrogen energy is developing more and more rapidly, and the demand for hydrogen cylinders with higher pressure and larger volume is increasing. The demand for testing equipment required for the production and research and development of hydrogen cylinders is also increasing.

[0003] The high-pressure hydrogen pressure test system is used to conduct hydrogen circulation experiments on hydrogen cylinders. The current high-pressure hydrogen pressure test system has the following disadvantages:

[0004] (1) The system pressure is low. The maximum working pressure of the current high-pressure hydrogen pressure test system is 70MPa, which cannot meet the requirements of the 90MPa hydrogen cylinder pressure cycle test;

[0005] (2) The system flow is small, the experimental efficiency is low, and the experimental time is long;

[0006] (3) The system does not have a temperature regulation function. The temperature of the hydrogen filled into the hydrogen cylinder is too high, which does not meet the requirements of the hydrogen cylinder test experiment;

[0007] (4) The system does not have a flow control function. The hydrogen filled into the hydrogen cylinder can only be adjusted qualitatively but not quantitatively, and the detailed experimental parameters cannot be controlled.

[0008] Currently, no effective solution has been proposed for the problems in the related technologies. Summary of the invention

[0009] In view of the above technical problems in the related technology, the present invention proposes an ultra-high pressure hydrogen pressure test system, which adopts a two-stage pressurization method of a diaphragm compressor and a high-pressure liquid-driven oil-free piston engine, and the system output pressure is high; a flow meter and an electric flow regulating valve are used to accurately control the amount of gas filled into and discharged from the test gas cylinder; a pre-cooling unit is used to reduce the high temperature generated by the high-pressure and large-flow gas instantly filled into the test gas cylinder.

[0010] To achieve the above technical objectives, the technical solution of the present invention is implemented as follows:

[0011] An ultra-high-pressure hydrogen pressure test system comprises a hydrogen input port, wherein the hydrogen input port is connected to the air inlet of a first gas cylinder group through a first pipeline provided with a first stop valve, the air outlet of the first gas cylinder group is connected to the air inlet of a second gas cylinder group through a second pipeline provided with a pressure reducing valve, the air outlet of the second gas cylinder group is connected to the air inlet of a 120MPa hydrogen compressor through a third pipeline, the air outlet of the 120MPa hydrogen compressor is connected to the air inlet of a high-pressure gas cylinder group through a fourth pipeline, the air outlet of the high-pressure gas cylinder group is connected to the hydrogen inlet and outlet of a test gas cylinder through a fifth pipeline, and the fifth pipeline is also connected to the first pipeline through a sixth pipeline provided with a fifth pneumatic ball valve and a second one-way valve.

[0012] Furthermore, a leak column unit is also provided on the first pipeline, and the leak column unit is located between the first stop valve and the hydrogen input port. The leak column unit includes an input stop valve, a first filter, a second one-way valve, a first pressure gauge and an output stop valve which are sequentially connected in series on the first pipeline along the gas flow direction.

[0013] Furthermore, the air release column unit also includes a nitrogen purge port and a pressure relief port, the nitrogen purge port is connected to one end of a purge pipe, a purge valve is provided on the purge pipe, the other end of the purge pipe is connected to the node between the input stop valve and the first filter, the pressure relief port is respectively connected to one end of the exhaust line, one end of the pressure relief pipe and one end of the safety line, the other end of the exhaust line is connected to the first flame arrester, the pressure relief pipe is provided with a pressure relief valve, the other end of the pressure relief pipe is connected to the node between the second one-way valve and the output stop valve, the safety line is provided with a first safety valve, and the other end of the safety line is connected to the node between the first filter and the second one-way valve.

[0014] Furthermore, the fifth pipeline is also connected to the fourth pipeline through the seventh pipeline, and the first pipeline, the second pipeline, the fourth pipeline, the fifth pipeline and the seventh pipeline are all provided with a first pneumatic ball valve and a second stop valve, and the first pipeline is also provided with a second filter, and the first pneumatic ball valve, the second stop valve and the second filter on the first pipeline are all located between the air inlet of the first gas cylinder group and the first stop valve, the second pipeline, the fifth pipeline and the sixth pipeline are all provided with a first pressure transmitter, and the second pipeline and the fifth pipeline are all provided with a second pressure gauge, the third pipeline and the fifth pipeline are all provided with a first temperature transmitter, and the third pipeline is also provided with a cooler, and the cooler is located between the air outlet of the second gas cylinder group and the first temperature transmitter.

[0015] Furthermore, a first safety unit is arranged on the second pipeline, and a second safety unit is arranged on the fifth pipeline and the sixth pipeline. The first safety unit and the second safety unit each include a second safety valve and a second flame arrester connected in series in sequence, and the first safety unit also includes a second pneumatic ball valve connected in parallel with the second safety valve.

[0016] Furthermore, the fifth pipeline is also connected to one end of the eighth pipeline, the other end of the eighth pipeline is connected to the node between the second one-way valve and the first pressure transmitter on the sixth pipeline, and the third pneumatic ball valve, the first one-way valve and the orifice plate are sequentially arranged on the eighth pipeline along the gas flow direction.

[0017] Furthermore, the 120MPa hydrogen compressor comprises a diaphragm compressor and a high-pressure liquid-driven oil-free piston machine which are connected in series.

[0018] Furthermore, the high-pressure gas cylinder group includes multiple parallel high-pressure gas cylinder units, and the high-pressure gas cylinder unit includes a third stop valve, a high-pressure gas cylinder, a second temperature transmitter, a fourth stop valve, a second pressure transmitter, a third filter and a fourth pneumatic ball valve connected in series in the gas flow direction.

[0019] Furthermore, a pressure relief unit is also provided on the sixth pipeline, and the pressure relief unit is located between the fifth pneumatic ball valve and the second one-way valve. A charging unit is provided on the fifth pipeline, and the pressure relief unit and the charging unit both include a flow meter and a first electric flow regulating valve connected in series in sequence, the first electric flow regulating valve is connected in parallel with a second electric flow regulating valve, and the pressure relief unit also includes a throttle valve connected in series with the flow meter.

[0020] Furthermore, a precooling unit is also provided on the fifth pipeline, and the precooling unit includes a fifth stop valve, a third temperature transmitter, a first high-pressure heat exchanger, a fourth temperature transmitter, a second high-pressure heat exchanger, a fifth temperature transmitter, a sixth stop valve and a third check valve which are connected in series in sequence along the gas flow direction, and the precooling unit is located between the charging unit and the first temperature transmitter.

[0021] The beneficial effects of the present invention are as follows: the test pressure is high, and the boosting method using a diaphragm compressor and a high-pressure liquid-driven oil-free piston machine can achieve a boosting pressure of 120MPa; a flow meter and an electric flow regulating valve can be used to accurately control the amount of gas filled into and discharged from the test gas cylinder; the output flow is large, and at a pressure level of 120MPa, the output flow is 200NM3 / H, greatly improving the efficiency of the inflation experiment; a pre-cooling unit can be used to reduce the high temperature generated by the high-pressure and large-flow gas being instantly filled into the test gas cylinder. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0023] Figure 1 Schematic diagram of an ultra-high pressure hydrogen pressure testing system according to an embodiment of the present invention.

[0024] In the figure:

[0025] 1. First stop valve; 2. First gas cylinder group; 3. Pressure reducing valve; 4. Second gas cylinder group; 5. 120MPa hydrogen compressor; 6. Test gas cylinder; 7. First non-return valve; 8. Deflation column unit; 9. Input stop valve; 10. First filter; 11. Second non-return valve; 12. First pressure gauge; 13. Output stop valve; 14. Purge valve; 15. First flame arrester; 16. Pressure relief valve; 17. First safety valve; 18. First pneumatic ball valve; 19. Second stop valve; 20. Second filter; 21. First pressure transmitter; 22. Second pressure gauge; 23. First temperature transmitter; 24. Cooler; 25. Second safety valve; 26. Second flame arrester; 27. Second pneumatic ball valve; 28. Third pneumatic ball valve; 29. ​​Third stop valve; 30. High-pressure gas cylinder; 31. Second temperature transmitter; 32. Fourth stop valve; 33. Second pressure transmitter; 34. Third filter; 35. Fourth pneumatic ball valve; 36. Fifth pneumatic ball valve; 37. Pressure relief unit; 38. Second non-return valve; 39. Pressurization unit; 40. Flow meter; 41. First electric flow regulating valve; 42. Second electric flow regulating valve; 43. Throttle valve; 44. Precooling unit; 45. Fifth stop valve; 46. Third temperature transmitter; 47. First high-pressure heat exchanger; 48. Fourth temperature transmitter; 49. Second high-pressure heat exchanger; 50. Fifth temperature transmitter; 51. Sixth stop valve; 52. Third non-return valve; 53. Orifice plate; 54. Sixth pneumatic ball valve; 55. Fourth non-return valve; 56. Bursting disc; 57. Fifth non-return valve; 58. Third flame arrester. DETAILED DESCRIPTION

[0026] The following will be combined with the accompanying drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the present invention.

[0027] like Figure 1As shown, an ultra-high pressure hydrogen pressure test system according to an embodiment of the present invention includes a hydrogen input port, the hydrogen input port is connected to the air inlet of the first gas cylinder group 2 through a first pipeline provided with a first stop valve 1, the air outlet of the first gas cylinder group 2 is connected to the air inlet of the second gas cylinder group 4 through a second pipeline provided with a pressure reducing valve 3, the air outlet of the second gas cylinder group 4 is connected to the air inlet of the 120MPa hydrogen compressor 5 through a third pipeline, the air outlet of the 120MPa hydrogen compressor 5 is connected to the air inlet of the high-pressure gas cylinder group through a fourth pipeline, the air outlet of the high-pressure gas cylinder group is connected to the hydrogen inlet and outlet of the test gas cylinder 6 through a fifth pipeline, and the fifth pipeline is also connected to the first pipeline through a sixth pipeline provided with a fifth pneumatic ball valve 36 and a second one-way valve 38.

[0028] In a specific embodiment of the present invention, a leak column unit 8 is also provided on the first pipeline, and the leak column unit 8 is located between the first stop valve 1 and the hydrogen input port, and the leak column unit 8 includes an input stop valve 9, a first filter 10, a second one-way valve 11, a first pressure gauge 12 and an output stop valve 13 which are sequentially connected in series on the first pipeline along the gas flow direction.

[0029] In a specific embodiment of the present invention, the air release column unit 8 also includes a nitrogen purge port and a pressure relief port, the nitrogen purge port is connected to one end of a purge pipe, a purge valve 14 is provided on the purge pipe, the other end of the purge pipe is connected to the node between the input stop valve 9 and the first filter 10, the pressure relief port is respectively connected to one end of the exhaust pipeline, one end of the pressure relief pipe and one end of the safety pipeline, the other end of the exhaust pipeline is connected to the first flame arrester 15, a pressure relief valve 16 is provided on the pressure relief pipe, the other end of the pressure relief pipe is connected to the node between the second one-way valve 11 and the output stop valve 13, a first safety valve 17 is provided on the safety pipeline, and the other end of the safety pipeline is connected to the node between the first filter 10 and the second one-way valve 11.

[0030] In a specific embodiment of the present invention, the fifth pipeline is also connected to the fourth pipeline through the seventh pipeline, and the first pipeline, the second pipeline, the fourth pipeline, the fifth pipeline and the seventh pipeline are all provided with a first pneumatic ball valve 18 and a second stop valve 19, and the first pipeline is also provided with a second filter 20, and the first pneumatic ball valve 18, the second stop valve 19 and the second filter 20 on the first pipeline are all located between the air inlet of the first gas cylinder group 2 and the first stop valve 1, the second pipeline, the fifth pipeline and the sixth pipeline are all provided with a first pressure transmitter 21, the second pipeline and the fifth pipeline are all provided with a second pressure gauge 22, the third pipeline and the fifth pipeline are all provided with a first temperature transmitter 23, and the third pipeline is also provided with a cooler 24, and the cooler 24 is located between the air outlet of the second gas cylinder group 4 and the first temperature transmitter 23.

[0031] In a specific embodiment of the present invention, a first safety unit is provided on the second pipeline, and second safety units are provided on the fifth pipeline and the sixth pipeline. The first safety unit and the second safety unit both include a second safety valve 25 and a second flame arrester 26 connected in series in sequence, and the first safety unit also includes a second pneumatic ball valve 27 connected in parallel with the second safety valve 25.

[0032] In a specific embodiment of the present invention, the fifth pipeline is also connected to one end of the eighth pipeline, the other end of the eighth pipeline is connected to the node between the second one-way valve 38 on the sixth pipeline and the first pressure transmitter 21, and the third pneumatic ball valve 28, the first one-way valve 7 and the orifice plate 53 are sequentially arranged on the eighth pipeline along the gas flow direction.

[0033] In a specific embodiment of the present invention, the 120 MPa hydrogen compressor 5 comprises a diaphragm compressor and a high-pressure liquid-driven oil-free piston machine connected in series.

[0034] In a specific embodiment of the present invention, the high-pressure gas cylinder group includes a plurality of high-pressure gas cylinder units connected in parallel, and the high-pressure gas cylinder unit includes a third stop valve 29, a high-pressure gas cylinder 30, a second temperature transmitter 31, a fourth stop valve 32, a second pressure transmitter 33, a third filter 34 and a fourth pneumatic ball valve 35 connected in series in the gas flow direction.

[0035] In a specific embodiment of the present invention, a pressure relief unit 37 is further provided on the sixth pipeline, and the pressure relief unit 37 is located between the fifth pneumatic ball valve 36 and the second one-way valve 38. A charging unit 39 is provided on the fifth pipeline, and the pressure relief unit 37 and the charging unit 39 both include a flow meter 40 and a first electric flow regulating valve 41 connected in series in sequence, and the first electric flow regulating valve 41 is connected in parallel with a second electric flow regulating valve 42, and the pressure relief unit 37 also includes a throttle valve 43 connected in series with the flow meter 40.

[0036] In a specific embodiment of the present invention, a precooling unit 44 is further provided on the fifth pipeline, and the precooling unit 44 includes a fifth stop valve 45, a third temperature transmitter 46, a first high-pressure heat exchanger 47, a fourth temperature transmitter 48, a second high-pressure heat exchanger 49, a fifth temperature transmitter 50, a sixth stop valve 51 and a third check valve 52 which are connected in series in sequence along the gas flow direction, and the precooling unit 44 is located between the charging unit 39 and the first temperature transmitter 23.

[0037] In order to facilitate understanding of the above technical solutions of the present invention, the above technical solutions of the present invention are described in detail below through specific usage methods.

[0038] The ultra-high pressure hydrogen pressure test system includes a 120MPa hydrogen compressor 5, a flow control unit and a control system.

[0039] The 120MPa hydrogen compressor 5 uses domestic diaphragm compressors and imported high-pressure liquid-driven oil-free piston machines for graded pressure. The diaphragm compressor is a positive displacement compressor with a high economic applicability in medium and low pressure gas compression applications. The model of the diaphragm compressor is GD-200 / 10-165, and the manufacturer is Jiangsu Hengjiu Machinery Co., Ltd. The boosting condition of the diaphragm compressor is less than 16MPa. There is a storage tank in series between the diaphragm compressor and the high-pressure liquid-driven oil-free piston machine. The storage tank is mainly used to store the boosted gas of the diaphragm compressor and used as a buffer tank. The working pressure of the storage tank is 20MPa and the volume is 80L. The model of the high-pressure liquid-driven oil-free piston machine is MC-235-01-YL-2001, and the manufacturer is Maichuang. The core component of the high-pressure piston compressor unit is the liquid-driven air pump, which consists of a high-pressure compression end, a medium-pressure drive end, and a connecting rod between the two. The piston area of ​​the high-pressure compression end is small, and the piston area of ​​the medium-pressure drive end is large. According to the principle of force balance, the liquid-driven air pump drive end is introduced into the 20MPa medium-pressure hydraulic pressure to push the drive end and the connecting rod to generate high-pressure gas at the high-pressure piston end. The 120MPa hydrogen compressor 5 has a pressure gauge, a pressure transmitter, and related valves.

[0040] The pressure transmitter is connected to the control system, so that the inlet and outlet pressures of the diaphragm compressor and the high-pressure liquid-driven oil-free piston machine can be monitored in real time and fed back to the control system, and the control system controls the start and stop of the 120MPa hydrogen compressor 5.

[0041] The flow control unit includes a pressure relief unit 37 and a pressure charging unit 39. The pressure relief unit 37 and the pressure charging unit 39 both include a flow meter 40, a first electric flow regulating valve 41, and a second electric flow regulating valve 42. The flow meter 40 is a 120MPa high-pressure hydrogen dedicated flow meter, and its model is Longye BA-1025-A08. The flow meter 40, the first electric flow regulating valve 41, and the second electric flow regulating valve 42 are all connected to the control system. The flow control unit uses the flow value as a control signal. The flow meter 40, the first electric flow regulating valve 41, and the second electric flow regulating valve 42 can form a closed-loop feedback, thereby dynamically controlling the boost speed, and then controlling the rate at which high-pressure hydrogen is filled into the test gas cylinder 66 and the rate at which the test gas cylinder 66 is depressurized.

[0042] The control system includes a PLC controller, the model of which is Siemens 6ES72881ST300AA0, and the control system is respectively connected to the first pressure transmitter 21, the first temperature transmitter 23, the second pressure transmitter 33, the second temperature transmitter 31, the flow meter 40, the first electric flow regulating valve 41, the second electric flow regulating valve 42, the third temperature transmitter 46, the fourth temperature transmitter 48, the fifth temperature transmitter 50, etc. The control system can detect, store and control various experimental parameters such as pressure parameters, temperature parameters, flow parameters, etc. in the ultra-high pressure hydrogen pressure test system.

[0043] During specific use: the 20MPa high-pressure hydrogen in the hydrogen trailer is released into the 20MPa first gas cylinder group 2 set in the system through the hydrogen inlet and the leaking column unit 8. Before use, the leaking column unit 8 needs to introduce high-purity nitrogen into the system through the purge valve 14 to replace the air in the system, and then the high-pressure hydrogen in the hydrogen trailer is successively transported to the rear-end pipeline through the input stop valve 9, the first filter 10, the second one-way valve 11, and the output stop valve 13 in the leaking column unit 8. The first safety valve 17 is arranged in the leaking column unit 8 to avoid the danger of overpressure in the leaking column unit 8. The first pressure gauge 12 is used to display the hydrogen pressure value at the rear end of the leaking column unit 8. The pressure relief valve 16 is used to release the high-pressure hydrogen in the leaking column unit 8 when the leaking column unit 8 is not in use. The hydrogen is discharged to the outdoors through the first flame arrester 15.

[0044] The hydrogen at the rear end of the gas release column unit 8 passes through the first stop valve 1, the first pneumatic ball valve 18, the second filter 20, and the second stop valve 19 into the first gas cylinder group 2 in the system as a hydrogen gas source. The rear end of the first gas cylinder group 2 is provided with a second safety valve 25 and a second pneumatic ball valve 27, which are used to release the hydrogen in the first gas cylinder group 2 in an emergency when an abnormality occurs in the system, and the hydrogen is discharged to the outside through the second flame arrester 26.

[0045] The first gas cylinder group 2 is equipped with a first pressure transmitter 21, a second stop valve 19, a second pressure gauge 22, a first pneumatic ball valve 18 and a pressure reducing valve 3 at the rear end to reduce the pressure of the hydrogen source in the first gas cylinder group 2 to 1MPa and store it in the second gas cylinder group 4 of 20MPa as the intake gas source of the 120MPa hydrogen compressor 5. A cooler 24 and a first temperature transmitter 23 are arranged between the second gas cylinder group 4 and the 120MPa hydrogen compressor 5. The cooler 24 is used to reduce the intake gas source temperature of the 120MPa hydrogen compressor 5, thereby indirectly reducing the gas storage temperature of the 120MPa hydrogen compressor 5.

[0046] The 120MPa hydrogen compressor 5 is used to increase the pressure of 1MPa low-pressure hydrogen to a rated pressure of 120MPa for output, with a displacement of up to 200NM3 / H. The high-pressure hydrogen is charged into the high-pressure gas cylinder group through the second stop valve 19, the first pneumatic ball valve 18, and the second stop valve 19.

[0047] The high-pressure gas cylinder group consists of a total of six high-pressure gas cylinder units connected in parallel, each of which consists of a third stop valve 29, a high-pressure gas cylinder 30, a second temperature transmitter 31, a fourth stop valve 32, a second pressure transmitter 33, a third filter 34 and a fourth pneumatic ball valve 35. The temperature inside the high-pressure gas cylinder group can be collected through the second temperature transmitter 31, and the pressure inside the high-pressure gas cylinder group can be collected through the second pressure transmitter 33. The third stop valve 29, the fourth stop valve 32 and the fourth pneumatic ball valve 35 are used to control the on and off of the high-pressure gas cylinder unit, and the third filter 34 ensures the quality of the gas output by the high-pressure gas cylinder group.

[0048] The outlets of the six high-pressure gas cylinder units are combined into a total output line (i.e., the fifth pipeline), and the total output line is provided with a second stop valve 19, a second pressure gauge 22, a second safety valve 25 and a first pneumatic ball valve 18. The second safety valve 25 is connected to the second flame arrester 26 for discharging hydrogen to the outside. The hydrogen in the fifth pipeline is charged into the test gas cylinder 6 after passing through the pressure charging unit 39 and the precooling unit 44. The pressure charging unit 39 includes a flow meter 40, a first electric flow regulating valve 41 and a second electric flow regulating valve 42. The 120MPa high-pressure hydrogen passes through the pressure charging unit 39 and enters the precooling unit 44 to cool the high-temperature hydrogen to a lower temperature and then is charged into the test gas cylinder 6. The precooling unit 44 is mainly composed of a first high-pressure heat exchanger 47 and a second high-pressure heat exchanger 49, and is then assisted by a fifth stop valve 45, a sixth stop valve 51, a third one-way valve 52, a third temperature transmitter 46, a fourth temperature transmitter 48 and a fifth temperature transmitter 50. The cooled high-pressure hydrogen passes through the first pneumatic ball valve 18 and the second stop valve 19 and then enters the test gas cylinder 6. The hydrogen inlet and outlet of the test gas cylinder 6 are provided with a first pressure transmitter 21 and a first temperature transmitter 23 for collecting the pressure and temperature values ​​of the hydrogen at the hydrogen inlet and outlet.

[0049] After the test gas cylinder 6 is filled to the rated pressure, the high-pressure hydrogen in the test gas cylinder 6 needs to be discharged into the first gas cylinder group 2 at a certain rate to realize the test gas cylinder 6 pressure charging-depressurization pressure cycle experiment (i.e., hydrogen cycle experiment). The fifth pneumatic ball valve 36 and the pressure relief unit 37 are arranged on the discharge pipeline (i.e., the sixth pipeline), and the pressure relief unit 37 is provided with a flow meter 40, a first electric flow regulating valve 41, a second electric flow regulating valve 42 and a throttle valve 43. The main function of the pressure relief unit 37 is to control the pressure relief rate of the high-pressure hydrogen in the test gas cylinder 6 through the first electric flow regulating valve 41 and the second electric flow regulating valve 42. The rear end of the pressure relief unit is provided with a second one-way valve 38, a second safety valve 25 and a first pressure transmitter 21, and the discharge pipeline is connected to the first gas cylinder group 2.

[0050] In order to meet the requirements of the test gas cylinder 6 for conducting hydrogen circulation experiments under high and low temperature experimental environments, the test gas cylinder 6 is placed in an environmental box, which can provide a high and low temperature environment of -45 to 85°C. A bursting disc 56, a fifth one-way valve 57 and a third flame arrester 58 are arranged on the environmental box. When the test gas cylinder 6 fails, the high pressure generated is discharged to the outdoors after passing through the bursting disc 56, the fifth one-way valve 57 and the third flame arrester 58.

[0051] The test gas cylinder 6 can also quickly release the high-pressure hydrogen in the test gas cylinder 6 into the first gas cylinder group 2 through the eighth pipeline, and the third pneumatic ball valve 28, the first one-way valve 7 and the orifice plate 53 are sequentially arranged on the eighth pipeline.

[0052] The fifth pipeline is also connected to one end of the ninth pipeline, the other end of which is connected between the first check valve 7 and the orifice plate 53 on the eighth pipeline, and the ninth pipeline is sequentially provided with a sixth pneumatic ball valve 54 and a fourth check valve 55. The ninth pipeline is used to quickly discharge the high-pressure hydrogen that has not passed through the charging unit 39 and the precooling unit 44 into the eighth pipeline.

[0053] The models of the first temperature transmitter 23 , the second temperature transmitter 31 , the third temperature transmitter 46 , the fourth temperature transmitter 48 , and the fifth temperature transmitter 50 may be SENEX ST-WZPB-043 or Okazaki T99.

[0054] The model of the first pressure transmitter 21 and the second pressure transmitter 33 may be SENEX DG1300-GY-B-2-160 / GE / SZ / CQ / CD5 / GZ, or may be SENEX DG1300-GY-B-2-40 / AM / GE / SZ / CQ / CD5 / GZ.

[0055] The pneumatic ball valves include a first pneumatic ball valve 18, a second pneumatic ball valve 27, a third pneumatic ball valve 28, a fourth pneumatic ball valve 35, a fifth pneumatic ball valve 36, and a sixth pneumatic ball valve 54. The pneumatic ball valves are used to realize automatic control of pipeline on-off. The pneumatic ball valves are connected to compressed air through pipelines provided with solenoid valves. The solenoid valves are connected to the control system through lines provided with relays. The model of the solenoid valves is AirTac 3V210-08-NC (explosion-proof), and the model of the relays is RXM4AB2P7+RXZE.

[0056] In summary, with the aid of the above-mentioned technical scheme of the present invention, a two-stage compression method of a diaphragm compressor and a high-pressure liquid-driven oil-free piston machine can be adopted to increase the rated pressure of low-pressure hydrogen to 120MPa high-pressure pressure, while ensuring that the flow rate is not less than 200NM3 / H. The 120MPa high-pressure hydrogen can be pressurized and released into the test gas cylinder at the rated filling and pressure relief rates through the charging unit and the pressure relief unit, thereby realizing the hydrogen circulation experiment of the test gas cylinder. The method can be widely used in scientific research institutes, special equipment testing institutes, hydrogen cylinder manufacturers and hydrogen fuel vehicle manufacturers. A pre-cooling unit can be used to reduce the high temperature generated by the instantaneous filling of high-pressure and large-flow gas into the test gas cylinder.

[0057] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. An ultra-high pressure hydrogen pressure test system, comprising a hydrogen inlet, the hydrogen inlet being connected to a gas inlet of a first gas cylinder group (2) via a first pipeline provided with a first stop valve (1), the gas outlet of the first gas cylinder group (2) being connected to a gas inlet of a second gas cylinder group (4) via a second pipeline provided with a pressure reducing valve (3), characterized in that: The gas outlet of the second gas cylinder group (4) is connected to the gas inlet of the 120 MPa hydrogen compressor (5) through a third pipeline, the gas outlet of the 120 MPa hydrogen compressor (5) is connected to the gas inlet of the high-pressure gas cylinder group through a fourth pipeline, the gas outlet of the high-pressure gas cylinder group is connected to the hydrogen inlet and outlet of the test gas cylinder (6) through a fifth pipeline, the fifth pipeline is also connected to the first pipeline through a sixth pipeline provided with a fifth pneumatic ball valve (36) and a second one-way valve (38), the first pipeline is also provided with a gas leakage column unit (8), the gas leakage column unit (8) is located between the first stop valve (1) and the hydrogen input port, the gas leakage column unit (8) comprises an input stop valve (9), a first filter (10), a second one-way valve (11), a first pressure gauge (12) and a second pressure gauge (13) which are sequentially connected in series on the first pipeline along the gas flow direction. (12) and an output stop valve (13), the 120MPa hydrogen compressor (5) comprises a diaphragm compressor and a high-pressure liquid-driven oil-free piston machine connected in series in sequence, the fifth pipeline is also provided with a precooling unit (44), the precooling unit (44) comprises a fifth stop valve (45), a third temperature transmitter (46), a first high-pressure heat exchanger (47), a fourth temperature transmitter (48), a second high-pressure heat exchanger (49), a fifth temperature transmitter (50), a sixth stop valve (51) and a third check valve (52) connected in series in sequence along the gas flow direction, the third pipeline and the fifth pipeline are both provided with a first temperature transmitter (23), the fifth pipeline is provided with a charging unit (39), and the precooling unit (44) is located between the charging unit (39) and the first temperature transmitter (23).

2. The ultra-high pressure hydrogen pressure test system according to claim 1, characterized in that: The air release column unit (8) further comprises a nitrogen purge port and a pressure relief port, wherein the nitrogen purge port is connected to one end of a purge pipe, a purge valve (14) is provided on the purge pipe, and the other end of the purge pipe is connected to a node between the input stop valve (9) and the first filter (10), the pressure relief port is respectively connected to one end of an exhaust pipeline, one end of a pressure relief pipe and one end of a safety pipeline, the other end of the exhaust pipeline is connected to a first flame arrester (15), a pressure relief valve (16) is provided on the pressure relief pipe, and the other end of the pressure relief pipe is connected to a node between the second one-way valve (11) and the output stop valve (13), a first safety valve (17) is provided on the safety pipeline, and the other end of the safety pipeline is connected to a node between the first filter (10) and the second one-way valve (11).

3. The ultra-high pressure hydrogen pressure test system according to claim 1, characterized in that: The fifth pipeline is also connected to the fourth pipeline via a seventh pipeline; the first pipeline, the second pipeline, the fourth pipeline, the fifth pipeline and the seventh pipeline are all provided with a first pneumatic ball valve (18) and a second stop valve (19); the first pipeline is also provided with a second filter (20); the first pneumatic ball valve (18), the second stop valve (19) and the second filter (20) on the first pipeline are all located between the air inlet of the first gas cylinder group (2) and the first stop valve (1); the second pipeline, the fifth pipeline and the sixth pipeline are all provided with a first pressure transmitter (21); the second pipeline and the fifth pipeline are all provided with a second pressure gauge (22); the third pipeline is also provided with a cooler (24); the cooler (24) is located between the air outlet of the second gas cylinder group (4) and the first temperature transmitter (23).

4. The ultra-high pressure hydrogen pressure test system according to claim 1, characterized in that: The second pipeline is provided with a first safety unit, the fifth pipeline and the sixth pipeline are both provided with second safety units, the first safety unit and the second safety unit both comprise a second safety valve (25) and a second flame arrester (26) connected in series, and the first safety unit also comprises a second pneumatic ball valve (27) connected in parallel with the second safety valve (25).

5. The ultra-high pressure hydrogen pressure test system according to claim 3, characterized in that: The fifth pipeline is also connected to one end of the eighth pipeline, the other end of the eighth pipeline is connected to the node between the second one-way valve (38) and the first pressure transmitter (21) on the sixth pipeline, and the third pneumatic ball valve (28), the first one-way valve (7) and the orifice plate (53) are arranged in sequence on the eighth pipeline along the gas flow direction.

6. The ultra-high pressure hydrogen pressure test system according to claim 1, characterized in that: The high-pressure gas cylinder group comprises a plurality of high-pressure gas cylinder units connected in parallel, wherein the high-pressure gas cylinder units comprise a third stop valve (29), a high-pressure gas cylinder (30), a second temperature transmitter (31), a fourth stop valve (32), a second pressure transmitter (33), a third filter (34) and a fourth pneumatic ball valve (35) which are sequentially connected in series along a gas flow direction.

7. The ultra-high pressure hydrogen pressure test system according to claim 3, characterized in that: The sixth pipeline is also provided with a pressure relief unit (37), the pressure relief unit (37) being located between the fifth pneumatic ball valve (36) and the second one-way valve (38), the pressure relief unit (37) and the pressure charging unit (39) both comprising a flow meter (40) and a first electric flow regulating valve (41) connected in series in sequence, the first electric flow regulating valve (41) being connected in parallel with a second electric flow regulating valve (42), and the pressure relief unit (37) further comprising a throttle valve (43) connected in series with the flow meter (40).

Citation Information

Patent Citations

  • Hydrogen cycle test system for high pressure gas cylinder

    CN110018069A

  • Well high -pressure gas compressor unit circulation test device

    CN205559246U

  • Ultrahigh-pressure hydrogen pressure test system

    CN211374355U